| Owner Solicitation Name: | Luminaires/Poles/Streetlight Items/Traffic Signal Parts/etc.
|
| Owner Name: | Hawaii, County of, Dept. of Finance, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Luminaires, poles, streetlight items, traffic
signal parts, etc.
|
|
| Owner Solicitation Name: | Facility Improvements And Renovations For Sister Maureen Intergenerational Learning Environment
|
| Owner Name: |
|
| Enginner Name: | Architects Pacific, Inc.
|
| Plankeeper Name |
|
| Scope: | Facility improvements and renovations.
|
|
| Owner Solicitation Name: | Request For Consultant Proposals Office Relocation Study
|
| Owner Name: | Hawaii Dept. of Hawaiian Home Lands (DHHL)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Request for consultant proposals office
relocation study.
|
|
| Owner Solicitation Name: | Hilo Waste Water Treatment Plant Repair of Primary Clarifier #3 Wastewater Division
|
| Owner Name: | Hawaii County Administration Office, Dept. of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Metals: stainless steel fabrication, wood and
plastics: recycled plastic lumber, finishes:
coating systems, mechanical: general mechanical
requirements, process piping, ball and solenoid
valves, collector modification, skimmer
assembly,
testing of primary clarifier #3, electrical:
instrumentation
|
|
| Owner Solicitation Name: | Kinoole Corridor Traffic Signal Upgrade, Hilo
|
| Owner Name: | Hawaii, County of, Dept. of Finance, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork: clearing and grubbing, removal of
structures and obstructions, excavation and
embankment, excavation and backfill for conduits
and structures, water pollution and erosion
control, dressing of shoulders, bases: plant mix
asphalt concrete base course, recycled plant mix
asphalt concrete base course, aggregate base
course, Brooming off, plant mix glassphalt
concrete base course, controlled low strength
material for utilities and structures, pavements:
asphalt concrete pavement, bituminous tack coat,
incidental construction: structural concrete,
reinforcing steel, manholes, inlets and catch
basins, guardrail, fences, sidewalks, curb and/or
gutter, reinforced concrete driveways, dust
control, traffic control signs, roadway lighting
system, traffic signal system, water system,
pavement markings, cellular phone, traffic
control devices, curb ramps, cold planing of
existing pavement, mobilization, material:
bituminous materials, aggregates, miscellaneous
[epoxy-resin system, grout, precast concrete
units, frames, grates, covers and ladder rungs,
luminaries, mast arm, light source, cables,
conductors and wires, controller equipment,
traffic signals and appurtenances, reflective
thermoplastic compound pavement markings, hot
applied rubberized sealant, luminaries and
conductor identification, engineer's tool kit],
structural steel and related material, cullet and
cullet-made materials.
|
|
| Owner Solicitation Name: | Kilauea Corridor Traffic Signal Upgrade, Hilo
|
| Owner Name: | Hawaii, County of, Dept. of Finance, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork: clearing and grubbing, removal of
structures and obstructions, excavation and
embankment, excavation and backfill for conduits
and structures, water pollution and erosion
control, dressing of shoulders, bases: aggregate
base course, brooming off, controlled low
strength material for utilities and structures,
pavements: asphalt concrete pavement, bituminous
tack coat, structures: concrete structures,
cement rubble masonry, incidental construction:
structural concrete, reinforcing steel, culverts
and storm drains, manholes, inlets and catch
basins, sidewalks, curb and/or gutter, reinforced
concrete driveways, standard street survey
monuments, dust control, traffic control signs,
roadway lighting system, traffic signal system,
water system, pavement markings, cellular phone,
traffic control devices, curb ramps, cold planing
of existing pavement, mobilization, materials:
bituminous materials, aggregates, miscellaneous
[epoxy-resin system, grout, precast concrete
units, frames, grates, covers and ladder rungs,
luminaries, mast arm, light source, cables,
conductors and wires, controller equipment,
traffic signals and appurtenances, reflective
thermoplastic compound pavement markings, hot
applied rubberized sealant, luminaries and
conductor identification, engineer's tool kit],
structural steel and related material, cullet and
cullet-made materials.
|
|
| Owner Solicitation Name: | Construction of Pahala 0,5 MG Concrete Reservoir
|
| Owner Name: | Hawaii County Water Supply Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Constructing a 0,5 mg reinforced concrete
reservoir and appurtenances and the subsequent
removal and disposal of the existing 0.5 mg steel
tank with the possibility of proper hazardous
waste handling, storage, trnsport and disposal of
lead based paint and/or petroleum contaminated
soill to an epa approved site.
|
|
| Owner Solicitation Name: | Lokelani Intermediate School Building E - Enclose Choral Room D.A.G.S. Job no. 15-16-4246
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of Choral Room. Exterior and
interior painting of new Choral Room.
Provision of air conditioning for new Choral Room
|
|
| Owner Solicitation Name: | Doa Main Office Complex - Electrical And Fire Safety Improvements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective demolition, excavation, lawns and
grass, concrete work, firestopping, painting,
asbestos abatement, lead based paint control
measures, fire alarm system, electrical work and
miscellaneous related work.
selective demolition, 2) excavation, 3) lawns and
grass, 4) concrete work, 5) firestopping, 6)
painting, 7) asbestos abatement, 8) lead based
paint control measures, 9) fire alarm system, 10)
electrical work and 11) miscellaneous related
work.
|
|
| Owner Solicitation Name: | F/D of (1) Compact Skid Steer Loader with Tandem Axle Flat Deck Trailer
|
| Owner Name: | Maui County Dept. of Finance
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivery of one compact skid steer
loader with tandem axle flat deck trailer.
|
|
| Owner Solicitation Name: | Central District Public Libraries Health and Safety Improvements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1-Remove and replace the entire skylight framing
system and glass.
2-Replace single leaf exterior doors, reinstall
hardware, repaint doors and door signs, and
install new weather stripping and door bottoms.
Install signage, restripe parking stalls, and
repaint curbs at the parking lot.
|
|
| Owner Solicitation Name: | Kauai War Memorial Convention Hall Ada Improvements
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Metals: metal fabrication, wood and plastics:
finish carpentry, thermal and moisture
protection: sealants, doors and windows: wood
doors, finish hardware, finishes: gypsum
wallboard systems, ceramic tile, painting,
specialties: sold phenolic toilet partitions,
toilet accessories, mechanical: plumbing.
|
|
| Owner Solicitation Name: | Plans, Replace Precast Concrete Railings & Spall Stabilization, Leeward Community College
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective demolition and removal of existing
precast concrete railing, new work consists of
construction of pedestal with concrete curbs,
waterproofing membrane, metal framing, direct
applied exterior finish system, precast concrete
caps, inset precast GFRC medallions, installation
of aluminum railing and precast concrete nosing,
spall stabilization of existing precast concrete
railings and sealing with penetration sealer,
removal and replacement of two area drains,
removal and reinstallation of existing plumbing
pipes, and related work.
|
|
| Owner Solicitation Name: | Maintenance and Water Treatment Services of Air Conditioning Equipment at Windward Community College
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance and water treatment services of air
conditioning equipment.
|
|
| Owner Solicitation Name: | Repair Wharves at the USCG Integrated Support Command
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit Honolulu
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all material, labor, equipment and
transportation necessary to provide structural
repairs to wharves. Structural repair for slabs,
edge beams and piles; replacement of utility
piping systems to include compressed air, bilge
water, sewer and cold water; and all related and
incidental work described in the contract
documents.
|
|
| Owner Solicitation Name: | Construction of Ironwood Subdivision G.I. Waterline Replacement
|
| Owner Name: | Hawaii County Water Supply Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of an 8" and 6" waterline and
appurtenances to replace the existing galvanized
waterline, water service and fire hydrant
connections. 670 LF 8" Class 52, DIP water line,
140 LF 6" Class 52 DIP water line, 2 EA 6" fire
hydrant unit, 2 EA 1.5" Type B service
connection for 5/8" meters on same side of the
road as pipeline. 2 EA 1.5" Type B service
connection for 5/8" meters across the road from
the pipeline, 4 EA 1" Type A service connection
on same side of the road as the pipeline, 3 EA
1" Type A service connection across the road, LS
testing and chlorination of pipeline.
|
|
| Owner Solicitation Name: | Construction Of The Keonepoko Nui Standpipe Facility
|
| Owner Name: | Hawaii County Water Supply Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a facility containing two
standpipes, three hose bibs and related
appurtenances and the removal of the existing
standpipe within the same site.
|
|
| Owner Solicitation Name: | Hia Architectural Barrier Removal, Phase II at Honolulu International Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work (demolition and removal work, aggregate
base course, asphalt concrete paving, concrete
curbs, sidewalks and ramps, pavement marking,
landscape irrigation, landscaping); Concrete
(concrete formwork, concrete reinforcement, cast-
in-place concrete); Masonry (concrete unit
masonry); Metals (metal fabrications); Wood and
Plastics (rought carpentry, finish carpentry,
treated lumber); Thermal and moisture protection
(membrane waterproofing, firestopping, expansion
joint system, sealants); Doors and Windows (steel
door frames, wood doors, access doors, aluminum
automatic sliding, doors and sidelites, finish
hardware, glazing); Finishes (lath and plaster,
gypsum wallboard, ceramic tile, terrazzo floor,
acoustical ceiling, resilient tile floor,
exterior finish system, painting, wall covering);
Specialties (solid polymer toilet partitions and
urinal screens, identifying devices, toilet and
bath accessories, miscellaneous specialties);
Furnishings (office furniture); Special
Construction (removal and disposal of asbestos-
containing materials, disturbance of lead
containing materials, removal and disposal of
polychlorinated biphenyls {pcbs} and mercury,
testing/air monitoring); Conveying Sytems
(elevators); Mechanical (plumbing); Electrical
(basic electrical materials and methods,
underground electrical, lighting).
|
|
| Owner Solicitation Name: | Seal Cracks at Pier 11 Ramp, Honolulu Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mobilization and Demobilization; Sealing Cracks.
|
|
| Owner Solicitation Name: | Repaint Exterior of Piers 10-11 Sheds, Honolulu Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mobilization and Demobilization; Painting; Gutter
Repairs.
|
|
| Owner Solicitation Name: | Replace Roll-Up Doors at Piers 13-14 Shed, Honolulu Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mobilization and Demobilization; Removing
Existing Roll-Up Doors; Concrete Repairs; New
Roll-Up Doors; Painting; Lead-Based Paint
Abatement and Disposal.
|
|
| Owner Solicitation Name: | Oaha District Rear Maintenance Yard Resurfacing
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork (clearing and grubbing, water pollution
and erosion control); Bases (brooming off);
Pavements (asphalt concrete pavement, bituminous
tack coat); Structures (concrete masonry unit
wall); Incidental Construction (cold planing of
existing pavement, security guard service,
mobilization); Materials (bituminous materials,
aggregates, masonry unit, joint materials, cullet
and cullet-made materials).
|
|
| Owner Solicitation Name: | Furnishing and Delivering Safety Equipment for DOT - Highways Division
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering Safety Equipment.
|
|
| Owner Solicitation Name: | Furnishing and Delivering Kauai District Office Furniture
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering Safety Equipment.
|
|
| Owner Solicitation Name: | Window Replacement Phase II Project at Kula Hospital
|
| Owner Name: | Hawaii Health Systems Corporation (HHSC)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Window replacement.
|
|
| Owner Solicitation Name: | Facility Plan for Wailua Wastewater Treatment Plant, Wailua, Kauai
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | of a wastewater facility plan: determining the
actual capacity of the wastewater treatment
plant, identifying the limitations or
constraining processes, projecting and estimating
ultimate flows to the treatment plant,
determining methods of expanding the plant to
accommodate the projected/ultimate flows or
replacement with a new plant, recommendation for
upgrading R-2 effluent quality water to R-1
quality effluent, preparation of an environmental
assessment report and other appurtenant issues.
|
|
| Owner Solicitation Name: | Consolidated Construction Projects, PRL 99-15, PRL 99-21, PRL 03-12, and PRL 02-11, Repair Red Hill Tank Numbers 1, Fleet and Industrial Supply Center
|
| Owner Name: | Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Division, Pacific Division/NAVFACENGCOM
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all labor, materials, and equipment
necessary to complete repair work at 4
underground fuel storage tanks. Cleaning tanks,
disposing wastes, and providing a certified gas
free environment with temporary ventilation and
lighting to complete underground tank repair
work. Repairing leaks, repairing upper and lower
tank domes, barrels, and welds; restoring center
towers and telescoping booms; providing
structural repairs; providing hydrostatic leak
tests; and other incidental work.
|
|
| Owner Solicitation Name: | Kennedy Theatre Replace Air Conditioning System, Uh, Manoa
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: selective demolition, metals
structural metal framing, thermal and moisture
protection: fluid applied roof coating, flashing
and sheet metal, sealants, finishes: painting,
specialties: metal wall louvers, special
construction: asbestos removal and disposal,
management of lead hazards, mechanical: general
mechanical requirements, noise and vibration
control, air conditioning and ventilation,
mechanical cleaning of HVAC systems, automatic
temperature controls, electrical: general
electrical provisions, basic electrical materials
and methods.
|
|
| Owner Solicitation Name: | Kalanimoku Building No. 3 Chiller and Cooling Towers Replacement
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective removal work, flashing and sheet metal
work, patching of roofing, structural steel,
miscellaneous metal work, painting, replacement
of chiller, chilled water condenser pumps,
cooling towers and associate piping, electrical
connections and controls, and incidental related
work.
|
|
| Owner Solicitation Name: | Repair Building #22 Renovation, Hawaii Army National Guard, Pearl City
|
| Owner Name: | State of Hawaii Dept. of Defense, Engineering Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: site demolition, earthwork for
structures and pavements, excavation, backfilling
and compacting for utilities, water distribution,
bituminous concrete pavement, bituminous concrete
pavement, bituminous prime coat, bituminous tack
coat, chain link fences and gates, concrete: cast-
in-place concrete, masonry: reinforced masonry,
metals: metal fabrications, woods and plastics:
rough carpentry, thermal and moisture protection:
flashing and sheet metal, firestopping, joint
sealants, doors and windows: steel doors and
frames, rolling service doors, door hardware,
finishes: metal support assemblies, gypsum board,
paints and coatings, specialties: identification
devices, special construction: preengineered
metal bldg., engineering control of asbestos
containing materials, lead in construction, wet-
pipe fire suppression sprinklers, electrical:
basic electrical materials and methods,
electrical distribution system, underground,
interior distribution system, interior lighting
|
|
| Owner Solicitation Name: | Hokulani Elementary School Various Buildings - Replace Carpet And Tiles
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of existing carpet and the installation
of new carpet and vinyl composition tile.
|
|
| Owner Solicitation Name: | Lihue Health Center Air Conditioning System Improvements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective removal work, sheet metal, painting,
air conditioning system improvements, electrical
work, and incidental related work.
|
|
| Owner Solicitation Name: | Kamehameha Highway Drainage Improvements, Vicinity of Waiau Power Plant
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork (clearing and grubbing, removal of
structures and obstructions, water pollution and
erosion control); Bases (aggregate base course);
Pavements (asphalt concrete pavement); Structures
(concrete structures); Incidental Construction
(structural concrete, reinforcing steel, fences,
traffic control signs, traffic control devices,
concrete retrofit, mobilization); Materials
(bituminous materials, aggregates, joint
materials, structural steel and related
materials, cullet and cullet-made materials).
|
|
| Owner Solicitation Name: | FY03 DAR Replacement Bldgs at Saddle Road
|
| Owner Name: | U.S. Army Corps of Engineers - District Honolulu
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | modified design and construction of four billets
and one 64' x 64' Recreation Center Recreation
Center will be primarily used by military
personnel for indoor recreational purposes and as
a social/meeting type facility. Design allows for
subdividing the multipurpose area into two rooms
via a folding partition. The facility provides a
kitchen area, storage rooms, restrooms, outside
lanai, air conditioning, and appropriate
utilities. Exterior wall is split-faced CMU and
shadow-block CMU with sloping standing seam metal
roofing. The roof rafters are heavy timber
exposed beam and exposed 2x6 T&G wood decking.
|
|
| Owner Solicitation Name: | Off-Campus Student Housing
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Off-Campus Student Housing.
|
|
| Owner Solicitation Name: | Municipal Solid Waste Recycling Facility
|
| Owner Name: | Honolulu City & County Dept. of Budget and Fiscal Services - Division of Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Municipal solid waste recycling facility.
|
|
| Owner Solicitation Name: | Department of Health Laboratory Emergency Power Upgrade
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New branch conduits, wiring, receptacles, and
empty conduits for data and telecommunication
use.
|
|
| Owner Solicitation Name: | Wailuku Health Center Laboratory Building Expansion
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Laboratory Building Expansion: Construction of a
new laboratory addition with a Laboratory,
Office, Chemical Storage Room and BSL Room to the
existing laboratory facility: demolition of any
existing chemical storage addition, structural
concrete slab, reinforced concrete masonry walls,
wood roof framing, composition shingle roofing,
partitions, interior and exterior finishes,
plumbing, air conditioning, electrical work, and
miscellaneous related work, laboratory cabinets
and associated plumbing fixtures. Provide air
conditioning for new Laboratory, Office, BSL Room
and existing Office.
|
|
| Owner Solicitation Name: | Furnishing and Delivering Motor Vehicles, Trailers, Utility Tractors and Equipment for DOT - Highway Division
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering Motor Vehicles,
Trailers, Utility Tractors and Equipment.
|
|
| Owner Solicitation Name: | Furnishing and Delivering Street Light Luminaires, Photoelectric Controls, Street Light Poles with Mast Arms and Cables
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering Street Light
Luminaires, Photoelectric Controls, Street Light
Poles with Mast Arms and Cables.
|
|
| Owner Solicitation Name: | Fort Weaver Road Widening Near Laulaunui Street
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork (clearing and grubbing, removal of
structures and obstructions, excavation and
embankment, excavation and backfill for conduits
and structures, water pollution and erosion
control); Bases (plant mix asphalt concrete base
course, recycled plant mix asphalt concrete base
course, aggregate base course, aggregate subbase
course, untreated permeable base course, brooming
off, plant mix glassphalt concrete base course,
controlled low strength material for utilities
and structures); Pavements (asphalt concrete
pavement, bituminous tack coat, portland cement
concrete pavement, prime coat for untreated
permeable base course); Structures (concrete
structures, cement rubble masonry, bus shelter);
Incidental Construction (structural concrete,
reinforcing steel, culverts and storm drains,
manholes, inlets and catch basins, underdrains,
guardrail, fences, sidewalks, curb and/or gutter,
grouted rubble paving, sprinkler system, grassed
surfaces, planting and transplanting, traffic
control signs, roadway lighting system, traffic
signal system, pavement markings, project field
office, traffic control devices, temporary
portable concrete barrier, curb ramps, electrical
utility adjustments, traffic surveillance and
monitoring system, mobilization); Materials
(bituminous materials, aggregates, concrete,
clay, and plastic pipe, fence and guardrail,
miscellaneous [frames, grates, covers and ladder
rungs, luminaires, cables, conductors and wires,
traffic signals and appurtenances, preformed
pavement marking tape, hot applied rubberized
sealant], cullet and cullet-made materials).
|
|
| Owner Solicitation Name: | Seismic retrofit of various bridges
|
| Owner Name: | Dept. of Transportation-Hawaii , DOT
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork - clearing and grubing, removal of
structurs and obstructions, excavation and
backfill for conduits and structures, water
pollution and erosion control; Structures - steel
structures, concrete structures, post-tension
thread bar; Incidental Construction - structural
concrete, reinforcing steel, traffic control
signs, field office, traffic control devices,
restrainers, drilling holes and installing
dowels, composite epoxy resin-fiber system, high
density polyethylene pipe, permanent rock
anchors, construction parcel, mobiliation
|
|
| Owner Solicitation Name: | Furnish, Deliver, Install, And Maintain Security Alarm System For Maui Community College, Uh
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish, deliver, install, and maintain security
alarm system.
|
|
| Owner Solicitation Name: | Furnishing Maintenance Services For Passenger Elevators For The Department Of Health,
|
| Owner Name: | HI State Procurement Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing maintenance services for passenger
elevators.
|
|
| Owner Solicitation Name: | P-193, Waterfront Improvements for K10-K11, Fleet Industrial Supply Center, Pearl Harbor
|
| Owner Name: | Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Division, Pacific Division/NAVFACENGCOM
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolish 73m (240 LF) of the existing portion of
Supply Wharf K11 and construct a new concrete
wharf on concrete piles with the capacity to
support supply loading and unloading operations.
Demolish existing waterfront transit
storage/staging facility, Building 478, and
construct a new 4,505 sm (48,486 sf) Waterfront
Transit shed of a single story steel frame
building with metal roof deck, asphalt concrete
pavement, concrete and pile foundations, supports
for utility service, fire protection, cargo
container loading docks, and security cage. A two
story CMU structure will be constructed on the
northern end of the new Waterfront Transit shed
to house wharf operation offices, rest rooms,
break rooms, conference/training room, elevator,
mechanical and electrical rooms, fire pump room
and a hazardous material storage area. Utility
work will include relocation of water, drain and
fuel lines, addition of two fuel risers at the
West end of K-11, relocation of light poles, and
the addition of operational area lighting.
Electrical service from Building 479, Station K4,
will be terminated for Building 478.
|
|
| Owner Solicitation Name: | Inspection, Maintenance, And Repair Of The Vertical Pump Drain Systems And Associated Electrical Equipment
|
| Owner Name: | Honolulu City & County Dept. of Budget and Fiscal Services - Division of Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Inspection, maintenance, and repair of the
vertical pump drain systems and associated
electrical equipment.
|
|
| Owner Solicitation Name: | Provide all Labor, Materials, Equipment, Management, Supervision, Tools, Services, Transportatioin and all Incidental Items Necessary to Construct Dip
|
| Owner Name: | US Army Contracting Agency (ACA), Fort Shafter, Regional Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all labor, materials, equipment,
management, supervision, tools, services,
transportatioin and all incidental items
necessary to Construct Dip Pond.
|
|
| Owner Solicitation Name: | Furnishing and Delivering Dump Trucks, Truck Tractors, Loader/Backhoe, Tractor Mowers, Utility Vehicle, Riding Mowers, Aerator,Water Tank Truck,
|
| Owner Name: | Hawaii, County of, Dept. of Finance, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivering dump trucks, truck
tractors, loader/backhoe, tractor mowers, utility
vehicle, riding mowers, aerator, water tank
truck, cargo van, command vehicle, compaction
trailers, trailer and/or other miscellaneous
equipment including lease/purchase agreements.
|
|
| Owner Solicitation Name: | Furnishing And Delivery Of Chain Link Fabric And Accessories
|
| Owner Name: | Honolulu City & County Dept. of Budget and Fiscal Services - Division of Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivery of chain link fabric and
accessories.
|
|
| Owner Solicitation Name: | Replacement of Backflow Prevention Devices at Lihue Airport
|
| Owner Name: | Dept. of Transportation-Kauai
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The scope of work consists of the removal and
disposal of the existing backflow prevention
devices and replacing with new backflow
prevention devices.
|
|
| Owner Solicitation Name: | Furnishing and Delivering of a Mid Size Sweeper to the Dillingham Airfield, Waialua
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering of a Mid Size Sweeper.
|
|
| Owner Solicitation Name: | Furnishing and Delivering of a Heavy Duty Grass Cutter to the Honolulu International Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering of a Heavy Duty Grass
Cutter.
|
|
| Owner Solicitation Name: | Pier 2 Warehouse and Office Improvements
|
| Owner Name: | Hawaii Dept. of Business, Economic Development & Tourism (DBEDT), Administrative Services Office/Contracts
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supplying all labor, equipment, and materials for
services related to, but are not limited to, the
construction of a mezzanine space addition for
office, utility room and toilet rooms, a
warehouse space at ground level for work shops
and cold storage, and a stairway; construction of
a new chill units, equipment pad and chain link
fence; installation of an air conditioning
system; modification of existing air duct and
water piping system; replacement of existing fan
coil unites; addition fan coil units and fire
sprinkling system, and incidental related works.
|
|
| Owner Solicitation Name: | Z- AF Fy04 Mcaf Project, Repair Airfield Pavement, Phase 3 And Upgrade Island Wide Infrastructure, Phase 1
|
| Owner Name: | Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Division, Pacific Division/NAVFACENGCOM
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | replacement of the existing deteriorated asphalt
concrete (AC) pavement with new AC pavement in
areas of the parallel taxiway, warm up pad,
ladder taxiway, taxiway A, taxiway B, and
auxiliary apron, pavement marking, airfield
lighting and incidental related work.
|
|
| Owner Solicitation Name: | Furnishing and Delivery of Solid Waste Management Equipment
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivery of solid waste management
equipment.
|
|
| Owner Solicitation Name: | Medical/Dental Clinic Replacement
|
| Owner Name: | Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Division, Pacific Division/NAVFACENGCOM
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a single story outpatient clinic
to provide medical and dental care to
beneficiaries. Constructing the east and west
parking lots, demolishing the existing parking
lot west of the existing clinic building and
constructing the Clinic Replacement then
demolishing the existing clinic building and
finally constructing the ambulance shelter, trash
enclosure and service area and drive. Reinforced
concrete foundation, slab, walls, and roof;
roofing; doors; windows; and finishes for
building envelope. Interior work shall include
interior partitions and finishes, doors,
millwork, medical equipment, mechanical,
electrical, and fire protection.
|
|
| Owner Solicitation Name: | Kaneohe/Kamehameha Highway Reconstructed Sewer
|
| Owner Name: | Honolulu City & County Dept. of Budget and Fiscal Services - Division of Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clean, televise & rehabilitate approx. 2,200 LF
of 27" sewer with CIPP, rehabilitate manholes,
lateral & sewer chimney reinstatement. Sewer
bypass pumping. See attached bid sheet for all
bid items.
|
|
| Owner Solicitation Name: | Hilo Waste Water Treatment Plant Replace Grit Classifiers
|
| Owner Name: | Hawaii County Administration Office, Dept. of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: controlled low strength material,
concrete: concrete reinforcement, cementitious
crystalline grout, non-shrink concrete grout,
structural repair mortar, metals: grit hopper and
cover, finishes: coating systems, equipment: grit
classifiers, bin valve, mechanical: general
mechanical requirements, process piping, foul air
piping, fittings, and appurtenances, eccentric
plug valves, ball, butterfly, and solenoid
valves, electrical: electrical controls and
relays, electrical hangers and supports,
electrical identification, minor electrical
demolition, enclosed switches.
|
|
| Owner Solicitation Name: | Hilo Wastewater Treatment Plant - Replace Grit Classifiers
|
| Owner Name: | Hawaii County Water Supply Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Wastewater treatment plant - replace grit
classifiers.
|
|
| Owner Solicitation Name: | Malaekahana State Recreation Area Ada Barrier Removal
|
| Owner Name: | Hawaii Dept. of Land & Natural Resources (DLNR)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: demolition, demolition of surfaces
with lead-containing paint, site preparation,
clearing and grubbing, earthwork, aggregate base
course, geotextile, portland cement concrete
pavement, pavement markings, copper pipe and
fittings, concrete: reinforcing steel, joint
sealers, concrete, concrete sidewalk, epoxy
adhesive, masonry: concrete masonry unit, metals:
metal fabrications: woods and Plastics: rough
carpentry, preservative treated lumber, plastic
picnic table, finishes: painting, specialties:
toilet partitions, toilet accessories, plumbing.
|
|
| Owner Solicitation Name: | Kahana Valley State Park Ada Barrier Removal
|
| Owner Name: | Hawaii Dept. of Land & Natural Resources (DLNR)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: demolition, site preparation, clearing
and grubbing, earthwork, aggregate base course,
soil treatment for vegetation control, aspdhaltic
concrete, tack coat, portland cement concrete
pavement, pavement markings, concrete:
reinforcing steel, joint sealers, concrete,
concrete sidewalk, epoxy adhesive, metals: metal
fabrications, woods and plastics: rough
carpentry, preservative treated lumber, plastic
picnic table, finishes: painting, specialties:
toilet partitions, toilet accessories, plumbing.
|
|
| Owner Solicitation Name: | Heeia-Kea Small Boat Harbor Comfort Station
|
| Owner Name: | Hawaii Dept. of Land & Natural Resources (DLNR)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mmobilization and demobilization; pollution
control; project signs; site demolition and
removal; demolition; site preparation work; soil
treatment for termite control; asphaltic concrete
paving; water systems; sanitary sewer system;
concrete formwork; concrete reinforcement; cast-
in-place concrete; concrete unit masonry; rough
carpentry; finish carpentry; preservative treated
lumber; fiber glass composite shakes; flashing
and sheet metal; sealants; fiberglass reinforced
polyester doors and frames; finish hardware;
ceramic tile; painting; solid phenolic toilet
doors; pvc louvers; building signage; basic
plumbing materials and methods; plumbing system;
plumbing fixtures and trim; basic electrical
materials and methods; lighting
|
|
| Owner Solicitation Name: | August Ahrens Elementary School Building L - Replace Air Conditioning
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site construction: demolition and removal, soil
treatment for termite control, concrete concrete,
thermal and moisture protection: built-up
roofing, flashing and sheet metal, sealants,
doors and windows: steel doors and frames, finish
hardware, finishes: gypsum wallboard, exterior
finish system, painting, specialties: louvers and
vents, mechanical: general mechanical
requirements, insulation of mechanical systems,
air conditioning and ventilation, control
systems, electrical: electrical work.
|
|
| Owner Solicitation Name: | Seafarers International Union Fire Training Center Project
|
| Owner Name: | Research Corporation of the University of Hawaii (RCUH)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Seafarers International Union Fire Training
Center Project.
|
|
| Owner Solicitation Name: | Facility Plan for Wailua Wastewater Treatment Plant, Wailua, Kauai
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Preparation of a wastewater facility plan:
determining the actual capacity of the wastewater
treatment plant, identifying the limitations or
constraining processes, projecting and estimating
ultimate flows to the treatment plant,
determining methods of expanding the plant to
accommodate the projected/ultimate flows or
replacement with a new plant, recommendation for
upgrading R-2 effluent quality water to R-1
quality effluent, preparation of an environmental
assessment report and other appurtenant issues.
|
|
| Owner Solicitation Name: | Plans, Relocate/ Remove Transformers, Maui Community College, University of Hawaii, Kahului, Hawaii
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing one transformer and relocating a second
transformer, installing a roof and expanded door,
and removal and disposal of air conditioning
equipment. The work includes but is not limited
to installation of temporary and permanent power
feeds, transferring of feeders for two buildings
to relocated transformer, disposal of one
transformer, draining and delivering of oil to an
oil disposal or recycling facility, performance
of all specified electrical tests and related
work.
|
|
| Owner Solicitation Name: | Renovate Elevator, Library Building 8807, Honolulu Community College
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition, removal of existing elevator,
installation of new ADA compliant elevator,
installation of new ADA door operator, rehang and
reset existing pair aluminum exit doors,
installation of new removable galvanized steel
railings, cutting and patching of walls,
painting, electrical, and related work.
|
|
| Owner Solicitation Name: | Seafarers International Uniion Fire Training Center, Kalaeloa - Barbers Point
|
| Owner Name: | Research Corporation of the University of Hawaii (RCUH)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: water system, drainage system,
flexible pavement, chain link fences and gates,
concrete: concrete formwork, concrete
reinforcement, cast-in-place concrete, metals:
metal fabrication, thermal and moisture
protection: sealants and caulking, doors and
windows: steel doors and frames, finish hardware,
finishes: ceramic tile, painting, mechanical:
plumbing, packaged water recycling system, air
conditioning and ventilation, electrical.
|
|
| Owner Solicitation Name: | Furnishing, Delivery, and Installation of Networking Equipment for the County of Kauai
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing, Delivery, and Installation of
Networking Equipment
|
|
| Owner Solicitation Name: | Furnishing and Delivery of Three 58,000 lb. GVWR Truck Cab & Chassis With Automated Side Loading Refuse Body
|
| Owner Name: | Maui County, Purchasing Division, Dept. of Finance
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivery of three (3) 58,000 lb.
Gvwr truck cab & chassis with automated side
loading refuse body
|
|
| Owner Solicitation Name: | Furnishing and Delivering of Street Sweeper at the Kahului Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering of Street Sweeper.
|
|
| Owner Solicitation Name: | Furnishing and Delivering Dirt, Sand and Cinder
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivering Dirt, Sand and Cinder.
|
|
| Owner Solicitation Name: | FY03 DAR Replacement Buildings at Saddle Road, Pohakuloa Training Area
|
| Owner Name: | US Army Corps Of Engineers, Honolulu
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | design-Build. Modified design and construction of
4 billets and 1 64' x 64' Recreation Center.
Exterior chain link fence enclosure with gate for
heat pump units on concrete pad. Exterior wall is
split-faced CMU and shadow-block CMU with sloping
standing seam metal roofing. The roof is pre-
engineered roof trusses with thermal insulation
and standing seam metal roofing.
|
|
| Owner Solicitation Name: | Small-Scale Sand Pumping Project Waikiki Beach, Oahu
|
| Owner Name: | Hawaii Dept. of Land & Natural Resources (DLNR)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Conduct an offshore small-scale sand-pumping
project. Offerors will be responsible for
designing a marine sand transfer system that will
deliver a maximum of 10,000 CY of sand (dry
volume) from approximately 2,000' offshore. The
contractor will be responsible for completing the
work and completing an after-project assessment
to discuss the methods used to pump sand, impacts
encountered during the operations, and corrective
measures utilized.
|
|
| Owner Solicitation Name: | Miscellaneous Equipment/Parts: Pumps/Storage Cabinets/ Sampler Controllers/Etc
|
| Owner Name: | Hawaii, County of, Dept. of Finance, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Miscellaneous Equipment/Parts: Pumps/Storage
Cabinets/ Sampler Controllers/Etc
|
|
| Owner Solicitation Name: | Upgrade A/C of Life Sciences (Bldg. 344) South Wing, University of Hawaii at Hilo
|
| Owner Name: | University of Hawaii
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective removal work, earthwork, concrete
equipment pad, chain link fence partition and
gate, ceiling and wall insulation, mechanical
insulation, gypsum board, acoustical suspended
ceiling, resilient tile flooring, painting, sheet
metal, air conditioning, electrical and
incidental related work.
|
|
| Owner Solicitation Name: | Furnish, Deliver and Install Base Station Radio, Rescue Phones, Mobile Radio, and/or Portable Radios for Various Departments
|
| Owner Name: | Hawaii, County of, Dept. of Finance, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish, deliver and install base station radio,
rescue phones, mobile radio, and/or portable
radios.
|
|
| Owner Solicitation Name: | Rehabilitation Of Streets Unit 34, Kailua/Waimanalo
|
| Owner Name: | Honolulu City & County Dept. of Budget and Fiscal Services - Division of Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Resurfacing of various streets, cold planing,
resurfacing of asphalt, concrete pavements,
reconstruction of weakened pavement,
reconstruction of existing bus pad,
reconstruction of existing concrete gutter,
adjustment of utility manhole frames and covers,
vehicle loop detectors, and installation of
pavement markings.
|
|
| Owner Solicitation Name: | Traffic Control Signalization at Various Locations on Oahu, Phase VI.
|
| Owner Name: | Honolulu City & County Dept. of Budget and Fiscal Services - Division of Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Traffic Control Signalization at Various
Locations.
|
|
| Owner Solicitation Name: | Kunia Road Improvements, Vicinity of South Kupuna Loop to Vicinity of Honowai Street
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork (removal of structures and
obstructions, excavation and embankment,
excavation and backfill for conduits and
structures, erosion control, dressing of
shoulders and/or sidewalks); Bases (plant mix
asphalt concrete base course, recycled plant mix
asphalt concrete base course, aggregate subbase
course, brooming off, plant mix glassphalt
concrete base course, controlled low strength
material for utilities and structures); Pavements
(asphalt concrete pavement, tackcoat); Incidental
Construction (structural concrete, reinforcing
steel, culverts and storm drains, manholes,
inlets and catch basins, guardrail, sidewalks,
curb and/or gutter, reinforced concrete
driveways, traffic control signs, roadway
lighting system, traffic signal system, pavement
markings, work zone traffic control, temporary
portable concrete barrier, curb ramps, cold
planning of existing pavement, mobilization);
Materials (bituminous materials, aggregates,
masonry unit, joint materials, fence and
guardrail); Pavements Miscellaneous [frames,
grates, covers and ladder rungs, luminaries,
cables, conductors and wires, controller
equipment, traffic signal appurtenances, pavement
markers, preformed pavement marking tape,
reflective thermoplastic compound pavement
markings, hot applied rubberized sealant,
luminaries and conductor identification],
structural steel and related material, cullet and
cullet-made materials).
|
|
| Owner Solicitation Name: | Installation Of Fire Sprinklers
|
| Owner Name: | East-West Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of fire sprinklers.
|
|
| Owner Solicitation Name: | Aloha Gardens - Helemano Plantation
|
| Owner Name: | ORI Anuenue, Hale, Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading and the construction of infrastructure
and various buildings on a 40 acre site.
|
|
| Owner Solicitation Name: | Upgrade Building Electrical Infrastructure, Campus Wide, Leeward Community College
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work (selective demolition, earthwork for
utilities, asphalt concrete paving, lawns and
grass); concrete (cast-in-place concrete);
thermal and moisture protection (sealants); doors
and windows (steel doors and frames, door
hardware); finishes (gypsum wallboard, painting);
special construction (removal and disposal of
asbestos-containing material, removal and
disposal of lead-based paint, testing and air
monitoring); mechanical (air conditioning and
ventilation); electrical
|
|
| Owner Solicitation Name: | Furnishing Of Services For A Maintenance And Service Contract For Air Conditioning Units And Related Equipment for a 24 Month Period
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing of services for a maintenance and
service contract for air conditioning units and
related equipment for 24 month period.
|
|
| Owner Solicitation Name: | Hamakua Ditch Watershed Project, Phase III Flume Replacement
|
| Owner Name: | Hawaii Dept. of Land & Natural Resources (DLNR)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clearing and grubbing, structure removal,
pollution control, mobilization and
demobilization, removal of water, excavation,
structure concrete, steel reinforcement, plastic
pipe, metal fabrication and installation,
contractor quality control, cement rubble masonry
|
|
| Owner Solicitation Name: | Ka Iwi Scenic Shoreline, Phase 1, Increment 2 Improvements, Federal-Aid Project no. stp-072-1(46), District of Honolulu, Island of Oahu
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Constructing two highway intersections, an
interior road and two parking lots, site work,
undergrounding of overhead lines, installing
guardrails and landscaping
|
|
| Owner Solicitation Name: | Heavy Equipment, Accessories, and Mowers
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Heavy Equipment, Accessories, and Mowers
|
|
| Owner Solicitation Name: | Renovate Building 8807, Library Stairwells, Honolulu Community College
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of existing stairwell light fixtures and
providing new, providing emergency lighting in
all stairwells, removing existing first floor
intermediate landing guardrail, patching existing
concrete floor and providing new security grille
and paint, removing existing floor paint, and
related work.
|
|
| Owner Solicitation Name: | Installation Of Warning Signs Within The Kaho`Olawe Island Reserve
|
| Owner Name: | Kaho`Olawe Island Reserve Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Constructing concrete footings, wood posts, and
anchors for the warning signs and installing the
signs on Kaho’olawe. Warning signs will be
installed on 46 different locations within the
Reserve. Prefabricated warning signs will be made
available to the contractor.
|
|
| Owner Solicitation Name: | Utility Grid Phase III
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical work, installation of single-mode
fiber optic cable, routed underground in inner
duct between buildings, termination with SC
connectors and tested per specifications, earth
work, landscaping, concrete reinforcement and
cast-in-place concrete work, and related work.
|
|
| Owner Solicitation Name: | Replace Cooling Tower and Central Plant Accessories
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace cooling tower and central plant
accessories.
|
|
| Owner Solicitation Name: | FY04 DLA MILCON PN KNMD043001 Replace Phillips Hydrant System; PN KNMD043002 Expand Strategic Aircraft Airlift Ramp; PN KNMD031006 Repair/Inspect Tank
|
| Owner Name: | US Army Corps Of Engineers, Honolulu
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolish an existing pumphouse and associated
piping, existing hydrant outlet pits and
associated lateral control pits, abandon fuel
piping under airfield and fill with lean
concrete, construct a pumphouse to contain five
600gpm pumps, provide twelve hydrant outlet pits
and associated fuel piping, one 500kw emergency
generator, cathodic protection, fire detection,
water and power utility services; demolish
existing aircraft apron and shoulder pavement,
relocate waterlines, fire hydrants, light
standards, apron/taxiway edge lights, fencing,
drainage ditch, dirt mounds on eastside of ramp
just outside existing fence, construct new apron
and shoulder pavement; drain/clean tanks, lift
tanks to install new reinforced concrete ring
walls, sand cushions, secondary containment
liners, leak detection and cathodic protection
systems, remove existing oil sand cushions,
perform tank repairs, and incidental work to
include installation of wear plates under
floating pan legs, weld tests, prep/paint
repaired areas, inspect double wiper seal on
floating pan and interior painting, install seal
between tank floor plates and concrete wing wall,
install high-high and low level alarms, add
service platform, replace existing hand operated
fuel recovery system with electrically operated
pump, perform complete API inspection, install
dike containment, and restore stairways in fuel
tank area.
|
|
| Owner Solicitation Name: | Chinatown Cultural Plaza ADA Renovations - Phase II
|
| Owner Name: | Longevity International Enterprises Corp. (LIEC)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace tenant entry door threshold and hardware.
Provide curb and handrails at existing ramp.
Demolish an existing ramp, steps, handrails, and
door and provide new ramp and handrails.
|
|
| Owner Solicitation Name: | Kahaluu Booster Pump "A" And "B" Repair, Kona
|
| Owner Name: | Hawaii County Water Supply Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Paying for all labor, materials, tools and
equipment necessary to install two booster pumps,
complete with motor and discharge head, including
removal and disposal of two existing booster
pumps.
|
|
| Owner Solicitation Name: | Momilani Elementary School Building B, Accessible Ramp
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Reinforced concrete ramp structure to provide
access to persons with disabilities, roofs, night
lighting, metal security grilles and railings,
and minor demolition for remodeling.
|
|
| Owner Solicitation Name: | McCully Moiliili Public Library, Accessibility And Other Imrpovements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work:selective demolition, asphaltic
concrete paving, concrete car stops, concrete
concrete and masonry repairs, metals: metal
fabrications, thermal and moisture protection:
sealants, doors and windows: steel door frames,
wood doors, door hardware, glazing, finishes:
gypsum board, resilient flooring, painting,
specialties: signage, miscellaneous specialties,
mechanical: mechanical general requirements,
plumbing, air conditioning and ventilation,
electrical: basic electrical materials and
methods.
|
|
| Owner Solicitation Name: | Hilo Intermediate School Building K – Re-Roof
|
| Owner Name: | DAGS-Hawaii
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of standing seam metal roofing, sheet
metal flashing, gutter and accessories. Removal
of existing concrete parapet, Paint finish for
all new repair work.
Bidder must possess a valid State of Hawai‘i
Contractor’s license classification B.
|
|
| Owner Solicitation Name: | Kapolei Elementary School Install Damper Control and Retrofit Doors
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Constructing shelter-in-place systems for
specified buildings.
|
|
| Owner Solicitation Name: | Fire Hydrants And Appurtenances
|
| Owner Name: | Kauai County Dept. of Water
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fire hydrants and appurtenances.
|
|
| Owner Solicitation Name: | This is a Firm Fixed Price Contract to Provide all Labor, Management, Supervision, Tools, Equipt, Materials, Services, Trans, & all Incidental Items
|
| Owner Name: | US Army Contracting Agency (ACA), Fort Shafter, Regional Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove and replace existing air handle units
(AHU) 1, and 4, Drive Units. Install New Motor,
Pulley, and Fly Wheel; Install New VFD System to
match new motor; Install new duct system to four
rooms; and Service 2 each AHU and test operation.
|
|
| Owner Solicitation Name: | Repair and Upgrade Sports Facilities, Phase I
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of sub-grade drainage system and
upgrading of field lighting, concrete spall and
crack repair, replacement of doors and windows,
replacement of traffic coating, painting,
upgrading public address system, reroofing, sheet
metal work, installation of package air
conditioning units, installation of security
lighting, installation of protection netting,
replacement of rubber athletic flooring,
replacement of synthetic turf flooring,
replacement of shade cloth, construction of roof
overhangs, and related work.
|
|
| Owner Solicitation Name: | Installation of (GFCI) 11,100 Gallon Above Ground Storage Tank, Aviation Fuel Tank Farm Facility, USCG Air Station Barbers Point, Kapolei
|
| Owner Name: | DHS - Direct Reports, United States Coast Guard (USCG), Commanding Officer, USCG Civil Engineering Unit Honolulu
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install a Goverment Furnished 11,100-gallon above
ground storage tank. Concrete mounting pads,
grounding and bonding, piping, fittings, flanges,
valves, supports and all related work for a
complete and useable system.
|
|
| Owner Solicitation Name: | Ada Curb Ramp Compliance Program, Phase III, Part B, Districts Of South Kohala, North Kona And South Kona
|
| Owner Name: | Hawaii County Administration Office, Dept. of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork: clearing and grubbing, removal of
structures and obstructions, excavation and
embankment, excavation and backfill for conduits
and structures, water pollution and erosion
control, dressing of shoulders, bases: aggregate
base course, brooming off, asphalt treated
permeable base, control low strength material for
utilities and structures, pavements: asphalt
concrete pavement, bituminous tack coat,
incidental construction: structural concrete,
reinforcing steel, culverts and storm drains,
manholes , inlets and catch basins, sidewalks,
curb and/or gutter, traffic control signs,
traffic signal systems, pavement markings,
traffic control devices, curb ramps, drilling
holes and installing dowel reinforcing bars,
mobilization, materials: bituminous materials,
aggregates, joint materials, miscellaneous [epoxy-
resin system, grout, frames, grates, covers and
ladder rungs, conductors and cables for traffic
signal system, optical units, traffic signals and
appurtenances, preformed pavement marking tape,
reflective thermoplastic compound pavement
markings], structural steel and related material,
cullet and cullet-made materials.
|
|
| Owner Solicitation Name: | Pearl Harbor Kai Elementary School Building F Renovation
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sitework and selective demolition, underground
storage tank investigation, testing, cleaning,
and abandonment (closure-in-place), exterior and
interior doors, windows, infill walls, and
similar items, interior walls, doors, movable
partitions, signage, interior finishes and
similar items, abatement work, and mechanical,
air conditioning, and electrical work.
|
|
| Owner Solicitation Name: | Kauluwela Elementary School Building M (Cafetorium) Asbestos Removal
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asbestos removal.
|
|
| Owner Solicitation Name: | Holualoa Elementary School Grounds - Replace Waterlines
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacing 1" & 3/4" galvanized waterlines with
copper including valves in approximately 5
locations.
|
|
| Owner Solicitation Name: | Haiku Elementary School Area 01 - Add Lights
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Add lights.
|
|
| Owner Solicitation Name: | Waiakea Intermediate School Area 03 - Resurface Playcourt
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Resurfacing the existing paved playcourt and
replacing basketball and volleyball equipment.
|
|
| Owner Solicitation Name: | Kihei Elementary School Campus - Replace Detector Check
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace detector check.
|
|
| Owner Solicitation Name: | Hana High & Elementary School Buildings K & G - Extend Program Bell
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Extend Program Bell.
|
|
| Owner Solicitation Name: | Rehabilitation of Streets, Unit 5B Piikoi Street from Kapiolani Boulivard to Matlock Street
|
| Owner Name: | Honolulu City & County Dept. of Budget and Fiscal Services - Division of Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitation of streets.
|
|
| Owner Solicitation Name: | Upcountry Maui Watershed Project, Distribution Pipeline, Phase 3
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Generally consists of 2,500 LF 20" DIP
irrigation pipeline, Horizontal directional
drilling of approximately 3,000 LF 25.8" OD HDPE
and appurtenant structures. The pipeline will be
below grade and flow via gravity.
|
|
| Owner Solicitation Name: | Maintenance of Motorized Doors at Honolulu International Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Motorized Door Maintenance.
|
|
| Owner Solicitation Name: | Maintenance of the Airport Telephone System, Kahului Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Telephone System Maintenance.
|
|
| Owner Solicitation Name: | Maintenance of 800 MHZ Communication System, Honolulu International Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 800 MHZ Communication System Maintenance.
|
|
| Owner Solicitation Name: | Repair ASP Road Clear,Repair Drainage Ditches, Repair Electrical,Comm Lines, Conduits, Boxes, etc.Provide Recommendations
|
| Owner Name: | US Army Contracting Agency (ACA), Fort Shafter, Regional Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair ASP Road. Clear/repair drainage ditches,
repair electrical/comm lines, conduits, boxes.
Provide recommendations/workplan to prevent
further damage from future rain storms.
|
|
| Owner Solicitation Name: | Replace Bollard at Pier 2, Nawiliwili Harbor
|
| Owner Name: | Dept. of Transportation-Kauai
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repairing the damaged concrete deck and
installing a new mooring bollard at pier,
painting the new bollard.
|
|
| Owner Solicitation Name: | Haiku Elementary School Area 01 - Add Lights
|
| Owner Name: | Dept. of Transportation, DOT - Maui
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site Construction (asphaltic concrete paving,
lawns and grass), Concrete (concrete work),
Electrical (general requirements for electrical
work).
|
|
| Owner Solicitation Name: | Hana High and Elementary School Building K & G - Extend Program Bell
|
| Owner Name: | Dept. of Transportation, DOT - Maui
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Finishes (painting), Electrical (general
requirements for electrical work, raceways,
fittings, and supports, conductors, wire and
cable).
|
|
| Owner Solicitation Name: | Kihei Elementary School Campus - Replace Detector Check
|
| Owner Name: | Dept. of Transportation, DOT - Maui
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site Construction (demolition and removal,
vegetation control, asphlatic concrete paving,
water system, lawns and grass), Concrete
(concrete work), Masonry (unit masonry
assemblies), Metals (metal fabrication).
|
|
| Owner Solicitation Name: | Repaint Light Poles and Service Enclosures, Kalaeloa Barbers Point Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing the existing paint and repainting the
existing light poles, electrical cabinets, light
pole stanchions, fire hydrants and other service
enclosures.
|
|
| Owner Solicitation Name: | Pavement Repairs at Fort Armstrong
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repairing damaged AC pavement, pavement markings.
|
|
| Owner Solicitation Name: | Replace Fenders at Pier 39-E, Honolulu Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacing a portion of the existing fender system
at pier, removing the existing fender system,
concrete repairs, and installing a new rubber
fender system.
|
|
| Owner Solicitation Name: | Monitoring and Maintenance of Water System, Honolulu International Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing and replacing the existing waterline and
hatches at pier.
|
|
| Owner Solicitation Name: | Aloha Gardens Wastewater Treatment Facility
|
| Owner Name: | ORI Anuenue, Hale, Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and installing of a wastewater
treatment facility that meets the necessary
effluent quality criteria to allow for effluent
disposal by reuse effluent as irrigation. The
wastewater facility shall have at minimum the
capability to treat the influent to R-2 standards
of compliance or the necessary standard for reuse
as irrigation water on vegetation.
|
|
| Owner Solicitation Name: | Application Of A Metal Roof Coating At The Hanapepe Multi-Purpose Complex
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Exterior metal including but not limited to metal
roof deck, metal roof vents, interior of gutters
and related roof penetrations.
|
|
| Owner Solicitation Name: | Renovation of Auxiliary Services (Bldg. 300) and Business Office (Bldg. 300A), University of Hawaii at Hilo
|
| Owner Name: | University of Hawaii - Oahu, Procurement/Property Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective removal work, asbestos-containing
material abatement, lead-containing paint related
work, concrete walkway, concrete unit masonry
wall, carpentry and millwork, ceiling and wall
insulation, doors, aluminum jalousie windows, one-
way mirror, cashier counter, gypsum board
partitions, ceramic tile, acoustical suspended
ceilings, resilient tile flooring, painting,
toilet partitions, toilet accessories, plumbing,
air conditioning and ventilation, sheet metal,
mechanical insulation, electrical and incidental
related work.
|
|
| Owner Solicitation Name: | Provide, Operate and MaintainTransoceanic Optical Transport - Pacific (TOT-P) Diverse Facilities under Indefeasible Right of Use for DoD Users Primari
|
| Owner Name: | Defense Information Systems Agency, Acquisition Directorate, DITCO-Pacific
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | End-to-end assured diverse and protected OC-3c
through OC-192c indefeasible right of use (IRU)
capital leased trunks between the Government
Furnished Equipment (GFE)/Vendor provided fiber
distribution panels for locations in the CONUS
and Pacific OCONUS and the GFE/Vendor provided
fiber distribution panels in the Pacific theatre.
Each DISN TOT-P protected circuit at data rates
of OC-3c, OC-12c, OC-48c and OC-192c, when
specified with End-to-End Assured Diversity in
the Telecommunications Request (TR), shall be
provided with complete physical diversity
(facilities and route avoidance) end-to-end.
Each protected OC-3c through OC-192c shall be
provided with complete physical diversity
(facilities and route avoidance) from all other
circuits or systems identified in the
Telecommunications Request (TR).
|
|
| Owner Solicitation Name: | Landscape Maintenance Services at the Kalihi-Palama Bus Facility
|
| Owner Name: | Oahu Transit Services, Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Landscape maintenance services.
|
|
| Owner Solicitation Name: | Painting Of Various County Buildings
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Exterior and interior painting of the gym and Gym
the gym floor and lines, and excluding the
exterior of the gym's metal side panels and top
of the roof. The interior and exterior painting
of , excluding the top of the roof. The exterior
only , excluding the roof tops, and the locker
room floor only Locker Roof.
|
|
| Owner Solicitation Name: | Consolidated Construction Projects, Repair Redhill Tank Numbers 1, 15, 6 And 16, Fleet And Industrial Supply Center, Pearl Harbor
|
| Owner Name: | Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Division, Pacific Division/NAVFACENGCOM
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction contractor is expected to provide
all labor, materials, and equipment necessary to
complete repair work at four underground fuel
storage tanks. Tank preparatory repair work will
consist of cleaning tanks, disposing wastes, and
providing a certified gas free environment with
temporary ventilation and lighting to complete
underground tank repair work. Tank repair work
will generally consist of repairing leaks,
repairing upper and lower tank domes, barrels,
and welds; restoring center towers and
telescoping booms; providing structural repairs;
providing hydrostatic leak tests; and other
incidental work.
|
|
| Owner Solicitation Name: | Aloha Stadium Lower Halawa Parking Lot Improvements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitation and resurfacing of a Parking Lot
which includes cold planing and resurfacing,
excavation and base repair, restriping, and other
miscellaneous items of work.
|
|
| Owner Solicitation Name: | Hilo Judiciary Complex Judiciary Building
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a new judiciary building, site,
landscaping, parking, and utility improvements.
|
|
| Owner Solicitation Name: | Highlands Intermediate School Music Building Extension
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Single story building with reinforced concrete
foundations and floor slab, concrete unit masonry
walls, open web joist, metal roof deck, concrete
topping, rigid roof insulation, modified bitumen
sheet roofing, flashing and sheet metal work,
doors, architectural finishes, building
specialties, fire alarm systems, plumbing, air
conditioning and ventilation, electrical work,
exterior utility system, asphalt concrete
pavement, landscaping, and incidental site work.
|
|
| Owner Solicitation Name: | Energy Emergency Preparedness Programs and Plans
|
| Owner Name: | Hawaii Dept. of Business, Economic Development & Tourism (DBEDT), Administrative Services Office/Contracts
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Update of the State of Hawaii Energy Emergency
Preparedness Program and Plans.
|
|
| Owner Solicitation Name: | Kuakini Highway Improvements, Palani Road To Hualalai Road, North Kona
|
| Owner Name: | Hawaii County Administration Office, Dept. of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earthwork: clearing and grubbing, removal of
structures and obstructions, excavation and
embankment, excavation and backfill for conduits
and structures, water pollution and erosion
control, dressing of shoulders, bases: plant mix
asphalt concrete base course, aggregate base
course, aggregate subbase course, brooming off,
plant mix glassphalt concrete base course,
controlled low strength material for utilities
and structures, pavements: asphalt concrete
pavement, bituminous tack coat, prime coat,
portland cement concrete pavement, structures:
concrete structures, railings, cement rubble
masonry, drilled shafts, incidental construction:
structural concrete, reinforcing steel, manholes,
inlets and catch basins, guardrail, fences,
sidewalks, curb and/or gutter, reinforced
concrete driveways, grouted rubble paving,
centerline and reference survey monuments,
standard street survey monuments, sprinkler
system, planting soil, grassed surface, planting
and transplanting, dust control, traffic control
signs, roadway lighting system, traffic signal
system, water system, sewer system, gas system,
shotcrete, pavement markings, underground
electric and telephone system, microcomputer
system, field office and project site laboratory,
cellular phone, traffic control devices, curb
ramps, drilling holes and installing dowel
reinforcing bars, manufactured stone facing, soil
anchors, property adjustment, project vehicles,
training special provisions, mobilization,
materials: bituminous materials, aggregates,
painting, fence and guardrail, miscellaneous
[epoxy-resin system, grout, frames, grates,
covers and ladder rungs, luminaries,
miscellaneous, cables, conductors, and wires,
controller equipment, traffic signals and
appurtenances, performed pavement marking tape,
hot applied rubberized sealant, root barrier,
luminaire and conductor identification,
engineering tool kit], structural steel and
related materials, cullet and cullet-made
materials)
|
|
| Owner Solicitation Name: | Waialua Elementary School Fire Alarm Upgrade
|
| Owner Name: | Hawaii State Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | School fire alarm upgrade.
|
|
| Owner Solicitation Name: | Kalihi Kai Elementary School Accessibility Improvements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective demolition, concrete patching, soil
treatment, carpentry, wood door and finish
hardware, gypsum wallboard, ceramic tile,
painting, toilet partitions, toilet accessories,
plumbing and miscellaneous related work.
|
|
| Owner Solicitation Name: | Athletic Complex Improvements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Athletic complex improvements.
|
|
| Owner Solicitation Name: | Waimanalo Elementary/Intermediate School Replace Program Bell
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace Program Bell.
|
|
| Owner Solicitation Name: | Waianae High School Building M - Bathroom/Locker Room Accessibility Improvements
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovating the existing locker room and restroom
for accessibility improvements:
1) replacing the existing ceramic tile finishes,
2) replacing all restroom plumbing fixtures,
3) constructing drywall partitions and lavatory
countertops,
4) installing toilet partitions and accessories,
5) installing an accessible shower stall.
|
|
| Owner Solicitation Name: | Kalakaua Intermediate School Replace Grease Trap
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace Grease Trap.
|
|
| Owner Solicitation Name: | Pauoa Elementary School Various Buildings - Replace Carpet and Tile
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of existing carpet and the installation
of new carpet and vinyl composition tile.
|
|
| Owner Solicitation Name: | Kula Elementary School Building D - Replace Kitchen Hood
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Maui District Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Thermal and moisture protection: flashing and
sheet metal, sealants, finishes: repainting
[exterior and interior], special construction:wet
chemical fire extinguishing system, mechanical:
general mechanical requirements, air handling
units, electrical general requirements, interior
wiring systems.
|
|
| Owner Solicitation Name: | Maintenance of Air Conditioning Equipment, Kahului Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair and maintenance of air conditioning
equipment at airport.
|
|
| Owner Solicitation Name: | Construct Room Bldg 1004 Wheeler Army AirField, Oahu, HI, Demo Existing Storage, Construct CMU Wall, Concrete Floor With new Floor Tiles, 8' Ceiling
|
| Owner Name: | US Army Contracting Agency (ACA), Fort Shafter, Regional Contracting Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct Room Bldg, Demo existing storage,
Construct CMU wall, concrete floor with new floor
tiles, 8' ceiling, 2-windows and roof. Provide
new lighting system and outlets.
|
|
| Owner Solicitation Name: | Metal Channel, Splice, Hanger, and Nuts
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivering Metal Channel, Splice,
Hanger, and Nuts
|
|
| Owner Solicitation Name: | Reroofing Of The Kalaheo Neighborhood Center
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Re-roofing services.
|
|
| Owner Solicitation Name: | Renovation of Learning Resource Center (Bldg. 334) and Wentworth Hall (Bldg. 348), University of Hawaii at Hilo
|
| Owner Name: | University of Hawaii
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective removal work, hazardous abatement work
which includes removal and disposal of asbestos-
containing materials and lead-containing paint,
concrete walkway, concrete unit masonry wall,
carpentry and millwork, ceiling and wall
insulation, doors, aluminum windows, gypsum board
partitions, ceramic tile, acoustical suspended
ceilings, resilient tile flooring, painting,
toilet partitions, toilet accessories, plumbing,
air conditioning and ventilation, electrical and
incidental related work.
|
|
| Owner Solicitation Name: | Kaahumanu Hale Reroofing and Waterproofing
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Re-roofing, flashing, re-sealing joints,
painting, metal roofing, replacement of roof
drains, replacement of exhaust fan duct work,7
removal of asbestos containing material and minor
electrical work.
|
|
| Owner Solicitation Name: | Capitol Center Building Replace Air Conditioning Chiller
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: selective demolition, metals: metal
fabrications, thermal and moisture protection:
roofing patch work, flashing and sheet metal,
sealants, finishes: painting, mechanical: air
conditioning, electrical: electrical work.
|
|
| Owner Solicitation Name: | Repair Subsidence at Piers 2-3, Hilo Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing and replacing the existing AC pavements
at piers.
|
|
| Owner Solicitation Name: | Repair Fender System, Port Allen
|
| Owner Name: | Dept. of Transportation-Kauai
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing and repairing the existing wooden fender
system.
|
|
| Owner Solicitation Name: | Helemano Elementary School Replace Alarm System
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Complete replacement of the existing fire alarm
system with a new hard wired fire alarm system
and other related incidental work.
|
|
| Owner Solicitation Name: | Kahului Elementary School Building K- Replace Kitchen Hood
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace Kitchen Hood.
|
|
| Owner Solicitation Name: | Kapunahala Elementary School Telecommunication System Improvements
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Telecommunication System Improvements.
|
|
| Owner Solicitation Name: | Liholiho Elementary School Building G - Asbestos Ceiling Removal
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of existing asbestos containing ceiling
tile and backing material down to existing metal
and wood framing and providing gypsum board,
acoustic ceiling tile, electrical work, and
miscellaneous related work.
|
|
| Owner Solicitation Name: | Lanikai Elementary School Fire Alarm Upgrade
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction: patching, repair and restoration,
lawns and grass, special construction: hard wired
fire alarm system, electrical: electrical work.
|
|
| Owner Solicitation Name: | King Kekaulike HS Building C - Replace Grease Trap
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace Grease Trap
|
|
| Owner Solicitation Name: | ADA Barrier Removal Project for Various Boating Facilities in North and Central East Oahu, Keehi Small Boat Harbor
|
| Owner Name: | Division of Boating and Ocean Recreation Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: demolition and removal, earthwork,
asphalt concrete pavement, pavement markings and
striping, signs and posts, concrete, metal
fabrications, woods and plastics: rough
carpentry, finish carpentry, preservative
treatment of wood products, thermal and moisture
protection: sealants, doors and windows: wood
door, finish hardware, finishes: gypsum board,
painting, specialties: toilet partitions,
identifying devices, toilet accessories,
mechanical: plumbing, electrical: electrical work
|
|
| Owner Solicitation Name: | Ada Barrier Removal Project for Various Boating Facilities in North and Central East Oahu, Haleiwa Small Boat Harbor
|
| Owner Name: | Division of Boating and Ocean Recreation Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: demolition and removal, earthwork,
asphalt concrete pavement, pavement markings and
striping, signs and posts, concrete, metal
fabrications, woods and plastics: rough
carpentry, finish carpentry, preservative
treatment of wood products, thermal and moisture
protection: sealants, doors and windows: wood
door, finish hardware, finishes: gypsum board,
painting, specialties: toilet partitions,
identifying devices, toilet accessories,
mechanical: plumbing, electrical: electrical work
|
|
| Owner Solicitation Name: | Pearl City Elementary School Uprgrade Fire Alarm System
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site construction: lawns and grass, concrete
pavements, finishes: painting, special
construction: hard wired fire alarm system,
electrical: general electrical requirements,
underground electrical work.
|
|
| Owner Solicitation Name: | Furnish Highway Traffic Control and Safety Measures
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing highway traffic control and safety
measures.
|
|
| Owner Solicitation Name: | Furnish Vehicle Towing Service, H-1 Freeway, Waiawa and Waiau Areas
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and having on duty a tow truck and
driver.
|
|
| Owner Solicitation Name: | Furnish Tire Services for State Highway Vehicles and Equipment
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing tire services for State Highway
vehicles and equipment.
|
|
| Owner Solicitation Name: | Kipapa Elementary School Fire Alarm Upgrade
|
| Owner Name: | Hawaii Dept. of Accounting & General Services (DAGS), Division of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Complete replacement of the existing fire alarm
system with a hard wired fire alarm system.
|
|
| Owner Solicitation Name: | Waimea High School, Room J221 - Replace Waste Line
|
| Owner Name: | DAGS-Kauai
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site construction: removal work, lawns and grass,
general mechanical requirements, plumbing.
|
|
| Owner Solicitation Name: | Kaneohe Public Library Accessibility And Other Improvements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work, cast-in-place concrete, concrete unit
masonry, finishes, removal and installation of
metal roofing, concrete unit masonry wall crack
repair, plumbing, and electrical work.
|
|
| Owner Solicitation Name: | Removal Of Scrap Metal And Associated Recyclable Materials To Permitted Recycling Facilities
|
| Owner Name: | Maui County, Purchasing Division, Dept. of Finance
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of scrap metal and associated recyclable
materials to permitted recycling facilities.
|
|
| Owner Solicitation Name: | Physical Improvements To Lanakila Public Housing – Phase IIB
|
| Owner Name: | Housing and Community Development Corporation of Hawaii (HCDCH)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Public housing improvements.
|
|
| Owner Solicitation Name: | Replace Waterline and Hatches at Pier 24, Honolulu Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing and replacing the existing waterline and
hatches at pier.
|
|
| Owner Solicitation Name: | King Kamehameha Sewage Pump Station Improvements
|
| Owner Name: | Hawaii County Administration Office, Dept. of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of the emergency generator and the
existing pumps, modification of the piping
system, electrical system, and the pump station
vault. New pump controls and SCADA system will be
added, dry well interior will be painted, and wet
well interior surfaces will be coated.
|
|
| Owner Solicitation Name: | Anuenue Radio Facilities and Tower Kauha Ranch
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work, termite control, antenna tower, chain
link fences and gates, lawns and grasses, cast-
in-place concrete, unit masonry assemblies,
metal fabrications, wood polymer composite
lumber, acoustic insulation, fluid applied
roofing, sheetmetal flashing and trim,
firestopping, joint sealant, standard steel doors
and frames, door hardware, fluid applied
flooring, painting, elastomeric wall coating,
metal wall louvers, metal plaques, portable fire
extinguisher, mechanical insulation, fuel storage
and piping system, clean agent fire extinguishing
system, air conditioning and ventilation,
grounding and bonding, 28) diesel generator, 29)
lighting, communications, and miscellaneous items
to complete work.
|
|
| Owner Solicitation Name: | Heeia State Park, ADA Barrier Removal
|
| Owner Name: | Hawaii Dept. of Land & Natural Resources (DLNR)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of parking stalls, parking stall
stripings, concrete wheel stopper, unisex comfort
station, comfort station modifications, drinking
water fountain, party hall modifications,
concrete walkways, picnic table, installation of
various signs and posts and miscellaneous related
work.
|
|
| Owner Solicitation Name: | Removal of Architectural Barriers at Harbors Administration Building, Honolulu Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selective removal work, concrete rehabilitation,
guardrails and handrails, doors, ceramic tile,
painting, toilet partitions, identifying devices,
toilet accessories, elevator repairs, plumbing,
electrical work, and incidental related work.
|
|
| Owner Solicitation Name: | Termite Treatment at Honolulu International Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Termite Treatment.
|
|
| Owner Solicitation Name: | Kalihi Kai Elementary School ADA Transition Plan Improvements
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: site demolition, selective demolition,
site preparation, clearing, earthwork, soil
treatment for vegetation control, traffic signs,
asphaltic concrete pavement, concrete curbs and
walks, pavement markings, lawns and grass, wood
and plastics: wood treatment, finish carpentry,
thermal and moisture protection: sealants, doors
and windows: wood doors, fiberglass reinforced
polyester doors, finish hardware, glazing,
finishes: ceramic tile, painting, specialties:
metal door louvers, signage, toilet accessories,
special construction: lead-based paint control
measures, mechanical: basic mechanical materials
and methods, plumbing systems, electrical:
electrical work, assistive listening system
|
|
| Owner Solicitation Name: | Kinau Hale Reroof
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site construction: selective demolition and
removal, wood and plastic: carpentry,
preservative treated lumber, thermal and moisture
protection: elastomeric sheet roofing, flashing
and sheet metal, sealants, special construction:
removal and disposal of asbestos containing
material, removal and disposal of lead based
painted materials, electrical: general electrical
provisions, basic electrical materials and
methods.
|
|
| Owner Solicitation Name: | Campbell High School Replace All Pole Lighting
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical: basic electrical materials and
methods, exterior lighting.
|
|
| Owner Solicitation Name: | Kilauea Elementary School Rooms A-1 and A-2 Renovate Interiors
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repainting of interior space, replacement of
resilient flooring/carpet, abatement of asbestos,
installation of sink with integral counter, and
installation of miscellaneous items.
|
|
| Owner Solicitation Name: | Maintenance of Air Conditioning Equipment, Honolulu International Airport
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance of Air Conditioning Equipment.
|
|
| Owner Solicitation Name: | Replace Roofing at Pier 31A Shed, Honolulu Harbor
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing and replacing the existing roof with a
new metal roof system at pier shed, replacing an
existing gutter and painting of the new roof and
gutter components, mobilization and
demobilization; replace roof; replace gutter;
painting.
|
|
| Owner Solicitation Name: | Furnishing and Delivering of Moveable Concrete Barrier, Interstate Route H-1 Zipper Lane Extension
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering of Moveable Concrete
Barrier.
|
|
| Owner Solicitation Name: | DOT - Construction Management Services with Expertise in Data Center Power and Cooling Equipment Renovation Work
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Inspection and construction administration
services for replacing data center’s
Uninterruptible Power Supply (UPS) and Air
Conditioning (AC) systems.
|
|
| Owner Solicitation Name: | DOT - Civil Engineering Design Services for Environmental Projects at Various Airports
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Complete design services for secondary
containment areas, oil-water separators, and
spill prevention control improvements.
|
|
| Owner Solicitation Name: | DOT - Civil Engineering Design Services for Maintenance and Repair Projects at Various Airports
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Complete design services for repaving airfield
and landside pavements, rehabilitation of
aircraft rescue and fire fighting training pits,
and infrastructure improvements and repairs.
|
|
| Owner Solicitation Name: | DOT - Design Services for Fort Barrette Road Widening, Barber's Point to Farrington Highway
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering services.
|
|
| Owner Solicitation Name: | DOT - Design Services for Kamehameha Highway Improvements, Waipahu Street to Ka Uka Blvd.
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering services.
|
|
| Owner Solicitation Name: | DOT - Professional Engineering firms to provide Construction Management Services for Capital Projects at Various Airports
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Inspection and construction administration
services.
|
|
| Owner Solicitation Name: | Northwest Hawaiian Islands Large Scale Marine Debris Survey
|
| Owner Name: | Dept. of Commerce, National Oceanic and Atmospheric Administration
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Survey to remove derelict fishing gear. Removal
of nets for sampling, mitigation of entanglement
hazards, and benthic habitat restoration are also
expected to occur. Once located and pre-removal
scientific data is collected, the fishing gear
will be cut free from the substrate and placed in
the attendant small boat or second small boat.
The small boats will then transport the recovered
debris to the charter vessel(s). The charter
vessel(s) must have the capability to transfer
marine debris from the small boats, haul it
aboard and then stow the recovered debris safely.
After debris offloading and provisioning fuel,
supplies, or personnel as necessary, the charter
will immediately return to the work sites and
repeat the debris cleaning/offloading cycle for
the duration of the charter. Vessels shall: be at
least 90 ft. in length, able to maintain a
minimum cruising speed of at least 8 nm/hr,
contain fuel capacity for 90 days of continuous
sea operations, able to crane-haul aboard 16,000
lbs. of marine debris, have sufficient deck space
for at least 50,000 lbs. of marine debris,
berthing space for an 8-16 member scientific
field party, have at least 50 ft2 of clean,
minimally exposed deck space available for
storage and operation of air compressor and SCUBA
tanks, have dry storage area for at least 150 ft3
in the main house for holding of scientific
supplies and freshwater deck hose for the washing
of diving equipment on a daily basis.
|
|
| Owner Solicitation Name: | Design, Install and Maintain a Voice over Internet Protocol (VoIP) Telephone System for the Office of Community Assistance
|
| Owner Name: | Kauai County Finance Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design, install and maintain a voice over
Internet protocol (VoIP) telephone system.
|
|
| Owner Solicitation Name: | DOT - Licensed Surveyor to provide Topographic Maps for Various Airport Projects
|
| Owner Name: | Hawaii Dept. of Transportation, Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Surveying and mapping services.
|
|
| Owner Solicitation Name: | Locksmith Services at Various Locations, Oahu
|
| Owner Name: | Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Division, Pacific Division/NAVFACENGCOM
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair and installation of mechanical,
electrical, and electronic locksets and other
types of locking devices; key duplication;
neutralization of locked cabinets, doors, safes,
and security containers and other locked items;
keying alike locksets; master keying lock
systems; changing combinations; and incidental
work as may be related to locksmith services.
|
|
| Owner Solicitation Name: | Furnishing and Delivery of Pavement Markings, Sign Plates, Sign Posts, Pavement Markers, Alkyd Thermoplastic and Signing Material
|
| Owner Name: | Maui County Dept. of Finance
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivery of pavement markings,
sign plates, sign posts, pavement markers, alkyd
thermoplastic and signing material
|
|
| Owner Solicitation Name: | Asbestos Abatement At Kamaaina Hale
|
| Owner Name: | Housing and Community Development Corporation of Hawaii (HCDCH)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asbestos abatement.
|
|
| Owner Solicitation Name: | Multiple Award Construction Contract (MACC), Waterfront Projects in the State of Hawaii
|
| Owner Name: | Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Division, Pacific Division/NAVFACENGCOM
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design and construction of piers/wharves and
other waterfront facilities, such as warehouse
construction, rehabilitation and/or improvements;
site improvements; utility connections;
maintenance and construction dredging; and other
incidental work. Selective demolition of existing
waterfront structures; pile supported
piers/wharves; marine concrete; reinforced
concrete wharf structures; precast, prestressed
concrete; concrete rehabilitation; prestressed
concrete bearing and fender piles; steel sheet
piles; fiberglass plastic fender work; marine
hardware; cylindrical fender system; coating of
waterfront steel structures; cathodic protection;
fire alarm systems; ship-to-shore utility
connections; plumbing; fuel piping; electrical
and pier telephone systems; and other incidental
work. Maintenance and/or construction dredging
and ocean and/or upland disposal of dredge
material. Transit storage/staging facility work;
reinforced concrete footings on precast,
prestressed concrete pile foundations; reinforced
concrete floor slabs; steel joist/metal deck roof
frame system; mezzanine, doors, windows,
architectural finishes; building specialties,
such as, fire alarm and sprinkler systems,
plumbing, air conditioning and ventilation;
electrical work and other incidental work. Site
work includes, but is not limited to, asphalt
concrete pavement; reinforced concrete apron;
water distribution; sanitary sewerage; fuel
distribution piping; chain link fence and gates;
selective demolition and removal work, and other
incidental work.
|
|
| Owner Solicitation Name: | Construction of the Waiaha Production Well and 2,0 MG Reservoir, Kona
|
| Owner Name: | Hawaii County Water Supply Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Structures: soil treatment for termite control,
removal and disposal of asbestos containing
material, demolition and disposal of lead-
containing painted items, concrete work, post-
tensioning system, unit masonry, carpentry and
millwork, caulking, miscellaneous iron and metal
work, finish hardware, architectural specialties,
chain link fence and gate, mechanical and
electrical: electrical work, pump station
mechanical equipment, supervisory control and
data acquisition system, deep well submersible
pumping unit, pump discharge piping and valve
system, well level recorder system, chlorine
residual analyzer, transit-time liquid flow
meter, tank level recording system.
|
|
| Owner Solicitation Name: | Pearl Harbor Kai Elementary School Fire Alarm Upgrade
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Thermal and moisture protection: firestopping,
special construction: removal and disposal of
asbestos-containing material, lead containing
paint control measures, testing and air
monitoring, hard wired fire alarm system,
electrical: basic materials and methods
|
|
| Owner Solicitation Name: | Ilima Intermediate School Upgrade Fire Alarm System
|
| Owner Name: | DAGS - Oahu, Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site construction: lawns and grass, thermal and
moisture protection: firestopping, special
construction: removal and disposal of asbestos-
containing material, lead-containing paint
control measures, testing and air monitoring,
hard wired fire alarm system, electrical: basic
materials and methods.
|
|
| Owner Solicitation Name: | Asbestos Abatement at Kamaaina Hale, 75-5837 Kuakini Hwy. Kailua, Kona
|
| Owner Name: | Housing and Community Development Corporation of Hawaii (HCDCH)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site work: moving, special construction:
abatement of asbestos containing materials,
asbestos abatement monitoring.
|
|