| Owner Solicitation Name: | Design/Construct FY04 Dormitory
|
| Owner Name: | Corps of Engineers, Alaska District (CEPOA-PA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design and construction of a new 3,600 SM , 96-
person dormitory for enlisted personnel grades
E1 - E4 using a 4-person module based on the
latest (June 02) Air Force Enlisted Dormitory
Design Guide. The new dormitory will also provide
a common area for social interaction along with
site development and amenities to the extent
affordable. Demolition of a small maintenance
building (built circa 1950) is also included.
|
|
| Owner Solicitation Name: | Cottonwood PSB Re-Locatable Asbestos Abatement
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Dispose of ACM containing ceiling texture
material (approximately 550 SF) and encapsulation
of ACM flooring material (approximately 515 SF of
12"x 12" VCT) within a Re-Locatable Storage
Building.
|
|
| Owner Solicitation Name: | Fort Yukon & Unalakleet Surveying
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional services for land surveying, aerial
photography, and topographic mapping services.
This work shall include all control and boundary
surveys necessary to produce the aerial
photography and mapping.
|
|
| Owner Solicitation Name: | Professional Architectectural and Engineering Services
|
| Owner Name: | Nikolai, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Architectectural and Engineering
Services to conduct and develop a sanitation
facilities master plan/feasibility study with
business plan component.
|
|
| Owner Solicitation Name: | Audio-Visual Supplies, Computer Library Supplies
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Audio-Visual Supplies, Computer Library Supplies
for the 2004-2005 school year.
|
|
| Owner Solicitation Name: | Willow/Hatcher Pass PSB Well Drilling
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Drill a 6" casing water well.
|
|
| Owner Solicitation Name: | Fort Yukon, Unalakleet, & Deadhorse Surveying/64832, 61438, & 62644
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Land surveying and topographic mapping services
for the Fort Yukon Airport Resurfacing,
Unalakleet Airport Paving, and Deadhorse Airport
Safety Area Expansion projects. This work shall
also include all control and boundary surveys
necessary to produce the aerial photography and
mapping for Unalakleet.
|
|
| Owner Solicitation Name: | Welding Supplies - Blanket Purchase Order
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Welding Supplies - Blanket Purchase Order.
|
|
| Owner Solicitation Name: | Planning and Design Services for a Snow Removal Equipment Facility at Juneau International Airport
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide planning and conceptual level design
services for a Snow Removal Equipment Facility at
JIA, to be included in an Environmental Impact
Statement being conducted by the FAA.
|
|
| Owner Solicitation Name: | Engineering Services for the Nondalton Solid Waste Project
|
| Owner Name: | Nondalton Village Safe Water (VSW) Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering Services for Solid Waste Project.
|
|
| Owner Solicitation Name: | Water System Improvements
|
| Owner Name: | Nikolaevsk Inc.
|
| Enginner Name: | CE2 Engineers
|
| Plankeeper Name |
|
| Scope: | Electrician services for electrical construction
work associated with a new water treatment system
and building along with various new process
vessels and equipment.
|
|
| Owner Solicitation Name: | RSA #29 & #30 Annual Road Maintenance
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Road maintenance work items. Labor, materials,
supervision, equipment, transportation and
supplies to maintain approximately 65-68 miles of
road.
|
|
| Owner Solicitation Name: | Carpet Replacement - Dorothy Swanda Jone Building
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove, purchase and replace approximately 10,000
square feet of carpet and accessories.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services for the 88th Avenue Water Transmission Main
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Architectural and Engineering Services for the
Water Transmission Main.
|
|
| Owner Solicitation Name: | Professional Design Services for the Campus Wide Design Standards
|
| Owner Name: | University of Alaska, Division of Design and Construction
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Proposals from consulting firms for the review
and revision of UAF Design Standards for the
Campus Wide Design Standards project.
|
|
| Owner Solicitation Name: | Truck Mounted Street Sweeper
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Truck Mounted Street Sweeper.
|
|
| Owner Solicitation Name: | Purchase New or as new Vibratory Pile Driver
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase New or as new Vibratory Pile Driver.
|
|
| Owner Solicitation Name: | Akiachak Bulk Fuel Horizontal Tanks
|
| Owner Name: | Alaska Community and Economic Development Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Bulk Fuel Horizontal Tanks.
|
|
| Owner Solicitation Name: | Akiachak Bulk Fuel Horizontal Tanks Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide horizontal bulk fuel tank storage tanks
for the Akiachak Bulk Fuel Project.
|
|
| Owner Solicitation Name: | Design/Construct FY04 Dormitory, Eielson AFB
|
| Owner Name: | US Army Corp of Engineers - Alaska, CEPOA-CT
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design/Build. Design and construction of a new
3,600 SM, 96-person dormitory for enlisted
personnel grades E1 - E4 using a 4-person module.
Demolition of a small maintenance building.
|
|
| Owner Solicitation Name: | Panning Services - National Scenic Byway Nomination and Corridor Management Plan
|
| Owner Name: | Homer, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide professional services for development of
a Corridor Management Plan. Coordinate with
federal, state, and local government entities,
Native corporations, and private landowners who
have management responsibilities for or an
interest in the Sterling Highway corridor.
Conduct meetings with Byway partnership group.
Develop a corridor management plan for the
Sterling Highway that prepares the route for
nomination as a National Scenic Byway or All-
American Road.
|
|
| Owner Solicitation Name: | Kotzebue School Improvements
|
| Owner Name: | Northwest Arctic Borough School District
|
| Enginner Name: | Krochina Architects
|
| Plankeeper Name |
|
| Scope: | Provide construction services for new building
additions totaling approximately 44,500 SF and
renovations to the existing elementary and
secondary schools.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services
|
| Owner Name: | Yukon Kuskokwim Health Corporation YKHC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | A/E services for rural primary care centers,
improvements and remodeling of clinical and
clinical support facilities and hospital areas
including, other tribal and community clinics and
healthcare facilities, water/ wastewater/landfill
projects and other sanitation facilities.
|
|
| Owner Solicitation Name: | Design, Furnish, and Install Interpretive Historic Panels/Signs
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | bBds for creating interpretive panels/signs for
Palmer Historic District and the Knik Townsite.
The expected finished product will be nine
durable outdoor interpretive signs. Six will be
for the Palmer Historic District and three for
the Knik Townsite.
|
|
| Owner Solicitation Name: | Construction of Structures and Facilities
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Alaska Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of a 450 mm by 12mm
culvert, sealing cracks and placing a slurry coat
on 1,950 SM
of existing asphalt parking lot and painting new
striping in the existing pattern striping.
|
|
| Owner Solicitation Name: | Hoonah Elementary School Renovation
|
| Owner Name: | Hoonah City School District, Hoonah Elementary School
|
| Enginner Name: | Jensen Yorba Lott, Inc.
|
| Plankeeper Name |
|
| Scope: | Selective demolition and renovation of the
existing elementary school and associated
systems, including installation of a new
ventilation system and mechanical room. Work also
consists of an elevator addition and associated
work.
|
|
| Owner Solicitation Name: | Planning, Design, Contract Administration and Construction Inspection
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: | CBJ (City of Borough of Jeneau), Engineering Dept.
|
| Plankeeper Name |
|
| Scope: | Qualified consultants to provide professional
services for planning, design, contract
administration and construction inspection of the
International Airport Taxiway Extension.
|
|
| Owner Solicitation Name: | Adult Multi-Custody Level Prison Facility and Program Services
|
| Owner Name: | Alaska Dept. of Corrections, Procurement Section
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,000 bed multi-custody prison facility and
program services.
|
|
| Owner Solicitation Name: | Janitorial Services Alaska State Museum
|
| Owner Name: | Alaska Dept. of Administration, General Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Janitorial Services.
|
|
| Owner Solicitation Name: | Marine Services Roof Replacement
|
| Owner Name: | Sitka, City and Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove and replace a 21,000 SF roof at the Marine
Services Center.
|
|
| Owner Solicitation Name: | Chugiak High School Ph. 3 Deferred Performing Arts Renovation
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Project scope includes major demolition within
the upper gymnasium and locker rooms. The
renovation of the space into Performing Arts
classrooms, Business classrooms and a Photography
classroom. Contract for materials and services to
renovate approximately 18,300 SF. Work includes
abatement, demolition, limited structural shell
and building envelope, masonry, concrete,
mechanical, electrical and finishes.
|
|
| Owner Solicitation Name: | FYF Generator Replacement
|
| Owner Name: | Alaska Dept. of Health and Social Services, Grants & Contracts Section
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of the generator.
|
|
| Owner Solicitation Name: | Construct Type III Hydrant Fueling System/Expand/Repair Aircraft Ramp
|
| Owner Name: | Corps of Engineers, Alaska District (CEPOA-PA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of a 2,400 GPM Standard Type III
Aircraft Hydrant Fueling System with 16 hydrant
pit/outlets, two above ground 10,000 BBL
operating tanks, pump house, 2 position truck
fill stand, HSV checkout facility, pantograph
storage facility and an emergency generator and
an Aircraft Parking Apron with 16 parking
positions for aircraft with concrete parking
aprons, taxi-ways, security lighting, taxi-way
edge lighting, striping and miscellaneous repairs
of existing taxiways. Demolition of three
existing Type I Hydrant Fueling Systems including
3 pump-houses, underground storage tanks, fuel
piping and pits.
|
|
| Owner Solicitation Name: | Board Room Sound System Upgrade
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Upgrade the boardroom sound system.
|
|
| Owner Solicitation Name: | Construction Inspection and Materials Testing
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2004/2005 Term Contract for Construction
Inspection and Materials Testing.
|
|
| Owner Solicitation Name: | Denardo Building Controls Upgrade
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all mobilization, demobilization, labor,
materials, supplies and equipment, for the
replacement of the existing electronic control
system to direct digital control according to the
project specifications.
|
|
| Owner Solicitation Name: | NOAA/NOS Kasitsna Bay Laboratory,Alaska Phase II
|
| Owner Name: | Department of Commerce, National Oceanic and Atmospheric Administration (NOAA), Central Administrative Support Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a wet/dry laboratory building
(4700 sf), seawater intake system, boat dock (80
lf) and trestle (265 lf), central heating plant
(300 sf), scuba support building (500 sf),
demolition, dry lab renovations, and a two story
dormitory (4800 sf) with an expansion of the
waste treatment plant system. All of the
buildings are wood framed structure with a
standing seam metal roof and wood siding. The
wet/dry laboratory, scuba, boardwalk, dock, and
trestle will be pile supported and the other
buildings will be concrete slab and footings. All
of the buildings are single story except for the
two story dormitory.
|
|
| Owner Solicitation Name: | Hazardous Material Storage Locker, U.S. Coast Guard Loran Station Shoal Cove
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install a Hazardous Material Storage Locker.
Installation of a concrete pad and/or concrete
footings, install the locker on the foundation,
and complete electrical tie.
|
|
| Owner Solicitation Name: | Resurrection River Bridge Construction
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a new steel bridge span,
including removal of portions of the existing
structure, excavation, concrete, reinforcing
steel, pile driving, rirap, seeding, topsoil,
erosion control, silt fence, etc.
|
|
| Owner Solicitation Name: | Water & Wastewater Utility 2004 Software Application Services
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Water & Wastewater Utility 2004 Software
Application Services.
|
|
| Owner Solicitation Name: | Electrical Contractor for Street Lighting
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Street lighting construction.
|
|
| Owner Solicitation Name: | Market Research for Communication Services at Eielson AFB, Alaska
|
| Owner Name: | Dept. of the Air Force, Pacific Air Forces
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Records Management, Publishing and Forms
Management, Administrative Communications.
Provide telephone, land mobile radio, cable, and
antenna systems support to base customers,
maintenance technicians, and commercial vendors.
|
|
| Owner Solicitation Name: | Hoonah - Airport Snow Removal Equipment Building
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of an approximately 4,500 SF airport
snow removal equipment building.
|
|
| Owner Solicitation Name: | ASD Water Bottling Plant
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The intent of the specification package is to
provide an outline of the requirements the owner
expects to be met by the equipment.
|
|
| Owner Solicitation Name: | Self Propelled Articulated Wheel Loader
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Self Propelled Articulated Wheel
Loader.
|
|
| Owner Solicitation Name: | Anchorage School District Administrative and Training Facility
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | School District Administrative and Training
Facility.
|
|
| Owner Solicitation Name: | Design Services for the Hospital Drive Lift Station Improvements
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide engineering services for the planning and
design of the Lift Station Improvements.
|
|
| Owner Solicitation Name: | System Integrator Services - Water Treatment Plant Improvements
|
| Owner Name: | Napaskiak, City of
|
| Enginner Name: | CRW Engineering Group, LLC
|
| Plankeeper Name |
|
| Scope: | Integration Services to be provided includes all
labor, materials, and equipment required for the
final design, fabrication, delivery, on-site
calibration, adjustment, testing and optimization
of control panels, controls-related devices and
instruments for the Primary Water Treatment Plant
(PWTP) being upgraded.
|
|
| Owner Solicitation Name: | Production Study - Ship Creek Water Treatment Facility
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Water Treatment Facility Production Study.
|
|
| Owner Solicitation Name: | Stateroom Cleaning in Prince Rupert, BC, Canada for AMHS Vessels
|
| Owner Name: | Alaska Dept. of Transportation, Headquarters (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Stateroom cleaning services onboard Alaska Marine
Highway System vessels while in port at Prince
Rupert, BC, Canada.
|
|
| Owner Solicitation Name: | Coffman Cove Ferry Terminal - Design of Upland Utilities
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The new terminal facility will include the
construction of a new access road, upland staging
and parking area, terminal building and marine
berthing structures to accommodate a new Ferry
Authority. The upland staging area, access road
and all marine terminal improvements are being
designed by the owner. Additional consultant
resources are needed to provide expertise and
labor for the design of the upland utilities.
Consultant services under this contract will
consist of the analysis and final design of
potable water, wastewater collection, treatment
and disposal systems, primary and secondary
electrical service, and telephone utilities for
the upland terminal site and ferry terminal berth.
|
|
| Owner Solicitation Name: | Decoy Boulevard Reconstruction Contract
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of an underground storm drainage
system throughout the Project area, 607 LF 4" &
6" pipe culvert, 352 LF 12" pipe culvert. 766 LF
18" pipe culvert, manholes, replacement
of the roadway embankment to a four-foot depth,
asphalt pavement, a new paved sidewalk with curb
and gutter along the northerly side of the
street, minor sanitary sewer and water system
improvements, and miscellaneous related work.
|
|
| Owner Solicitation Name: | CO-OP Food Store Renovation
|
| Owner Name: | Medicine Hat Cooperative Association
|
| Enginner Name: | Goehring Construction Ltd.
|
| Plankeeper Name |
|
| Scope: | Renovation of store.
|
|
| Owner Solicitation Name: | Wescott Pool Facility Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Locker rooms & restrooms renovations, bleacher
seating replacement, door repairs /replacement
and electrical repairs/ improvements.
|
|
| Owner Solicitation Name: | Campus Classroom Expansion PH IV
|
| Owner Name: | University of Alaska, Facilities Planning & Construction Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Approximately 1,800 SF of interior remodel work
on the first floor, and approximately 3,000 SF of
remodel and finish work on the second story,
within an existing, partially completed classroom
addition within the existing hangar building. The
work includes installation of owner provided
materials as well as materials provided by the
contractor. Project Bid Alternate #1: Scope of
work includes installation of contractor
furnished exterior aluminum window in Office 212.
Work also includes insulation, framing and
finishes as shown on project drawings and
specifications.
|
|
| Owner Solicitation Name: | Mad Rush II
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Tongass National Forest, Federal Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction or reconstruction of all or portions
of Forest Service Roads. Mobilization, survey,
design, construction staking, clearing, grubbing
and excavation, pit development, quality control
and quality measurement, certification for
quality and quantity, furnish, haul and place
shot rock borrow excavation, culvert
installation, and seeding and fertilizing.
Mobilization, brushing reconditioning of roadbed,
furnish, haul and place shot rock borrow
excavation on the traveled way including
turnouts, culvert, installations, seeding and
fertilizing. The project consists of 8.55km of
reconstruction and 2.79km of new construction.
|
|
| Owner Solicitation Name: | Hamme Pool Facility Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Locker rooms & restrooms renovations, bleacher
seating replacement, door repairs /replacement
and electrical repairs/ improvements.
|
|
| Owner Solicitation Name: | Environmental Investigation
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design and perform an environmental
investigation, evaluate potential remedial
alternatives, and identify and potentially
implement interim measures at the specified rail
yard and contiguous ARRC-owned properties. This
work will include soil, groundwater and surface
water characterization to determine the nature
and extent of contamination at the facility that
may affect potential receptors; ecological and
human health risk characterization; development
of site-specific cleanup levels; identification
and potential implementation of interim measures;
and identification and evaluation of potential
remedial alternatives for any remediation that
may be required. Contaminants of potential
concern include petroleum (including diesel range
organics (DRO), gasoline range organics (GRO) and
residual range organics (RRO)), volatile organic
compounds (VOCs) including benzene and toluene,
semivolatile organic compounds (SVOCs), and
metals such as copper, manganese, nickel, lead,
mercury, cobalt and zinc. The primary pathway of
concern is through groundwater and surface
water to potential receptors.
|
|
| Owner Solicitation Name: | Design/Construct Joint Security Forces Complex
|
| Owner Name: | Corps of Engineers, Alaska District (CEPOA-PA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design/Construct Joint Security Forces Complex.
|
|
| Owner Solicitation Name: | New Branch Bank Construction
|
| Owner Name: | First National Bank Alaska
|
| Enginner Name: | Charles Bettisworth & Company
|
| Plankeeper Name |
|
| Scope: | Constructing a new 11,400 SF Branch Bank building.
|
|
| Owner Solicitation Name: | Savikko Park Log Shelter Renovation
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and removal of the existing log
shelter, providing an approved design sealed by a
professional Engineer registered in the State of
Alaska, or an Architect licensed by the State of
Alaska, and the construction of a new log shelter
of the same footprint. Also included is the
removal and disposal of hazardous waste materials
to include pressure treated wood. Additive
Alternate work includes providing a second
electric circuit, a water line and spigot to the
shelter, and providing all related cutting and
patching.
|
|
| Owner Solicitation Name: | Materials Supply
|
| Owner Name: | Yukon - Kuskokwim Delta AVCP Regional Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of construction material.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services
|
| Owner Name: | Sitka, City and Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide professional design services for the High
School Performance Center and Auditorium. This
project will include programming and design of a
1000 seat performing arts facility including an
acoustically designed auditorium, to serve as a
quality performance space for such diverse
activities as band, choir and orchestra
performance, drama and musical theater
productions and local and professional dance
performances.
|
|
| Owner Solicitation Name: | Crossties, Switches Packages and Preplated Railroad Ties
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Crossties, Switches Packages and
Preplated Railroad Ties. Quantities are expected
to vary from 10,000 to 100,000 ties per year for
the contract
term.
|
|
| Owner Solicitation Name: | Purchase of 3 CY Wheel Loader
|
| Owner Name: | DOT/PF Statewide Procurement
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 3 CY Wheel Loader.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services for the Expansion of the Court Complex
|
| Owner Name: | Bethel, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The intent of this expansion project is to add a
two-story building attached by a
walkway/utilidoor to the existing facility. The
first floor, including the connecting
walkway/utilidoor, is estimated to be 3,100 SF
The second story is approximately 2,300 SF and
will remain unfinished with plans for completion
and use in the future. There is another 1,028 SF
of the existing building that will require
remodel.
|
|
| Owner Solicitation Name: | Campus Wide Elevator Jack Replacement
|
| Owner Name: | University of Alaska, Division of Design and Construction
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing and replacing underground elevator
hydraulic cylinders.
|
|
| Owner Solicitation Name: | 2004 Project Management Services for Project Management & Engineering Proposals
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Project Management Services for Project
Management & Engineering Proposals.
|
|
| Owner Solicitation Name: | Northwood Street Maintenance Overhead Door Replacement
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consisting of replacing overhead door components
for twelve overhead doors.
|
|
| Owner Solicitation Name: | Fairbanks Regional Office Building - Janitorial Contract
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, tools, equipment, materials,
and supplies to provide janitorial services, in
accordance with the technical specifications for
approximately 35,738 SF of office space and
11,659 SF of common area space and 35,400 SF of
parking space.
|
|
| Owner Solicitation Name: | Concrete Railroad Crossties
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 5200 Concrete Ties 24” tie spacing
141AB or 115 RE rail, 1:40 rail seat New
construction Pandrol e-clips (Required)
Speed: 60 mph, Tonnage: 15 MGT, Axel loads: up to
286,000 cars. The material to be furnished shall
be delivered, unloaded, and neatly stockpiled
near the worksite for installation per the
contract plans. When handling ties in the plant,
yard or at the delivery site, they shall not be
dropped or otherwise damaged. They shall be
stacked on firm level ground, not more than 20
ties high. Dunnage will not be placed in the rail
seats.
|
|
| Owner Solicitation Name: | Demolition, Construct Precast Concrete Girder Bridge and Other Work
|
| Owner Name: | Alberta Infrastructure and Transportation
|
| Enginner Name: | AMEC Infrastructure Ltd.
|
| Plankeeper Name |
|
| Scope: | Demolition, Construct Precast Concrete Girder
Bridge and Other Work.
|
|
| Owner Solicitation Name: | Technical Service Agreement
|
| Owner Name: | North Slope Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repairs and Upgrade of Overhead Doors - One year
term contract.
|
|
| Owner Solicitation Name: | Soldotna Wastewater Treatment Plant Improvements Third Clarifier/UV Disinfection System Installation
|
| Owner Name: | Soldotna, City of
|
| Enginner Name: | HDR Alaska, Inc.
|
| Plankeeper Name |
|
| Scope: | Remove existing RBC basin, construct a third
clarifier, modify the existing chlorine contact
chamber to accommodate installation of an
ultraviolet disinfection system, construct a
pumping building, purchase and installation of
standby generator, modify plant piping, and other
miscellaneous associated work.
|
|
| Owner Solicitation Name: | Sitka-Harbor Drive & Bridge Improvements
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Drive Safety Improvements: This project is
primarily shoulder and sidewalk reconstruction,
on the bridge approaches. Major work items
include approach railing, curb, gutter &
sidewalk, luminaries, utility bank and a load
center. Minor items include pavement grinding,
paving, stormdrain reconstruction, rock
excavation, signing and striping.
Bridge Rehabilitation: This project is primarily
to remove existing and install new bridge railing
with transition/connections to new and existing
approach railing on the bridge. Minor items of
work include corrosion protection, and
illumination systems on the bridge.
Bridge Seismic Retrofit: The purpose of this
project is to reduce the bridge's seismic
vulnerability to an earthquake. Major items of
work include, structural steel pier jackets,
horizontal cross ties, structural concrete and
reinforcing steel. Minor items of work include
corrosion protection and bearing replacement.
|
|
| Owner Solicitation Name: | Database Management of the Online AMHS Reservation System
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Receive, process, and respond to requests for
information about the Online AMHS Reservations
System (OARS) generated as a result of its
marketing program. Additionally, the Contractor
will be responsible for the creation and
management of AMHS databases(s), weekly/monthly
report generation, and performing database sorts.
|
|
| Owner Solicitation Name: | Borough Administration Building Flooring Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Flooring Improvements, demolition of exisiting
flooring materials and installation of new
flooring materials.
|
|
| Owner Solicitation Name: | Nelson Island Roads Preliminary Design and Environmental Services
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | NEPA scoping, environmental research, and
necessary preliminary/reconnaissance level design
to support the scoping effort, complete a scoping
summary report, and recommend the appropriate
class of environmental document for the proposed
road system on Nelson Island. This study will
evaluate alternatives and impacts of proposed
roads between the island communities. The road
system assessment will include a deepwater port
spur.
|
|
| Owner Solicitation Name: | Prequalification of Prime Contractors for Whitemud Drive / 34 Street Interchange
|
| Owner Name: | Edmonton, City of - Materials Management
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | PRE-QUALIFICATION for drive / street interchange.
|
|
| Owner Solicitation Name: | Wastewater Feasibility Study
|
| Owner Name: | Anderson, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Work consists of evaluating feasibility and
providing preliminary engineering of a community
wastewater system and expanding regional septage
lagoon.
|
|
| Owner Solicitation Name: | Colville River Road
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering, Surveying, Geotechnical,
Hydrological, and Environmental services for a
proposed project. Construction of approximately
20 mile long road including all associated stream
and river crossings. Included in this project is
an approximately 3,300 LF bridge across.
|
|
| Owner Solicitation Name: | Perform Source Water Assessments of Public Water Systems
|
| Owner Name: | Alaska Dept. of Environmental Conservation, Division of Information and Administrative Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional services to perform Source Water
Assessments of Public Water Systems. The contract
term is for the state fiscal year 2004.
|
|
| Owner Solicitation Name: | Colville River Road
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering, Surveying, Geotechnical,
Hydrological, and Environmental services for a
proposed project. Construction of approximately
20 mile long road including all associated stream
and river crossings. Included in this project is
an approximately 3,300 LF bridge across.
|
|
| Owner Solicitation Name: | Surveying Services
|
| Owner Name: | Orutsararmiut Native Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Surveying necessary for approvable subdivision
plan plat for a 5.45 acre tract within. The
subdivision will be used for Housing Program
goals and objectives.
|
|
| Owner Solicitation Name: | Purchase Metal Walkway Materials
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 900 LF 6” X 9” wide flange I beam 900 LF 3” X 2”
X 3/16” angle 900 LF 1 ˝” Schedule 40 galvanized
pipe 150 pieces 1” X 1/8 center mesh 4” center on
center, by 36” X 48” bar grate, galvanized,
serrated 19W4(less than ˝” gap between bars).
|
|
| Owner Solicitation Name: | South Tongass Sewer
|
| Owner Name: | Ketchikan Gateway Borough
|
| Enginner Name: | R & M Engineering
|
| Plankeeper Name |
|
| Scope: | Construct approx three miles of 8" diameter HDPE
force main sewer; one mile of gravity sewer; and
three pump stations. Open cut.
|
|
| Owner Solicitation Name: | Meadow Lake Elementary Turn Lanes/Highway Lighting
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Civil Engineering Consultants for design and
preparation of plans, specifications and
estimates for turn lanes and highway lighting.
|
|
| Owner Solicitation Name: | Meadow Lake Elementary Turn Lanes/Highway Lighting
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Turn lanes and highway lighting construction.
|
|
| Owner Solicitation Name: | Solicitation for Interest in Multiple Award Design-Build Contract
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design-Build. General building type renovation
projects, but with some new construction.
|
|
| Owner Solicitation Name: | Napaskiak Wastwater Lagoon Construction
|
| Owner Name: | Alaska Village Safe Water
|
| Enginner Name: | CRW Engineering Group, LLC
|
| Plankeeper Name |
|
| Scope: | Construct a new, approximately 4 acre dual-cell
wastewater treatment lagoon and associated
piping, construct approximately 400 LF of above-
ground discharge pipeline, construct a platform
for dumping of wastewater haul tanks, and two
binwall access ramps to augment a bridge
(constructed by others).
|
|
| Owner Solicitation Name: | Relocation of Existing 750 kVA Transformer
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Relocation of existing 750 kVA transformer.
Remove the existing generator and install it at a
new location to accommodate future construction
at the Station. Trench excavation and backfill,
demolition of concrete slab, removal of existing
cable, underground installation of new conduit
and cable, and reinstallation of the existing
transformer and meter.
|
|
| Owner Solicitation Name: | Engineering and Surveying Services for Various Rural Southwest Alaska Airports
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Geotechnical services, surveying, hydrological
analysis, boardwalk design and construction
assistance services for rural airport relocations.
|
|
| Owner Solicitation Name: | Trail Right-of-Way Research, Kashwitna-Montana Creeek Area
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide land status research, documentation,
surveying, and mapping for public trail right-of-
way easements.
|
|
| Owner Solicitation Name: | Crow Creek Road Rehabilitation
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Services shall include a design study report,
right of way mapping, public involvement, a
utility conflict report, plans, specifications
and estimates, assistance during bidding, and
assistance during construction.
|
|
| Owner Solicitation Name: | Nenana Port Access
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitating and surfacing 1.5 km of road in
including replacing railroad crossings. The
project also includes rehabilitating the bridge
embankment adjacent to the project alignment.
|
|
| Owner Solicitation Name: | Noel Wien Library Restroom Renovations
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of tile wall and floor
finishes, toilet partitions, accessories, sinks,
counter tops, and mirrors. Paint ceilings and
complete all associated work as indicated in the
documents.
|
|
| Owner Solicitation Name: | Crow Creek Road Rehabilitation
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Services shall include a design study report,
right of way mapping, public involvement, a
utility conflict report, plans, specifications
and estimates, assistance during bidding, and
assistance during construction.
|
|
| Owner Solicitation Name: | Purchase of a Portable Gravel Screening Plant
|
| Owner Name: | DOT/PF Statewide Procurement
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of a Portable Gravel Screening Plant.
|
|
| Owner Solicitation Name: | Carlson Activity Center Mechanical, Electrical & Ticketing Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovation of southeast exit vestibule and
creation of a new ticketing booth, replacement of
certain mechanical actuators, and upgrade of
lighting controls. Renovation of southeast exit
vestibule and creation of a new ticketing booth,
replacement of certain mechanical actuators, and
upgrade of lighting controls.
|
|
| Owner Solicitation Name: | Insulated Pipe & Appurtenances for the Bethel Water and Sewer Improvements - Phase C Project and the Bethel Sewer Force Main Realignment Project
|
| Owner Name: | Bethel, City of
|
| Enginner Name: | CRW Engineering Group, LLC
|
| Plankeeper Name |
|
| Scope: | Fabrication, and delivery of insulated pipe,
fittings, joint kits and appurtenances. HDPE
core pipe with 3" insulation with corrugated
metal pipe jacket.
|
|
| Owner Solicitation Name: | Mitigation Plan.com and VRiskMap software
|
| Owner Name: | Alaska Dept. of Military and Veterans Affairs
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide MitigationPlan.com software and VRiskMap
software.
|
|
| Owner Solicitation Name: | Bartlett High School Renewal PH 2B - Renovation & Performing Arts Addition
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | School building renovation and addition.
|
|
| Owner Solicitation Name: | Alaska State Fair Intermodal Transportation Facility
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of intermodal transportation
facility.
|
|
| Owner Solicitation Name: | Wrangell City Dock North Mooring Dolphin Project
|
| Owner Name: | Wrangell, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Base Bid: 1) Furnishing and driving steel pipe
piles for the support of a new dolphin, 2)
Furnish and install one pile rock anchor, and 3)
Furnish and install dolphin cap. Additive
Alternate: A1) Furnish and install catwalk, and
A2) Catwalk support piles and beam.
|
|
| Owner Solicitation Name: | Gym Bleacher Replacement
|
| Owner Name: | Kenai Peninsula Borough, Purch. and Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove existing and to furnish and install new
telescoping gym bleachers.
|
|
| Owner Solicitation Name: | 2004-2006 Term Agreement for Traffic Design Services
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide traffic design services in support of the
design and construction of Highway Safety
Improvements Program (HSIP) projects and highway
design projects. Services will include
preparation of plans, specifications, and
estimates relating to roadway channelization,
traffic signals, highway lighting, signage, and
pavement markings.
|
|
| Owner Solicitation Name: | Proposals Strategic Plan Facilitation
|
| Owner Name: | Haines Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Facilitate and guide the development of a ten-
year strategic plan that will: Define the ten-
year vision of the borough Establish goals that
will lead to the accomplishment of the vision
Outline time-phased steps necessary to reach the
goals Develop strategies for implementing,
measuring, evaluating and updating the plan.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services
|
| Owner Name: | North Pacific Rim Housing Authority NPRHA
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consulting A&E services to assist in the
development and oversight of the Project.
|
|
| Owner Solicitation Name: | Computer Aided Dispatch (CAD), Automated Information System (AIS)
|
| Owner Name: | Wasilla Police Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing a comprehensive multi-agency, multi-
jurisdictional Computer Aided Dispatch (CAD),
Automated Information System (AIS), and Mobile
Computing capability for police, fire and
Emergency Services (EMS).
|
|
| Owner Solicitation Name: | Borough Wide Comprehensive Plan
|
| Owner Name: | North Slope Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work will include the necessary analysis and
revision of the comprehensive plan to meet the
borough's current land use and management needs.
|
|
| Owner Solicitation Name: | Provide Design Services for the Knik View Water Intertie
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Design Services for Water Intertie.
|
|
| Owner Solicitation Name: | Mendenhaven Park Playground Equipment
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supplying and installing playground equipment.
Additive Alternate #1 includes providing varying
amounts of fall protection surfacing material.
|
|
| Owner Solicitation Name: | Glacier Valley Sports Field Restrooms
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: | CBJ (City of Borough of Jeneau), Engineering Dept.
|
| Plankeeper Name |
|
| Scope: | Construction of a new, 650 square foot restroom
and concession facility. The building will house
two unisex toilet rooms, a mechanical room, a
chalk room, and a DEC approved concessions room.
The main structure includes casti-in-place
concrete, CMU, glu-lam wood beams, cx6 tongue and
groove decking, metal roof and wall panels, and
glass block.
|
|
| Owner Solicitation Name: | Replace Elevator Controls
|
| Owner Name: | Bureau of Land Management (BLM) Alaska State Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The general construction of replacement of
elevator controls, motor-generator sets, and
other related work to the elevators in the
Federal Building. Related electrical and
mechanical work indicated in the documents.
|
|
| Owner Solicitation Name: | Steward Road Bridge
|
| Owner Name: | Unalaska, City of
|
| Enginner Name: | Peratrovich, Nottingham & Drage, Inc.
|
| Plankeeper Name |
|
| Scope: | Remove Existing Bridge and Construct New
Bridge; Water, Sewer, Storm Drain, Electrical
and Telephone Utilities; Earthwork, Armor
Stone, Vegetation and Guardrails.
|
|
| Owner Solicitation Name: | Juneau Cruise Ship Dock Improvements
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of two moorage dolphins, rock
anchors, and appurtenances, and miscellaneous
decking replacement.
|
|
| Owner Solicitation Name: | New Fire Station & DRS Bay Addition
|
| Owner Name: | Delta Junction, City of
|
| Enginner Name: | MACTEC Engineering and Consulting Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of a new fire station and addition
of a vehicle bay to the existing Delta Rescue
Squad (DRS) building. Additive alternates to
provide; the DRS Bay Addition and; Second Floor
living Quarters have been included.
|
|
| Owner Solicitation Name: | Cisco Smartnet Maintenance for Statewide Network Hardware
|
| Owner Name: | Alaska Dept. of Administration, General Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cisco Smartnet Maintenance for Statewide Network
Hardware.
|
|
| Owner Solicitation Name: | Telephone Engineering Services
|
| Owner Name: | Ketchikan Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide professional telephone engineering
support to the Telephone Division for switching,
transmission and outside plant on a daily basis,
not to exceed 40 hours per week.
|
|
| Owner Solicitation Name: | Installation of Used Oil Burners
|
| Owner Name: | North Slope Borough CIPM Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Area-wide installation of used oil burners- NSB
DMS facilities.
|
|
| Owner Solicitation Name: | Demolition of Houses
|
| Owner Name: | Ketchikan Gateway Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of three houses.
|
|
| Owner Solicitation Name: | Rainbird Trail Improvements
|
| Owner Name: | Ketchikan Gateway Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Trail Improvements.
|
|
| Owner Solicitation Name: | Akiachak Bulk Fuel Tank Farm Control Panels Purchase
|
| Owner Name: | Alaska Community and Economic Development Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bulk Fuel Tank Farm Control Panels Purchase.
|
|
| Owner Solicitation Name: | Gladys Wood Elementary School Roof Upgrade
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof upgrade.
|
|
| Owner Solicitation Name: | Akiachak Bulk Fuel Tank Farm Control Panels Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide bulk fuel tank farm control panels.
|
|
| Owner Solicitation Name: | Exterior Finish and Insulation System
|
| Owner Name: | University of Alaska, Division of Design and Construction
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Application of a new exterior finish and
insulation system (EIFS.
|
|
| Owner Solicitation Name: | M/V Columbia Machinery & Ship Systems Refurbishment
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing all labor and materials and/or
equipment for upgrade and modifications of
various ship systems: main engine
overhaul/upgrade; overhaul/inspection of
auxiliary maneuvering machinery; upgrade engine
room systems (diesel oil, lube oil, jacket water,
auxiliary steam & condensate); overhaul of waste
heat boilers; replacement of main engine exhaust
silencers; replacement of main engine exhaust
expansion joints; replacement of vehicle deck
sprinkler system; bow thruster control system
replacement; asbestos abatement of uptakes,
linings and piping; annual overhaul work and a
dry docking
|
|
| Owner Solicitation Name: | Fort Yukon Community Center Sprinkler System
|
| Owner Name: | Yukon Flats School District
|
| Enginner Name: | Design Alaska, Inc.
|
| Plankeeper Name |
|
| Scope: | Installation of a fire sprinkler system.
|
|
| Owner Solicitation Name: | Fort Yukon Community Center Sprinkler System
|
| Owner Name: | Fort Yukon Community Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of a fire sprinkler system.
|
|
| Owner Solicitation Name: | Harper Building Deferred Renewal Project
|
| Owner Name: | University of Alaska, Division of Design and Construction
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Application of a new exterior finish and
insulation system.
|
|
| Owner Solicitation Name: | Network Appliance FAS270 Storage System
|
| Owner Name: | Alaska Revenue Dept., Division of Admin. Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Network Appliance FAS270 Storage System.
|
|
| Owner Solicitation Name: | Middle School Pumps 5/6 Installation Retrofit
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all necessary work to remove two 11/2 hp
pumps and replace with two 3 hp pumps and
retrofit associated piping.
|
|
| Owner Solicitation Name: | O'Malley Elementary School Re-Roof
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform modification to the roofing system.
|
|
| Owner Solicitation Name: | Plant Purchase
|
| Owner Name: | Ketchikan Gateway Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of plants and materials for gardens,
parks, and hanging baskets for the 2004 growing
season.
|
|
| Owner Solicitation Name: | Install Overhead Crane and Door Operator in Boathouse at USCG Station Ketchikan
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide and install an overhead hoist with a
motorized trolley unit and festoon on an existing
W 14 X 53' beam in the boathouse. The
hoist/trolley system shall operate via a wall
mounted control unit and a remote controller.
Both controllers shall be outfitted with an
emergency stop. A door operator shall be
installed to safely open and close a pair of
doors 26 LF in height with a combined width of 10
LF through which the crane travels. The leading
edges of the doors shall be outfitted with
pneumatic safety edges to reverse door upon
contact with an obstruction. The door operator
shall have a wall mounted operating station.
Modifications are required to provide electrical
services to accommodate these systems.
|
|
| Owner Solicitation Name: | AC-5 Hot Mix
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of AC-5 Hot Mix on as needed bases.
|
|
| Owner Solicitation Name: | AC-5 Hot Mix
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of approximately 500 ton of AC-5 Hot
Mix.
|
|
| Owner Solicitation Name: | Cordova Wastewater Treatment Plant Upgrades
|
| Owner Name: | Cordova, City of
|
| Enginner Name: | GV Jones & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Wastewater Treatment Plant Upgrades.
|
|
| Owner Solicitation Name: | Juneau Parking facility Planning and Conceptual Design
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional services for the preparation of
informational documents for two proposed parking
structures. Services may include concepts,
conceptual floor plans, cost estimates, artistic
renderings, traffic impacts, participation in
public meetings and landscape design.
|
|
| Owner Solicitation Name: | Larsen Bay Bulk Fuel Horizontal Tanks Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide bulk fuel tanks.
|
|
| Owner Solicitation Name: | Larsen Bay Bulk Fuel Pipe and Pipe Accessories Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide pipe and pipe accessories.
|
|
| Owner Solicitation Name: | Larsen Bay Pipe and Pipe Accessories Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide pipe and pipe accessories.
|
|
| Owner Solicitation Name: | Larsen Bay Bulk Fuel Horizontal Tanks
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide bulk fuel horizontal tanks.
|
|
| Owner Solicitation Name: | Demolition of Powerhouse and Woodroom Buildings
|
| Owner Name: | Ketchikan Gateway Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition services of the powerhouse and wood
room buildings.
|
|
| Owner Solicitation Name: | Dimond High School Replacement Phase 2 Demolition
|
| Owner Name: | Anchorage School District, Facilities/Maintenance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | High school demolition.
|
|
| Owner Solicitation Name: | East High School Musical Instrument Storage
|
| Owner Name: | Anchorage School District, Facilities/Maintenance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | High School Musical Instrument Storage.
|
|
| Owner Solicitation Name: | Glenn Hwy MP 172-189 Rehabilitation - Surveying & Mapping
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Research of existing survey and ownership
records, field retracement surveys, reduction of
field survey data, and control monumentation for
the purposes of defining and perpetuating the
existing right of way and it's relationship with
adjoining surveys. The primary intent of these
services is the preparation of base maps and
right of way plans.
|
|
| Owner Solicitation Name: | Planning, Design, and Contract Administration Services for Gunakadeit Park Enhancements
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The Consultant's design shall provide public
restroom facilities to the area. Additional
proposed improvements include Convention and
Visitors Bureau information kiosk, a modest
Police Department office, a bus stop, a
vendor/refreshment kiosk, seating areas, bike
racks, improved signage including an interactive
map of downtown walking routes and an area
available for a wide variety of public
performances. Aesthetic improvements using color,
2-D and 3-D art, symbolism, acoustical
treatments, increased lighting, and appropriate
landscaping will make the park an inviting place
for year round activities.
|
|
| Owner Solicitation Name: | Wallpaper-NCO Quarters
|
| Owner Name: | BLM Alaska State Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Wallpaper for NCO Quarters( Quantity - 1)
|
|
| Owner Solicitation Name: | 2004 Anchorage Building 26 Electrical Upgrades
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical Upgrades
|
|
| Owner Solicitation Name: | Imaging/ Scanning Hardware/ Software Solution
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Imaging/ Scanning Hardware/ Software Solution.
|
|
| Owner Solicitation Name: | FIA Baggage Conveyor Modifications
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all mobilization, demoblization, labor,
materials,supplies and equipment for
modifications to the baggage conveyors and
modifications to the control and power for the
baggage conveyors, painting and flooring and/or
ceiling improvements.
|
|
| Owner Solicitation Name: | Construction in Anaktuvuk Pass, Atqasuk, Nuiqsut, Point Hope, Point Lay, and Wainwright
|
| Owner Name: | North Slope Borough CIPM Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of used oil burners.
|
|
| Owner Solicitation Name: | Lunch Creek Trail Construction
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Tongass National Forest, Federal Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove and dispose of existing pressure treated
boardwalk trail as well as construction of new
trail. Construction of 1080 M of trail includes
clearing and grubbing, ditch excavation,
placement of borrow excavation, silt fence, type
I and II turnpike trail, placement of
geosynthetics, compacted crushed aggregate
surfacing, culvert installations, a 6.1 m
temporary timber bridge, treated log steps, and
pressure treated log retaining wall.
|
|
| Owner Solicitation Name: | Imshp Roof Replacement
|
| Owner Name: | Alaska Dept. of Natural Resources, Division of Parks and Outdoor Recreation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Work includes removal of the existing roofing and
providing new roofing.
|
|
| Owner Solicitation Name: | IMSHP Roof Replacement
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of the existing roof and providing new
roofing for historic buildings.
|
|
| Owner Solicitation Name: | ANC Artwork and Animal Enclosures
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design and Construction of casework for the
exhibit of existing one-percent for arts
collection and the cleaning and installation for
exhibit of existing wildlife collection.
|
|
| Owner Solicitation Name: | 2004 Reforestation Project
|
| Owner Name: | Kenai Peninsula Borough - Spruce Bark Beetle Offices, Homer Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Reforestation project.
|
|
| Owner Solicitation Name: | Design Development, Construction Documents, Bidding Consultation and Construction Contract Negotiation, and Construction Inspection for the Clark Bay
|
| Owner Name: | Inter-Island Ferry Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design development, construction documents,
bidding consultation and construction contract
negotiation, and construction inspection . A new
building of approximately 1,800 SF.
|
|
| Owner Solicitation Name: | Professional Services for Environmental Permit Renewal and Administration Proposals
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Professional Services for Environmental
Permit Renewal and Administration Proposals.
|
|
| Owner Solicitation Name: | Clark Bay Terminal Improvements Project Passenger Terminal Building Design and Related Services
|
| Owner Name: | Inter-Island Ferry Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional services for design, development
construction documents, bidding consultation and
construction contract negotiation, and
construction inspection for the Passenger
Terminal Building Improvement. This is a new
building of approximately 1,800 SF.
|
|
| Owner Solicitation Name: | Contract Administration and Inspection Services for Decoy Boulevard Reconstruction
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Contract Administration and Inspection
Services for Boulevard Reconstruction. The work
consists of installation of an underground storm
drainage system throughout the project area,
replacement of the roadway embankment to a four-
foot depth, asphalt pavement, a new paved
sidewalk with curb and gutter along the northerly
side of the street, minor sanitary sewer and
water system improvements, and miscellaneous
related work.
|
|
| Owner Solicitation Name: | Woodriver Elem School Site and Traffic Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: | PDC, Inc. - Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | School Site and Traffic Improvements.
|
|
| Owner Solicitation Name: | Woodriver Elem School Elect. Svc. Replacement
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: | PDC, Inc. - Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | School Elect. Svc. Replacement.
|
|
| Owner Solicitation Name: | Power Plant Control System Upgrade Project
|
| Owner Name: | Chugach Electric Association, Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide and install a Combustion Turbine Controls
System Upgrade. Complete the controls system
upgrade.
|
|
| Owner Solicitation Name: | Term Construction Contract
|
| Owner Name: | University of Alaska, Anchorage, Facilities Planning & Construction
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Various schools site reconstructions.
|
|
| Owner Solicitation Name: | Two (2) - 138/34.5 Kv Power Transformer
|
| Owner Name: | Chugach Electric Association, Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Two substation power transformers and related
field engineering services for unit assembly upon
delivery or as required when transformer
installation is to occur.
|
|
| Owner Solicitation Name: | A/E and Construction Management Services for a New Snow Removal Equipment Building
|
| Owner Name: | Nenana, Municipality of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | A/E and construction management services for a
new snow removal equipment building.
|
|
| Owner Solicitation Name: | False Pass Bulk Fuel Horizontal Tanks Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide bulk fuel tanks for the False Pass Bulk
Fuel Project.
|
|
| Owner Solicitation Name: | S/D Fire Alarm Replace-Joy,NPHS,TJH,Woodriver
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fire Alarm Replace.
|
|
| Owner Solicitation Name: | Statewide Decontamination Program
|
| Owner Name: | Alaska Clean Water Fund, Division of Water, Facility Programs, Department of Environmental Conservation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Statewide decontamination programe. For closer
info please see the attached file.
|
|
| Owner Solicitation Name: | ASD Traffic Safety- Birchwood ABC, Chinook, and Ptarmigan Elementary Schools A
|
| Owner Name: | Anchorage School District, Facilities/Maintenance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Trafic safety.
|
|
| Owner Solicitation Name: | Water & Sewer Feasibility Study
|
| Owner Name: | Alaska Village Safe Water
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Water & sewer feasibility study.
|
|
| Owner Solicitation Name: | Campus Wide Elevator Jack Replacement
|
| Owner Name: | University of Alaska, Division of Design and Construction
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of single-bottom hydraulic jacks and
limited ADA and seismic improvements.
|
|
| Owner Solicitation Name: | RSA #20 Annual Road Maintenance
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide annual road maintenance services.
|
|
| Owner Solicitation Name: | Koyukuk Bulk Fuel Horizontal Tanks Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide bulk fuel tanks.
|
|
| Owner Solicitation Name: | ANC Environmental Database Information (Edi) System Support
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | environmental and geotechnical reports from
Airport Tenants and Projects into an existing
Environmental Data Information (EDI) system, a
GIS based system. The Contractor shall also
assist in querying and presenting the EDI data in
both tabular and graphic formats. In addition,
Contractor shall provide technical support as
needed for the verification of reports entered,
update the EDI system software as necessary, and
assist the Contracting Agency with the
repair/resolution of mechanical and software
problems that arise with the EDI system.
|
|
| Owner Solicitation Name: | J.M Asplund WWTF Headworks Modifications
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of an existing wood floor, associated
structural members, office, kitchen and shower
facilities removal and associated mechanical
plumbing, HVAC and electrical work. The
demolished floor will be replaced with a new
concrete floor and structural system, plumbing,
HVAC and electrical systems.
|
|
| Owner Solicitation Name: | M/V Bob Ellis Upgrades
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide marine, structural, electrical, and
mechanical upgrades.
|
|
| Owner Solicitation Name: | Tanana Water and Sewer Feasibility Update
|
| Owner Name: | Alaska Village Safe Water
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide engineering services to update the
community's 1997 water and feasibility study.
|
|
| Owner Solicitation Name: | Purchase of Traffic Marking Paint, Solvent & Marking Beads
|
| Owner Name: | Alaska Dept. of Transportation, Headquarters (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of traffic marking paint, solvent &
marking beads for delivery to various locations
statewide.
|
|
| Owner Solicitation Name: | Nelson Lagoon Bulk Fuel Horizontal Tanks Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bulk fuel horizontal tanks purchase.
|
|
| Owner Solicitation Name: | Architectural And Engineering Services For The Design And Construction Assistance For Six Aip Funded Storage Buildings
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide architectural and engineering services
for the design and construction assistance for
six AIP funded storage buildings: , schematic
design, design development, bid-ready
construction documents, assistance during
bidding, and assistance during construction.
|
|
| Owner Solicitation Name: | Seismic Re-Engineering of the VMT
|
| Owner Name: | Prince William Sound Regional Citizens Advisory Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Identification of seismic design standards
applicable to: VMT when it was designed
and built in 1970s, VMT as it exists today
including those standards “grandfathered�
from an earlier era; and VMT if it were being
designed and built today. Comparison of the three
sets seismic design standards with emphasis on
the present condition of the VMT. Coordination
with Joint Pipeline Office regarding seismic
compliance requirements applicable to the VMT.
Identification and description of extents to
which VMT facilities (oil storage tanks, piping,
rock cuts, containment dikes, and slopes) might
not have sufficient structural integrity to
satisfy current seismic engineering standards.
One-day visual inspection of VMT facilities to
confirm if examples of insufficient structural
integrity actually exist. Recommendations for
appropriate and feasible seismic re-engineering
activities to bring VMT into compliance with
current seismic design standards.
|
|
| Owner Solicitation Name: | Professional Engineering Services For Conceptual Development Layouts And Cost Estimates For A Float System In The New Boat Harbor In Chignik
|
| Owner Name: | Chignik, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Developing up to three preliminary harbor layout
alternatives, and a supportable opinion of
probable construction by cost component for each,
conducting a workshop.
|
|
| Owner Solicitation Name: | South Lindy Mountain Roads
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Tongass National Forest, Federal Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design-Build. Construction of a total of 4.83 km
of 4.2 m wide single lane road with turnouts. The
work entails construction staking, preliminary
road survey, road design, clearing and grubbing,
excavation, borrow excavation, haul, end haul,
composite road construction, placed riprap,
mobilization, installation of corrugated metal
pipe, pit development, and seeding.
|
|
| Owner Solicitation Name: | Engineering Services for Various City Projects
|
| Owner Name: | Seldovia, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Serve as the City Engineer on an as needed basis
for civil engineering and public works projects.
|
|
| Owner Solicitation Name: | Roadway Painting
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roadway painting.
|
|
| Owner Solicitation Name: | Third Street Douglas Utilities Replacement
|
| Owner Name: | Juneau Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asphalt removal, new water and sewer mainline
and services, asphalt pavement, curb and gutter,
sidewalk, and miscellaneous related work.
|
|
| Owner Solicitation Name: | Corrosion Abatement Study
|
| Owner Name: | Prince William Sound Regional Citizens Advisory Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Identification of corrosion standards applicable
to operations and maintenance at the
VMT and the extent to which the standards are
driving non-tank corrosion abatement at
VMT facilities. Review of ongoing and recent
compliance activities by Joint Pipeline Office to
remedy non-tank corrosion issues at the VMT.
Coordination of activities with PWSRCAC’s C-Plan
Streamlining Project. Identification and
description of extent to which VMT non-tank
facilities have suffered corrosion damage and the
extent to which corrosion standards are being
used to address such corrosion.
One-day visual inspection of VMT facilities to
confirm if examples of non-tank corrosion
not in compliance with the permitted levels of
applicable standards actually exist.
Recommendations for appropriate and feasible
corrosion abatement activities to bring
VMT non-tank facilities into compliance with
applicable standards.
|
|
| Owner Solicitation Name: | Purchase Of Arctic Pipe & Fittings
|
| Owner Name: | Alaska Dept. of Corrections, Procurement Section
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mnufacture of the following: Arctic PE water main
fusion- coupled, Arctic PE water service line
Harco-coupled, and all associated fittings.
|
|
| Owner Solicitation Name: | Janitorial Services for the Reid and Pat Wise Memorial Buildings
|
| Owner Name: | Ketchikan Gateway Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial services.
|
|
| Owner Solicitation Name: | Seward Middle School Phase 1 - Site Work
|
| Owner Name: | Kenai Peninsula Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing all labor, materials and equipment for
clearing, grubbing, rough grading, sewer line
installation, and culvert installation in
preparation for the construction.
|
|
| Owner Solicitation Name: | Compliance Monitoring Data Collection Services Attached
|
| Owner Name: | Dept. of Health & Social Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Monthly telephonic data collection from up to 150
adult lock-ups, adult jails, and juvenile secure
holdover facilities.
|
|
| Owner Solicitation Name: | Grant Management Software
|
| Owner Name: | Alaska Commission on Postsecondary Education
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | provide software to be used to manage the
AlaskAdvantageTM Grant Program and the state's
GEAR UP grant. Qualifications for vendors include
experience developing, implementing and
supporting software of similar purpose and scope
for at least three (3) customers of a similar or
larger organizational size. ACPE is Alaska's
state financial aid agency, providing
approximately $60 million in student financial
aid annually consisting of education loans and
grants. ACPE is seeking information on software
to manage the grant program only.
|
|
| Owner Solicitation Name: | Pile Driving Inspection, High Strain Dynamic Testing and Analysis, Parks Hwy, Bridge 210
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Contractor shall assist State Foundation Engineer
with pile driving inspection and perform high-
strain dynamic pile testing using a Pile Dynamic
Analyzer (PDA) on at least two and possibly up to
four steel pipe piles and H-Piles.
|
|
| Owner Solicitation Name: | New Community Library
|
| Owner Name: | Delta Junction, City of
|
| Enginner Name: | MACTEC Engineering and Consulting Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of a new 5,000 SF community library.
|
|
| Owner Solicitation Name: | Klawock School Window Replacement
|
| Owner Name: | Klawock, City of
|
| Enginner Name: | Minch-Ritter-Voelckers Architects PC
|
| Plankeeper Name |
|
| Scope: | Removal of existing wood framed or vinyl clad
windows. Disposal of windows. Supply and
installation of new vinyl clad wood windows.
Supply and installation of new framing and trim
as required. Other misc. work cutting, patching,
repair relating to the installation of new
windows. Alternates additional window bays.
|
|
| Owner Solicitation Name: | ITB 62152 Northern Region Bridge Scour & Retrofit FFY04
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing all labor, materials, equipment and
performing all work onBridge Scour & Retrofit:
installation of scour erosion measures at four
bridges.
|
|
| Owner Solicitation Name: | Diomede Bulk Fuel Tanks Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bulk fuel tanks purchase.
|
|