| Owner Solicitation Name: | Hawarden City Hall/Community Center
|
| Owner Name: | Hawarden, City of
|
| Enginner Name: | InVision Architecture, Ltd.
|
| Plankeeper Name |
|
| Scope: | Adaptive reuse/remodel of the existing unoccupied
middle school into City Hall/Community Center. It
consists of a 3,000 SF single story addition,
elevator, a portion of roof structure, partial
roof replacement, window replacements, interior
remodel and complete mechanical and electrical
upgrades.
|
|
| Owner Solicitation Name: | Equipment Lift
|
| Owner Name: | Cedar Rapids Golf Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Two (2) equipment hoist workstations. The lifts
being requested will be used for a variety of
equipment - the smallest unit serviced will be a
golf cart to the fairway mower or a 1-ton dump
truck being the largest.
|
|
| Owner Solicitation Name: | Rider Hall Tuckpointing - Phase II
|
| Owner Name: | University of Northern Iowa
|
| Enginner Name: | Howard R. Green Company
|
| Plankeeper Name |
|
| Scope: | Tuckpointing, caulking, brick replacement and
other incidental work.
|
|
| Owner Solicitation Name: | Kamerick Art Building Roofs 1 and 2
|
| Owner Name: | University of Northern Iowa
|
| Enginner Name: | Howard R. Green Company
|
| Plankeeper Name |
|
| Scope: | Art building roofs 1 and 2.
|
|
| Owner Solicitation Name: | Biology Research Center - HVAC Replacement
|
| Owner Name: | University of Northern Iowa
|
| Enginner Name: | West Plains Engineering
|
| Plankeeper Name |
|
| Scope: | HVAC replacement, mechanical, electrical and
miscellaneous general construction.
|
|
| Owner Solicitation Name: | 5th Grade Addition, Upper Elementary and 6-8 Middle School Facility
|
| Owner Name: | Creston Community School District
|
| Enginner Name: | Rambo Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | 5th grade addition, upper elementary and 6-8
middle school facility, general, mechanical and
electrical construction.
|
|
| Owner Solicitation Name: | Installation of a Traffic Signal and the Associated Intersection Improvements
|
| Owner Name: | Sioux City
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of a traffic signal and the
associated intersection improvements.
|
|
| Owner Solicitation Name: | Construction of Municipal Well #4
|
| Owner Name: | Gilbert, City of
|
| Enginner Name: | WHKS & Co.
|
| Plankeeper Name |
|
| Scope: | Furnishing of labor, equipment and new materials
for the construction of the Municipal Well #4.
Major construction items include gravel-pack deep-
well construction, well pump and appurtenances,
pitless well adapter unit, flow meter pit with
meter, electrical.
|
|
| Owner Solicitation Name: | Washington Elementary School HVAC Project
|
| Owner Name: | Council Bluffs Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school HVAC project.
|
|
| Owner Solicitation Name: | East Bremer Avenue Sidewalk Improvement Project
|
| Owner Name: | Waverly, City of
|
| Enginner Name: | Yaggy Colby Associates
|
| Plankeeper Name |
|
| Scope: | 150 LF of curb and gutter, 2,339 SY of PC
concrete sidewalk, 500 SY of new PC concrete
driveway and alley, 9,120 SF of brick pavers,
3,380 SY of sidewalk removal and 7 EA storm sewer
intakes.
|
|
| Owner Solicitation Name: | UIHC: J.W.Colloton Pavilion (JCP) - Renovate CT Scanner Rooms 3537 and 3439
|
| Owner Name: | The University of Iowa, Design & Construction Services Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovation of 2 CT scanner rooms.
|
|
| Owner Solicitation Name: | Flooring Repair - Lar Vet Med
|
| Owner Name: | Iowa State University, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Flooring repair.
|
|
| Owner Solicitation Name: | AG Chemical Application
|
| Owner Name: | Iowa State University, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | AG chemical application.
|
|
| Owner Solicitation Name: | Water Service Center Remodeling
|
| Owner Name: | Ankeny, City of
|
| Enginner Name: | FEH Associates
|
| Plankeeper Name |
|
| Scope: | Minor demolition, concrete slab on grade, masonry
walls, structural steel, windows and doors,
roofing, building insulation, interior finishes,
interior walls, millwork, toilet partitions,
miscellaneous general construction, mechanical
systems, plumbing systems, and electrical systems.
|
|
| Owner Solicitation Name: | Daniels Park - Upper Roadway and Parking Lot Improvements
|
| Owner Name: | Cedar Rapids, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of an asphalt overlay on the
existing roadway and parking lots, the
replacement of concrete curb and concrerte
pavement at drive entrance, widening of the
roadway, reshaping of parking lots and all
associated work including the removal of excess
seal coat surfacing, required base work, and
grading.
|
|
| Owner Solicitation Name: | Riverside Boulevard Sanitary Sewer Relining Project
|
| Owner Name: | Sioux City
|
| Enginner Name: | DeWild-Grant Reckert & Associates
|
| Plankeeper Name |
|
| Scope: | Cured-in-Place Pipe Relining of 800 LF of 10"
sanitary sewer.
|
|
| Owner Solicitation Name: | South 11th Street Rise Project, Highway 141 and South 11th Street Widening and Paving and Highway 141 and NW 62nd Avenue Widening and Paving
|
| Owner Name: | Grimes, City of
|
| Enginner Name: | Fox Engineering Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Location 1. grading, paving, storm sewer, water
main, sanitary sewer, and miscellaneous
associated work. Location 2. grading, storm
sewer, paving, pavement widening, and
miscellaneous associated work. Location 3.
grading, storm sewer, paving, pavement widening,
and miscellaneous associated work.
|
|
| Owner Solicitation Name: | Sulfuric Acid/Ames Power Plant
|
| Owner Name: | Ames, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sulfuric acid for power plant.
|
|
| Owner Solicitation Name: | Westwood Drive Improvements Paving and Sidewalk Project
|
| Owner Name: | Marshalltown, City of
|
| Enginner Name: | Clapsaddle-Garber Associates
|
| Plankeeper Name |
|
| Scope: | Drive improvements paving and sidewalk project.
Estimated quantities: 3,352 CY of excavation,
roadway and borrow, 4,840 CY of shoulder
construction and finishing, 2,594 CY of topsoil,
stripping, stockpile, and respread, 1,200 T of
special backfill, 827 SY of pavement, 7" PCC,
Class M, 22,764 SY of pavement, 7" PCC, Class C,
3,730 SY of sidewalk, 4" PCC, 1,759.8 SY of
driveway, 6" PCC, approach and transition, 650 SQ
of sodding, 19 Acre of permanent seeding, 1,250
T of erosion stone, 1,221 SY of 4" HMA sidewalk,
1,026 SY of HMA pavement transition, 3,558 LF of
high tensile wire fencing.
|
|
| Owner Solicitation Name: | South Sanitary Sewer Extension
|
| Owner Name: | New Hampton, City of
|
| Enginner Name: | TeKippe Engineering, P. C.
|
| Plankeeper Name |
|
| Scope: | 5,000 LF 10" Sanitary sewer extension. Please
see the attached file for detailed scope,
specifications, Addendum 1 and 2.
|
|
| Owner Solicitation Name: | Roofing Project
|
| Owner Name: | East Union Community School District
|
| Enginner Name: | The Energy Group
|
| Plankeeper Name |
|
| Scope: | Installation of a new roof and roof insulation on
the school building, concourse area and gym with
bid alternate for extended warranty.
|
|
| Owner Solicitation Name: | HVAC Replacement
|
| Owner Name: | East Union Community School District
|
| Enginner Name: | The Energy Group
|
| Plankeeper Name |
|
| Scope: | Installation of a Geothermal Heat Pump System
for the Classroom building and replacing gas-
fired rooftop heating units on the Gym/Concourse
building with bid alternates for extending the
geothermal system to serve the Gym/Concourse
building and for 300 LF 5" horizontal
directional boring.
|
|
| Owner Solicitation Name: | Roosevelt Elementary School HVAC Project
|
| Owner Name: | Council Bluffs Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school HVAC project.
|
|
| Owner Solicitation Name: | XRF Lead Paint Analyzer
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | XRF lead paint analyzer.
|
|
| Owner Solicitation Name: | Westinghouse/Cutler - Hammer Fan and Monitor Sub Station Replacement Kits 120V and 240V
|
| Owner Name: | Cedar Rapids Water Pollution Control Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | (1) 120v fan kit p/n CDVF 5000, (1) 240v fan kit
p/n CDVF 5200 for 750KVA transformers, (1) 120v
fan kit p/n CDVF 5016, (1) 240v fan kit p/n CDVF
5216 for 2000 KVA transformers, (1) 120v monitor
kit p/n CD13V001 and (1) 240v monitor kit p/n
CD23V001.
|
|
| Owner Solicitation Name: | Kirschbaum Flagstone Seating Area
|
| Owner Name: | Davenport, City of, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Materials and installation of 1 EA of stamped
flagstone seating area, 1 EA of stamped flagstone
drinking fountain pad. Please see attached file
for specifications and drawing.
|
|
| Owner Solicitation Name: | Replace Floor in Room 14 Lindquist Center
|
| Owner Name: | University of Iowa, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Floor replacement.
|
|
| Owner Solicitation Name: | Central Campus-Pammel Drive Lighting Upgrade
|
| Owner Name: | Iowa State University, Facilities Planning & Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lighting upgrade.
|
|
| Owner Solicitation Name: | Roof, Masonry, and Site Improvements Middle School/High School
|
| Owner Name: | Benton Community School District, Central Administration
|
| Enginner Name: | Shive Hattery Engineers & Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Replacement of middle school/high school roof,
which is approximately 100,000 SF (standing seam
and low slope metal roof), masonry restoration to
the middle school/high school building, site
improvements including new exterior storm
drainage and grading and storm drainage
improvements, and structural improvements
including the replacement of the existing chiller
support.
|
|
| Owner Solicitation Name: | 2004 Running Track and Athletic Fields Lighting Improvement
|
| Owner Name: | Northeast Community School District
|
| Enginner Name: | Shive Hattery Engineers & Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of a 400-M synthetic surface running
track and field events, regarding of football
field, and new athletic lighting for the track,
football field, softball and baseball diamonds.
|
|
| Owner Solicitation Name: | Mower
|
| Owner Name: | Iowa State University, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mower.
|
|
| Owner Solicitation Name: | 2004 Roof Improvements Various Locations
|
| Owner Name: | Ankeny Community School District
|
| Enginner Name: | Shive Hattery Inc.
|
| Plankeeper Name |
|
| Scope: | Base Bid A - Roof replacement of Roof Level A.4
at the first Elementary School, Seam/Flashing
Repairs at the first Elementary School, and roof
replacement of the Mansard roof at the second
Elementary School. Total roof replacements
project size is approximately 8,542 SF. at
Elementary and includes removal of existing roof
system and the installation of fully-adhered EPDM
roof system. Project size for the seam/flashing
repairs is approximately 3,240 LF at the first
Elementary School, and replacement of the mansard
roof at the second Elementary School. Total
project size at Elementary is 5,816 SF. Alternate
Bid B - Roof replacement of Roof Level A.4 at the
first Elementary School. Alternate Bid C -
Seam/Flashing Repairs at the first Elementary
School. Alternate Bid D - Replacement of the
mansard roof at the second Elementary School.
|
|
| Owner Solicitation Name: | Audio/Visual Equipment
|
| Owner Name: | Davenport, City of, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Audio/visual equipment.
|
|
| Owner Solicitation Name: | Industrial Site Site Grading and Excavation
|
| Owner Name: | Anita, City of
|
| Enginner Name: | Snyder & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | 3,600 CY of topsoil strip, stockpile and
respread, 26,250 CY of excavation, site grading,
1,300 LF of erosion control silt fence, 60 LF of
corrugated metal pipe, 24' Dia., 12 ga., 1 LS for
compaction testing, appurtenances and associated
miscellaneous work. Alternate bid No. 1: 405 SY
of PCC pavement, driveway, 6' thick,
appurtenances and associated miscellaneous work.
|
|
| Owner Solicitation Name: | 2004 Sanitary Sewer Rehabilitation Project
|
| Owner Name: | Cedar Falls, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish and install a cured in place liner within
existing 8, 12 and 15", diameter sanitary sewers
in selected areas. This project encompasses
approximately 96 service taps to be re-
established in accordance with city sanitary
sewer rehabilitation specifications using no dig
techniques.
|
|
| Owner Solicitation Name: | Water Treatment Plant Improvements, Sludge Lagoons
|
| Owner Name: | Creston City Water Works
|
| Enginner Name: | Garden & Associates Ltd.
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, materials and incidentals to
construct 4 additional sludge lagoon cells at
the water treatment plant, including but not
limited to excavation, soil sterilization,
seeding, manholes, control structures,
connection to existing structure, approximate
quantities: 2,770 T of lagoon rip-rap, 590 LF of
12" DIP lagoon piping, 835 LF of 12" PVC lagoon
piping, 180 LF of 8" DIP lagoon piping, 310 LF
of 4" DIP lagoon piping, 12" gate valve, two (2)
8" gate valves, field fence, testing, and
miscellaneous associated work.
|
|
| Owner Solicitation Name: | HVAC Improvements - Ames, Iowa
|
| Owner Name: | Dept. of Agriculture, Animal and Plant Health Inspection Service, Administrative Services Division/SCSC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Improvement/installation of a heating,
ventilation and air conditioning (HVAC) system(s)
consisting of an air handling unit, ductwork, VAV
boxes, chilled water, hot water and steam piping,
and temperature controls as to be reflected on
drawings and specifications. Install government
furnished equipment (two air handling units and
one 60 T air cooled packaged chiller) and other
general construction.
|
|
| Owner Solicitation Name: | Mowing and Trimming Services at the Ames Municipal Airport
|
| Owner Name: | Ames, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mowing and trimming services at the airport.
|
|
| Owner Solicitation Name: | Lighting Project for Football Field
|
| Owner Name: | Treynor Community Schools
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lighting project for football field.
|
|
| Owner Solicitation Name: | Marion Street and 3rd Avenue Intersection Repair Project
|
| Owner Name: | Hiawatha, City of
|
| Enginner Name: | Hall & Hall Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Pavement removal, storm sewer construction, PC
concrete pavement construction.
|
|
| Owner Solicitation Name: | Portable Exhibits and Displays
|
| Owner Name: | Iowa Dept. of Administrative Services, Dept. of General Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide portable exhibits and displays.
|
|
| Owner Solicitation Name: | Lock Box Services for the University of Iowa
|
| Owner Name: | University of Iowa, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lock Box Services.
|
|
| Owner Solicitation Name: | Extension of 10" Treated Water River Crossing -- 2004
|
| Owner Name: | Estherville, City of
|
| Enginner Name: | Jacobson Westergard & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Extension of 10" treated water river crossing,
716 LF of 6" PVC water main, 17 EA of DI
fittings, 4 EA of 10" gate valve with box
(placement only), 435 T of granular backfill. No
boring.
|
|
| Owner Solicitation Name: | APC Uninterruptable Power Supplies
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | APC uninterruptable power supplies.
|
|
| Owner Solicitation Name: | Plumbing and Electrical Inspections of 6 Homes
|
| Owner Name: | Southwest Iowa Planning Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Plumbing and electrical inspections of the 6
homes for housing rehabilitation. The inspection
will determine what rehabilitation work is
necessary to meet plumbing and electrical codes.
|
|
| Owner Solicitation Name: | 2004 Clarinda Housing Floor Covering Improvements
|
| Owner Name: | Clarinda Housing Commission
|
| Enginner Name: | Snyder & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Furnish and install vinyl flooring, carpeting,
pad, vinyl wall base and associated work in the
Community Buildings at 2 Housing Facilities.
|
|
| Owner Solicitation Name: | Construction of a Building
|
| Owner Name: | Woodbury County Fair Association
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Constructing a 72'xl40', 16' high exhibit
building.
|
|
| Owner Solicitation Name: | Aquatic Centers Shade Structures
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Aquatic centers shade structures.
|
|
| Owner Solicitation Name: | Fourth Avenue Water Main Improvements
|
| Owner Name: | Portsmouth, City of
|
| Enginner Name: | Snyder & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | 740 LF 4" PVC C900 water main, including
abandonment of existing 2" water main,
reconnection of water services, and associated
and miscellaneous work. Contractor has the
option to bore the entire project.
|
|
| Owner Solicitation Name: | Edgewood Road NW, from E Avenue to Crestwood Drive, Pavement Rehabilitation
|
| Owner Name: | Cedar Rapids Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3,100 T of HMA overlay, 500 SY of PCC pavement
repair, 12,300 SY of PCC pavement cracking and
seating, curb repairs.
|
|
| Owner Solicitation Name: | 2004 Roof Improvements Whittier Elementary School
|
| Owner Name: | Indianola Community School District
|
| Enginner Name: | Shive Hattery Inc.
|
| Plankeeper Name |
|
| Scope: | Roof replacement of selected roof levels 4.1-4.4
at elementary school. Total project size is
approximately 8,400 SF. Complete removal of
existing roof systems and installation of SBS
modified bitumen and associated sheet metal
accessories.
|
|
| Owner Solicitation Name: | Strayer - Wood Theatre Roofs 1 and 3
|
| Owner Name: | University of Northern Iowa
|
| Enginner Name: | Howard R. Green Company
|
| Plankeeper Name |
|
| Scope: | Roofing.
|
|
| Owner Solicitation Name: | Statement of Qualifications Design Services for the Redesign and Remodeling of the Existing Ellis Clubhouse and Twin Pines Clubhouse
|
| Owner Name: | Cedar Rapids Golf Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Statement of Qualifications for the proposed
design services for the redesign and remodeling
of 2 existing clubhouses.
|
|
| Owner Solicitation Name: | Addition, Iowa Army National Guard Armory
|
| Owner Name: | Iowa Army National Guard, Facilities and Construction Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The addition consists of approximately 7,401 SF
at the southeast corner of the existing building,
and will be of frost protected slab on grade,
interior concrete masonry unit (CMU) walls,
exterior CMU walls with jumbo brick veneer that
matches the existing building, steel roof joists,
metal roof deck, insulated membrane roof, hollow
metal and wood doors with hollow metal frames,
acoustical tile ceilings, high efficiency
windows, store front glazing systems, and DDC
controlled geothermal HVAC system. Interior
finishes will be similar to the finishes in the
existing building.
|
|
| Owner Solicitation Name: | DC-GCSD Track and Football/Soccer Field
|
| Owner Name: | Dallas Center-Grimes Community School District
|
| Enginner Name: | RDG Crose Gardner Shukert
|
| Plankeeper Name |
|
| Scope: | Construction of a new running track and
football/soccer field at high school, earthwork;
a running track of 8 - 42" lanes, jumping event
areas, and throwing event areas with an all-
weather synthetic surfacing material, a
football/soccer field with drainage system, 1
soccer size practice field: irrigation system for
all fields, 8' chain link enclosure fence:
irrigation system electrical and water services:
seeding of all turf areas.
|
|
| Owner Solicitation Name: | HSC Apartments HVAC Replacement Phase VI
|
| Owner Name: | University of Northern Iowa
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Apartments HVAC replacement.
|
|
| Owner Solicitation Name: | Cedar Falls High School Phase 2 - 2004 Additions and Renovation Project
|
| Owner Name: | Cedar Falls Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3-story addition housing mechanical equipment,
administrative offices and English departmental
offices; Gymnasium Entrance Addition; Renovation
of existing wing of the building; and parking lot
development. Site development, paving, retaining
wall alterations, concrete footings and
foundations, precast concrete floor structure,
masonry walls, steel structure, rough and finish
carpentry, cabinetry and counters, built-up
roofing, sheet metal, aluminum storefront system
with glazing, wood and metal doors, metal frames,
gypsum drywall partition systems, carpet,
resilient flooring, tile, acoustical ceilings,
painting, HVAC systems, plumbing, sprinkler
system, fire alarm, electrical entrance and
electrical distribution system.
|
|
| Owner Solicitation Name: | 2004 Roof Improvements
|
| Owner Name: | Iowa City Community School District
|
| Enginner Name: | Shive Hattery Engineers & Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Replacement of a roof on a portion of Elementary
School, and roof restoration and canopy
replacement at the Physical Plant.
|
|
| Owner Solicitation Name: | Greater Des Moines Softball Park Field Lighting
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of field sports lighting for 4
existing softball fields, installation of
lighting, wiring and conduit, sports light
structures and concrete foundations, and testing
of lighting, removing and replacing areas of
concrete where required to place light
structures, and site restoration as required.
|
|
| Owner Solicitation Name: | 2004 9th Street/14th Avenue Storm Sewer Reconstruction Project - Phase II
|
| Owner Name: | Marion, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of 373 LF of 42 dia, 238 LF of 36
dia, 449 LF of 24 dia RCP storm sewers along with
associated intakes, manholes and approximately
1450 SY of pavement removal and replacement.
|
|
| Owner Solicitation Name: | 2004 Street Restoration Program, Phase II, Crack and Seat/HMA Resurfacing
|
| Owner Name: | Cedar Falls, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | All materials, labor and equipment required for
the completion of ACC/PCC milling, cracking and
seating of PCC pavement and HMA resurfacing.
|
|
| Owner Solicitation Name: | 2004 Street Restoration Program, Phase I, PCC Patching/Subdrainage
|
| Owner Name: | Cedar Falls, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | All materials, labor and equipment required for
the completion of 4.25 miles PCC pavement
patching, 12,000 LF 6" subdrain, 100 LF storm
sewer installation and sanitary
sewer repairs.
|
|
| Owner Solicitation Name: | One Ton Trucks
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1 T Trucks.
|
|
| Owner Solicitation Name: | Skid-Steer Loaders
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Skid-steer loaders.
|
|
| Owner Solicitation Name: | Water System Improvements
|
| Owner Name: | Urbandale Water Utility
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Base Bid: Furnish all labor and equipment
required for installing materials furnished by
the Owner in open cut or tunneling, including
approximately 50 LF of 6" and 1,390 LF of 8" PVC
and five hydrants furnished by the Owner.
Furnish all labor, equipment and remaining
materials as outlined on the estimate project
quantities including but not limited to,
connections to existing system, main line gate
valves, insulation, tracer wire, polyethylene
encasement, auxiliary valves, valve boxes,
corporation cocks and saddles, 1" copper
service lines, connections to existing curb
stops; also furnishing all labor, materials and
equipment for concrete street with 2" asphalt
overlay and driveway removal and replacement,
sidewalk removal and replacement, surface
removal and preparation for sidewalk
installation and sodding, traffic
control and miscellaneous associated work
including cleanup.
|
|
| Owner Solicitation Name: | Heavy Duty 1-Ton Truck
|
| Owner Name: | Des Moines County Regional Waste Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Heavy duty 1-T truck.
|
|
| Owner Solicitation Name: | UIHC: John Pappajohn Pavilion - Nuclear Medicine Room Renovation
|
| Owner Name: | The University of Iowa, Design & Construction Services Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Room renovation.
|
|
| Owner Solicitation Name: | Phase II Additions and Renovations
|
| Owner Name: | Woodbine Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Addition of a 12,000 SF gymnasium and the
addition of a 2-story, 18,000 SF classroom
addition, demolition of a 3-story 26,000 SF
masonry structure and miscellaneous interior
renovation work, building demolition, stone and
masonry salvage, multiscope, masonry, steel
fabrication and erection, custom cabinets,
roofing, aluminum storefronts and glazing,
flooring and tile, acoustical ceiling, wood
athletic flooring, terrazzo flooring, painting,
laboratory casework and equipment, telescoping
bleachers, fire suppression sprinkler,
mechanical, electrical.
|
|
| Owner Solicitation Name: | IIRH Computer Cluster
|
| Owner Name: | University of Iowa, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | IIRH computer cluster.
|
|
| Owner Solicitation Name: | One - Diesel Powered Tractor
|
| Owner Name: | Woodbury County Auditor
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | One - diesel powered tractor.
|
|
| Owner Solicitation Name: | Walk-In Freezer
|
| Owner Name: | Iowa Dept. of Administrative Services, Dept. of General Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Walk-in freezer.
|
|
| Owner Solicitation Name: | Tem Cooling Holder
|
| Owner Name: | Iowa State University, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Tem cooling holder.
|
|
| Owner Solicitation Name: | Boiler Replacement at the Cornell Elementary School
|
| Owner Name: | Saydel Community School District
|
| Enginner Name: | EDA, Inc.
|
| Plankeeper Name |
|
| Scope: | Boiler replacement at the elementary school.
|
|
| Owner Solicitation Name: | Service Building Insulation & Siding, Creston Substation
|
| Owner Name: | US Dept. of Energy, Western Area Power Administration
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New insulation and steel siding on a service
building.
|
|
| Owner Solicitation Name: | East Side Sanitary Sewer Main Extension
|
| Owner Name: | Pleasant Hill, City of
|
| Enginner Name: | McClure Engineering Company
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, materials, and equipment to
construct gravity sewers, sewer forcemains, and
three wastewater pumping stations associated
appurtenances, and all work laid out in the plans
and specifications.
|
|
| Owner Solicitation Name: | Burge Residence Hall - Renovate Restrooms - Phase 1
|
| Owner Name: | The University of Iowa, Design & Construction Services Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovation of the restrooms in the 3rd house on
Levels 2, 3, 4 and 5. Level 2 will be designed
for men and Levels 3, 4 and 5 will be designed
for women. There are a total of 4 restrooms
included in the project. A custodial and a trash
room will also be provided on Levels 2, 3, 4 and
5. Work includes 1. the demolition of partitions,
doors, finishes, plumbing fixtures and electrical
systems, 2. the installation of partitions,
doors, finishes and toilet and shower partitions,
3. the installation of piping and plumbing
fixtures and 4. the installation of electrical
systems including lighting and power.
|
|
| Owner Solicitation Name: | Replacement of Unit Ventilators at High School Building
|
| Owner Name: | Clarinda Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of unit ventilators at high school
building.
|
|
| Owner Solicitation Name: | Finkbine Storage Facility
|
| Owner Name: | The University of Iowa, Design & Construction Services Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Storage facility.
|
|
| Owner Solicitation Name: | Eckstein Medical Research Building (EMRB) - Room 70 MRI Installation
|
| Owner Name: | The University of Iowa, Design & Construction Services Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Medical research building - room 70 MRI
installation.
|
|
| Owner Solicitation Name: | Hydraulic Pavement Breaker - Backhoe Mounted
|
| Owner Name: | Cedar Rapids, City of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1 backhoe mounted, hydraulic pavement breaker.
Must mount to John Deere 710D, 710G and CAT 446
backhoes.
|
|
| Owner Solicitation Name: | Freight Depot Improvements
|
| Owner Name: | Chariton, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitation of an historic building and site
utilities.
|
|
| Owner Solicitation Name: | Sale of Guard Shack
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sale of guard shack.
|
|
| Owner Solicitation Name: | Parking Lot 65-Improvements for Circulation/Signage (Alumni Hall)
|
| Owner Name: | Iowa State University, Facilities Planning & Management Office
|
| Enginner Name: | Snyder & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Parking lot improvements for circulation/signage.
|
|
| Owner Solicitation Name: | Mowing of 3 City Parks
|
| Owner Name: | Red Oak, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mowing of 3 parks, for the mowing season of 2004.
|
|
| Owner Solicitation Name: | Highway 1 Widening
|
| Owner Name: | Solon, City of
|
| Enginner Name: | MMS Consultants, Inc.
|
| Plankeeper Name |
|
| Scope: | All labor, materials and equipment necessary to
construct approximately 4,300 SY of 9" concrete
paving, 660 CY 6" of modified subbase, 1,570 LF
of 4" longitudinal subdrain, 240 T of granular
shoulder, 5,500 CY of earthwork, 843 LF of of 12"
to 27" storm sewer, concrete intake structures,
concrete driveway removal and reconstruction,
curb and gutter, permanent pavement markings,
traffic control, rip-rap, seeding, silt fence,
and miscellaneous work, including surface
restoration and cleanup.
|
|
| Owner Solicitation Name: | Mowing the Parks
|
| Owner Name: | Worth County Conservation Board
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mowing the parks.
|
|
| Owner Solicitation Name: | 2004 Sidewalk, Curb, and Ramp Program
|
| Owner Name: | Davenport, City of, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Over 30,000 SF by 4" thick PCC sidewalk, several
hundred SF of ADA pedestrian curb ramps, and
various other related items necessary to complete
the work.
|
|
| Owner Solicitation Name: | Roof Replacement at Duck Creek Lodge
|
| Owner Name: | Davenport, City of, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof replacement.
|
|
| Owner Solicitation Name: | 20th Street NW - PCC Paving - Sioux Center
|
| Owner Name: | Sioux Center, City of
|
| Enginner Name: | DeWild Grant Reckert & Associates Co.
|
| Plankeeper Name |
|
| Scope: | Construction of approximately 1,300 T of modified
subbase, 3,470 SY of 7" PCC pavement, Class C,
96 LF of 36" storm sewer, 2000D, with apron,
14 LF of 42" storm sewer, 2000D, 116 LF of 48"
storm sewer, 2000D, with apron, 2 EE of 6' x 8'
storm sewer structures, 1,100 LF of 4"
longitudinal subdrain and other related
construction work.
|
|
| Owner Solicitation Name: | Jefferson Building - Renovate 2nd Floor
|
| Owner Name: | The University of Iowa, Design & Construction Services Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Building - renovate 2nd floor.
|
|
| Owner Solicitation Name: | Repair Coal Bunker
|
| Owner Name: | Iowa State University, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair coal bunker.
|
|
| Owner Solicitation Name: | Linux Computer Cluster Grid System
|
| Owner Name: | University of Iowa, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Linux computer cluster grid system.
|
|
| Owner Solicitation Name: | Boiler No. 2 Replacement Central Energy Plant at the State Capitol Complex
|
| Owner Name: | Iowa Dept. of Administrative Services, Dept. of General Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Boiler replacement central energy plant.
|
|
| Owner Solicitation Name: | Elementary School Exterior Door Replacements
|
| Owner Name: | Underwood Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school exterior door replacements.
|
|
| Owner Solicitation Name: | In-Line Rink
|
| Owner Name: | Iowa State University, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | In-line rink.
|
|
| Owner Solicitation Name: | Sandbags
|
| Owner Name: | Davenport, City of, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 200,000 EA of woven poly sandbags, 14x26, with
attached ties.
|
|
| Owner Solicitation Name: | Miscellaneous Roof Maintenance and Repair Services for Facilities Services Group
|
| Owner Name: | University of Iowa, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Miscellaneous roof maintenance and repair
services.
|
|
| Owner Solicitation Name: | Rathbun Hatchery Renovations and Additions
|
| Owner Name: | Iowa Dept. of Natural Resources, Construction Services Bureau
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of: 1. New water treatment equipment
and associated structures, including two new drum
screens inside a new structure and building, new
vertical turbine water supply pumps, new service
and fire flow pumps, vertical pressure filters,
ultraviolet treatment equipment, an oxygen
storage tank, and electrical control equipment.
2. Site piping, vaults and valving, and
modifications to the existing aeration tank. 3.
Site electrical work, process electrical work,
and miscellaneous electrical power work. 4. New
mechanical service equipment. 5. Demolition of
existing HVAC and water process equipment. 6.
Removal of on-site underground fuel storage
tanks. 7. Installation of a new propane storage
tank with associated piping and controls. 8.
Construction of a building addition with interior
finishes to the existing Research Building. 9.
Construction of water treatment equipment within
the new Research Building addition. 10.
Construction of new lagoons/ponds, including
earthwork, piping, liners and ancillary features.
11. All other incidental work. Please see the
attached file for Items of work.
|
|
| Owner Solicitation Name: | Spirit Lake Hatchery Renovations and Aquaria Systems
|
| Owner Name: | Iowa Dept. of Natural Resources, Construction Services Bureau
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a new water treatment building
and associated structures including a new drum
screen and structure, new pumps, filters,
ultraviolet light disinfection, and an oxygen
storage tank and feed equipment. Other components
include site piping, a masonry building,
electrical power and controls, and an emergency
generator. This project also includes removal and
replacement of the existing aquaria tanks and
mechanical systems within the main hatchery
building as well as other incidental work. Items
of work: LS for mobilization - demobilization, LS
for site restoration / seeding / sidewalk /
paving, LS for site piping, LS for treatment
building foundation, LS for treatment building
floor, LS for treatment building superstructure,
LS for treatment building plumbing, LS for site
electrical, LS for process electrical, LS for
site and process HVAC systems, LS for interior
process piping / appurtenances, LS for interior
plumbing systems, LS for interior filtration
systems.
|
|
| Owner Solicitation Name: | Iowa Events Center Public Network Services, LAN/PBX
|
| Owner Name: | Polk County Purchasing Division
|
| Enginner Name: | HOK Sport + Venue + Event
|
| Plankeeper Name |
|
| Scope: | Network services, LAN/PBX.
|
|
| Owner Solicitation Name: | Computer Software Lar Contract
|
| Owner Name: | Iowa Dept. of Administrative Services, Dept. of General Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Computer software Lar 3 year contract.
|
|
| Owner Solicitation Name: | Honey Creek State Park Campground Improvements
|
| Owner Name: | Iowa Dept. of Natural Resources, Construction Services Bureau
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of 7 paired granular surfaced
campsites with shared living spaces and water and
sewer hook-ups, electrical service upgrade for 49
sites as well as related work. Camp pad
construction: 330 CY of Excavation, Class 13, 577
T of Macadam Stone Base, 231 T of Granular
Surfacing, Crushed Limestone 1/2 " -3/8 ", 1,972
SY for Engineering Fabric, LS for Seeding,
Fertilizing and Mulching. Water supply
system: 592 LF of 2 " Dia. PVC Pipe, 265 LF of
1 " Dia. Copper Water Service Tubing, 818 LF of
Detectable Warning Tape, 3 " Water, 1 EA of 2"
Gate Valve with Box, 15 EA of Corporation Stop,
15 EA of Curb Stop/Valve Box, 15 EA of Yard
Hydrant, 13 EA of Splitter, 1 EA of 2-1/8 "
Flushing Hydrant, 1 EA of 2" Cap and Block, LS
for Disinfection. Gravity wastewater system: 511
LF of 8 " Dia. PVC Pipe, 264 LF of 6 " Dia. PVC
Pipe Laterals, 739 LF of Detectable Warning Tape,
3 " Sewer, 7 EA of 8 " X8 " X6 " PVC Wyes, 3 EA
of Manholes, 8 EA of RV to Sanitary Sewer Hook-Up
Assembly. Camp pad electrical service: 1,424 LF
of Trench, Sgl. Circuit Secondary, 50 LF of
Trench, Dbl. Circuit Secondary, 1,435 LF of
Detectable Warning Tape, 3" Electric, 25 LF of
Road Crossing Conduit, Secondary Sch. 80 PVC, 23
EA of Sgl. Campsite Outlet Post, 50 Amp Metallic
Power Center, 13 EA of Dbl. Campsite Outlet Post,
50 Amp Metallic Power Center, 1,007 LF of No. 4
AWG Grnd. Cond. Cable, Type THW or USE, 912 LF of
No. 2 AWG Grnd. Cond. Cable, Type THW or USE,
2,181 LF of No. 2/0 AWG Single Conductor Cable,
Type USE, 840 LF of No. 3/0 AWG Single Conductor
Cable, Type USE, 2,736 LF of No. 4/0 AWG Single
Conductor Cable, Type USE, 3 EA of Pad Mounted
400 Amp/240 Volt Main Distribution Panel, 1 EA of
Pad Mounted 600 Amp/240 Volt Main Distribution
Panel.
|
|
| Owner Solicitation Name: | Pine Lake State Park PCC Paving, Realignment, and Parking
|
| Owner Name: | Iowa Dept. of Natural Resources, Construction Services Bureau
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | PCC paving of various campground roads and the
realignment of the road, and other work.
Estimated quantities: 1,272 Units of Clearing and
Grubbing, 2,698 T of Special Backfill, 2,095 CY
of Excavation, Class 10 Roadway and Borrow, 1,652
CY of Excavation, Class 13 Roadway and Borrow,
765 T of Granular Shoulders, Type A, 3.15 Sta of
Shoulder Construction, Earth, 8,933 SY of 6"
Std/Slip Form PCC Pavement, Class C, Class 3,
Dur, 1 LS for Portland Cement Concrete Pavement
Samples, 150 T of Granular Surfacing, Class A
Crushed Stone, 1,365 SY of Removal of Pavement
(HMA), 20 SY of 4" Sidewalk, PC Concrete, 106 LF
of Curb, Special, As Per Plan, 1 LS for
Construction Survey, 1.8 Sta of Painted Pavement
Markings - Waterborne/Solvent, 1 EA of Painted
Symbols and Legend Ð Waterborne/Solvent, 1 LS for
Traffic Control, 86 SY of Patches, Full Depth
Finish, By Area, HMA, 2 EA of Patches, Full Depth
Finish, By Count, HMA, 1 LS for Mobilization.
|
|
| Owner Solicitation Name: | Lubricants
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lubricants.
|
|
| Owner Solicitation Name: | Banner Wildlife Area Roadway Construction / Improvements
|
| Owner Name: | Iowa Dept. of Natural Resources, Construction Services Bureau
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading and paving of roadways with bike trails
and parking areas, an earthen berm adjacent to
existing shooting range at the wildlife area.
Estimated quantities: 15.5 Acre of clearing and
grubbing, 11,398 T of special backfill, 6,222 CY
of excavation, Class 10, roadway and borrow,
14,550 CY of excavation, Class 13, roadway and
borrow, 57 T of granular shoulders, Type A, 275
Sta of shoulder construction, earth, 14,016 T of
1/2" hot mix asphalt mixture, base, 1 LS for hot
mix asphalt pavement samples, 195.72 Sta of
painted pavement markings, waterborne, 4 EA of
painted symbols and legends, waterborne, 1 LS
for
traffic control, 1 LS for mobilization, 1 LS for
seeding and fertilizing.
|
|
| Owner Solicitation Name: | FY 2004 Street Reconstruction Program
|
| Owner Name: | Waterloo, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of street improvements in, along and
upon portions of certain streets, avenues, roads,
and alleys, and such other work as may be
incidental thereto along and upon the following
streets, avenues, roads and alleys.
Street improvements consisting of: Alternate A:
5-1/2 or 81/2" thick HMA 1M and 3M Intermediate
and Base, 3/4", 60% CR or 75% CR with a 2" thick
HMA 1 M and 3M Surface, ]/2", 60% CR or 75% CR
between new 24" curb and gutter sections;
or Alternate B: 6 or 8" non-reinforced PCC paving
with integral curb and gutter. Subgrade drain
tile, granular subbase, new storm sewer and
appurtenances and other such work as may be
incidental thereto. All street improvements
consist of the reconstruction of an existing
paved street, which is to be replaced with a
proposed street.
|
|
| Owner Solicitation Name: | Primary Sludge to Blend Tank Lining Process
|
| Owner Name: | Cedar Rapids Water Pollution Control Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lining process of approximately 100 LF of 10"
pipe containing two (2) 45 degree angles and one
(1) 90 degree angle. The Cured-In-Place process
on lining is the only acceptable method for this
project.
|
|
| Owner Solicitation Name: | Grading 'Area C-3' at the Newton Sanitary Landfill
|
| Owner Name: | Newton Public Works Dept.
|
| Enginner Name: | Fox Engineering Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of a groundwater diversion system,
installation of a recompacted soil and flexible
membrane composite base liner, installation of a
leachate collection system and miscellaneous
associated work in Area C-3. Quantities: 1 LS
for mobilization, 1,030 LF of waterline, remove
and replace, 224,400 CY of excavation, Class 10,
232,800 Sta.-Y of overhaul, 1,000 CY of
overexcavation of unsuitable material, 33,730 SY
of scarify and recompact subgrade, 33,730 SY of
groundwater diversion layer, 1,660 LF of
groundwater diversion pipe, 4" dia., 910 LF of
prepare existing base liner edge, 26,400 CY of
compacted base liner, 33,730 SY of flexible
membrane liner, 2,105 LF of flexible membrane
liner protection, 1,645 LF of leachate
collection pipe, 8" dia., perforated, 460 LF of
leachate collection pipe, 8" dia., non
perforated, 3 EA of eachate access points, 2,105
LF of filter fabric trench covering, 450 LF of
surface water diversion, 1 LS for trench block,
1,700 LF of silt fence, 970 LF of woven wire
fence, 48 T of revetment, Class E.
|
|
| Owner Solicitation Name: | Greene County Medical Center Addition
|
| Owner Name: | Greene County Medical Center
|
| Enginner Name: | Davis Design
|
| Plankeeper Name |
|
| Scope: | Addition and limited renovation to the existing
medical center. The addition will comprise of a
new front entrance/canopy, offices, gift shop,
conference room, lobby, long term care dining
room, and support spaces.
|
|
| Owner Solicitation Name: | Main Street Improvements Phase 1, Part 2 and Phase 2
|
| Owner Name: | Central City, City of
|
| Enginner Name: | Hart Frederick Consultants PC
|
| Plankeeper Name |
|
| Scope: | Rehabilitation of approximately 2,000 LF of
street, replacement of existing water mains,
services, fire hydrants, and valve, replacements
of existing sanitary sewer mains, manholes, and
services; installation of RCP storm sewer pipe
and intakes, replacement of existing sidewalks,
drives, streets, including special pavement areas
(precast concrete paver panels) in streets and
sidewalks; handicap ramps, street lighting,
seeding, fertilizing and mulching, and other
removal and replacement of miscellaneous
appurtences, together with incidental work.
Proposed street is to be 7 and 8" of portland
cement concrete. Phase 1: sewer spot repair, 460
LF of 8" water line, 613 LF of 6" water line; 30
LF of miscellaneous 4" water line, 200 LF of 3/4"
to 1" water line, 75 LF of 15" RCP storm sewer,
76 LF of 12" RCP storm sewer. Phase 2: 589 LF of
8" sanitary sewer, 400 LF of 4" service line, 747
LF of 8" water line, 256 LF of 6" water line, 54
LF of 4" water line, 1000 LF of water service,
183 LF of 18" RCP storm sewer, 187 LF of 15"
storm sewer, 512 LF of 12" storm sewer. All open
cut. Electrical part - possibility for boring.
|
|
| Owner Solicitation Name: | Athletic Track Surfacing
|
| Owner Name: | Muscatine Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of an all-weather track surface to
be located at the high school, installation of a
new 1/2" polyurethane and rubber surfacing as per
manufacturer's specifications. Apply lane lines
and event markings.
|
|
| Owner Solicitation Name: | 2004 Site Improvements at Franklin, Garfield, and Grant Elementary Schools and at the Muscatine High School
|
| Owner Name: | Muscatine Community School District
|
| Enginner Name: | Stanley Consultants, Inc.
|
| Plankeeper Name |
|
| Scope: | Base bid work: resurfacing, partial replacement,
and striping of 3 parking lots at the high
school. Alternate No. 1 - high school running
track: rebuilding the high school running track.
Alternate No. 2 - road widening: widening a
portion of the high school road that runs north
of the high school building and south of the
track, adding curb section to another road; and
associated work. Alternate No. 3 - main entrance
widening: widening the high school main entrance
drive. Alternate No. 4 - elementary school
parking lot: removing and replacing parking lot
at elementary school. Alternate No. 5 -
elementary school parking lot: removing and
replacing parking lot at elementary school.
Alternate No. 6 - elementary school parking lot:
removing and replacing parking lot at elementary
school. Alternate No. 7 - crack and joint
cleaning and sealing for PCC pavement: crack and
joint cleaning and sealing of portland cement
concrete (PCC) pavement. Alternate No. 8 - crack
cleaning and sealing for ACC Pavement: crack and
joint cleaning and sealing of asphaltic cement
concrete (ACC) pavement.
|
|
| Owner Solicitation Name: | College Courts Apartments HVAC Replacement
|
| Owner Name: | University of Northern Iowa
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | College courts apartments HVAC replacement.
|
|
| Owner Solicitation Name: | Edison Elementary School HVAC Project
|
| Owner Name: | Council Bluffs Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school HVAC project.
|
|
| Owner Solicitation Name: | FY 04 Draintile Program
|
| Owner Name: | Cedar Rapids Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,500 LF of 6" subdrain and associate pavement
replacement, installing drain tile in various
locations to eliminate issues related to
groundwater including icing, algae, and
undermining to streets and sidewalk, seeding and
parking restoration.
|
|
| Owner Solicitation Name: | 1st Avenue SE Water Main Replacement Project
|
| Owner Name: | Cedar Rapids Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,500 LF of 12" and 1,200 LF of 16" water main,
200 LF of bore and case, pavement repair, and
other related work.
|
|
| Owner Solicitation Name: | Supervisory Control and Data Acquisitions System (SCADA) for the Water and Pollution Control Department
|
| Owner Name: | Ames, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and installation of a supervisory
control and data acquisition (SCADA) system for
the water plant and associated wellfield, and
other components to provide a complete and
functioning system.
|
|
| Owner Solicitation Name: | Integrated Data Management System
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Integrated data management system.
|
|
| Owner Solicitation Name: | Outer Drive Widening
|
| Owner Name: | Sioux City
|
| Enginner Name: | DeWild-Grant Reckert & Associates
|
| Plankeeper Name |
|
| Scope: | 9,532 CY of excavation and embankment, 23,050 SY
of subgrade preparation, 54 T of ACC shoulder,
339 LF of 15' RCP storm sewer, 2,156 SY of
removal of pavement, 13,231 SY of 8' PCC
pavement, 15 EA of storm sewer inlet, LS for
traffic signals and other related construction
work.
|
|
| Owner Solicitation Name: | 2004 Bituminous Seal Coat Program
|
| Owner Name: | Waverly, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish all labor, materials and equipment to
construct the following: Bituminous seal coat
approximately 111,500 SY of city streets, 1,673 T
of 3/8" roadway-cover aggregate, 33,450 Gal. of
MC-800 binder bitumen.
|
|
| Owner Solicitation Name: | Waverly Homes 2004 Remodeling Project
|
| Owner Name: | Waverly Low Rent Housing Agency
|
| Enginner Name: | Invision Architecture
|
| Plankeeper Name |
|
| Scope: | Bid 1: An addition to building to add conference
room and additional maintenance area.
Bid 2: Residing of building exterior with siding
to match other buildings, revising roof valleys
and roof gutter system, replacement of exterior
lighting and air conditioner.
|
|
| Owner Solicitation Name: | 2004 Manhole Rehabilitation
|
| Owner Name: | Bettendorf, City of
|
| Enginner Name: | Egger Engineering and Land Surveying, PC
|
| Plankeeper Name |
|
| Scope: | Furnishing all labor, tools, equipment, and
materials for rehabilitating 54 manholes totaling
approximately 395 VF with a cementitious liner,
maintenance and control of existing sewage flow,
restoration of disturbed surfaces, maintenance
and control of traffic, compliance with trench-
safety requirements, and other incidental items.
|
|
| Owner Solicitation Name: | Traffic Signal LED Modules
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Traffic signal LED modules.
|
|
| Owner Solicitation Name: | Brook Run Park and Riley Park Improvements
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of 6" PCC or 7" HMA with PCC curb
and gutter parking lots, modular play equipment,
gazebo, restroom enclosure, PCC sidewalk and
curb, and restoration.
|
|
| Owner Solicitation Name: | 8th and Mulberry Parking Garage Demolition
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of structures, site clearance and
disconnection of utilities and plumbing services.
|
|
| Owner Solicitation Name: | 2004 Watermain Replacement Project
|
| Owner Name: | Oxford, City of
|
| Enginner Name: | Hart Frederick Consultants PC
|
| Plankeeper Name |
|
| Scope: | Base bid: Installation of approximately 1,760 LF
of 8" DR-18 PVC water main, connections to
existing system, replacement of existing
hydrants, valves, valve boxes, reconnection of
water service lines to system, and all other
associated appurtenances and incidental work.
Bid involves installation of 1 railroad right-of-
way crossing (boring with steel casing and DI
carrier pipe), partial road, and driveway
surface restoration of all disturbed areas.
Alternate 1: approximately 1,200 LF of 8" DR-18
PVC water main, including connections,
associated appurtenances, and all incidental
work. Alternate 2: approximately 525 LF of 8" DR-
18 PVC water main, including connections,
associated appurtenances, and all incidental
work.
|
|
| Owner Solicitation Name: | 2004 Street Repair
|
| Owner Name: | Bettendorf, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Full-depth patching to replace approximately
3,105 square yards of Portland cement concrete
pavement at various locations, traffic control,
saw cuts, concrete panel removal, earth/
asphalt/sealcoat excavation, disposal of old
materials, crushed stone stabilization, drainable
base, drain tile, concrete forming and jointing,
subgrade and backfill compaction, boulevard
shaping, seeding, fertilizing, and mulching.
|
|
| Owner Solicitation Name: | UIHC: Pediatric Office Room Enclosures - Second Floor JW Coloton Pavilion
|
| Owner Name: | University of Iowa
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pediatric office room enclosures.
|
|
| Owner Solicitation Name: | College Park Subdivision Utility and Street Improvements
|
| Owner Name: | Southwestern Community College
|
| Enginner Name: | Mid-State Surveying & Consulting, Inc.
|
| Plankeeper Name |
|
| Scope: | Furnishing of all labor, equipment, and
materials for: Portland cement concrete paving,
Estimated construction quantities: 765 CY of
excavation and grading, 659 CY of topsoil strip,
salvage and respread, 2,020 SY of 7" PCC
pavement, 537 LF of 6" water main, 94 LF of
storm sewer, 407 LF of sanitary sewer, silt
fence, traffic control, and miscellaneous
related work and appurtenances.
|
|
| Owner Solicitation Name: | Virginia Street Reconstruction, 19th Street to Ingleside Avenue
|
| Owner Name: | Sioux City
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of 17 LF 12" RCP storm sewer, 147
LF 15" RCP storm sewer, 159 LF 18" RCP storm
sewer, 549 LF 60" RCP storm sewer, 840 LF
of 8" DIP water main, 100 LF of 8" VCP sanitary
sewer, and 2,700 SY of 6' PCC paving.
|
|
| Owner Solicitation Name: | Paving Project
|
| Owner Name: | Des Moines County Regional Waste Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Approximately 3,234 SF paving project at
Recycling Center.
|
|
| Owner Solicitation Name: | Iowa River Gazebo 2004
|
| Owner Name: | Coralville, City of
|
| Enginner Name: | RDG Planning & Design, Inc.
|
| Plankeeper Name |
|
| Scope: | Site demolition, storm sewer, concrete sidewalk
paving, color-conditioned concrete sidewalk
paving, color texturing existing concrete
pavement, limestone and brick veneer,
prefabricated steel gazebo structure, lights and
associated electrical work, landscaping and all
other work.
|
|
| Owner Solicitation Name: | UIHC: J W Coloton Pavilion - Interventional Radiology North Angio Room Renovation
|
| Owner Name: | University of Iowa
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Room renovation.
|
|
| Owner Solicitation Name: | Test and Balance Services for Iowa Laboratories Facility
|
| Owner Name: | Iowa Dept. of Administrative Services, Dept. of General Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Test and balance services for laboratories
facility.
|
|
| Owner Solicitation Name: | Window Air Condition
|
| Owner Name: | Iowa State University, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Window air condition.
|
|
| Owner Solicitation Name: | Swimming Pool Chemicals
|
| Owner Name: | Cedar Rapids, City of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Swimming pool chemicals.
|
|
| Owner Solicitation Name: | Swimming Pool Water Filtration Treatment and Heating System
|
| Owner Name: | Bettendorf Community School District
|
| Enginner Name: | Finch Walter P Architect
|
| Plankeeper Name |
|
| Scope: | Swimming pool water filtration treatment and
heating system.
|
|
| Owner Solicitation Name: | Swimming Pool Improvements
|
| Owner Name: | Slater, City of
|
| Enginner Name: | Mer Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Swimming pool improvements, the approximate
quantities are as follows: Section A:
Construction of a 5,150 SF swimming pool with
treatment and treatment building and the
demolition of the existing pool. Section B:
Construction of a 1,880 SF block bathhouse and
concession facility and the demolition of the
existing bathhouse and concession stand.
|
|
| Owner Solicitation Name: | Fire/EMS Station #18 Site Remediation
|
| Owner Name: | West Des Moines, City of
|
| Enginner Name: | Herbert Lewis Kruse Blunck Architecture (HLKB)
|
| Plankeeper Name |
|
| Scope: | Removal and reinstallation of flagpoles,
undersealing of sidewalks, installation and
compaction of topsoil, re-sodding, repair and
replacement of in grade light fixtures.
|
|
| Owner Solicitation Name: | Housing Rehabilitation Services, Plumbing
|
| Owner Name: | Muscatine, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Housing rehabilitation services, plumbing.
|
|
| Owner Solicitation Name: | 2004/2005 Water System Improvements Program Water Service Transfer Contract No. 1
|
| Owner Name: | Ames, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Water system improvements, Quantities: 9 EA of
restore water service, type A; 8 EA of restore
water service type B; 11 EA of restore water
service type C; 11 EA of restore water service
type D; 24.66 SY of sodding. All long side
services will be bored.
|
|
| Owner Solicitation Name: | 2004 Pavement Joint/Crack Sealing Program
|
| Owner Name: | West Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and sealing approximately 79,182 LF of
joints and cracks on existing PCC pavement.
|
|
| Owner Solicitation Name: | 50th Street Improvements E P True Parkway to Ashworth Road
|
| Owner Name: | West Des Moines, City of
|
| Enginner Name: | Missman, Stanley and Associates, P. C.
|
| Plankeeper Name |
|
| Scope: | 3,000 LF of storm sewer, 24,000 CY of excavation,
1,100 CY of structural concrete for a quad
10'x12' box culvert and 10'x10' pedestrian
underpass, 35,000 SY of Portland cement concrete
pavement, 3,000 SY of Portland cement pavement
for recreation trail, traffic signalization,
traffic control, and other related items.
|
|
| Owner Solicitation Name: | Pearson Hall-Remodeling (Phase 1)
|
| Owner Name: | Iowa State University, Facilities Planning & Management Office
|
| Enginner Name: | Herbert Lewis Kruse Blunck Architecture (HLKB)
|
| Plankeeper Name |
|
| Scope: | Remodeling of approximately 16,000 GSF on the
first floor of the hall, general demolition of
interior partition walls, miscellaneous casework,
lay-in ceilings, corridor and restroom quarry
tile, doors and frames, plumbing fixtures,
miscellaneous HVAC, light fixture and
miscellaneous power and telecommunication
fixtures and wiring, and a small area of existing
flooring and exterior wall for a new interior
ramp. General construction of new partition walls
of gypsum board, wood paneling, and metal writing
boards, etched glass partition walls, custom
doors and frames as well as standard wood in
hollow metal doors, carpeted office floors and
stone tile flooring in public corridors, painted
exposed open ceilings, lay-in ceilings, new
restroom fixtures and furnishings, and a new
interior ramp connecting the existing corridor to
the south plaza. Mechanical construction to
include new water service and sprinkler system,
plumbing and fixtures for two remodeled restrooms
and a new custodial closet, mixing boxes and
related HVAC work for existing dual deck system.
Electrical work to include new lighting fixtures,
power, telecommunication, access control and all
associated wiring and cabling.
|
|
| Owner Solicitation Name: | College Courts Apartments Windows and Doors Phase II
|
| Owner Name: | University of Northern Iowa
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Apartments windows and doors, and incidental work.
|
|
| Owner Solicitation Name: | South 18th Street Improvements
|
| Owner Name: | Council Bluffs, Public Works Dept.
|
| Enginner Name: | HGM Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | 1,078 SY of pavement removals, 1,283 SY of 6'
granular subbase, 301 LF of 6' sanitary sewer
lateral, 14 EA pf sanitary service tap of
existing DI sewer, 82 LF of 15' RCP storm sewer,
362 LF of 18' RCP storm sewer, 382 LF of 36' RCP
storm sewer, 744 LF of longitudinal subdrain, 4'
Dia., 319 LF of video sewer inspection, 3 EA of
single, type ÔM-A' Intake, 3 EA of special type
ÔM-C' intake combination, 2 EA of 36' x 36' x 24'
RCP storm sewer tee with grate, 1,118 SY of 7'
non-reinforced PCC pavement with 6' integral
curb, and other necessary and incidental items.
|
|
| Owner Solicitation Name: | Reverse Osmosis Equipment Installation Unit 8 Demineralizer Replacement
|
| Owner Name: | Muscatine Board of Water, Electric, and Communications Trustees
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of the existing Unit 8 demineralizer
equipment, concrete demolition, concrete pad
installation, installation of new reverse osmosis
equipment, and associated accessories for Power
and Water Generation Station.
|
|
| Owner Solicitation Name: | Rue Elementary School Restroom Project
|
| Owner Name: | Council Bluffs Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school restroom project.
|
|
| Owner Solicitation Name: | Hoover Elementary School Electrical Upgrade Project
|
| Owner Name: | Council Bluffs Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school electrical upgrade project.
|
|
| Owner Solicitation Name: | Lawn Chemicals
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lawn chemicals.
|
|
| Owner Solicitation Name: | Terminal and Hangar Building for Newton Municipal Airport
|
| Owner Name: | Newton Public Works Dept.
|
| Enginner Name: | TSP Six, Inc.
|
| Plankeeper Name |
|
| Scope: | Single story airport terminal building of
conventional construction attached to a single
story aircraft hangar building with mezzanine,
which is a pre-manufactured metal building. The
terminal building portion is approximately 4,221
SF in gross area and the hangar portion is
approximately 11,617 SF in gross area.
The terminal portion of the building is slab on
grade construction with continuous reinforced
concrete footings and foundation walls, face
brick and concrete block load bearing masonry
walls with metal stud and drywall interior
partitions. The roof construction of the east
portion is standard parallel chord open web
steel roof joists, steel roof deck with rigid
foam roof insulation and adhered EPDM roofing.
The west portion of the terminal building
includes custom steel trusses, vaulted drywall
ceilings and architectural metal roof system.
The HVAC system for the terminal building
includes multiple forced air high efficiency
furnaces with remote high efficiency DX
condensing units. Some standard and custom
casework is included. The hangar portion of the
building is slab on grade construction with
continuous reinforced concrete footings and
foundation walls, pre-manufactured
metal building frame, wall panels and roof
panels. The HVAC system for the hangar building
includes air handling and exhaust equipment and
radiant floor heating system and boiler.
The project includes typical electrical power
and lighting systems. The sanitary system
includes an onsite sanitary treatment system.
|
|
| Owner Solicitation Name: | Unit 7 and 8 Turbine Areas Fire Protection System Upgrade - 2004
|
| Owner Name: | Muscatine Board of Water, Electric, and Communications Trustees
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing the documentation, equipment, tools,
materials, labor and supervision necessary to
install new wet-pipe sprinkler systems below the
operating floors of Unit 7 and 8 Turbine Area,
installing new preaction spray systems on the
Unit 7 and 8 steam turbines and generators,
installing a new addressable fire alarm releasing
panel for Units 7 and 8, and removing the
existing partial coverage sprinkler system in
Unit 8, at Power and Water's Generation Station.
|
|
| Owner Solicitation Name: | Rockwell - Swaledale Community School - West Entry Addition
|
| Owner Name: | Rockwell - Swaledale Community School District of Rockwell
|
| Enginner Name: | Waggoner & Wineinger Architects
|
| Plankeeper Name |
|
| Scope: | School west entry addition, general construction,
electrical construction: power and lighting.
|
|
| Owner Solicitation Name: | Country Club Glen Park Improvements
|
| Owner Name: | Clive, City of
|
| Enginner Name: | Snyder & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Demolition, site grading and erosion control,
sanitary sewer, water main, storm sewer system,
site electrical, PCC curbs and pavement, PCC
walks, ACC trails, pavement markings, and
associated improvements.
|
|
| Owner Solicitation Name: | Fremont Heights Part 2 2004 Improvements Project
|
| Owner Name: | Lone Tree, City of
|
| Enginner Name: | Hart Frederick Consultants PC
|
| Plankeeper Name |
|
| Scope: | Installation of approximately 1,949 LF of 8"
DR18 PVC water main installation with
connections to existing system, hydrants,
valves, water service, corp and curb stops and
other appurtances, installation of 1,280 LF of
8" SDR26 PVC sanitary sewer main, wyes, services
and manholes, 785 LF of assorted sizes of RCP
storm sewer, intakes, flared end section and
6,700 SY of 7" thick PCC streets 31’ B/C-B/C
with granular subbase and grading, necessary
erosion control and seeding. All piping is to be
open cut.
|
|
| Owner Solicitation Name: | Track Refurbishing
|
| Owner Name: | Central Clinton Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Track refurbishing.
|
|
| Owner Solicitation Name: | Roof Project, for Iowa Workforce Development
|
| Owner Name: | Iowa Dept. of Administrative Services, Dept. of General Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide mechanically attached thermoplastic
olefin (tpo) white roof system (min. 45 mil) over
the existing roof. The area to be resurfaced is
approx. 22,700 SF.
|
|
| Owner Solicitation Name: | Pest Control Services
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pest control services.
|
|
| Owner Solicitation Name: | Skywalk Bridge HVAC Replacement
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Skywalk bridge HVAC replacement.
|
|
| Owner Solicitation Name: | Roosevelt Elementary School Asbestos Abatement/Window Removal Project
|
| Owner Name: | Council Bluffs Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school asbestos abatement/window
removal project.
|
|
| Owner Solicitation Name: | Edison Elementary School Asbestos Abatement/Window Removal Project
|
| Owner Name: | Council Bluffs Community School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary school asbestos abatement/window
removal project.
|
|
| Owner Solicitation Name: | NEC Displays
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | NEC displays.
|
|
| Owner Solicitation Name: | Fleur Drive Median Army Post Road to McKinley Avenue Landscape Project
|
| Owner Name: | Des Moines Water Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installing footings for median planter walls and
associated median corner piers, median in-line
piers, and in-line median nodes; pre-casting and
installing median planter walls, median corner
piers, median in-line piers, and in-line median
nodes; constructing concrete planting bed curbs;
providing, installing, and grading aggregate
backfill and 5" depth of reinforced colored
concrete (colored concrete band) around the
median planter walls, planter curbs, turf
planting areas, and antique clay street pavers;
and providing proper traffic control during
completion of this work. The Owner will provide
and install the subgrade material and amended
soil for inside the planting areas (raised
planter beds, seasonal planting beds and turf
planting areas). The Owner will also provide and
install the clay street pavers.
|
|
| Owner Solicitation Name: | Max O Pelzer Student Center Food Service Equipment
|
| Owner Name: | Iowa Lakes Community College
|
| Enginner Name: | Architects Collaborative
|
| Plankeeper Name |
|
| Scope: | Food service equipment, a pre-engineered steel
structure.
|
|
| Owner Solicitation Name: | Maintenance Facility Construction
|
| Owner Name: | Worth County Auditor
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct a 64’x55’ maintenance facility, all
electrical, plumbing, heating and concrete as
specified.
|
|
| Owner Solicitation Name: | Penn Center Care Facility Wastewater Treatment Facility Improvements 2004
|
| Owner Name: | Delaware, County of
|
| Enginner Name: | IIW Engineers and Surveyors, PC
|
| Plankeeper Name |
|
| Scope: | Wastewater treatment facility improvements,
installation of synthetic lagoon liner and
valving.
|
|
| Owner Solicitation Name: | Lawn Chemicals
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lawn chemicals.
|
|
| Owner Solicitation Name: | Portland Cement Concrete
|
| Owner Name: | Des Moines, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Portland cement concrete.
|
|
| Owner Solicitation Name: | 48" Non Reflective Mesh Roll-up Signs
|
| Owner Name: | Ames, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 48" non reflective mesh roll-up signs.
|
|
| Owner Solicitation Name: | Grass Mowing
|
| Owner Name: | Morning Sun, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grass mowing contract for the 2004 season.
|
|
| Owner Solicitation Name: | Blairs Ferry Road NE from C Avenue - Lindale, Widening and Rehabilitation
|
| Owner Name: | Cedar Rapids Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 6,000 T of HMA overlay, 2,300 SY of PCC paving,
680 LF of 12" - 36" concrete storm sewer, 250 LF
of 6" - 12" water main, traffic signals.
|
|
| Owner Solicitation Name: | Creston Gateway Beautification
|
| Owner Name: | Creston, City of
|
| Enginner Name: | Howard R. Green Company
|
| Plankeeper Name |
|
| Scope: | Concrete footings, limestone veneer pillar,
treated lumbar and weathering steel railing,
weathering steel and aluminum sign and lighting
for 3 gateway signs, with a third sign to be bid
as an add alternate.
|
|
| Owner Solicitation Name: | Utilities - Pammel Court Chilled Water Extension
|
| Owner Name: | Iowa State University, Facilities Planning & Management Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Utilities - chilled water extension.
|
|
| Owner Solicitation Name: | Public Works Crew Room Addition
|
| Owner Name: | Cedar Falls, City of
|
| Enginner Name: | Andersen Holst Trost Svoboda Architects ( AHTS)
|
| Plankeeper Name |
|
| Scope: | Public works crew room addition, site development
work and a building addition of approximately 650
SF masonry and metal exterior, HVAC, electrical
and plumbing systems, concrete footings,
foundations, and floors, and other miscellaneous
work.
|
|
| Owner Solicitation Name: | Reconstruction - Bridge Widening
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Widening a 146' - 8 x 28' - 0 pretensioned
prestressed concrete beam bridge to 30' - 6; 860
CY of excavation, CL 10, roadway + borrow; 160 SY
of HMA wedge/level/strenght; 173 CY of structural
concrete (bridge); 1,654 LB of reinforced steel;
41,586 LB of reinforced steel, epoxy coated.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 125' - 0 x 30' - 6 continuos concrete slab
bridge; 2,015 CY of excavation, CL 10, roadway +
borrow; 310 CY of structural concrete (bridge);
38,251 LB of reinforced steel; 33,962 LB of
reinforced steel, epoxy coated.
|
|
| Owner Solicitation Name: | Bridge Rehabilitation
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair 42'x44' steel I-beam bridge; 38 CY of
structural concrete (miscellaneous); 8,145 LB of
reinforced steel, epoxy coated; 200 CY of
embankment-in-place; 132 SY of paved shild PCC,
7".
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 112'6x32' continuous concrete slab
bridge with 5' sidewalk; 430 CY of structural
concrete (bridge); 10,091 LB of reinforced steel;
77,369 LB of reinforced steel, epoxy coated;
1,036 CY of excavation, CL 10, RDWY+borrow; 1,620
SY of STD/S-F PCC PAV'T, CL C CL 2, 8".
|
|
| Owner Solicitation Name: | Bridge Replacement - PPCB
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 139'5x24' pretensioned concrete ebam
bridge. 226 CY of structured (bridge); 55,130 LB
of reinforced steel; 3,583 CY of excavation, CL
10, RDWY+borrow.
|
|
| Owner Solicitation Name: | Bridge Replacement - PPCB
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 118'-10 X 30'-6 pretensioned
prestressed concrete beam bridge; 444 CY of
excavation, CL 10, RDWY+borrow; 365 CY of
structured concrete (bridge); 75,503 LB of
reinforced steel.
|
|
| Owner Solicitation Name: | Bridge New - Other
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 240'-0 X 6'-0 pre-manufactured trail
bridge; 30 CY of structured concrete (bridge|;
4,214 LB of reinforced steel.
|
|
| Owner Solicitation Name: | RCB Culvert New - Single Box
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design no. 103 & 204 reinforced concrete box
culverts; 565 M3 of structured concrete (RCB
CULV); 57,891 KG of reinforced steel.
|
|
| Owner Solicitation Name: | Bridge Replacement - PPCB
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 177'2 X 30'6 variable skew
pretensioned prestressed concrete beam bridge;
41,591 CY of excavation, CL 10, RDWY+borrow;
46,594 ST-Y of overhaul; CY of structured
concrete (miscellaneous); 604 CY of structured
concrete (bridge); 47,448 LB of reinforced steel;
67,542 LB of reinforced steel, epoxy coated.
|
|
| Owner Solicitation Name: | Bridge Replacement - CCS
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 125'-0" X 30'-0" continuous concrete
slab bridge - division 1; 326 CY of structural
concrete (bridge); 38,906 LB of reinforced steel;
34,083 LB of reinforced steel, epoxy coated.
|
|
| Owner Solicitation Name: | RCB Culvert Replacement - Single Box
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | RCB Culvert Replacement - Single Box.
|
|
| Owner Solicitation Name: | RCB Culvert Replacement - Twin Box
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 10'X 8'X 40'-0 RCB culvert; 709 CY
excavation, CL 10, RDWY+ borrow; 172 CY of
structural concrete (RCB culvert); 24,623 LB of
reinforced steel.
|
|
| Owner Solicitation Name: | Bridge Replacement - CCS
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 112'-6 X 24-6 CCS bridge; 215 CY of
structural concrete (bridge); 24,623 LB of
reinforced steel; 2,383 CY of excavation, CL 10,
RDWY+borrow.
|
|
| Owner Solicitation Name: | Bridge and Approaches - PPCB
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 176'-4 X 30'-6 pretensioned
prestressed concrete beam bridge; 733 CY of
excavation, CL 10, RDWY+borrow; 198 SY of STD/S-F
PCC PAV'T, CL C CL 3, 8"; 241 CY of structural
concrete (bridge); 4,656 LB of reinforced steel;
59,150 LB of reinforced steel, epoxy coated.
|
|
| Owner Solicitation Name: | Bridge Rehabilitation
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design No. 1204;A 351' X 28'continuous steel I-
beam bridge; 12 CY of structural concrete
(miscellaneous); 1,456 LB of reinforced steel,
epoxy coated; 1,086 SY of bridge floor overlay;
50 SY of bridge floor repair, CL A.
|
|
| Owner Solicitation Name: | Bridge Rehabilitation
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for repair to a 240' X 52'continuous I-beam
bridge; 24 CY structural concrete
(miscellaneous); 2,869 LB of reinforced steel,
epoxy coated.
|
|
| Owner Solicitation Name: | Bridge Replacement - PPCB
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 151'-4 X 30'-6 pretensioned
prestressed concrete beam bridge - division 1;
215 CY strutural concrete (bridge); 4,545 LB of
reinforced steel; 51,819 LB of reinforced steel,
epoxy coated; 2,287 CY of excavation, CL 10,
RDWY+borrow.
|
|
| Owner Solicitation Name: | Bridge Replacement - PPCB
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a A 226'-4 X 30'-6 presentioned
prestressed concrete beam bridge; 923 CY of
excavation, CL 10, RDWY+borrow; 427 CY of
structural concrete (bridge) 14, 233 LB of
reinforced steel;74,370 LB of reinforced steel,
epoxy coated.
|
|
| Owner Solicitation Name: | Bridge Replacement - PPCB
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 188'-10 X 30'-0 pretensioned
prestressed concrete beam bridge; 28,500 CY of
excavation, CL 10, RDWY+borrow; 297 CY of
structural concrete (bridge); 6,150 LB of
reinforced steel; 61,137 LB of reinforced steel,
epoxy coated.
|
|
| Owner Solicitation Name: | Bridge Replacement - CCS
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 125'-0 X 30'-0 continuous concrete
slab bridge; 6,897 CY of axcavation, CL 10,
RDWY+borrow; 312 CY of structural concrete
(bridge); 38,577 LB of reinforced steel; 32,912
LB of reinforced steel, epoxy coated.
|
|
| Owner Solicitation Name: | Bridge New - Other
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a pre-engineered steel truss trail
bridge and PCC trail; 4,126 CY of excavation, CL
10, RDWY+borrow; 2,920 SY of recreational trail,
PCC, 5".
|
|
| Owner Solicitation Name: | Bridge Replacement - PPCB
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Items for a 201'-7 X 32'-0 pretensioned
prestressed concrete beam bridge W/ 10'-0
sidewalk; 48 CY of excavation, CL 10,
RDWY+borrow; 540 SY of STD/S-F PCC PAV'T, CL C CL
2, 8"; 565 CY of structural concrete (bridge);
15,891 LB of reinforced steel; 90,721 LB of
reinforced steel, epoxy coated.
|
|
| Owner Solicitation Name: | PCC Pavement - Grade and New
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 8,865 CY of excavation, CL 10, RDWY+borrow; 2,975
SY of STD/S-F PCC PAV'T, CL C CL 3, 8".
|
|
| Owner Solicitation Name: | PCC Curb and Gutter
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Curb and gutter and landscaping items; 221 SY of
STD/S-F PCC PAV'T, CL C CL 3, 7"; 1,269 TON of
HMA (1M ESAL) SURF, 1/2", NO FRIC.
|
|
| Owner Solicitation Name: | PCC Pavement Widening / PCC Resurfacing
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site 01: Pavement repair, water main and
associated pavement, and signals.
Site 02: The retaining wall.
Site 03: All work not specified for site 01 or
site 02. Cold weather concrete protection is
incidental.
6,237 CY of excavation, CL 10, RDWY+borrow; 1,829
SY of STD/S-F PCC PAV'T, CL M CL 3, 7"; 430 SY of
STD/S-F PCC PAV'T, CL M CL 3, 8"; 3,599 TON of
HMA Wedge/Level/Strenght; 2,408 TON of HMA (10M
Esal) Surf, 1/2", FRIC L-3.
|
|
| Owner Solicitation Name: | PCC Pavement Replace
|
| Owner Name: | Iowa Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,133 CY of excavation, CL 13, RDWY+borrow; 1,640
SY of STD/S-F PCC PAV'T, CL C CL 3, 7"; 47 SY of
recreational trail, HMA, 6".
|
|