| Owner Solicitation Name: | Construction of Gravity Sewer and Lift Station
|
| Owner Name: | Fyffe, Town of
|
| Enginner Name: | Ladd Environmental Consultants, Inc.
|
| Plankeeper Name |
|
| Scope: | Open cut construction of 6,681 LF of 4", 6" and
8" PVC Gravity Sewer; 36 Manholes; Lift Station;
3,250 LF 4" PVC Force Main; 83 Service Wyes; and
3 Individual Grinder Stations.
|
|
| Owner Solicitation Name: | Metal Traffic Signals
|
| Owner Name: | Huntsville Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Metal traffic signals.
|
|
| Owner Solicitation Name: | 29th Street (M.L. King Jr. Blvd. To Fosters Ferry Road) & Herman Avenue (29th Street to Fosters Ferry Road) Roadway Improvements
|
| Owner Name: | Tuscaloosa Purchasing Dept.
|
| Enginner Name: | McGiffert and Associates, LLC
|
| Plankeeper Name |
|
| Scope: | 1,800 c.y.i.p Unclassified Excavation, 15,600
c.y.i.p Borrow Excavation, 8,700 SY Crushed
Aggregate Base, Type ``B'' (ALDOT 825) (6''
Compacted Thickness), 3,200 SY Improved
Bituminous Concrete Binder Layer (5-1/2''
Compacted Thickness) (ALDOT 429B), 8,700 Improved
Bituminous Concrete Binder Layer (3'' Compacted
Thickness) (ALDOT 429B), 35,700 SY Improved
Bituminous Concrete Wearing Surface (1''
Compacted Thickness)(ALDOT 429A), 3,000 tons
Improved Bituminous Concrete Binder Layer,
Leveling (ALDOT 429A), 7,600 SY Planing of
Existing Pavement, 14,200 LF 24'' Combination
Curb and Gutter, 2,450 LF 30'' Valley Gutter,
3,850 SY Concrete Sidewalk (6' wide, 6''
Thickness), 1,976 LF 15'' RCP Storm Sewer Pipe,
282 LF 18'' RCP Storm Sewer Pipe, 632 LF 24'' RCP
Storm Sewer Pipe, 664 LF 30'' RCP Storm Sewer
Pipe, 448 LF 22'' x 13.5'' RCP Storm Sewer Pipe -
124 LF 28.5'' x 18'' RCP Storm Sewer Pipe, 972 LF
43'' x 26.6'' RCP Storm Sewer Pipe, 16 LF 10' x
6' Concrete Box Culvert 32 each Type ``S'' Inlet,
17 each Yard Inlet, approximately 4.7 miles of
Temporary Traffic Striping, approximately 5.0
miles of Permanent Traffic Striping, 81 each
mailboxes, 42 each utility valve box adjustments,
10 each fire hydrant assembly relocations, 26
each manhole cover adjustments, 50 each water
meter box resets, 1,910 LF of chain link fence.
|
|
| Owner Solicitation Name: | Reroofing of Administration and Health Building for Central Alabama Community College
|
| Owner Name: | Central Alabama Community College
|
| Enginner Name: | PH & J Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | 48,000 SF of metal re roofing work, with all
trades incorporated in the general contract.
|
|
| Owner Solicitation Name: | Intersection Valves and Sleeves for a Romac Quickvalve System
|
| Owner Name: | Alexander City
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Intersection valves and sleeves.
|
|
| Owner Solicitation Name: | Central Avenue Drainage Improvements
|
| Owner Name: | Decatur Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Drainage improvements.
|
|
| Owner Solicitation Name: | Additions and Alterations to Fire Station (Design/Build)
|
| Owner Name: | Wilsonville, Town of
|
| Enginner Name: | Lathan Associates Architects, P.C.
|
| Plankeeper Name |
|
| Scope: | Design/build additions and alterations to fire
station.
|
|
| Owner Solicitation Name: | Zero Turn Commercial Mid-Mount Finishing Mowers
|
| Owner Name: | Mobile, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Zero Turn Commercial Mid-Mount Finishing Mowers.
|
|
| Owner Solicitation Name: | 310C John Deere Backhoe
|
| Owner Name: | Satsuma, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 310C John Deere Backhoe.
|
|
| Owner Solicitation Name: | Electronics Drive
|
| Owner Name: | Anniston, City of
|
| Enginner Name: | Sain Associates Inc.
|
| Plankeeper Name |
|
| Scope: | Reconstruction of Drive, approximately 0.5 miles
in length, to include grading, drainage, base
and paving, concrete curb and gutter, and
8" waterline relocation.
|
|
| Owner Solicitation Name: | Service Trucks
|
| Owner Name: | Birmingham-Jefferson County Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Three (3) Service Trucks with Service Body
retrofits.
|
|
| Owner Solicitation Name: | Renovation of the Boys and Girls Club in Semmes
|
| Owner Name: | Mobile County Commission
|
| Enginner Name: | Slater & Slater Architects
|
| Plankeeper Name |
|
| Scope: | 1. Safety and security items a) 18 Fire
Extinguishers, size 2A-10BC b) 12 Exit Lights, 98
2-lamp pendant mtd. fluorescent fixtures with 6
Emergency Light Packs; 20 2 lamp fluorescent
fixtures surface mtd., with 1 Emergency Light
Pack; 10 incandescent fixtures in Rest Rooms, and
20 new light switches. c) 1 single exterior metal
door, frame & hdwe Mk B; 3 pairs exterior metal
doors, frames and hardware, Mks. ``C'', ``D'' &
``N''; 2 single exterior metal doors, frames and
hardware Mk. ``E''; 1 pair interior ``B'' labeled
interior metal doors, frames and hardware, Mk.
``F''; 9 single interior ``20 minute'' metal
doors, frames and hardware, Mks. ``G'', ``H'', &
``J''; 2 pairs interior metal doors, frames and
hardware, Mk ``T''; and repair and refinish, and
provide new hardware for approx. 10 exterior
entrance door leaves and frames Mk. ``K'', ``L'',
``M'' & ``N'', and 13 interior leaves and frames
Mk. ``O'', ``P'', ``Q'', ``R'', & ``S''. d)
Provide a new divider partition in the main
Corridor at Doors ``F''. e) Remove approximately
24 windows above door head level in Corridor
partitions. Verify the count at the site. Close
the openings created, by installing steel stud
partitions in the openings, with 5/8'' X-rated
gypsum board on each side, and with the joint
between the concrete block and gypsum board
sealed with fire retardant caulking. f) Removal
and proper disposition of light fixtures and
doors to be replaced in b) and c) above, and i) &
j) below. g) Remove and properly dispose of 2 gas
fired unit heaters in Corridor, and 2 in
Gymnasium. h) Encapsulate 9''x9'' floor tile in
``Band Room'' Building, with new 12''x12'' vinyl
tile. Note that the old flooring is probably
vinyl asbestos tile, and that any precautions
required by cognizant agencies will be a part of
this contract. i) 10 ea. 2'x4' 4 lamp fluorescent
lay-in fixtures with 3 Emergency Light Packs in
Corridor; j) Provide approx. 8 1'x1' lay-in
incandescent light fixtures to match existing
fixtures over bleacher seats in Gymnasium. k)
Provide three new high bay ceiling flood light
fixtures to match existing fixtures in Gymnasium.
Wiring is in place. These are to replace fixtures
that are now missing. Provide safety chains to
securely fasten new high bay floodlights in the
Gymnasium to the structural steel trusses upon
which they are mounted. l) Repair roof of
Gymnasium, including installation of new roof
jacks on pipe vents, heater stacks, etc. & repair
of roof and flashings in accordance with the
plans and specifications. m) Approx. 5 clearstory
windows around Gymnasium have been covered on the
inside with plywood. Provide framing and vinyl
siding to cover the outside of these windows in a
manner that will prevent water from entering the
building. Note that the actual vinyl siding will
be supplied by the Owner at no cost to the
Contractor. 2. Miscellaneous Items a) Remove all
toilet partitions and toilet vestibule partitions
and provide approximately 9 new toilet
partitions, 2 new toilet vestibule partitions, &
1 partition at water heater. b) Remove all
existing steel projected windows in approx. 7
rooms and replace with horizontal sliding
aluminum windows, and filler walls consisting of
steel stud framing, gypsum wallboard interior
surface, structural sheathing board, and vinyl
siding exterior finish to match those existing in
Classrooms 212 & 214. Note that the actual vinyl
siding will be supplied by the Owner at no cost
to the Contractor. Provide removable structural
plywood panel to be installed when hurricane
winds are expected. Store same on site where
directed. c) Remove and dispose of approx. 150
damaged 2'x4' ceiling tile, and provide new tile
to substantially match remaining adjacent units.
Repair ceiling grid where damaged. 3.
Utility/energy efficiency items a) Owner will
provide new electric water heater where shown on
plans. Install same under this contract including
electrical and plumbing services. b) Remove and
dispose of 2 existing exhaust fans over new exit
doors Mk. ``C''.c) Owner will provide new ceiling
mounted exhaust fans in boys' & girls' Restrooms.
Provide electric service to these units & thru
wall ductwork & shutters, under this contract.d)
Disconnect all plumbing fixtures from water
supply, both hot and cold, and cap off supply
piping. e) Provide new water meter and water
service, both hot & cold, to plumbing fixtures f)
Provide two new heat pump HVAC systems in the
Gymnasium, complete as noted.
|
|
| Owner Solicitation Name: | Cab & Chassis
|
| Owner Name: | Huntsville Utilities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Part A1 - (4) New/Unused 35,000 GVWR Cab &
Chassis. Part A2 - (3) New/Unused 35,000 GVWR Cab
& Chassis. Part B - (1) New/Unused 50,000 GVWR
Cab & Chassis. Part C - (1) New/Unused 60,000
GVWR Cab & Chassis.
|
|
| Owner Solicitation Name: | Langan Park Perimeter Fitness Trails - Phase III Extension
|
| Owner Name: | Mobile, City of
|
| Enginner Name: | Plauche Johnson Landscape Architects
|
| Plankeeper Name |
|
| Scope: | Fitness trails extension.
|
|
| Owner Solicitation Name: | Waterline Relocation on Electronics Drive
|
| Owner Name: | Anniston, City of
|
| Enginner Name: | Sain Associates Inc.
|
| Plankeeper Name |
|
| Scope: | Relocation of approximately 2,621 LF 8" Class
350 DIP water line, Bore under railroad in 1
location approximately 50 LF with steel casing.
|
|
| Owner Solicitation Name: | Power Supply Subassembly
|
| Owner Name: | US Army Aviation and Missile Command DAAH01, ATTN: AMSAM-AC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Power supply subassembly, PRON D14A4009, NSN:
6130-01-478-7722, P/N: A31U29280-127. 33 each.
|
|
| Owner Solicitation Name: | (1) New/Unused Tractor Trencher
|
| Owner Name: | Huntsville Utilities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | (1) New/Unused Tractor Trencher which meets or
exceeds specifications of a Vermeer Model LM-42
trencher.
|
|
| Owner Solicitation Name: | Fiber Optic Cable Installation
|
| Owner Name: | University of North Alabama, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fiber optic cable installation of 3 different
cables totaling 2,500 - 3,000 LF. Bore in 2
possible locations 300 LF 4" conduit, and 200 LF
of 4" conduit.
|
|
| Owner Solicitation Name: | Poarch Creek Sewage Lagoon
|
| Owner Name: | Poarch Band of Creek Indians - Indian Housing, Tribal Offices
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Constructing a 100,000 gallon per day aerated
lagoon system, with lined aeration ponds,
sedimentation basin, sand filters, reject pond
and effluent storage pond.
|
|
| Owner Solicitation Name: | Lamps & Ballasts
|
| Owner Name: | Madison County Board of Education, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lamps & ballasts.
|
|
| Owner Solicitation Name: | Electrical Supplies
|
| Owner Name: | Madison County Board of Education, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical supplies.
|
|
| Owner Solicitation Name: | Lighting Fixtures
|
| Owner Name: | Madison County Board of Education, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lighting fixtures.
|
|
| Owner Solicitation Name: | Guardrail Installation On Lee Street At Rogersville
|
| Owner Name: | Lauderdale County Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Guardrail installation.
|
|
| Owner Solicitation Name: | A New Development for Victor Tulane Courts AL 6-9
|
| Owner Name: | Montgomery Housing Authority
|
| Enginner Name: | Barganier Davis Sims, Architects Associated
|
| Plankeeper Name |
|
| Scope: | New development.
|
|
| Owner Solicitation Name: | Erosion Control Breakwater Project
|
| Owner Name: | Alabama Dept. of Conservation and Natural Resources
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitating approximately 1,100 LF of
shoreline with a riprap breakwater.
|
|
| Owner Solicitation Name: | Grant Street Well Air Stripping
|
| Owner Name: | Talladega Water & Sewer Board
|
| Enginner Name: | Paul B. Krebs & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Street stripping.
|
|
| Owner Solicitation Name: | Highway Improvements - Intersection of U.S. Highway 11 and Deerfoot Parkway
|
| Owner Name: | Trussville, City of
|
| Enginner Name: | Gonzalez Strength & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Roadway widening and turn lane additions.
approximately 245 LF storm drain pipe, 2295 LF of
roadway widening with 238 LF of curb and gutter.
|
|
| Owner Solicitation Name: | New Current Production Model Advanced Traffic Signal Controller Cabinet Assemblies
|
| Owner Name: | Huntsville Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New Current Production Model Advanced Traffic
Signal Controller Cabinet Assemblies.
|
|
| Owner Solicitation Name: | Choctaw Point Terminal Demolition
|
| Owner Name: | Alabama State Port Authority, Technical Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and removal of above and below ground
structures including buildings, piping, concrete,
asphalt, fencing, piers over water, steel storage
tanks, including clearing and grubbing where
appropriate, scope shall include all existing
structures
|
|
| Owner Solicitation Name: | Twenty Five (25) MultiRae Plus Air Monitors
|
| Owner Name: | Huntsville, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Twenty Five (25) MultiRae Plus Air Monitors.
|
|
| Owner Solicitation Name: | Penhale Park Pumping Station Improvements
|
| Owner Name: | Helena, City of
|
| Enginner Name: | Ceteng, LLC, Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | Pumping station improvements.
|
|
| Owner Solicitation Name: | Rails to Trails, Phase II, Elkmont, Alabama to Veto
|
| Owner Name: | Limestone County Commission
|
| Enginner Name: | Pugh, Wright & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Clearing and grubbing; excavation; bridges and
roadbed processing, borrow, and storm sewers.
|
|
| Owner Solicitation Name: | Removal of Concrete Duct Bank
|
| Owner Name: | Alabama State Port Authority, Technical Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove and dispose of concrete duct bank. The
duct bank is approximately 24”x24”x 350’.
|
|
| Owner Solicitation Name: | Traffic Signs
|
| Owner Name: | Mobile, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Traffic signs.
|
|
| Owner Solicitation Name: | Power Supply
|
| Owner Name: | US Army Aviation and Missile Command DAAH23, ATTN: AMSAM-AC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | PRON: AX4C9116AX, NSN: 6130-01-260-7166, PN:
13074397-019. Quantity: 20 each plus One 100%
option applicable to the TADS/PNVS.
|
|
| Owner Solicitation Name: | Intersection and Signalization Improvements at Shelton Road and Madison Boulevard
|
| Owner Name: | Apac-Southeast, Inc., Alabama Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Intersection and Signalization Improvements.
|
|
| Owner Solicitation Name: | Wall Triana Landscape Improvements
|
| Owner Name: | Huntsville-Madison County Airport Authority
|
| Enginner Name: | Reece Hoopes & Fincher
|
| Plankeeper Name |
|
| Scope: | Installation of an irrigation system, tree,
shrub, and flowerbed establishment; also turf
establishment from seed and sod.
|
|
| Owner Solicitation Name: | Renovations and Additions to West End High School (Prequalification)
|
| Owner Name: | Etowah County Board of Education
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of a new 1-story classroom building
addition to the existing administra
tion/classroom building. The new classroom
building will include a practice gymnasium
related sitework, paving, landscaping and
improvements of site utilities.
|
|
| Owner Solicitation Name: | Wilson Road Pump Station Rehabilitation
|
| Owner Name: | Clanton, City of
|
| Enginner Name: | AME Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Pump station rehabilitation.
|
|
| Owner Solicitation Name: | New Metal Building
|
| Owner Name: | Muscle Shoals, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New metal building to be constructed on new
sportsplex.
|
|
| Owner Solicitation Name: | Meters
|
| Owner Name: | Opelika, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The solid-state meter shall be a state-of-the-art
measurement device, which utilizes industrial
grade electronic components. The meter shall
allow quick and easy retrofitting of the meter
with future functionality modules. The
measurement portion of the meter shall be housed
in the base of the meter (metrology) and the
functionality will be housed in the top module
(functionality module). The calibration shall not
be affected by changing the functionality module.
The energy version of the meter shall be
available with an LCD register in either a 5x1 or
4x10 register. The meter should also be available
with multifunction registers.
|
|
| Owner Solicitation Name: | Computer Equipment
|
| Owner Name: | Opelika, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Computer equipment.
|
|
| Owner Solicitation Name: | Airport Ballfield Lighting
|
| Owner Name: | Camden, City of
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | One new 300' ballfield complete, one new 200'
practice field and related items.
|
|
| Owner Solicitation Name: | Airport Ballpark Improvements
|
| Owner Name: | Camden, City of
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | One new 300' ballfield complete, one new 200'
practice field and related items.
|
|
| Owner Solicitation Name: | The Purchase of One Farm Tractor for the Baldwin County Commission
|
| Owner Name: | Baldwin County Commission, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The purchase of one (1) farm tractor.
|
|
| Owner Solicitation Name: | Hayes Marketplace Shopping Center
|
| Owner Name: | Pelham, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clearing and grubbing, installation of soil
erosion control measures, mass excavation and
grading, wet and dry utility construction, storm
drainage system construction, paving of roads and
parking lots consisting of approximately 4000
spaces, building pad preparation for
approximately 815,000 SF of planned retail
buildings, construction of retaining walls and
reinforced slopes, bridge/culvert construction,
traffic signal installation, installation of
landscaping, and construction of monument signs.
|
|
| Owner Solicitation Name: | Phase 2 - Sewer Rehabilitation
|
| Owner Name: | Citronelle Utilities Board/South Alabama Utilities
|
| Enginner Name: | Speaks & Associates, Consulting Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Trenchless rehabilitation of approximately 1,000
LF of 12", 3,600 LF of 10", and 8,160 LF of 8"
clay sanitary sewer with cured-in-place pipe
including labor, equipment, materials, and all
other items as required to complete the work
called for herein. The liner thickness for this
project shall be 6.0 mm. Also included is the
rehabilitation of approximately 43 manholes
(approximately 300 vertical feet.)
|
|
| Owner Solicitation Name: | Foley Beach Express Sewer Extension
|
| Owner Name: | Foley, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 5,800 LF of 10" PVC Gravity Sewer; 17 Each
of Precast Concrete Manholes; 1 EA Lift Station;
85 LF of 20" Steel Casing, Dry Jack and Bore;
40 LF of 16" Steel Casing, Dry Jack and Bore;
4,700 LF of 12" Class 160 PVC Force Main;
6,300 LF of 10" Class 160 PVC Force Main; 140 LF
of 10" PE SDR 17 Force Main; 200 LF of 12"
PE SDR 17 Force Main.
|
|
| Owner Solicitation Name: | Janitorial and Mowing Services
|
| Owner Name: | U.S. Army Engineer District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial and mowing services.
|
|
| Owner Solicitation Name: | Installation of Water Lines
|
| Owner Name: | Central Talladega County Water District
|
| Enginner Name: | Ladd Environmental Consultants, Inc.
|
| Plankeeper Name |
|
| Scope: | Installation of approximately 32.5 miles of 8",
6" and 3" PVC water lines, Bore in several
locations totaling 1,900 LF 6"-16" steel casing
with DIP carrier, booster pump station, and
related appurtenances.
|
|
| Owner Solicitation Name: | Water Storage Tank
|
| Owner Name: | Central Talladega County Water District
|
| Enginner Name: | Ladd Environmental Consultants, Inc.
|
| Plankeeper Name |
|
| Scope: | 300,000 gallon welded steel ground water storage
tank.
|
|
| Owner Solicitation Name: | Pre-Engineered Office and Maintenance Building
|
| Owner Name: | Central Talladega County Water District
|
| Enginner Name: | Ladd Environmental Consultants, Inc.
|
| Plankeeper Name |
|
| Scope: | Pre-engineered office and maintenance building.
|
|
| Owner Solicitation Name: | Purchase of One (1) Farm Tractor
|
| Owner Name: | Baldwin County Commission, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of One (1) Farm Tractor.
|
|
| Owner Solicitation Name: | Repair Fire Damaged Apartments Johnson Towers
|
| Owner Name: | Huntsville Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair Fire Damaged Apartments.
|
|
| Owner Solicitation Name: | Pruning and Removal of Trees
|
| Owner Name: | Huntsville, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal, pruning, and/or cleanup of trees and
parts of trees growing on City property, rights-
of-way, etc.
|
|
| Owner Solicitation Name: | Radio Maintenance Contract
|
| Owner Name: | Alabama State Port Authority, Technical Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Radio equipment maintenance, including hand-held,
desk units’ mobiles and stations.
|
|
| Owner Solicitation Name: | One (1) New Modular Interconnect System
|
| Owner Name: | Huntsville, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | One (1) New Modular Interconnect System.
|
|
| Owner Solicitation Name: | Addition to Valley Head School
|
| Owner Name: | DeKalb County Board of Education
|
| Enginner Name: | Cooper & Associates, Architects
|
| Plankeeper Name |
|
| Scope: | Addition to school.
|
|
| Owner Solicitation Name: | Sewers 2004
|
| Owner Name: | Daphne, City of
|
| Enginner Name: | Hutchinson, Moore, & Rauch, LLC
|
| Plankeeper Name |
|
| Scope: | 1,700 LF 8" Sanitary Sewer Main, 3,500 LF 2"
Pressure Force Main, 26 EA Low Pressure Service
Connections.
|
|
| Owner Solicitation Name: | Housing Rehabilitation Work 114 57th Street Fairfield, 1109 9th Avenue Midfield
|
| Owner Name: | Jefferson County, Planning and Community Development
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Housing rehabilitation work.
|
|
| Owner Solicitation Name: | Purchase (1) Portable Cascade System, (1) Thermal Imaging Camera, and (10) SCBA's
|
| Owner Name: | Bayou La Batre, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase (1) portable cascade system, (1) thermal
imaging camera, and (10) SCBA's.
|
|
| Owner Solicitation Name: | Demolition of Unsafe Structures
|
| Owner Name: | Eufaula, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of unsafe structures that have been
declared a public nuisance by the city building
official.
|
|
| Owner Solicitation Name: | Provision of Closed Top Recycling Roll-off Containers
|
| Owner Name: | Baldwin County Commission, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provision of Closed Top Recycling Roll-off
Containers.
|
|
| Owner Solicitation Name: | Genie Model TZ-34/20 Boom Lift
|
| Owner Name: | University of Alabama in Huntsville, Purchasing Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Genie Model TZ-34/20 Boom Lift. Alternate 1:
Provide Non-praking outrigger footpads for indoor
use. Please see the attached file for detailed
information.
|
|
| Owner Solicitation Name: | Box Assembly, Power Distribution
|
| Owner Name: | US Army Aviation and Missile Command DAAH01, ATTN: AMSAM-AC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Multiple launch rocket system (MLRS), PRON:
D1386659, Nomenclature: Distribution Box, NSN:
6110-01-346-7913, PN: 13209070. The current known
quantity for this item is 25 each.
|
|
| Owner Solicitation Name: | Indefinite Delivery Contracts for A-E Svcs for Surveying & Mapping Svcs
|
| Owner Name: | U.S. Army Engineer District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Architect and Engineering (A-E) services are
required for an Indefinite Delivery Contract for
Surveying & Mapping Services.
|
|
| Owner Solicitation Name: | Modernization
|
| Owner Name: | Chickasaw Housing Authority
|
| Enginner Name: | Speaks & Associates, Consulting Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Partial renovation of 8 duplex housing units with
interior and exterior refurbishing along with the
addition of newly constructed laundry/storage
rooms, central heating and cooling, kitchen
renovation with new cabinets, water heater
closets, rear porches, the removal of asbestos
materials, the replacement of roof shingles and
roof venting and repairing of broken concrete
sidewalks, renovations and additions to the
Administration Buildings and other related items.
|
|
| Owner Solicitation Name: | McGehee Road, Orchard Drive and St. Elmo Circle Grade, Drain, Base and Pave
|
| Owner Name: | Mobile County Commission
|
| Enginner Name: | Rester & Coleman Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Grade, drain, base and pave.
|
|
| Owner Solicitation Name: | Conveyor Gearbox Modification McDuffie Terminals Conveyors B & E
|
| Owner Name: | Alabama State Port Authority, Technical Services Division
|
| Enginner Name: | Cowles, Murphy, Glover & Associates
|
| Plankeeper Name |
|
| Scope: | Removal of the existing gearbox gears and
shafting and installing new gears, seals,
coupling hub and shafting as required by the
specifications.
|
|
| Owner Solicitation Name: | Miscellaneous Roofing&HVAC Work Forchatom Elementary Schoolmillry High Schoolmcintosh Highschool for the Washington Board of Educationchatom
|
| Owner Name: | Washington County Board of Education
|
| Enginner Name: | Barganier Davis Sims, Architects Associated
|
| Plankeeper Name |
|
| Scope: | Miscellaneous Roofing&HVAC Work.
|
|
| Owner Solicitation Name: | New Administration Building Prime Contractor, Roofing, Mechanical and Electrical Contractor Pre-Qualification
|
| Owner Name: | Southern Union State Community College, Wadley Campus
|
| Enginner Name: | Jenkins Munroe Jenkins Architecture
|
| Plankeeper Name |
|
| Scope: | Two-story concrete frame building of
approximately 30,000 SF, walls of masonry and
drywall, pitched metal roof, related sitework and
demolition.
|
|
| Owner Solicitation Name: | 2004 Montgomery Southwest Well Field Construction Project
|
| Owner Name: | Montgomery Water Works and Sanitary Sewer Board
|
| Enginner Name: | CH2M Hill, Inc.
|
| Plankeeper Name |
|
| Scope: | Schedule of Work A: Construction of 700 gpm new
potable water wells 1, 2, and 4. Schedule of Work
B: Construction of 700 gpm new potable water
wells 5, 6, and 8. Schedule of Work C:
Construction of 700 gpm new potable water wells
3, 7, 9, and 10.
|
|
| Owner Solicitation Name: | Swine Research & Education Center-New Building
|
| Owner Name: | Auburn University, Facilities Division, Design & Development
|
| Enginner Name: | Curry-Wille & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Site development, general construction,
mechanical and electrical for housing, Research
Lab, Manure handling and feed mill. The following
Prime Trade Bid Packages are currently available
for bids: Package 1-Site Work and Building
Demolition; Feed Mill Building & Animal
Buildings, Package 2-Office/Laboratory Building,
Package 3-Feed Mill Equipment.
|
|
| Owner Solicitation Name: | Repairs to Buildings #2276 & #2277 AL ARNG Training Site
|
| Owner Name: | Armory Commission of Alabama, Military Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repairs to buildings.
|
|
| Owner Solicitation Name: | Approximately 424,000 BF Scribner of Pine Sawtimber
|
| Owner Name: | Alabama Dept. of Corrections
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 165 cords of pine pulpwood, and 172 cords of
hardwood pulpwood in a marked thinning of mature
natural pine stands.
|
|
| Owner Solicitation Name: | Addition to Cherokee Nursing Home Centre
|
| Owner Name: | Cherokee County Health Care Authority
|
| Enginner Name: | Edmondson & Associates, P.A., Architect
|
| Plankeeper Name |
|
| Scope: | Addition to Nursing Home Centre.
|
|
| Owner Solicitation Name: | Renovation and Modernization for Various Sites
|
| Owner Name: | Anniston Housing Authority
|
| Enginner Name: | Taylor Design Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Site utility replacement, electrical service and
interior wiring, HVAC installation, window and
screen replacement, and exterior modifications at
various sites.
|
|
| Owner Solicitation Name: | Greens Mowers
|
| Owner Name: | Mobile, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Greens Mowers.
|
|
| Owner Solicitation Name: | Sanitary Sewer Improvements for Highway 123 Area
|
| Owner Name: | Ozark, City of
|
| Enginner Name: | Polyengineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Sanitary sewer improvements. 15,000 LF 8" PVC
gravity sewer, Bore in several locations
totaling 400 LF 16" steel casing (2 of those
locations will bore approximately 100 LF each).
|
|
| Owner Solicitation Name: | Miscellaneous Roofing & HVAC Work for Chatom Elementary School, Millry High School, Mcintosh High School
|
| Owner Name: | Washington County Board of Education
|
| Enginner Name: | Barganier Davis Sims, Architects Associated
|
| Plankeeper Name |
|
| Scope: | Install new retrofit roof framing system on
existing roof surface of approximately 32,000 SF
Install new HVAC. system. Install new retrofit
roof framing system on existing roof surface and
roof panels over an existing asphalt shingle
roof. Install new HVAC system in Cafeteria.
Approximately 5,070 SF Install new retrofit roof
framing system on existing roof surface.
Approximately 4,800 SF.
|
|
| Owner Solicitation Name: | Consulting, Architectural / Engineering
|
| Owner Name: | Alabama Dept. of Revenue
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consulting, architectural or engineering firms to
provide professional design services to
facilitate building seven (7) wallsSite
investigation to design floor plans for
constructing seven (7) walls.
|
|
| Owner Solicitation Name: | Steel Casing Pipe
|
| Owner Name: | U.S. Army Engineer District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Steel Casing Pipe for a 21-mile upland disposal
area. Requirements: New, 30 inch O.D. x .375
walls, DSAW, ASTM A252, Grade 2, Domestic Steel
Casing Pipe. No mid welds. Beveled ends, 40-foot
lengths (exact).
|
|
| Owner Solicitation Name: | Steel Casing Pipe for 21 mile upland disposal area. New, 30 inch O.D. x .375 wall, DSAW, ASTM A252, Grade 2, Domestic Steel Casing Pipe. No mid welds.
|
| Owner Name: | U.S. Army Engineer District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Steel Casing Pipe for a 21-mile upland disposal
area. New, 30" O.D. x .375 wall, DSAW, ASTM A252,
Grade 2, Domestic Steel Casing Pipe. No mid
welds. Beveled ends, 40' lengths (exact).
|
|
| Owner Solicitation Name: | Consulting Services
|
| Owner Name: | Calhoun County Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Program Management, Preliminary Design, Field
Surveys, Environmental Surveys, Right of Way
Acquisition, Final Design, Bidding Assistance and
Construction Management on Roadway and Bridge
Projects.
|
|
| Owner Solicitation Name: | Monthly Elevator Maintenance
|
| Owner Name: | Alabama State Port Authority, Technical Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance and inspection will be performed on a
Monthly basis on a regular weekday (excluding
holidays) Between the hours of 8:00 am and 5:00
pm in accordance With a maintenance log which is
to be kept in the Operations Building. B. Upon
completion of each
|
|
| Owner Solicitation Name: | Perch Creek Pump Station Renovation and Force Main Reroute - Phase A
|
| Owner Name: | Mobile Board of Water & Sewer Commissioners
|
| Enginner Name: | Volkert & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | 1 LS 48“ x 18“ Tapping Valve and Sleeve, 6,600
LF 18“ DI (CL 52) Sanitary Sewer Force Main
(Open Cut), 450 LF 18“ DI (CL 52) Sanitary Sewer
Force Main (Restrained Joint). 200 LF 20“ HDPE
(SDR 11) DIPS Sanitary Sewer Force Main
(Directional Drill).
|
|
| Owner Solicitation Name: | Perch Creek Pump Station Renovation and Force Main Reroute - Phase C
|
| Owner Name: | Mobile Board of Water & Sewer Commissioners
|
| Enginner Name: | Volkert & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | 3,500 LF 6“ HDPE (SDR 11) Slipline Existing 16“
CI Sanitary Sewer Force Main; 400 LF 6“ DIP (CL
52) Sanitary Sewer Force Main; 1 EA Diesel Pump;
2 EA Channel Grinder (On Rails); 1 LS Bypass
Pumping; 1 EA Pump Station Upgrade with
Electrical Controls.
|
|
| Owner Solicitation Name: | Renovation of Facilities at Point Mallard Park
|
| Owner Name: | Decatur Purchasing Dept.
|
| Enginner Name: | Schoel Design Group P.C.
|
| Plankeeper Name |
|
| Scope: | Renovation of facilities at park.
|
|
| Owner Solicitation Name: | Replacement of Floating Cover System For Bienville Reservoir
|
| Owner Name: | Mobile Board of Water & Sewer Commissioners
|
| Enginner Name: | McCrory & Williams, Inc.
|
| Plankeeper Name |
|
| Scope: | Replacement of the polypropylene geomembrane
floating cover system for water reservoir.
|
|
| Owner Solicitation Name: | Ridgemont Court and Sugar Creek South Sewer Lines Replacement
|
| Owner Name: | Mobile Board of Water & Sewer Commissioners
|
| Enginner Name: | McCrory & Williams, Inc.
|
| Plankeeper Name |
|
| Scope: | Directional Bore in 2 locations 600 LF 8" HDPE
sewer line.
|
|
| Owner Solicitation Name: | Birmingham-Jefferson Convention Complex - Storefront Improvements
|
| Owner Name: | Real Estate Management
|
| Enginner Name: | Designform, Inc.
|
| Plankeeper Name |
|
| Scope: | Demolition and replacement of storefront
entrances.
|
|
| Owner Solicitation Name: | Will Coleman Center - Pool Renovation
|
| Owner Name: | Andalusia Utilities Board
|
| Enginner Name: | CDG Engineers & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Installation of pool liner system, installation
of pump and filtration equipment, removal and
replacement of concrete deck, and installation of
other pool accessories.
|
|
| Owner Solicitation Name: | Alpha Buildings and Extensions Roof Replacement
|
| Owner Name: | University of South Alabama
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Alpha Buildings and Extensions Roof Replacement.
|
|
| Owner Solicitation Name: | Re-Roofing Project - Vacca Campus
|
| Owner Name: | Alabama Youth Services Dept.
|
| Enginner Name: | Giattina Fisher Aycock Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Re-roofing. A mandatory pre-bid conference will
be at the Department of Youth Services Vacca
Campus located at 8950 Roebuck Boulevard,
Birmingham Alabama 35126, telephone 205-838-4991.
|
|
| Owner Solicitation Name: | Re-Roof Project - Vacca Campus
|
| Owner Name: | Alabama Youth Services Dept.
|
| Enginner Name: | Giattina Fisher Aycock Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Re-Roof Project.
|
|
| Owner Solicitation Name: | Beulah Road 5MG Ground Level Storage Tank Rehabilitation
|
| Owner Name: | Albertville, City of
|
| Enginner Name: | Paul B. Krebs & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Tank rehabilitation.
|
|
| Owner Solicitation Name: | Sandblasting & Painting of AL Hwy. 9 Elevated Water Storage Tank
|
| Owner Name: | Wetumpka, Water Works & Sewer Board
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | 1 L.S. Sandblast and Paint 250,000 Gallon
Elevated Water Tank.
|
|
| Owner Solicitation Name: | TV Inspection for Lower Valley Creek Sanitary Sewer Collection System, Contracts 26 & 27 and for Five Mile Creek Sanitary Sewer Collection, Contr. 20
|
| Owner Name: | Jefferson County Commission
|
| Enginner Name: | US Infrastructure, Inc.
|
| Plankeeper Name |
|
| Scope: | 158,773 LF Mainline Television Inspection, Pipe
Diameter 16" or Less, 2,767 LF Mainline
Television Inspection, Pipe Diameter Greater Than
16", 88 EACH Locate and Expose Buried Manhole.
|
|
| Owner Solicitation Name: | Design/Build Recreational Lighting Project
|
| Owner Name: | Decatur Utilities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install sports field lighting for 11 soccer
fields utilizing 80'-90' mounting heights.
Bidder will be responsible for providing all
engineering, labor and material for the project.
All secondary electrical wiring and control
wiring should be included.
|
|
| Owner Solicitation Name: | Exterior and Interior Renovations for Magnolia Gardens Apartments I/AL 54-4 And Magnolia Gardens Apartments II/AL 54-7
|
| Owner Name: | Florence Housing Authority
|
| Enginner Name: | SKT Architects, P.C.
|
| Plankeeper Name |
|
| Scope: | Remove existing exterior plywood siding and
install new brick veneer. Remove existing
aluminum slider windows and install new aluminum
single hung thermal windows. Remove existing thru-
wall HVAC units in all apartments and install new
ductless split-system heat pumps. Install
pressurization system in two stairwells. Upgrade
of existing automatic fire sprinkler systems.
Installation of sprinkler heads in apartments.
Upgrade of existing fire protection systems,
emergency call systems and life safety systems.
Pressure cleaning of all exposed exterior
concrete building surfaces.
|
|
| Owner Solicitation Name: | Exterior Renovations to the Davis Theatre
|
| Owner Name: | Troy State University Montgomery
|
| Enginner Name: | Seay, Seay, and Litchfield
|
| Plankeeper Name |
|
| Scope: | Theatre exterior renovations.
|
|
| Owner Solicitation Name: | Re-Roofing Project - Vacca Campus
|
| Owner Name: | Alabama Youth Services Dept.
|
| Enginner Name: | Giattina Fisher Aycock Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Re-roofing.
|
|
| Owner Solicitation Name: | AL Hwy. 69 Lift Station Upgrade & Force Main
|
| Owner Name: | Greensboro, City of
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | 4,700 LF of 6" Force Main, 130 LF of 10" Steel
Encasement Pipe, 1 Lift Station Rehabilitation,
640 LF of various HDPE Storm Drainage Pipe, and
related appurtenances.
|
|
| Owner Solicitation Name: | Reroofing of the Career and Technology Center
|
| Owner Name: | Cherokee County Board of Education
|
| Enginner Name: | Stephen Ward & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Reroofing.
|
|
| Owner Solicitation Name: | University of South Alabama Alpha Buildings and Extensions Roof Replacement Mobile
|
| Owner Name: | University of South Alabama
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Buildings and Extensions Roof Replacement.
|
|
| Owner Solicitation Name: | University of South Alabama Baseball Stadium Pre-Cast Package
|
| Owner Name: | University of South Alabama
|
| Enginner Name: | TAG/The Architects Group Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of a baseball stadium pre-cast.
|
|
| Owner Solicitation Name: | Construction of the Ballantrae Golf Clubhouse
|
| Owner Name: | Pelham, City of
|
| Enginner Name: | Maxus Construction Company
|
| Plankeeper Name |
|
| Scope: | Construction of new ex terior and interior wall
sys tems, roof system, plumbing, mechanical and
electrical sys tems. Bid Package A - CONCRETE
WORK Bid Package B - MASONRY WORK Bid Package C -
STEEL WORK Bid Package D - ROUGH CARPENTRY WORK
Bid Package F - ROOFING AND SHEETMETAL WORK Bid
Package G - CAULKING AND SEALANT WORK Bid Package
H - DOORS AND WINDOWS WORK Bid Package J - GYPSUM
BOARD SYSTEM AND INSULATION WORK Bid Package O -
FIREPLACE WORK Bid Package P - FOOD SERVICE
EQUIPMENT WORK Bid Package Q - ELEVATOR WORK Bid
Package R - FIRE PRO TECTION WORK Bid Package S -
PLUMBING WORK Bid Package T - HVAC WORK Bid
Package U - ELECTRICAL WORK.
|
|
| Owner Solicitation Name: | Internal Gate Expansion at Mobile
|
| Owner Name: | Alabama State Port Authority, Technical Services Division
|
| Enginner Name: | Mobile Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Installation of a weigh scale and access roads,
remote connectivity and control through existing
fiber optic network system, and miscellaneous
work as required for a complete working system.
|
|
| Owner Solicitation Name: | Trailer and Truck
|
| Owner Name: | Calhoun County Water And Fire Protection Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | (1) 1977 Butler Trailer vin#774126, (2) 1993 GMC
Truck vin#1GTEK14H8PZ536819.
|
|
| Owner Solicitation Name: | Attendance Software for the Baldwin County
|
| Owner Name: | Baldwin County Commission, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Attendance Software.
|
|
| Owner Solicitation Name: | Provision of Time and Attendance Software
|
| Owner Name: | Baldwin County Commission, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provision of Time and Attendance Software.
|
|
| Owner Solicitation Name: | IDIQ Contract for Rental of Cutterhead Pipeline Dredge & Attendant Plant with Operators for Maintenance Dredging of the Tennessee-Tombigbee Waterway &
|
| Owner Name: | U.S. Army Engineer District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rental of cutterhead pipeline dredge with
operators, for maintenance dredging.
|
|
| Owner Solicitation Name: | ATCT and Electrical Vault Improvements and Taxiway A Edge Lighting Replacement
|
| Owner Name: | Tuscaloosa Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Schedule 1 involves the replacement of the ATCT
lighting control panel along with associated
upgrades to the electrical vault. Schedule 2
involves the replacement of the Taxiway A edge
lighting circuit, including 217 new base-can-
mounted medium intensity light fixtures, 31,000
LF of cable in new conduit, and associated
counterpoise, handholes, and manholes.
|
|
| Owner Solicitation Name: | Lake Drive Tricentennial Park Fountain System
|
| Owner Name: | Mobile, City of
|
| Enginner Name: | CSA Group, Inc.
|
| Plankeeper Name |
|
| Scope: | Fountain system.
|
|
| Owner Solicitation Name: | Engineering Services
|
| Owner Name: | Northwest Alabama Council of Local Governments
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional engineering services in completing a
wastewater facilities plan to include a new
industrial park. (1) Analysis of existing
conditions to include Land Use, Population,
Climate, Geology, Soils, Topography, Hydrology,
Existing Quantity and Quality of Water, Water
System, Air Quality, Drainage, Roads, Flood
Plains, Recreation and Industrial Development,
Historic and Archaeological sites among other
factors. (2) Phase 1 Environmental Assessment of
the Industrial Park. (3) Analysis of future
economic and population growth. The facility
planning period will extend 20 years beyond the
date when the planned facility is scheduled to
begin operation. (4) Analysis of existing and
future wastewater systems. (5) Recommendations of
preferred alternatives. (6) Potential sources of
funding.
|
|
| Owner Solicitation Name: | Engineering Services
|
| Owner Name: | Northwest Alabama Council of Local Governments
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | professional engineering services in completing a
storm drainage plan to include a new
industrial park. (1) Analysis of existing
conditions to include Land Use, Population,
Climate, Geology, Soils, Topography, Hydrology,
Existing Quantity and Quality of Water, Water
System, Air Quality, Roads, Flood Plains,
Recreation and Industrial Development, Historic
and Archaeological sites among other factors. (2)
Current drainage conditions. (3) Analysis of
future economic and population growth. The
facility planning period will extend 20 years
beyond the date when the planned facility is
scheduled to begin operation. (4) Analysis of
existing and future drainage systems. (5)
Recommendations of preferred alternatives. (6)
Potential sources of funding.
|
|
| Owner Solicitation Name: | Exterior Renovation of 239 Dwelling Units
|
| Owner Name: | Huntsville Housing Authority
|
| Enginner Name: | Bradfield, Richards, Rhodes and Associates, Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Replacement of roof decking and shingles, ridge
vents, new windows and security screens, new
exterior door and frames, new security screen
doors, hardware, and attic draft stops.
|
|
| Owner Solicitation Name: | Econchate Water Pollution Control Plant Improvements
|
| Owner Name: | Montgomery Water Works and Sanitary Sewer Board
|
| Enginner Name: | CH2M Hill, Inc.
|
| Plankeeper Name |
|
| Scope: | One new Preliminary Treatment Facility including
screening and grit removal including a separate
electrical building. One new hydrogen peroxide
system including an 8,000-gallon tank and
metering pumps. One new raw sewage splitter
structure. One new trickling filter recirculation
pump station including a separate electrical
building and secondary clarifier splitter
structure. Miscellaneous sludge pump replacement.
One new metal maintenance building. One new
effluent sampling and compliance box. Two new
precast concrete buildings for existing pumping
facilities. Chlorine contact basin modifications
including a new static screen and debris pump.
Demolition of existing concrete structures,
including the existing influent flow splitter and
existing preliminary treatment facilities. Three
trickling filter mechanism modifications for
conversion to variable speed. One new thickened
sludge pump station including a new precast
concrete building. Miscellaneous grading,
pavement, and drainage improvements.
|
|
| Owner Solicitation Name: | Soccer Field Lighting
|
| Owner Name: | University of Montevallo
|
| Enginner Name: | Mills-Conoly Engineering, P.C.
|
| Plankeeper Name |
|
| Scope: | Installation of concrete poles, structures,
luminaries, panelboards, contractors, power
distribution equipment and controls as indicated
for a complete operational soccer field lighting
system.
|
|
| Owner Solicitation Name: | New Elementary School
|
| Owner Name: | Macon County School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New elementary school.
|
|
| Owner Solicitation Name: | Lunch Room Expansion to Crossville High School Crossville
|
| Owner Name: | DeKalb County Board of Education
|
| Enginner Name: | McKee and Associates
|
| Plankeeper Name |
|
| Scope: | Building addition of 2,680 SF. Type of frame:
Metal Deck. Construction of adjoining lunch room
addition, consisting of site work, concrete slab
on grade, modified roofing system, brick and CMU
walls, interior finishes, and all related trades,
including plumbing, HVAC and electrical.
|
|
| Owner Solicitation Name: | Rolling Hills Elementary School Renovation
|
| Owner Name: | Huntsville City Schools, Purchasing Dept.
|
| Enginner Name: | L. Hughes Associates, Architects
|
| Plankeeper Name |
|
| Scope: | Exterior/interior painting of walls, doors, and
frames; installation of windows, lintels, carpet,
and front counter; installation of toilet
partitions, grab bars, and toilet paper
dispensers; replacement of some glazing;
replacement of acoustical ceiling tiles and
grids; and replacement of utility door.
|
|
| Owner Solicitation Name: | Aquatic Center Locker Rooms Replace / Repair Finishes
|
| Owner Name: | University of Alabama at Tuscaloosa, Construction Administration
|
| Enginner Name: | Ward Scott Veron Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Center Locker Rooms Replace / Repair Finishes.
|
|
| Owner Solicitation Name: | Sony Vaio Notebook Computer with Intel Centrino Mobile Technology - Model PCG-TR2A
|
| Owner Name: | University of Alabama in Huntsville, Purchasing Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sony Vaio Notebook Computer with Intel Centrino
Mobile Technology - Model PCG-TR2A.
|
|
| Owner Solicitation Name: | Engineering/Architectural Services Tom Brown Village AL 1-10 Air Conditioning
|
| Owner Name: | Birmingham Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Project analysis, schematic designs, design
development, construction bid documents,
construction specifications, cost estimates,
construction administration, submittal review and
inspection of work in progress.
|
|
| Owner Solicitation Name: | Motor, Direct Current
|
| Owner Name: | US Army Aviation and Missile Command DAAH01, ATTN: AMSAM-AC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | System: Patriot, Pron: D14H1373, Nomenclature:
Motor, Direct Current, NSN: 6105-01-098-6558,
P/N: 10252431-1 for a quantity of 22 each.
|
|
| Owner Solicitation Name: | Trinity Gardens Senior Housing
|
| Owner Name: | Mobile Housing Board
|
| Enginner Name: | Watermark Design Group, LLC
|
| Plankeeper Name |
|
| Scope: | New construction of 16 residential dwelling units
contained in 4 buildings and new site work.
|
|
| Owner Solicitation Name: | Janitorial Supplies
|
| Owner Name: | Madison County Board of Education, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial Supplies
|
|
| Owner Solicitation Name: | Sewer Improvements East Three Notch Street
|
| Owner Name: | Andalusia Utilities Board
|
| Enginner Name: | Bob Carter & Associates, LLC
|
| Plankeeper Name |
|
| Scope: | Approximately 3,200 LF of 8" Line Cleaning,
3,200 LF of 8" Cured-in-Place Liner
Installation, 3,200 LF of
8" Preliminary Video Inspection, 3,200 LF of 8"
Post Video Inspection, 96 VF of Manhole Rehab,
1,700 LF of Service Liner Installation, and
other necessary appurtenances.
|
|
| Owner Solicitation Name: | Pavement Rehabilitation
|
| Owner Name: | Alabama Dept. of Transportation (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Guardrail, tack coat, asphalt, mobilization,
drainage, pavement marking, signage.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Concrete Pavement Rehabilitation
|
| Owner Name: | Alabama Dept. of Transportation (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Superpave, concrete, mobilization, pavement
marking, signage.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Guardrail Median Protection
|
| Owner Name: | Alabama Dept. of Transportation (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Guardrail, mobilization, signage.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Base and Pavement, Partial Grade and Drain
|
| Owner Name: | Alabama Dept. of Transportation (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Riprap, excavation, tack coat, concrete,
mobilization, field office, underdrain, seeding,
signage.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge and Approaches
|
| Owner Name: | Alabama Dept. of Transportation (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clearing and grubbing, culvert, excavation,
backfill, tack coat, concrete, bridge work,
steel, pile driving, RCP, pipe rehabilitation,
riprap, guardrail, fence, water main, PVC pipe,
DI fittings, seeding, pavement marking, signage.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Maintenance Roadside Mowing
|
| Owner Name: | Alabama Dept. of Transportation (DOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance Roadside Mowing.
|
|
| Owner Solicitation Name: | Maintenance of MTX Coag-A-Mate Instrument
|
| Owner Name: | US Army Aviation Center, Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all personnel, test equipment,
transportation, materials, replacement parts,
lodging, and associated travel expenses to
accomplish on-site maintenance and repair
services. Please see the attached file for
further information.
|
|
| Owner Solicitation Name: | Freezer/Cooler Replacement For Central School, Monrovia Elementary School and Madison Cross Roads School
|
| Owner Name: | Madison County Board of Education, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction and installation of Freezer/Coolers.
|
|
| Owner Solicitation Name: | One (1) Hydro Seeder
|
| Owner Name: | Baldwin County Commission, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of One (1) Hydro Seeder.
|
|
| Owner Solicitation Name: | University of South Alabama Research Park Roadway Construction and Bridge Installation
|
| Owner Name: | University of South Alabama
|
| Enginner Name: | Speaks & Associates, Consulting Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Research Park Roadway Construction and Bridge
Installation.
|
|
| Owner Solicitation Name: | Modernization of Public Housing Sites
|
| Owner Name: | Troy City Housing Authority
|
| Enginner Name: | William J. Peek, Architect
|
| Plankeeper Name |
|
| Scope: | Replacement windows, security window screens,
kitchen cabinet replacement, fixture trim-outs,
prime doors, smoke detectors, HVAC, interior door
replacement, trim, painting.
|
|
| Owner Solicitation Name: | Infrastructure Improvements to Serve Precision Strip, Inc. Contract No. 2 Wastewater System Extension
|
| Owner Name: | Talladega, City of
|
| Enginner Name: | Tetra Tech, Inc
|
| Plankeeper Name |
|
| Scope: | 7,100 LF of 6" HDPE sewer forcemain; a Sewage
Pump Station; 2,200 LF of 10" PVC gravity sewer
main; 400 LF of 8" Restrained Joint DIP in the
16" Steel Casing Pipe installed by Jack & Bore
and appurtenances.
|
|
| Owner Solicitation Name: | Renovation of Primary School for the Greene County Board of Education
|
| Owner Name: | Greene County Board of Education
|
| Enginner Name: | PH & J Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Approximately 19,628 SF of renovated area, with
all trades incorporated in the general contract.
|
|
| Owner Solicitation Name: | Dredge Material Managment Area Weir Box & Discharge Pipe Replacement Mobile
|
| Owner Name: | Alabama State Port Authority, Technical Services Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of steel weir boxes, underground
steel piping, open cut 3,000 LF 30" underground
HDPE & Steel piping, and concrete junction boxes
per contract documents.
|
|
| Owner Solicitation Name: | Landscape and Athletic Field Maintenance Equipment
|
| Owner Name: | Huntsville Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Landscape and Athletic Field Maintenance
Equipment.
|
|
| Owner Solicitation Name: | Duck Samford Stadium Repair Project
|
| Owner Name: | Auburn, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition, 1,000 LF of under-drain system,
bleacher removal / repair, 300 LF of Keystone
Retaining wall, 400 LF of Aluminium handrails,
Aluminium bleachers installation, concrete steps
replacement.
|
|
| Owner Solicitation Name: | Thirteen (13) Single Family Houses
|
| Owner Name: | Poarch Band of Creek Indians - Indian Housing, Tribal Offices
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Thirteen (13) Single Family Houses.
|
|
| Owner Solicitation Name: | U.S. Army Aviation and Missile Command
|
| Owner Name: | US Army Aviation and Missile Command DAAH23, ATTN: AMSAM-AC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | PRON: AX4F50694X , NSN: 5640-01-249-8577, PN: 7-
311180041-123. Quantity: 30 each, applicable to
Ah-64 Airframe.
|
|
| Owner Solicitation Name: | Contract 1 - Double Buxahatchee Treatment Plant Capacity
|
| Owner Name: | Calera, City of
|
| Enginner Name: | Carr & Associates Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Double the treatment capacity of the existing
0.75 MGD sewage treatment plant, by installation
of additional secondary units in order to meet
new effluent limitations by addition of tertiary
filters, and appurtenance.
|
|
| Owner Solicitation Name: | Contract 2 - U.S. Highway 31 Sewer Improvements
|
| Owner Name: | Calera, City of
|
| Enginner Name: | Carr & Associates Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Approximately 5,300 LF of 8" PVC/DIP sanitary
sewer main, Jack & Bore in several locations 175
LF 16" steel casing (1/4" wall thickness), 33
manholes, and other related appurtenances.
|
|
| Owner Solicitation Name: | Contract 3 - Camp Branch Water Reclamation Facility
|
| Owner Name: | Calera, City of
|
| Enginner Name: | Carr & Associates Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Construct a new 3.5 MGD sewage treatment plant at
a new site, using the SBR process to meet NPDES
permit effluent limitations, including
appurtenances.
|
|
| Owner Solicitation Name: | Contract 4 - Camp Branch Off Site Utilities
|
| Owner Name: | Calera, City of
|
| Enginner Name: | Carr & Associates Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Install approximately 5,037 LF of 8" DIP water
main, 1,410 LF of 6" DIP water main, 14,591 LF
of 14" and 16" Class 200 PVC force main, 6,575
LF of 18" SDR 35 PVC outfall sewer, Jack & Bore
56 LF 8" steel casing (1/4" wall thickness),
Jack & Bore 60 LF 12" steel casing (1/4" wall
thickness), Jack & Bore 95 LF 20" steel casing
(1/4" wall thickness), Jack & Bore 155 LF 24"
steel casing (1/4" wall thickness), a sewage
pumping station and appurtenances.
|
|
| Owner Solicitation Name: | Improvements to Rolston Park in the City of Bayou La Batre (Phase I)
|
| Owner Name: | Mobile County Commission
|
| Enginner Name: | Polysurveying of Mobile
|
| Plankeeper Name |
|
| Scope: | 850 LF curb and gutter streets with drainage &
site improvements 550 LF of 6" HDPE water
distribution system 950 LF 6" HDPE sewer
collection system and holding tank. Wrought iron
fencing. Concrete walking
trail with lighting 6 each 18' x 12' pavilions1
each 24' x 20' pavilion2 each playgrounds
Landscaping & planting.
|
|
| Owner Solicitation Name: | Grand Bay Sewer Improvements
|
| Owner Name: | Mobile County Commission
|
| Enginner Name: | Speaks & Associates, Consulting Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | 7,850 LF of 6" PVC Sanitary Sewer Force Main and
all related appurtenances, Bore in several
locations 250 LF 8" steel casing.
|
|
| Owner Solicitation Name: | HVAC and Electrical Upgrade
|
| Owner Name: | Eutaw Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform HVAC and Electrical upgrade for 10 to 50
units.
|
|
| Owner Solicitation Name: | Construction of Grant Street Well Air Stripping
|
| Owner Name: | Talladega Water & Sewer Board
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of weel air stripping.
|
|
| Owner Solicitation Name: | Fayette Pavilion Design New Forest Pavilion
|
| Owner Name: | Auburn University, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of new wooden pavilion structure of
approximately 2340 SF.
|
|
| Owner Solicitation Name: | Two Phase Design Build for Integrated Operational Support Facility
|
| Owner Name: | U.S. Army Engineer District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New Integrated Operational Support Facility. The
project includes extension/upgrades of existing
utilities, paving, landscaping, and installation
of a new fire pump.
|
|
| Owner Solicitation Name: | Dune Habitat Restoration and Beach Access Improvements at Gulf State Park
|
| Owner Name: | Alabama Dept. of Conservation and Natural Resources
|
| Enginner Name: | CDG Engineers & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Work includes 3,500 LF of Dune Walkovers, 3
Comfort Stations, 5 Picnic Pavilions, Paving,
Concrete Pavers, Sidewalks, Landscaping and other
miscellaneous items of work.
|
|
| Owner Solicitation Name: | Grant Street Well Air Stripping
|
| Owner Name: | Talladega Water & Sewer Board
|
| Enginner Name: | Paul B. Krebs & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Street Well Air Stripping.
|
|
| Owner Solicitation Name: | Gateway Park Phase 1
|
| Owner Name: | Montgomery Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Park construction.
|
|
| Owner Solicitation Name: | Construction of the Morgan County Jail - Demolition Phase
|
| Owner Name: | Morgan County Commission
|
| Enginner Name: | Pugh, Wright & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Demolition.
|
|
| Owner Solicitation Name: | Metal Retrofit Roofing at Linden High School Cafeteria Building
|
| Owner Name: | Linden City Board of Education
|
| Enginner Name: | McKee and Associates
|
| Plankeeper Name |
|
| Scope: | Renovation/Retrofit of 4,240 SF. Reroofing
approximately 4,240 SF of existing area with a
new standing seam metal roofing system, fascia
and soffit.
|
|
| Owner Solicitation Name: | Asphalt Pothole Patcher
|
| Owner Name: | Huntsville Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of approximately One (1) New, Current
Production Model Asphalt Pothole Patcher. Please
see the attached file for further information.
|
|
| Owner Solicitation Name: | Gateway Park Executive 9-Hole Golf Course for the City of Montgomery
|
| Owner Name: | Montgomery Purchasing Dept.
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | Gateway Park Executive 9-Hole Golf Course.
|
|
| Owner Solicitation Name: | Metal Roof Repairs of Riverton Middle School for the Madison County Board of Education
|
| Owner Name: | Madison County Board of Education, Purchasing Dept.
|
| Enginner Name: | Stephen Ward & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Metal Roof Repairs of Middle School.
|
|
| Owner Solicitation Name: | Guaranteed Well and Treatment Facility
|
| Owner Name: | Billingsley, Town of
|
| Enginner Name: | Larry E. Speaks & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Construct a 150-gallon-per-minute Guaranteed
Quantity/Quality Gravel Filter Well complete with
pump, motor, controls and observation well for
source water protection studies. Construct a 350
gallons-per-minute Corrective Treatment Facility
complete with aerator, detention basin, lime
feeder, chlorinator, duplex 150 gallons-per-
minute service pumps, yard piping, security
fencing and all necessary appurtenances to
deliver water into the existing system. Furnish
and install a Radio Telemetry unit precisely
compatible with the existing telemetry system for
operating the well and plant. The installation
includes required reprogramming of the existing
system. (Deductive Alternates are included in
Treatment Facility Construction).
|
|
| Owner Solicitation Name: | Distribution Improvements
|
| Owner Name: | Billingsley, Town of
|
| Enginner Name: | Larry E. Speaks & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Construct approximately 60,000 LF of PVC and
DIP water mains, 8" and 6" in diameter, 13,500
LF of PVC and DIP mains, 4" and 3" in diameter;
approximately 105 standard 3/4" services and
service changeovers, including wet connection,
valves and boxes, air-relief valves, flush
hydrants, five railroad crossings, highway
crossings, stream crossings, stormwater permit
erosion control measures and all necessary
appurtenances. Remove, dispose of
approximately 7,000 LF of asbestos cement pipe
and replace with PVC. Bore 1,000 LF 6" DIP, Jack
& Bore in several locations totaling 500 LF 10"
steel casing, 150 LF 6" steel casing, and 405 LF
14" steel casing.
|
|
| Owner Solicitation Name: | Elevated Water Storage Tank
|
| Owner Name: | Billingsley, Town of
|
| Enginner Name: | Larry E. Speaks & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Construct one (1) Steel Elevated Water Storage
Tank with a capacity of 150,000 gallons. The tank
shall be constructed to be 45' from the top of
the foundations to the overflow. The Tank shall
be provided with foundations, yard piping,
industrial grade fence, concrete structures,
power service and panel, SCADA Control Unit
(RTU), access drive and all incidental
appurtenances including stormwater permit erosion
control measures. Furnish and install a Solenoid
Controlled Valve and Vault complete with a radio
telemetry SCADA Control Unit (RTU) at the
existing Pleasant Hill Tank precisely compatible
with the existing telemetry system for operating
the valve. The installation includes required
reprogramming of the existing system.
|
|
| Owner Solicitation Name: | New Flooring and Base, Security Windows and Screens, Landscaping
|
| Owner Name: | Opp Housing Authority
|
| Enginner Name: | Brown Chambless Architects
|
| Plankeeper Name |
|
| Scope: | New floor tile and base at each unit. Maintenace
of the building. New windows and security screens
at all windows. Landscape repair work at several
areas indicated on the plans. Replace exterior
security screen doors per each.
|
|
| Owner Solicitation Name: | Prepare Substation Site
|
| Owner Name: | Huntsville Utilities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide labor, equipment, materials, and
supervision to prepare our proposed substation
site per specifications. *See attached file for
further details.
|
|
| Owner Solicitation Name: | Demolition of Building 2109 (Gas Station) and Awning that is Associated with this Project
|
| Owner Name: | Anniston-Calhoun County Fort McClellan Development Joint Powers Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of Gas station.
|
|
| Owner Solicitation Name: | Software Asset Management Software
|
| Owner Name: | Dept. of Air Force, Headquarters Standard System Group (SSG), Artis Clayton
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Software Asset Management (SAM) Tools for
efficient and effective utilization of NIPRnet
and SIPRnet software assets, resulting in a
cradle-to-grave process for managing software.
Customize software searches, upchannel reports
(detailed and summarized), export aggregated
data, automatically associate license use with
Software License contracts, access software on
Operating Systems other than Microsoft, access
servers as well as personal computing devices
(desktops, laptops, tablets, PDAs), automatically
collect complete and accurate AF NIPR/SIPR
software information across the enterprise,
deposit and retrieve all AF NIPR/SIPR software
with visibility for all authorized AF staff via a
web interface, manage NIPR/SIPR software assets,
and, using auto-discovery, identify hardware on
which SW runs.
|
|
| Owner Solicitation Name: | Install a Steel Siding and Components to an Existing Structure in the MPF Cool-Down Conveyor area at the ANCDF)
|
| Owner Name: | Westinghouse Anniston
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Approximately 5,000 SF of metal siding.
Installation of structural steel, siding,
handrails, stairs, and grating. Installation of
three (3) WA provided 12,000 SCFM Portable HEPA
Filtration Units and associated metal duct.
Installation of three (3) 8'x8' motor operated
dampers. Installation of one (1) 36" diameter
motor operated damper. Three (3) mandoors and
(2) motor operated 12'x12' overhead doors.
Procurement and installation of a central vacuum
system. Installation of thee DAAMS heated sample
lines. Installation of power and control wiring
for filtration units, vacuum system, lighting,
dampers, a nd doors.
|
|
| Owner Solicitation Name: | Network Equipment
|
| Owner Name: | Madison County Board of Education, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Network Equipment.
|
|
| Owner Solicitation Name: | Additions and Renovations to Guntersville State Park
|
| Owner Name: | Alabama Dept. of Conservation and Natural Resources
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | Demolition, renovation and additions to the
existing Lodge and Hotel, and Kitchen Equipment
at various locations; A new Guard House with on-
site sewage disposal system; a new Laundry
facility, and demolition and replacement of
existing site utilities at various locations;
Sitework, paving, and landscaping; And all
related work.
|
|
| Owner Solicitation Name: | Dunlop Drive Extension
|
| Owner Name: | Opelika, City of
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | The principle items of work are approximately 0.9
mile of asphalt road construction, including
concrete bridge and other related appurtenances.
|
|
| Owner Solicitation Name: | Construction of New School
|
| Owner Name: | Barton Academy
|
| Enginner Name: | TAG/The Architects Group Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of New School.
|
|
| Owner Solicitation Name: | Citronelle High School Football and Baseball Stadiums
|
| Owner Name: | Barton Academy
|
| Enginner Name: | Clark, Geer, Latham and Associates
|
| Plankeeper Name |
|
| Scope: | High School Football and Baseball Stadiums.
|
|
| Owner Solicitation Name: | Tanner Williams Elementary School Multi-Purpose Building
|
| Owner Name: | Barton Academy
|
| Enginner Name: | Harvey Gandler Architect
|
| Plankeeper Name |
|
| Scope: | Elementary School Multi-Purpose Building.
|
|
| Owner Solicitation Name: | Gordon Palmer Hall, Fourth Floor HVAC Replacement
|
| Owner Name: | University of Alabama at Tuscaloosa, Construction Administration
|
| Enginner Name: | R. H. Smith & Associates
|
| Plankeeper Name |
|
| Scope: | HVAC Replacement.
|
|
| Owner Solicitation Name: | UAH-Propulsion Test Facility Expansion
|
| Owner Name: | University of Alabama - Huntsville, Purchasing Dept.
|
| Enginner Name: | L. Hughes Associates, Architects
|
| Plankeeper Name |
|
| Scope: | Test Facility Expansion.
|
|
| Owner Solicitation Name: | New NASA Hangar Facility for the Huntsville International Airport in Huntsville
|
| Owner Name: | Huntsville-Madison County Airport Authority
|
| Enginner Name: | JH Partners Architecture and Interiors
|
| Plankeeper Name |
|
| Scope: | Construction of New NASA Hangar Facility.
|
|
| Owner Solicitation Name: | Pavement Renovation of Shelbie King Hall at the University of Alabama Huntsville
|
| Owner Name: | University of Alabama - Huntsville, Purchasing Dept.
|
| Enginner Name: | SKT Architects, P.C.
|
| Plankeeper Name |
|
| Scope: | Pavement Renovation.
|
|
| Owner Solicitation Name: | Tennis Facility Courts
|
| Owner Name: | Huntsville, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a new Tennis Facility Courts.
|
|
| Owner Solicitation Name: | Rubber Removal Project
|
| Owner Name: | Montgomery Airport Authority
|
| Enginner Name: | Barge Waggoner Sumner & Cannon, Inc.
|
| Plankeeper Name |
|
| Scope: | Rubber Removal. Removal of rubber deposits on
Runway.
|
|
| Owner Solicitation Name: | Pavement Markings
|
| Owner Name: | Montgomery Airport Authority
|
| Enginner Name: | Barge Waggoner Sumner & Cannon, Inc.
|
| Plankeeper Name |
|
| Scope: | Pavement Markings.
|
|
| Owner Solicitation Name: | Morris WWFT Influent Pump Station Controls System Replacement
|
| Owner Name: | Prichard Water Works and Sewer Board
|
| Enginner Name: | McCrory & Williams, Inc.
|
| Plankeeper Name |
|
| Scope: | Fabrication and Installation of an influent
pumping controls system; PLC programming &
systems integration; Installation of station wet
well level instrumentation.
|
|
| Owner Solicitation Name: | Weight Room Addition to Jess Lanier High School Bessemer
|
| Owner Name: | Bessemer Board of Education
|
| Enginner Name: | Goodwyn Mills & Cawood, Inc.
|
| Plankeeper Name |
|
| Scope: | Weight Room Addition to High School.
|
|
| Owner Solicitation Name: | Soccer Facility
|
| Owner Name: | Huntsville, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a new Soccer Facility.
|
|
| Owner Solicitation Name: | Computers, AMD 2600-XP (2.083GHz)
|
| Owner Name: | University of Alabama in Huntsville, Purchasing Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 11 Computers, AMD 2600-XP (2.083GHz),
333 Awesome globalwin FSP82 SCKT, MSI K7N2D-L
SCKT-A A/L, 512 MB DDR PC3200 400 MHz 64x64,
Maxtor 80 GB Ultra 133 7200 2 MB, MSI FX5200 8x
128 MB TV/DVI/2H, Aopen 52x32x52 CDRW, Mitsumi
1.44 3.5" Floppy Drive, Microsoft Windows XP Pro
OEM, Norton Antivirus 2004 Retail, ATX Silver
Case W/400W PS System assembly. KDS 19" .25
1600x1200 @ 65Hz, Microsoft internet KB PS2 Kit.
|
|
| Owner Solicitation Name: | Improvements to Spring Branch Wastewater Treatment Plant
|
| Owner Name: | Huntsville Engineering Dept.
|
| Enginner Name: | Tetra Tech, Inc
|
| Plankeeper Name |
|
| Scope: | (1) the removal and relocation of the existing
mechanical coarse bar screens and the
installation of two mechanical fine screens with
a dewatering unit; (2) the construction of a pre-
fabricated metal covering for the headworks; (3)
the installation of two submersible grit pumps
and a coarse bubble aeration system; (4) the
demolition of the existing aeration system and
the installation of a full-floor, grid, fine-
bubble diffuser system including improvements to
the air piping system; (5) the replacement of
equipment on Plant 1A final clarifiers; (6)the
replacement of Plant 1A RAS pumps; (7) the
replacement of an existing floating-cover on the
secondary anaerobic sludge digester with new
floating gasholder cover equipment; (8) the
relocation of the existing plant 1A MCC unit; and
(9) the waterproofing of the Plant 1A pump and
pipe gallery roof system.
|
|
| Owner Solicitation Name: | Large Animal Teaching Hospital Food & Dairy Animal Facilities
|
| Owner Name: | Auburn University, Purchasing Dept.
|
| Enginner Name: | Parsons Wible Brummal Alkire Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of new large animal wards consisting
of 4 structures of concrete block brick veneer,
steel and/or wood roof framing, concrete floor
slabs, special stall and door construction, dairy
equipment, HVAC, electrical & plumbing.
|
|
| Owner Solicitation Name: | Telephone System
|
| Owner Name: | Troy State University Montgomery
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New telephone system.
|
|
| Owner Solicitation Name: | Modernization of Public Housing Sites
|
| Owner Name: | Leeds Housing Authority
|
| Enginner Name: | William J. Peek, Architect
|
| Plankeeper Name |
|
| Scope: | Partial sidewalk replacement, partial sanitary
sewer replacement and cleanouts, site signage,
landscaping, aluminum fascia and soffits,
roofing, insulation, exterior windows, security
screens, stoops, exterior doors and hardware,
security screen doors, vinyl floor tile,
interior doors and hardware, kitchen retrofit,
bathroom retrofit, ceramic floor tile,
electrical rewiring, HVAC, replace ceilings,
paneling, painting, blinds, unit numbers and
closet rods and shelves.
|
|
| Owner Solicitation Name: | Pumper FireTruck
|
| Owner Name: | Huntsville Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide 1 new custom pumper truck. The apparatus
body must be of the all aluminum modular type,
and shall be completely assembled prior to
installation on the chassis.
Please see the attached file for further
information.
|
|
| Owner Solicitation Name: | Brewer Porch Phone/Data Conduits
|
| Owner Name: | University of Alabama at Tuscaloosa, Construction Administration
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Open cut installation of 2,900 LF 4" conduits
and junction boxes. Phone/Data Conduits.
|
|
| Owner Solicitation Name: | Professional Legal Services
|
| Owner Name: | Huntsville Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Legal Services.
|
|
| Owner Solicitation Name: | Water and Sewer Improvements
|
| Owner Name: | Troy, City of
|
| Enginner Name: | Bob Carter & Associates, LLC
|
| Plankeeper Name |
|
| Scope: | 2,200 LF of 8" PVC Gravity Sewer, 10 manholes,
900 LF of 8" DIP water main, and other
miscellaneous items. Bore 50 LF with steel
casing.
|
|
| Owner Solicitation Name: | Road Materials and Works
|
| Owner Name: | Shelby County Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Base Material “Dense Grade“, Bituminous
Treatment, Planning (Milling) of Existing Paving,
Bituminous Concrete Binder, Bituminous Concrete
Plant Mix, Various Traffic Stripe, Markings,
Legends and Pavement Markers. Please see the
attached file for further information.
|
|
| Owner Solicitation Name: | Construction of Elevator Additions at Erwin High School and Fultondale High School
|
| Owner Name: | Jefferson County Board of Education
|
| Enginner Name: | Harris and Associates Architects Planners
|
| Plankeeper Name |
|
| Scope: | Construction of Elevator Additions at High
Schools.
|
|