| Owner Solicitation Name: | Alpenglow Elementary School Sidewalk Repair
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, materials, equipment, tools
and supervision necessary to properly provide all
necessary work to replace a concrete walkway and
provide insulation to prevent soils from frost
heaving as shown on the drawing.
|
|
| Owner Solicitation Name: | Gustavus Airport Lighting System Engineering Services
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide professional electrical engineering
services necessary to produce plans,
specifications and estimate (PS&E) for a lighting
system. The lighting system will include all edge
lights, runway end identifier lighting system
(REILS), a rotating beacon, illuminated guidance
and distance to go signs, and taxiway A and B
edge lights.
|
|
| Owner Solicitation Name: | Delta Elementary School Construction Project in Delta Junction, Alaska
|
| Owner Name: | Delta Greely School District
|
| Enginner Name: | Kumin Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | School construction.
|
|
| Owner Solicitation Name: | Office Conversion-Interior Remodel
|
| Owner Name: | Ketchikan Gateway Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Office conversion-interior remodel.
|
|
| Owner Solicitation Name: | Polaris K-12 School Addition & Renovation
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Nw addition of approximately 51,000 SF, molition
of approximately 11,000 SF and interior
renovations of approximately 22,000 SF the
project also includes parking lot, playfield, and
playground improvements. site improvements,
foundations, super structure, exterior enclosure,
roof systems, partitions walls, special
partitions, doors, finishes, ceilings, fixed
furnishings, plumbing, HVAC, fire protection,
special systems/mechanical, service/distribution,
lighting, power, special systems/electrical,
equipment/furnishings, and selective demolition.
|
|
| Owner Solicitation Name: | Bear Valley & Fire Lake Elementary School Restroom Renovations
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, materials, equipment, tools
and supervision necessary to properly provide all
necessary work to remove and dispose of existing
toilet partition and replace with new partitions.
|
|
| Owner Solicitation Name: | Klatt Spring Hill Elementary School Restroom Renovations
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, materials, equipment, tools
and supervision necessary to properly provide all
necessary work to remove existing toilet
partitions and replace with new toilet partions.
|
|
| Owner Solicitation Name: | Paint Central Landfill Buildings
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply all labor, equipment, tools, and materials
required for preparation and repainting of
exterior surfaces of buildings.
|
|
| Owner Solicitation Name: | MSB Administrative Building UPS Replacement
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace an uninterrupted power supply (UPS).
|
|
| Owner Solicitation Name: | Juneau Administrative Housing Project
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Alaska Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of one new wood-frame, two-story, 8
unit housing building including exterior decks
and stairs, and one new wood-frame two-story 6
unit housing building including exterior decks
and stairs. Construction of a sewer line from the
existing sewer main and sewer service connections
to the new housing units. Installation of a water
main from the existing main and water service and
meter to the new housing units. Installation of a
new primary and secondary electrical service to
the new housing units. Installation of buried
conduit, pedestals and conductors for Telephone
and Cable TV utilities. Electrical service work
ahead of the primary side of the transformers
will be accomplished by AEL&P and paid for by the
contractor. Construction of crushed aggregate
parking lot and access road, gate and concrete
curbs and sidewalks. Landscaping is limited to
slope restoration, seeding and planting bed
landscaping. Paving for the Access Road and
Parking Lot.
|
|
| Owner Solicitation Name: | Barnes Grinder Pump Assemblies, Grinder Pumps & Control Panels for Bethel Water & Sewer Improvements Phase C & Bethel Sewer Force Main Realignment
|
| Owner Name: | Bethel, City of
|
| Enginner Name: | CRW Engineering Group, LLC
|
| Plankeeper Name |
|
| Scope: | Grinder Pump Assemblies, Grinder Pumps & Control
Panels.
|
|
| Owner Solicitation Name: | North Slope Borough Public Works Office Renovation, 2nd 29-Unit Complex
|
| Owner Name: | North Slope Borough CIPM Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Interior and exterior renovation of approximately
23,260 SF of office space, including site work,
structural improvements, architectural
improvements, and complete mechanical and
electrical replacements.
|
|
| Owner Solicitation Name: | "Team- Build" Design and Construction of a K-12 School Addition and Renovation in Brevig Mission
|
| Owner Name: | Bering Straits School Dist
|
| Enginner Name: | Kumin Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction services for site development and
building construction for an approximately 12,000
SF addition and 2,000 SF renovation to the
existing school facility.
|
|
| Owner Solicitation Name: | General Construction And Maintenance Requirements - Request for Qualification
|
| Owner Name: | Alaska Communications Systems
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | General construction and maintenance requirements.
|
|
| Owner Solicitation Name: | New Mainline Vessel Design Services
|
| Owner Name: | Alaska Dept. of Transportation, Headquarters (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide professional design services to prepare a
Design Study Report including preparation and
assistance with a Public Participation Plan.
|
|
| Owner Solicitation Name: | Install Multi-Media System, United States Coast Guard, Integrated Support Command, Kodiak
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer (fp), USCG Integrated Support Command Kodiak
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install a complete multi-media system to include
1 EACH Government Furnished Projector.
Audio/video, sound system with flat screen
monitor incorporated into a lockable, mobile,
lectern for the conference room.
|
|
| Owner Solicitation Name: | Installation of Wastewater Treatment USCG ATTU
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of Waste Water Treatment Plant.
provide all materials, supplies, equipment,
transportation and perform the labor to remove
existing underground wastewater treatment plant,
wood framed treatment plant building and concrete
foundation; provide temporary sewage lagoon;
engineer, provide and install a commercially
available prepackaged underground wastewater
treatment plant capable of handling 3000 gallons
per day, include a passive cathodic protection
system, and connect to existing 4" sewer
line; construct a pre-engineering metal framed
building with concrete slab over the treatment
plant; install waterline and connect potable
water to building.
|
|
| Owner Solicitation Name: | Professional A/E Services to Support Area-Wide Projects
|
| Owner Name: | Tagiugmiullu Nunamiullu Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional A/E services.
|
|
| Owner Solicitation Name: | Borough of Juneau Evergreen Avenue Reconstruction, Phase II
|
| Owner Name: | Juneau Engineering Dept.
|
| Enginner Name: | CBJ (City of Borough of Jeneau), Engineering Dept.
|
| Plankeeper Name |
|
| Scope: | Replacement of water, sanitary sewer and storm
drainage systems, new roadway and sidewalk
embankments, asphalt pavement, curb and gutter,
concrete sidewalk and driveway slabs, waste site
development, and miscellaneous related work.
|
|
| Owner Solicitation Name: | Request for Information for Policy and Procedure Software
|
| Owner Name: | Alaska Commission on Postsecondary Education
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | information from vendors who provide software
that offers the ability to develop and publish
documents to a well-organized, easily navigable
and updateable, on-line procedure resource and
repository. Responses to this Request for
Information (RFI) should describe software with
functionality to provide users with simple and
efficient methods to find and retrieve up-to-date
business critical information.
|
|
| Owner Solicitation Name: | Big Dipper Arena Aisle Lighting
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lighting.
|
|
| Owner Solicitation Name: | Maintenance Storage Building at the Kodiak Launch Complex, Kodiak
|
| Owner Name: | Alaska Aerospace Development Corporation (AADC)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct a two-story 19,000 SF
maintenance/storage building which includes
service/ storage bays, machine shop, and offices,
an ancillary storage building and generator
building of approximately 200 SF in area each,
power conduit and wiring, data and communication
conduit and cabling, above ground fuel tanks,
septic tank system, and a water treatment system.
The building systems include a post tensioned
concrete slab on grade, with an in floor slab
heating system, a pre-engineered metal building
system with overhead doors, and cast iron forced
draft boilers.
|
|
| Owner Solicitation Name: | Diomede Stainless Steel Fabrication Purchase
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Diomede stainless steel fabrication purchase.
|
|
| Owner Solicitation Name: | Fairbanks Regional Office Building - Hallway Ceiling System
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all professional architectural and
engineering services, mobilization,
demobilization, transportation, subsistence,
labor, materials, tools, equipment and
supervision necessary to design, engineer and
replace the hallway ceiling system.
|
|
| Owner Solicitation Name: | Parks Highway: MP 39-41 Rehb-Seward Meri
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a five-lane highway, improvement
of existing frontage roads, a multi-use pathway,
a grade separated single point interchange (SPI),
an at-grade instersection, a retained embankment
crossing and an at-grade signalized intersection.
|
|
| Owner Solicitation Name: | Port of Dillingham
|
| Owner Name: | Dillingham, City of
|
| Enginner Name: | Peratrovich, Nottingham & Drage, Inc.
|
| Plankeeper Name |
|
| Scope: | Minor demolition (bldg, bulkhead wall, etc),
construct new open cell fill dock and
appurtenances, install high mast lights, sewer,
and electrical utilities, earthwork and armor
stone placement
|
|
| Owner Solicitation Name: | Furnishing One (1) Each Mini-Pumper Fire Apparatus
|
| Owner Name: | Anchorage Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing one rach mini-pumper fire apparatus.
|
|
| Owner Solicitation Name: | Fairbanks Regional Office Building - Hallway Ceiling System
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all professional architectural and
engineering services, mobilization,
demobilization, transportation, subsistence,
labor, materials, tools, equipment and
supervision necessary to design, engineer and
replace the hallway ceiling system.
|
|
| Owner Solicitation Name: | 2004 ARRC Track Material
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Track Spike 115# 5/8�X6� 61/Keg 5,400 Kegs,
Funded FRA 4428 kegs, FTA 324 kegs & ARRC 648 kegs
Track Bolt 115# 1-1/6� X 6� 23/pail 288 Pails,
Funded FRA 28 pails, FTA 44 pails & ARRC 216 pails
Nutlock 1-1/16�115# 125/pail 64 Pails, Funded FRA
6 pails, FTA 7 pails & ARRC 51 pails
Anchor Unit 5 Rail 115# 28/bag 4,680 Bags,
Funded FRA 3556 bags, FTA 562 bags & ARRC 562 bags
E-Clip Small E-2055 Pandrol 25/bag 800 Bags,
Funded FRA 256 bags, FTA 304 bags & ARRC 240 bags
6. E-Clip Small E-2056 Pandrol Reverse 20 Bags
_________ Bag ___________ Total
25/bag – Funded FRA 20 bags
7. J-Clip, joint Bar JCL-J267 Pandrol 45 Bags
_________ Bag ___________ Total
25/bag - Funded FRA 12 bags, FTA 17 bags & ARRC
16 bags
8. J-Clip, Joint Bars E-2063 Pandrol 20 Bags
_________ Bag ___________ Total
25/bag (CUT for Insulated) – Funded ARRC 20 bags
9. Screw, Pandrol, 15/16�x6 40/pail 540 Pails
_________ Pail ___________ Total
- Funded FRA 155 pails, FTA 185 pails & ARRC 200
pails
10. Plate Tie 6� Base 141 Rail 600 Each _________
Each ___________ Total
Part Number Pandrol TPL-P2 - Funded FRA 360 each,
FTA 240 each
11. Plate Tie 5 ½� Base 115 Rail 5,000 Each
_________ Each ___________ Total
Part Number Pandrol TPLP26M - Funded FRA 1,196
ea, FTA 1,610 ea & ARRC 2,194
|
|
| Owner Solicitation Name: | Architects/Engineers (A/E) for the Complete Design of a Replacement K-12 School
|
| Owner Name: | Southwest Region Schools
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Planning and design of approximately 46,845 SF of
replacement school located on a new site.
Educational space shall include standard
classrooms, library, labs, shops, gymnasium,
multi-purpose room, food service, offices,
storage and circulation space as required per the
educational specification program.
|
|
| Owner Solicitation Name: | Contract Administration and Inspection Services for Third Street Douglas Utilities Replacement
|
| Owner Name: | Juneau Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide contract administration and inspection
services for utilities replacement.
|
|
| Owner Solicitation Name: | Furnishing Donal- Son Filters
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing donal- son filters.
|
|
| Owner Solicitation Name: | Install Fire Alarm Systems Family Housing USCG Air Station Sitka
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing fire alarm systems and wiring in 15
family housing buildings and providing and
installing 15 new fully addressable fire alarm
systems complete with all heat and smoke
detection devices, manual pull stations, audible
and visual notification devices, main and remote
indicator panels and battery backup power supply.
Cutting, patching, and painting of existing wall
board which contains small amounts of asbestos.
|
|
| Owner Solicitation Name: | Wastewater Lagoon Construction Project
|
| Owner Name: | Napaskiak, City of
|
| Enginner Name: | CRW Engineering Group, LLC
|
| Plankeeper Name |
|
| Scope: | Work will include the construction of a new (4
acre +/-) dual cell wastewater treatment lagoon
and associated piping, approximately 400 LF of
above ground discharge pipeline, a platform for
dumping of wastewater haul tanks, and two binwall
access ramps to augment a bridge constructed by
others.
|
|
| Owner Solicitation Name: | Replacement of Loan Origination and Servicing Software
|
| Owner Name: | Alaska Community and Economic Development Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide a replacement for the loan origination
and loan servicing software.
|
|
| Owner Solicitation Name: | Providing a Replacement for the Division's Loan Origination and Loan Servicing Software
|
| Owner Name: | Alaska Community and Economic Development Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing a replacement for the Division's loan
origination and loan servicing software.
|
|
| Owner Solicitation Name: | Construction of the Napaskiak Wastewater Lagoon Construction Project
|
| Owner Name: | Alaska Village Safe Water
|
| Enginner Name: | CRW Engineering Group, LLC
|
| Plankeeper Name |
|
| Scope: | Construction of a new (4 acre +/-) dual cell
wastewater treatment lagoon and associated
piping, approximately 400 LF of above ground
discharge pipeline, a platform for dumping of
wastewater haul tanks, and two binwall access
ramps.
|
|
| Owner Solicitation Name: | ANC North Terminal Signage Replacement
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of signage, modular
signs, directories, wall plaques, blade signs,
doorframe signs and oversized way finding signage.
|
|
| Owner Solicitation Name: | Design/ Build Construction
|
| Owner Name: | Seldovia Village Tribe
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design/ Build construction of a sub-regional
health clinic.
|
|
| Owner Solicitation Name: | Analytical Laboratory Services for the Kodiak Island Borough Landfill Facility
|
| Owner Name: | Kodiak Island Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Analytical laboratory services associated with
water samples. The samples are associated with
the required semi-annual monitoring program for
the landfill operations and include leachate,
surface water and groundwater samples. Other
sampling events are also addressed.
|
|
| Owner Solicitation Name: | Janitorial Services
|
| Owner Name: | Kenai Peninsula, Borough of, Purchasing and Contracting Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial services.
|
|
| Owner Solicitation Name: | Construct to Add/Alter Operations Offices for Hangars 3 and 15
|
| Owner Name: | US Army Corps of Engineers, AK District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct additions to Hangars 3 (approximately
3,000 SF) and 15 (approximately 2,000 SF).
Renovate offices at Hangar 15 (approximately
1,500 SF). Electrical, HVAC, fire
protection/detection, and utility support.
|
|
| Owner Solicitation Name: | Landfill Track Dozer
|
| Owner Name: | Delta Junction, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Landfill Track Dozer.
|
|
| Owner Solicitation Name: | Purchase & Installation of New Digital Electronic Control Upgrade at Centennial Hall Convention Center
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase & installation of new digital electronic
control upgrade.
|
|
| Owner Solicitation Name: | IDIQ 2nd Job Order
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Tongass National Forest, Federal Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Preparation of Job Order Proposals to include
project scoping, cost estimating, and development
of Job Order specific
specifications/requirements. Carpentry, plumbing,
electrical, laborers, power equipment operators,
cement workers, painters, and other trades common
to the construction industry.
|
|
| Owner Solicitation Name: | Construction of Naukati School
|
| Owner Name: | Southeast Island School District
|
| Enginner Name: | Jensen Yorba Lott, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of a new 12,00sf K-12 school
consisting of 4 classrooms, a multipurpose
gymnasium and associated support spaces. Work
includes site work including on site water
collection system and sewage treatment, concrete
foundation, wood framed superstructure, exterior
enclosure of cedar horizontal siding, cedar
shingle panel siding, metal roofing, vinyl clad
wood windows, hollow metal doors and frames and
interior finishes of ceramic tile, sheet vinyl,
carpet, gypsum wall board, paint and various
miscellaneous finishes, mechanical systems
include oil fired boilers and hot water base
board heat, building ventilation including air
handling units and exhaust fort, fire sprinklers
and plumbing fixtures, electrical systems include
power, lighting, phone and computer data, and
fire alarm.
|
|
| Owner Solicitation Name: | New Solid Waste Landfill and Septage Disposal Facility
|
| Owner Name: | Delta Junction, City of
|
| Enginner Name: | MACTEC Engineering and Consulting Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of a new solid waste landfill and
septage disposal facility. xcavation and
embankment for disposal cells, roads and building
pads; two structures including a wood frame
scalehouse (320 SF) and structural steel
equipment storage (2,350 SF); a weigh scale
system; and other miscellaneous items.
|
|
| Owner Solicitation Name: | Arctic Pipe and Fittings
|
| Owner Name: | Marshall, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase: HDPE insulated arctic water and sewer
pipe and all associated fittings.
|
|
| Owner Solicitation Name: | Pipe
|
| Owner Name: | Alaska Village Safe Water
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide 8" and 6" HDPE SDR 11 pipe and
accessories.
|
|
| Owner Solicitation Name: | Skagway Pullen Creek RV Park Electrical Upgrades
|
| Owner Name: | Skagway, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical upgrades to the Park.
|
|
| Owner Solicitation Name: | Forest Service Collocated Administrative Facilities Design/Build Project
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Alaska Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design-Build. Design and construction of a 4,400
SF single-story warehouse; a 11,700 SF single-
story dry storage building; and related site
work, utilities, parking areas, and access roads.
Design of a 17,400 SF two-story office building.
Construction of the office building, related site
work and parking areas. Site Preparation,
Earthwork, Crushed Aggregate Surfacing,
Waterline, Sanitary Sewer, Primary and Secondary
Exterior Electrical, Concrete, Metal Fabrication,
Rough Carpentry, Finish Carpentry, Thermal and
Moisture Protection, Roofing, Siding, Doors,
Windows, Painting, Flooring, Cabinets, Plumbing,
Fire Sprinkler System, Prefabricated Metal
Buildings, Heating, Ventilation, and Interior
Electrical.
|
|
| Owner Solicitation Name: | Construction of New Garages - Homer
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct ten new 600 SF garages. Demolition of
existing carports, including storage sheds and
lighting. Relocation of existing fuel oil tanks,
light poles and mailboxes are required.
Demolition and reconstruction of existing
concrete sidewalks. Construction of new garages,
including excavation, foundations, concrete slab
on grade, wood framing, metal roofing, wood
shingle siding, doors, windows and installation
of gypsum wall board, unit heaters and new power
and lighting. Existing driveways will need
widening and paving. Demolition of existing
ceiling of the lower floor and installation of
resilient channels and gypsum board ceilings is
required.
|
|
| Owner Solicitation Name: | Hakwak Highway Project Highway Construction Km 1716.6 To Km 1723.6 2004-2005
|
| Owner Name: | Yukon, Dept. of Infrastructure, Dept. of Highways & Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Highay construction.
|
|
| Owner Solicitation Name: | Birchwood E.S. Miscellaneous System Upgrade
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing the necessary labor, and materials for
construction, installation and coordination,
moving and packing of school district property
required to accomplish the mechanical, electrical
and structural upgrades: new ventilation
equipment, new lighting, new suspended ceilings,
supporting structural modifications, supporting
architectural modifications, standby electrical
generator, and security system.
|
|
| Owner Solicitation Name: | Nelson Lagoon Freight Transportation Services
|
| Owner Name: | Alaska Energy Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Freight Transportation Services for the
Bulk Fuel Project
|
|
| Owner Solicitation Name: | Russian Jack Elementary School Fire Alarm Strobe Upgrades
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform upgrades to the fire alarm strobes.
|
|
| Owner Solicitation Name: | Wasilla Public Works Remodel
|
| Owner Name: | Wasilla Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and remodel work. Hazardous materials
removal, demolition and new construction
consisting of remodeled office spaces, new
finishes, new work stations, and associated
mechanical and electrical work.
|
|
| Owner Solicitation Name: | Web-Based Laboratory Information Management System
|
| Owner Name: | Alaska Dept. of Health and Social Services, Grants & Contracts Section
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase and support of or technical assistance
in planning, developing, implementing and
supporting a web-based Public Health Laboratory
Information Management System to provide a
flexible, comprehensive, integrated database
system that addresses the workflow and
communication needs of the public health
laboratory.
|
|
| Owner Solicitation Name: | Construction Services Contracts - Construction Management and related Expertise on an As-Needed Basis
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction Management and related Expertise on
an As-Needed Basis.
|
|
| Owner Solicitation Name: | Furnishing Miscellaneous Steel Products
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing Miscellaneous Steel Products.
|
|
| Owner Solicitation Name: | Sub-Regional Clinic Conceptual Planning
|
| Owner Name: | Chignik Bay Tribal Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish conceptual planning services for a sub-
regional health clinic. Services will include
development of a business plan for both
construction (including a cost estimate) and
operation of a clinic; and creation of a
conceptual architectural design for the clinic.
|
|
| Owner Solicitation Name: | Hazardous Waste Disposal Services
|
| Owner Name: | Kodiak Island Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Services of a qualified hazardous waste disposal
firm to provide yearly household hazardous waste
disposal services.
|
|
| Owner Solicitation Name: | Purchase and Delivery of New Light Fixtures for the City Augustus Brown Swimming Pool
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase and delivery of new light fixtures.
|
|
| Owner Solicitation Name: | Yakutat Airport Runway & Apron Resurfacing & Taxiway Construction - Environmental Inspector
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional environmental inspector services to
assist the DOT&PF Project Engineer. The Project
Engineer is the construction contract
administrator in Yakutat. The Environmental
Inspector is needed to assure that construction
complies with environmental permits and
regulations.
|
|
| Owner Solicitation Name: | Wireless Communication Access System (WCAS) and a Business Center Concession Agreement
|
| Owner Name: | Anchorage Airport Leasing and Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Wireless Communication Access System (WCAS) and a
Business Center Concession Agreement.
|
|
| Owner Solicitation Name: | New Anchorage Civic and Convention Center
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New Civic and Convention Center construction.
|
|
| Owner Solicitation Name: | Janitorial Services for the National Guard Armory
|
| Owner Name: | Alaska Army National Guard, Dept. of Military and Veterans Affairs
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide janitorial services.
|
|
| Owner Solicitation Name: | DCAA Remodel Anchorage Federal Building
|
| Owner Name: | Bureau of Land Management (BLM) Alaska State Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remodeling an existing office on the second
floor. Demolotion of walls, rebuild of walls,
minor plumbing and soundproofing of private
offices. The existing carpet is to remain and
border or patch is allowed. Addition of one door.
Approximate square footage is 2,220 SF.
|
|
| Owner Solicitation Name: | Chugach Engineering and Road Maintenance
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Alaska Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Road maintnenace work, Construction &
reconstruction of various roads. No drilling and
shooting will be anticipated, side slopes will
not consistently exceed 45 % and not more than 20
% of excavated material shall be designated for
end haul. Traveled way restoration (bituminous
and aggregate and native surfaces), roadside
vegetation management, drainage restoration
replacement and installation, cut and fill slope
stabilization and road sign installation.
Excavating and removal of corrugated metal pipes
(various sizes), ripping, re-contouring,
placement of mineral/woody material, installation
of surface drainage and access blocking features.
Signing(traffic control), Safety, Construction
Staking, Clearing, Earthwork, Drainage (surface,
sub-surface, corrugated metal pipe), Aggregate
Placement (base and surfacing, riprap, pit run),
Providing Water, Erosion Control Measures, Dust
Abatement - Placement of Bituminous Concrete
Pavement (Not to exceed 500 T). Disposal of
Materials, Drainage Installation and Removal
Blading - Slide & Slough Removal - Ditch
Cleaning - Culvert Inlet Cleaning - Logging Out
and Road Side Brushing (with/without chipping
requirements).
|
|
| Owner Solicitation Name: | PT. Lay Tank Farm Secondary Containment Replacement Project.
|
| Owner Name: | North Slope Borough CIPM Dept.
|
| Enginner Name: | LCMF, LLC
|
| Plankeeper Name |
|
| Scope: | Tank secondary containment replacement.
|
|
| Owner Solicitation Name: | College Gate and Save Fire Alarm Replacement
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of Fire Alarm Systems.
|
|
| Owner Solicitation Name: | Girdwood Elementary Fire Protection System
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction, installation and coordination,
moving and packing of school district property
required to accomplish the mechanical and
electrical upgrades.
|
|
| Owner Solicitation Name: | Palmer Municipal Ice Arena Building Project
|
| Owner Name: | Palmer City Manager
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and installation of an approximately
35,200 SF pre-engineered metal building, related
site, utilities, concrete, electrical and
mechanical work.
|
|
| Owner Solicitation Name: | Workstations
|
| Owner Name: | Alaska Court System
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase workstations.
|
|
| Owner Solicitation Name: | Boardwalk Lumber Sealed Bid, City of Nunapitchuk
|
| Owner Name: | Alaska Village Safe Water
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Boardwalk lumber - 70,000 board feet of pressure
treated boardwalk material.
|
|
| Owner Solicitation Name: | City of Fairbanks Fire Station Construction Services
|
| Owner Name: | Fairbanks, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fire Station Construction Services.
|
|
| Owner Solicitation Name: | Fairbanks Regional Office Building - Exterior Painting
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mobilization, demobilization, transportation,
subsistence, labor, materials, tools, equipment
and supervision necessary to paint the exterior
building.
|
|
| Owner Solicitation Name: | Purchase of two IBM 2074-003 Console Support Controllers
|
| Owner Name: | Alaska Dept. of Administration, General Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of two IBM 2074-003 Console Support
Controllers.
|
|
| Owner Solicitation Name: | Furnishing Electrical Conductor, Cable-In-Duct Conduit , and Cable
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing electrical conductor, cable-in-duct
conduit, and cable.
|
|
| Owner Solicitation Name: | Heating System Repair/Replacement
|
| Owner Name: | Interior Weatherization, Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair and/or replacement of heating systems.
|
|
| Owner Solicitation Name: | Excavator and Dump Truck Quotations
|
| Owner Name: | Chuathbaluk, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of one 1995 or newer hydraulic excavator
and one 1990 or newer 10-12 Yard Dump Truck.
|
|
| Owner Solicitation Name: | Sitka-Rocky Gutierrez Airport Perimeter Fence
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installing approximately 2,482` of eight` high
security fence, including two sections that will
be below mean high water in a sheltered, but
tidally influenced lagoon. Construct two each
heavy-duty steel in water security barriers that
will be exposed to the open ocean. Install one
24` wide gate.
|
|
| Owner Solicitation Name: | Central Peninsula Landfill Expansion - Phase II
|
| Owner Name: | Kenai Peninsula Borough, Purch. and Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Development of a lined landfill cell, leachate
collection, recirculation, and gas system;
storage facilities, and loading station; access
road development; mechanical building with pumps,
blowers, and backup generator; and stormwater
runon/runoff control system including a detention
basin.
|
|
| Owner Solicitation Name: | New Quinhagak Airport Electrical Improvements
|
| Owner Name: | Native Village of Kwinhagak
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mobilization and demobilization; completion of
all works related to the supply and installation
of the Airport runway and taxiway lighting,
beacon and tower; electrical work for structures;
lighted wind cones; installation of FAA-supplied
PAPI and REIL systems; electrical service line
extension; and lighting and related electrical
work for a runway extension.
|
|
| Owner Solicitation Name: | Electrical Supplies
|
| Owner Name: | Sacramento County Dept. of General Services, Public Works Agency
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical Supplies. See attached file.
|
|
| Owner Solicitation Name: | New Quinhagak Airport Production of Crushed Aggregate Surface Course
|
| Owner Name: | Native Village of Kwinhagak
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mobilization and demobilization; all works
related to the production to stockpile, of up to
35,450 Mg of crushed aggregate surface course.
The NVK's equipment and labor workforce will be
available, at no cost to the contractor, to
stockpile "Pit Run" gravel for the purpose of
production of crushed aggregate surface course.
|
|
| Owner Solicitation Name: | Fence Installation, Old Federal Building, Anchorage
|
| Owner Name: | Bureau of Land Management (BLM) Alaska State Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish and install fencing around the
parkingarea. Three operable vehicle gates and
three main gates are to be included with
appropriate hardware, conduit, power and access
controls.
|
|
| Owner Solicitation Name: | Akiak Replacement School
|
| Owner Name: | Yupiit School District
|
| Enginner Name: | Koonce Pfeffer Bettis, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of new K-12 school of approximately
29,000 SF.
|
|
| Owner Solicitation Name: | Akiachak Replacement School
|
| Owner Name: | Yupiit School District
|
| Enginner Name: | Koonce Pfeffer Bettis, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of new K-12 school of approximately
42,000 SF.
|
|
| Owner Solicitation Name: | Muldoon Road Landscaping & Pedestrian Improvements, Phase II
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Constructing an asphalt multi-use pathway, new
pedestrian sidewalks and landscaping amenities.
|
|
| Owner Solicitation Name: | Request for Statement of Qualifications for Engineering Consultant Services
|
| Owner Name: | Alaska Village Safe Water
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing Engineering Services for the Ninilchik
water and sewer feasibility study update. Work
consists of assessing water and sanitation
possibilities, analyzing possible locations for
sewage treatment and discharge, and estimating
capital and O&M costs.
|
|
| Owner Solicitation Name: | Trail Construction/Reconstruction
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Alaska Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Trail survey and staking, tread construction,
bridge construction, installation of drainage
structures, vegetation management, installation
of barriers and retaining walls.
|
|
| Owner Solicitation Name: | Supply Riprap from a Commercial Source
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply Riprap from a Commercial Source.
|
|
| Owner Solicitation Name: | Supply Riprap
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply RipRap From A Commercial Source.
|
|
| Owner Solicitation Name: | Aurora Harbor Improvements
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Reconstructing three approaches, gangways and
landing floats, replacing all uplands and
headwalk electric system components (main panels,
transformers, wiring, and installing new
pedestals), and, installing a vacuum pump
sewerage system.
|
|
| Owner Solicitation Name: | Pioneer Park Electronic Sign Bids
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide a new electronic marquee with illuminated
programmable message boards.
|
|
| Owner Solicitation Name: | Remove and Replacement of Domestic Water Heaters
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove and replace the domestic water heaters
from pools. This project will improve the
facilities to provide sufficient hot showers for
the increasing number of swimmers. The Contractor
will remove and properly dispose of the existing
water heaters, and provide all labor and
materials to install six owner-provided Triangle
Tube, model Smart 80, indirect fired water
heaters.
|
|
| Owner Solicitation Name: | Flag Quarters Construction Services for Micellaneous Projects, Juneau
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide construction services for miscellaneous
projects at the flag quarters. Demolition,
removal, and replacement of existing exterior
wood deck and railings. Demolition, removal, and
replacement of existing carpeting, (approximately
2100 SF) on first and second floors. Prep and
paint exterior, including wood siding, doors,
soffits, and trim. Prep and paint interior walls
and ceilings.
|
|
| Owner Solicitation Name: | Naukati Road Resurfacing
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Tongass National Forest, Federal Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Reconditioning of roadbed, replacement of 4
culverts and placement of crushed aggregate.
|
|
| Owner Solicitation Name: | Fairbanks Regional Office Building - HVAC Air Duct Cleaning
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all mobilization, demobilization,
transportation, subsistence, labor, materials,
tools, equipment and supervision to thoroughly
clean all HVAC systems so specified and to verify
the cleanliness through visual inspection and/or
testing.
|
|
| Owner Solicitation Name: | Roof Repair of Bldgs 9, 16, and 45 at Kulis Air National Guard Base, Anchorage
|
| Owner Name: | Alaska Air National Guard, 176th WING/LGC, Kulis Ang Base
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof repair, replacement. New cold roof
installation.
|
|
| Owner Solicitation Name: | Bethel Main Lift Station Improvements
|
| Owner Name: | Bethel, City of
|
| Enginner Name: | CH2M Hill - Alaska
|
| Plankeeper Name |
|
| Scope: | New main lift (pump) station: grading and site
work required to complete the owner furnished
site pad, a new steel frame base level floor
support welded to existing owner furnished pipe
piles, a new below grade wetwell, manufactured
building, insulated arctic piping, a new grinder
pump system. The coordination and installation of
OWNER-furnished pumps and an owner-furnished
emergency generator.
|
|
| Owner Solicitation Name: | K-Beach Station #4 Water and Power
|
| Owner Name: | Kenai Peninsula Borough, Purch. and Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing all labor, materials and equipment for
the 1,000 GPM Emergency Fire Water System,
generator, water pipe and controls.
|
|
| Owner Solicitation Name: | Glennallen Elementary School Renovation
|
| Owner Name: | Copper River School District
|
| Enginner Name: | USKH Inc.
|
| Plankeeper Name |
|
| Scope: | Renovations to mechanical and structural systems.
|
|
| Owner Solicitation Name: | Kachemak Emergency Services Fire Station and Community Hall
|
| Owner Name: | Kenai Peninsula Borough, Purch. and Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing all labor, materials and equipment to
construct a single-story, pre-engineered building
and associated site improvements to house a
volunteer Fire Department and Community Hall. The
building is approximately 6,900 SF (including
mezzanine) and includes 5 vehicle bays serviced
by three sectional overhead doors, an office,
storage and decontamination areas, mechanical
rooms and a community hall, with kitchen.
|
|
| Owner Solicitation Name: | Provide Janitorial Services for the Public Health Center Located in Ketchikan
|
| Owner Name: | Dept. of Health & Social Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide janitorial services.
|
|
| Owner Solicitation Name: | Kenai Tanker Base Access Road
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of an access road at a base,
construction of a security fence and gate, the
installation of various utilities as additive
alternates.
|
|
| Owner Solicitation Name: | Request for Statement of Interest and Qualifications for Engineering and Other Professional Services For Soldotna Municipal Airport
|
| Owner Name: | Soldotna, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional services of a qualified airport
consulting firm or firms for a five-year contract
to assist the City on various areas. Civil,
electrical, and mechanical engineering on several
anticipated construction projects. Airspace
consultation. Preparation of Environment
documents as required. Helping with property and
equipment acquisitions. Keeping the City’s DBE
program current. Other consultation as requested
|
|
| Owner Solicitation Name: | ANC Taxiway K Reconstruction, Taxiway J to Taxiway A
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | provide professional design services for the
Taxiway K reconstruction project that extends a
taxiway. Survey and preliminary design to produce
an Engineer Design Report, amend or supplement
environmental documents and permits, design two
separate bid ready sets of construction plans
breaking the total work into two construction
projects, assistance during bidding, and
assistance during construction.
|
|
| Owner Solicitation Name: | Provision of Satellite Paging and Telephone Equipment and Services to the State
|
| Owner Name: | Telecommunication Headquarters, Enterprise Technology Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | provision of satellite telephone and paging
equipment and services. The State currently has
approximately 410 satellite phones that are
active. The majority use the Iridium system
(about 310), the remainder (about 100) use the
Globalstar system. The provider must support all
existing satellite
phones that are in use by the State, including
both systems. The
|
|
| Owner Solicitation Name: | Woodriver Elementary School Site Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site repairs, upgrades and traffic improvements
to driveways, parking lots, lights, headbolt
heaters and electrical and telephone service.
|
|
| Owner Solicitation Name: | Palmer-Wasilla Extension Water Main Project
|
| Owner Name: | Wasilla Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Open cut approximately 5,100 LF of 8", 12", and
16"
diameter water main as well as fire hydrant
assemblies and other appurtenances.
|
|
| Owner Solicitation Name: | Storage Area Fence
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Storage area fence.
|
|
| Owner Solicitation Name: | Construction of Watch Tower Repair
|
| Owner Name: | Jantz Associates Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cut rotted portion of 4 corner logs, install a
new foundation slab and steel anchor pedestals.
Install new T-111 plywood siding at the lower 10'-
0" of the tower. Install new working platform at
the approxi- mate 22' level. Stain the entire
structure.
|
|
| Owner Solicitation Name: | Nordale Elementary School Replacement
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | School Replacement.
|
|
| Owner Solicitation Name: | Purchase Traffic Marking Paint, Solvent and Reflective Beads - Northern Region, Fairbanks
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase Traffic Marking Paint, Solvent and
Reflective Beads.
|
|
| Owner Solicitation Name: | Contract Administration and Inspection Services for Evergreen Avenue Reconstruction, Phase II
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consultants to provide contract administration
and inspection services for a road Reconstruction
project.
|
|
| Owner Solicitation Name: | Hazardous Building Materials Abatement, Demolition, Haul-off & Disposal on 15 Residential Properties
|
| Owner Name: | Cook Inlet Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hazardous Building Materials Abatement,
Demolition, Haul-off & Disposal
|
|
| Owner Solicitation Name: | Professional Engineering Services for 2 Street and Drainage Proejcts
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Engineering Services for 2 Street
and Drainage Proejcts.
|
|
| Owner Solicitation Name: | Sitka Access Eis and Northern Panhandle Transportation Study
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | (1) Initiate a Access EIS and (2) conduct a
Transportation Study. Initiation of the Access
EIS requires professional services to develop the
(a) Purpose and Need for improving access; (b)
conducting inter-agency and public scoping; (c)
identifying the full range of alternatives; (d)
determining which alternatives meet NEPA
requirements for further consideration; and (e)
developing the scope of work for EIS completion,
professional services to identify, evaluate and
compare the feasibility, benefits, costs and
impacts of the transportation alternatives
available to transport people, vehicles, goods
and freight to develop a Access and Community
Access Plan. Recommend projects supported by
purpose and need and reconnaissance information,
including road corridor mapping, ferry terminal
locations and vessel requirements. Work will be
performed by a combination of the selected
contract team, subcontractors added by amendment,
and the Department.
|
|
| Owner Solicitation Name: | Minto School Restroom Renovation
|
| Owner Name: | Yukon-koyukuk Regional Educational Attendance Area (reaa)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design and construction of two ADA accessible
rest- rooms and two ADA accessible restroom/
shower/locker rooms and other related
modifications as required to meet ADA standards.
|
|
| Owner Solicitation Name: | Purchase Of Five 4-Wheeled Loaders With Buckets And Forks, And One 2 Stage Self Contained Loader Mount Snow Blower
|
| Owner Name: | North Slope Borough CIPM Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase Of Five 4-Wheeled Loaders With Buckets
And Forks, And One 2 Stage Self Contained Loader
Mount Snow Blower
|
|
| Owner Solicitation Name: | On-Call Architectural & Engineering Services
|
| Owner Name: | Matanuska-Susitna, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide on-call services for small projects of
repair, maintenance, renovation and also for
minor construcion projects.
|
|
| Owner Solicitation Name: | City Of Bethel Water And Sewer Facilities Master Plan Update
|
| Owner Name: | Alaska Village Safe Water
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Updating and revising several sections of the
current water and sewer facilities Master Plan
Update, preliminary design of a proposed water
distribution and pressure sewer collection system
to confirm system layout, pressure zones, water
storage needs, fire flows, and pipe sizes.
|
|
| Owner Solicitation Name: | Solftware Development
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Alaska Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Solftware Development. Developing, installation
and maintenance of a computerized system for
recording log lengths and sawmill downtime.
|
|
| Owner Solicitation Name: | Borough of Juneau Glacier Fire Station Soil Cleanup
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: | CBJ (City of Borough of Jeneau), Engineering Dept.
|
| Plankeeper Name |
|
| Scope: | Soil cleanup.
|
|
| Owner Solicitation Name: | Purchase, Delivery And Personnel Training Of (5) Five Wheeled Tractors With Backfill Blade And Traversing Trenching Attachment
|
| Owner Name: | North Slope Borough CIPM Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase, Delivery And Personnel Training Of (5)
Five Wheeled Tractors With Backfill Blade And
Traversing Trenching Attachment
|
|
| Owner Solicitation Name: | Purchase Sixty-Two (62) Windows Of Various Sizes And One-Thousand (1000) Feet Of White Vinyl Brick-Mold
|
| Owner Name: | Alaska Housing Finance Corporation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | purchase sixty-two (62) windows of various sizes
and one-thousand (1000) feet of white vinyl brick-
mold
|
|
| Owner Solicitation Name: | 2004-0222-4757 Archives Boiler Replacement
|
| Owner Name: | Alaska Dept. of Administration, General Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace existing boiler and disposal of the old
boiler.
|
|
| Owner Solicitation Name: | Single Source Contract For Corporations Database Software
|
| Owner Name: | Alaska Community and Economic Development Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation, customization, and maintenance of
the Secretary of State Knowledge Base (SOSKB).
SOSKB is an integrated imaging and indexing
application that maintains corporate records.
This software package is an off-the-shelf
scalable, fully electronic document imaging,
storage, and retrieval system that has been
successfully deployed in a government setting.
The resulting contract will include a web-based
research and filing application.
|
|
| Owner Solicitation Name: | Improvements to Main Entrance to ISC Base Ketchikan
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove approximately 45,000 SF of existing
concrete and asphalt paving. Remove unsuitable
subsurface material and replace this material
with specified NFS material. Install
approximately 45,000 SF of asphalt pavement.
Install PVC conduit pipes for electrical lines.
Install concrete curb and gutters and other misc.
work.
|
|
| Owner Solicitation Name: | Airport Heights Elementary HVAC Upgrade Phase 1
|
| Owner Name: | Anchorage School District, Facilities/Maintenance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | HVAC Upgrade
|
|
| Owner Solicitation Name: | Naknek School Roof Replacement
|
| Owner Name: | Naknek School
|
| Enginner Name: | Kumin Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Roof replacement.
|
|
| Owner Solicitation Name: | Bartlett H.S. Renewal Temporary Music Room Tenant Improvement
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing the necessary labor, and materials to
convert the technology department area into music
program teaching space and the science storage
room into a technology computer lab.
|
|
| Owner Solicitation Name: | Transmission Line Maintenance for the Swan Lake and Lake Tyee Transmission Lines
|
| Owner Name: | Four Dam Pool Power Agency
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Transmission Line Maintenance
|
|
| Owner Solicitation Name: | Prince of Wales Island Road Maintenance
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Tongass National Forest, Federal Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide for routine and recurring road
maintenance. Surface blading to achieve proper
drainage and compaction.
|
|
| Owner Solicitation Name: | Shakwak Highway Project Highway Construction Km 1749.6 To Km 1759.2 Alaska Highway Yukon 2004-2005
|
| Owner Name: | Yukon, Dept. of Infrastructure, Dept. of Highways & Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Highway construction.
|
|
| Owner Solicitation Name: | Soldotna Middle School Fire System
|
| Owner Name: | Kenai Peninsula Borough
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | of installation of a fire detection and alarm
system in a building containing asbestos
materials, however, no abatement is anticipated.
|
|
| Owner Solicitation Name: | Barnette Elementary School Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school improvements.
|
|
| Owner Solicitation Name: | Purchase and Delivery of Industrial Electrical Control Components
|
| Owner Name: | North Slope Borough CIPM Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase and Delivery of Industrial Electrical
Control Components
|
|
| Owner Solicitation Name: | Equipment Rental - Northway Maintenance Area
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide various pieces of equipment to include
fuels, lubricants, cutting edges and operators on
an as-required basis.
|
|
| Owner Solicitation Name: | Equipment Rental - Tok Maintenance Area
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide various pieces of equipment to include
fuels, lubricants, cutting edges and operators on
an as-required basis.
|
|
| Owner Solicitation Name: | Woodside Manor Foundation Repair Project
|
| Owner Name: | Kodiak Island Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Foundation Repair Project
|
|
| Owner Solicitation Name: | Denali Elementary School Replacement
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | School replacement.
|
|
| Owner Solicitation Name: | Prince of Wales Island Equipment Rental (With Labor for Road Mtnc./Repair)
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Tongass National Forest, Federal Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide services of a backhoe, dump truck,
equipment trailer, and operator(s) on a fully
operational basis to perform miscellaneous road
maintenance and repair work including removal of
road slumps, slides, installation of road closure
devices such as mounding and pit barriers, water-
bars, cleaning ditches and culver inlets/outlets,
minor remedial road and parking area work.
|
|
| Owner Solicitation Name: | Ryan MS Lighting, Ceiling & Flooring Replace
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lighting, Ceiling & Flooring Replace.
|
|
| Owner Solicitation Name: | Petersburg and Wrangell Non-NHS Highway System Refurbishment
|
| Owner Name: | Alaska Dept. of Transportation, Southeast Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Patching the existing asphalt pavement and
overlaying a 0.75 MILE section, grinding and
repaving of approximately 0.61 MILES, new
pavement surface, waterproof membrane and
expansion joint repair on bridge.
|
|
| Owner Solicitation Name: | Execution of the St. Mary's Elicavicuar Elementary School Repairs & Renovations
|
| Owner Name: | St. Mary's Elicavicuar Elementary School
|
| Enginner Name: | URS Corporation
|
| Plankeeper Name |
|
| Scope: | Boiler replacement and gym/cafeteria repair.
|
|
| Owner Solicitation Name: | North Star Fire Station #3 Facility Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fire Station Facility Improvements
|
|
| Owner Solicitation Name: | North Star Fire Station #5 Facility Improvements
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fire Station Facility Improvements
|
|
| Owner Solicitation Name: | Parks Hwy, MP 44 - 52.3, Lucas Rd. to Big Lake Cutoff Environmental Document and Preliminary Engineering
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide preliminary engineering and environmental
services necessary to complete and obtain
approval for an environmental document and
acquire all environmental permits and clearances.
|
|
| Owner Solicitation Name: | Furnishing Concrete Products On An "As Needed" Basis
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing concrete products on an "as needed"
basis.
|
|
| Owner Solicitation Name: | Repair of the Landfill Fence in Nuiqsut Alaska
|
| Owner Name: | North Slope Borough CIPM Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair of the Landfill Fence
|
|
| Owner Solicitation Name: | Skagway Swimming Pool Feasibility Study
|
| Owner Name: | Skagway, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Conduct a feasibility study for the city on the
construction and operation of a municipal
swimming pool at the municipal Recreation Center.
|
|
| Owner Solicitation Name: | Hoonah Road Maintenance
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-10 Tongass National Forest, Federal Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide for the complete maintenance of the
traveled way of the roads described in the
project. Spot scarifying, blading, and rolling
pot holes, washboard areas, and rutted areas.
|
|
| Owner Solicitation Name: | Alaska Drinking Water Loan Fund - City of Juneau, Drinking Water Storage Tanks Upgrades
|
| Owner Name: | Alaska Clean Water Fund, Division of Water, Facility Programs, Department of Environmental Conservation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Drinking water storage tanks upgrades.
|
|
| Owner Solicitation Name: | ANC Residential Sound Insulation - Phase III
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of sound insulation products and
measures, including doors, windows and
insulation. The completion of work is intended to
reduce noise levels within the homes affected by
this project.
|
|
| Owner Solicitation Name: | 2004 Professional Project Management Services
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2004 Professional Project Management Services
|
|
| Owner Solicitation Name: | Provide Hazardous Materials Clean - Up Services on an "As Required" Basis for Municipal Light & Power Utility
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Hazardous Materials Clean - Up Services
on an "As Required" Basis
|
|
| Owner Solicitation Name: | Liquid, Emulsified Asphalt
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Liquid, Emulsified Asphalt.
|
|
| Owner Solicitation Name: | Transformer Removal and Replacement, NOAA Facility, Fox
|
| Owner Name: | US Army Corp of Engineers - Alaska, CEPOA-CT
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of PCB containing
transformers.
|
|
| Owner Solicitation Name: | FY 2004 Substation and Switchyards Equipment Maintenance Contract
|
| Owner Name: | Thomas Bay Power Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | FY 2004 Substation and Switchyards Equipment
Maintenance Contract
|
|
| Owner Solicitation Name: | Highway & Airport Runway Maintenance Sand - Northern Region
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Airport Maintenance Sand
|
|
| Owner Solicitation Name: | Construction Management Services for Construction Of the Multi-Purpose Community Building
|
| Owner Name: | Native Village of Unalakleet
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Procurement of all materials, tools, and supplies
for the successful completion of a 4,060 SF
building, (excluding procurement and installation
of foundation)
|
|
| Owner Solicitation Name: | Northern Region Airport Surveying
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional land surveying for various Airport
Improvement projects
|
|
| Owner Solicitation Name: | Design/Build Services Valdez Animal Shelter Project
|
| Owner Name: | Valdez City Engineer
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | provide design/build services for: A new 4,000 -
5,000 square foot Animal Shelter. The new
building will be located adjacent to the current
Animal Shelter building, and will meet ADA access
requirements and state and local building codes.
The facility will contain a cat room, dog kennel
area, puppy room, lobby, restrooms, break room,
food room, volunteer room, medical room, storage
rooms, a mechanical room, an incinerator room,
bonding room, isolation room, grooming room, a
garage and an office. Site grading, a parking
lot, utility connections and some landscaping
will also be constructed.
|
|
| Owner Solicitation Name: | Campground Maintenance
|
| Owner Name: | BLM National Business Center BC662
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Garbage disposal, toilet facility cleaning,
fireplace cleaning, table cleaning, and record
keeping/reporting.
|
|
| Owner Solicitation Name: | Downtown Street Improvements
|
| Owner Name: | Fairbanks, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Reconstructing approximately 3,000 LF of
Streets. New sidewalk, curb and gutters will be
installed and utility, drainage, and surface
improvements will be constructed. Overhead
electrical and communications cables will be
relocated to underground ducts, adjacent services
reconnected, and existing wooden utility poles
will be removed. A new street light system will
also be constructed.
|
|
| Owner Solicitation Name: | Construction of a New K-12 School in Circle
|
| Owner Name: | Yukon Flats School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work, general construction, and mechanical
and electrical work.
|
|
| Owner Solicitation Name: | Pearl Creek ES Water Tank Replacement
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Water Tank Replacement
|
|
| Owner Solicitation Name: | Treated Lumber and Boardwalk Hardware
|
| Owner Name: | Napaskiak, City of
|
| Enginner Name: | CRW Engineering Group, LLC
|
| Plankeeper Name |
|
| Scope: | Materials, transportation and delivery of Treated
Lumber and Boardwalk Hardware.
|
|
| Owner Solicitation Name: | Ressurrection River Bridge Construction
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | MObilization ad demobilization, temporary
structures, shoo-fly, removal of portions of the
existing structure, unclasified excavation,
excavation for structures, porous backfill
material, class concrete, reinforcing steel,
drive steel pipe piles, 48" diameter, drive steel
pipe piles, 42" diameter, pile splice 48"
diameter, pile splice 42" diameter, special pipe
pile excatavion, damproofing, place bearings,
erect new 118`-3" span, riprap, seeding, topsoil,
geotextile, erosion control, erosion and
pollution control, silt fence, fertilizer.
|
|
| Owner Solicitation Name: | Anchorage Pioneer Home Fire Alarm Replacement
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing of a new code compliant fire alarm
system and removing the two existing systems. The
existing systems must remain operational until
the new system is fully operational.
|
|
| Owner Solicitation Name: | New Truck-Trailer Hostler/Jockey Truck
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New Truck-Trailer Hostler/Jockey Truck
|
|
| Owner Solicitation Name: | ARRC Shop Truck F-650 4X4
|
| Owner Name: | Alaska Railroad Corp., Purchasing & Materials
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | ARRC Shop Truck F-650 4X4
|
|
| Owner Solicitation Name: | Old Glenn Highway: Glenn Highway to Plumley Road
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Reclaim and pave 11 miles of a highway,
waterproof membrane, culverts, striping, signing,
guardrail, seeding and other miscellaneous work.
|
|
| Owner Solicitation Name: | Mountain View Elementary School Re-Roof
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovate 8 restrooms at a School.
|
|
| Owner Solicitation Name: | Fairbanks Parking Structure - Janitorial Contract
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, tools, equipment, materials
and supplies to provide janitorial services, in
accordance with the technical specifications for
approximately 115,000 SF of lobby, stairwell
space and parking areas.
|
|
| Owner Solicitation Name: | Pioneer Park Gold Dome Exterior - Ph 2
|
| Owner Name: | Fairbanks North Star, Borough of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Gold Dome Exterior
|
|
| Owner Solicitation Name: | Romig M.S. Restroom, Fire Alarma nd Security System Renewal
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renewal of 8 Restrooms, replacement of the fire
alarm system and the security system, replacement
of the MDP, and demolition of the generator
|
|
| Owner Solicitation Name: | Abbott Loop Elementary School Drainage Upgrade
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, materials, equipment, tools
and supervision necessary to properly provide all
necessary work to install a French drain system
|
|
| Owner Solicitation Name: | Lemon Creek Watershed Assessment and Sediment Transport Study
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: | Juneau, City and Borough of, Engineering Dept.
|
| Plankeeper Name |
|
| Scope: | Consultants to provide professional services for
a sediment transport study and watershed
assessment.
|
|
| Owner Solicitation Name: | Construction of a New 5,400 SF Health Clinic
|
| Owner Name: | Native Village of Deering
|
| Enginner Name: | DOWL Engineers
|
| Plankeeper Name |
|
| Scope: | Construction of a New 5,400 SF Health Clinic:
gravel pad, pilings, sewer line connection,
water line, and building construction.
|
|
| Owner Solicitation Name: | Eagle River Elementary Bathroom Upgrade
|
| Owner Name: | Anchorage School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovation of six existing bathrooms with
supporting menchanical and electrical
modifications. Demolish six existing bathrooms.
Provide new floor/wall surfaces, plumbing
fixtures with minor mechanical and electrical
modifications
|
|
| Owner Solicitation Name: | Seward Middle School Phase 2 Site Finishing & Building Construction
|
| Owner Name: | Kenai Peninsula Borough, Purch. and Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing all labor, materials and equipment
for: site finishing and building construction.
|
|
| Owner Solicitation Name: | Self Propelled ArticulateSelf Propelled Articulated Wheel Loader
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Self propelled articulated wheel loader.
|
|
| Owner Solicitation Name: | Interior/Exterior Painting of CG Owned Housing Units
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer (fp), USCG Integrated Support Command Ketchikan
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | There are 13 units that are to be painted, 6
three bedroom each, 6 two bedroom each, and 1 two
bedroom, with an option for four more 3 bedrooms.
|
|
| Owner Solicitation Name: | Twentymile River Bridge No. 634, Surveying & Mapping Services
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Digital elevation information for two-dimensional
hydraulic modeling of tidal and flood flows
|
|
| Owner Solicitation Name: | Mayville Municipal Airport
|
| Owner Name: | Mayville, City Auditor
|
| Enginner Name: | Moore Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Runway 17/35 (3300' x 56') – rehabilitation 1 LS
mobilization; 310 SY topsoil; 18,620 SF pavement
marking; 2,0 acre seeding; 1 LS testing allowance
and other miscellaneous items. Station 31+60 to
43+00 2,800 LF crack repair (route & seal); 600
ton 1,5" hot bituminous pavement wear course
nddot cl 29 and other miscellaneous items.
station 10+00 to 31+60 14,200 SY bituminous
pavement reclamation; 3,130 ton 4" hot bituminous
pavement wear course nddot cl 29; 3,000 ton
aggregate base course - nddot cl 5; 510 gal
bituminous tack coat and other miscellaneous
items.
|
|
| Owner Solicitation Name: | Fabrication and Delivery of Insulated Pipe & Fittings
|
| Owner Name: | Native Village of Kwinhagak
|
| Enginner Name: | CRW Engineering Group, LLC
|
| Plankeeper Name |
|
| Scope: | Fabrication and Delivery of Insulated Pipe &
Fittings
|
|
| Owner Solicitation Name: | Gravity and Force Main Sewer Construction Materials
|
| Owner Name: | Aniak, City of
|
| Enginner Name: | Kuskokwim Architects and Engineers, Inc. (KAE)
|
| Plankeeper Name |
|
| Scope: | HDPE pipe and fittings, insulated and bare,
ductile iron pipe and fittings, arctic boots, and
miscellaneous valves.
|
|
| Owner Solicitation Name: | Alakanuk Federal Scout Readiness Center
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a 1,500 SF Armory, consisting of
type V-B construction, site work, mechanical, and
electrical.
|
|
| Owner Solicitation Name: | Kwigillingok Federal Scout Readiness Center
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a 1,500 SF Armory, consisting of
type V-B construction, site work, mechanical, and
electrical.
|
|
| Owner Solicitation Name: | Quinhagak Federal Scout Readiness Center
|
| Owner Name: | Alaska Dept. of Transportation, Central Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a 1,500 SF Armory, consisting of
type V-B construction, site work, mechanical, and
electrical.
|
|
| Owner Solicitation Name: | CBJ Airport Runway Painting
|
| Owner Name: | Juneau, City and Borough of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Airport Runway Painting
|
|
| Owner Solicitation Name: | Materials to Construct Three Sewer Lift Station Buildings
|
| Owner Name: | Aniak, City of
|
| Enginner Name: | Kuskokwim Architects and Engineers, Inc. (KAE)
|
| Plankeeper Name |
|
| Scope: | Materials to Construct Three Sewer Lift Station
Buildings and approximately 112,000 SF of Rigid
Foam Insulation.
|
|
| Owner Solicitation Name: | UAA KPC Power & Lighting Upgrades
|
| Owner Name: | University of Alaska, Anchorage, Facilities Planning & Construction
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Power & Lighting Upgrades
|
|
| Owner Solicitation Name: | Equipment Rental - Delta/Trims Maintenance Area
|
| Owner Name: | Alaska Dept. of Transportation, Northern Region Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide various pieces of equipment to include
fuels, lubricants, cutting edges and operators,
on an an-required basis for work.
|
|
| Owner Solicitation Name: | Courthouse Re-Roof For Ketchikan Alaska Court System
|
| Owner Name: | Alaska Court System
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Courthouse Re-Roof
|
|
| Owner Solicitation Name: | Provide Traffic Sign Materials
|
| Owner Name: | Anchorage, Municipality of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Traffic Sign Materials
|
|