| Owner Solicitation Name: | 6 Horse Head to Head Straight Load Trailer
|
| Owner Name: | Palatine Park District, Palatine Hills Golf Course
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 6 Horse Head to Head Straight Load Trailer.
|
|
| Owner Solicitation Name: | Carpet and Installation
|
| Owner Name: | University of Illinois, Chicago, Purchasing Division (M/C 560)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Carpet and installation.
|
|
| Owner Solicitation Name: | New Lenox Commons Park - Phase I
|
| Owner Name: | New Lenox, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New park construction.
|
|
| Owner Solicitation Name: | Pennsylvania Avenue Residence Hall (PAR) Dining Rooms & Dining Services Feasibility Study
|
| Owner Name: | University of Illinois at Urbana-Champaign, Division of Planning, Construction & Maintenance
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Concept designs to meet the Housing Dining
Services needs. Connect and maximize the seating
space in the east and west dining areas with
options to utilize the two courtyards for indoor
greenhouse type seating. Designs for the serving
areas utilizing existing or new hoods, freezers,
and coolers, and other kitchen equipment. Designs
may include multiple ala carte venues, requiring
point of sale system kiosks. Redesign front
entry, 1st floor front desk, and offices
Assessment of equipment replacement needs
Detailed program. Project schedule. Construction
budget will achieve recommended design concepts
and upgrades.
|
|
| Owner Solicitation Name: | Demolition and Removal of the Jr. High School
|
| Owner Name: | Aledo, City of
|
| Enginner Name: | Missman, Stanley & Associates
|
| Plankeeper Name |
|
| Scope: | Demolition and removal of School, miscellaneous
paving and placing fill.
|
|
| Owner Solicitation Name: | Service and Maintenance of all Surveillance Equipment at CTA Rapid Transit Stations
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Service and Maintenance of Surveillance Equipment.
|
|
| Owner Solicitation Name: | Welding Rods & Supplies
|
| Owner Name: | Illinois State Toll Highway Authority, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Welding Rods & Supplies. Please see
attached file for detailed scope and
specifications.
|
|
| Owner Solicitation Name: | Greentree Park Playground Equipment Installation
|
| Owner Name: | Libertyville, Village of, Parks & Recreation Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Excavation, placing concrete curbing and
installation of owner purchased playground
equipment.
|
|
| Owner Solicitation Name: | Consultant Services to Perform Verification of Factors of Eligibility, Suitability, Income Determination and UPCS Unit Inspections
|
| Owner Name: | Chicago Housing Authority, Procurement & Contract Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consultant Services.
|
|
| Owner Solicitation Name: | Water Valves Removal and Replacement
|
| Owner Name: | Northbrook, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of non-functioning water
valves including vaults, fire hydrants and
auxiliary valves with Village standard water
valves, pre-cast concrete vaults, fire hydrants
with auxiliary valves, necessary water main line
stops and 6 inch or 8 inch Class 52 D.I.W.M.,
including all excavation, restoration and
appurtenances.
|
|
| Owner Solicitation Name: | Repair and Painting of Police Vehicle
|
| Owner Name: | Zion, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair and painting of a City of Zion Police
vehicle.
|
|
| Owner Solicitation Name: | Cleaning of Anaerobic Digesters and Other Improvements at Stickney and Calumet Water Reclamation Plants
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning of Anaerobic Digesters and Other
Improvements.
|
|
| Owner Solicitation Name: | Design Upgrades to the Campus Electrical Distribution System
|
| Owner Name: | Eastern Illinois University, Charleston
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design upgrades to the campus electrical
distribution system.
|
|
| Owner Solicitation Name: | Sheridan Elementary School - Renovations
|
| Owner Name: | Board of Education of Elgin School District U-46
|
| Enginner Name: | B & H Industries
|
| Plankeeper Name |
|
| Scope: | Building renovation.
|
|
| Owner Solicitation Name: | Replace Roofs
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Upchurch Group, Inc.
|
| Plankeeper Name |
|
| Scope: | Replace Roofs.
|
|
| Owner Solicitation Name: | Computer Control Center at Stickney Water Reclamation Plant
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Computer Control Center at Water Reclamation
Plant.
|
|
| Owner Solicitation Name: | Addition and Remodeling Project at Washington Elementary School
|
| Owner Name: | Young Women's Christian Association of Elgin (YWCA)
|
| Enginner Name: | Dahlquist and Lutzow Architects, Ltd.
|
| Plankeeper Name |
|
| Scope: | Building Addition and Remodeling.
|
|
| Owner Solicitation Name: | Pedestrian Barricades
|
| Owner Name: | Naperville Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of galvanized steel pedestrian
barricades.
|
|
| Owner Solicitation Name: | Residential and Commercial Structures Demolition
|
| Owner Name: | Northeast Illinois Regional Commuter Railroad Corporation (METRA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolish Approximately 13 Residential and
Commercial Structures.
|
|
| Owner Solicitation Name: | Re-Route Sludge Pipeline
|
| Owner Name: | Glen Ellyn, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of 50 LF 3" DIP, 3 hp submersible
pump, slide rail system and electrical work.
|
|
| Owner Solicitation Name: | Resurfacing of Indoor Pool
|
| Owner Name: | South Barrington Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Resurfacing of Indoor Pool.
|
|
| Owner Solicitation Name: | Ridge North Sewer & Watermain Extension from I-80 to Ridge North Subdivision
|
| Owner Name: | Minooka, Village of
|
| Enginner Name: | Robert E. Hamilton Consulting Engineers, P. C.
|
| Plankeeper Name |
|
| Scope: | Construction of approximately 10,400 LF of 16"
diameter watermain, 760 LF of 12" watermain; 165
LF jack and bore under Interstate; 3,743 LF of
12" sanitary forcemain; 315 LF of 15" sanitary
sewer; 3,094 LF of 18" sanitary sewer, 889 gpm,
lift station complete, generator, and
appurtenances.
|
|
| Owner Solicitation Name: | Heating Plant Burner Management and Boiler Oxygen Trim Upgrades
|
| Owner Name: | Northern Illinois University, Office of Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction work on the heating plant burner
management and boiler oxygen trim upgrades.
Burner management upgrade for two boilers and the
oxygen trim upgrade for one boiler.
|
|
| Owner Solicitation Name: | Ridge North Elevated Water Storage Tank Construction
|
| Owner Name: | Minooka, Village of
|
| Enginner Name: | Robert E. Hamilton Consulting Engineers, P. C.
|
| Plankeeper Name |
|
| Scope: | Construction, painting and sterilization of the
tank, foundation and appurtenances.
|
|
| Owner Solicitation Name: | Sanitary Mainline, Hydrant and Valve Improvement
|
| Owner Name: | Bloomingdale, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of various hydrants, mainline valves
and sanitary wyes.
|
|
| Owner Solicitation Name: | Prequalification for Landscaping
|
| Owner Name: | William Rainey Harper College
|
| Enginner Name: | Gilbane Building Company
|
| Plankeeper Name |
|
| Scope: | Landscaping work to furnish and install plant
material only.
|
|
| Owner Solicitation Name: | DeGarmo Hall Chilled Water Improvements
|
| Owner Name: | Illinois State University, Normal
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | General and Heating. Extension of the campus quad
chilled water loop system via direct buried
distribution piping and associated revisions to
the existing chilled water piping system to
facilitate connection to campus quad water loop
system.
|
|
| Owner Solicitation Name: | Service Agreement for 3 Trane Centrifugal Compressor Chillers and 1 High Temperature Hot Water Absorber
|
| Owner Name: | DuPage County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Monthly routine operation inspection for all
machines to be performed in accordance with
manufacturers recommendations; 1 pre-scheduled
annual preventive maintenance operational
inspection on each unit; all labor, replacement
parts, oil, lubricants and materials including
refrigerant.
|
|
| Owner Solicitation Name: | Repair and Replacement of Concrete for Areas Disturbed for Underground Operand and Maintenance Repairs of Water and Sewer Problems
|
| Owner Name: | DuPage County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair and Replacement of Concrete for Areas
Disturbed for Underground Operand and
Maintenance Repairs of Water and Sewer Problems.
|
|
| Owner Solicitation Name: | Repair and Replacement of Asphalt for Areas Disturbed for Underground Operation and Maintenance Repairs of Water and Sewer Problems
|
| Owner Name: | DuPage County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair and Replacement of Asphalt for Areas
Disturbed for Underground Operation and
Maintenance Repairs of Water and Sewer Problems.
|
|
| Owner Solicitation Name: | Sanitary Lateral and Main Line Sewer Sectional Repairs for Public Works Sewer System
|
| Owner Name: | DuPage County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sanitary Lateral and Main Line Sewer Sectional
Repairs for Public Works Sewer System. Term
Contract.
|
|
| Owner Solicitation Name: | 2003-2004 Vehicle Equipment Purchase and Changeover/Installation
|
| Owner Name: | Lisle, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of vehicle equipment and the
changeover/installation of the equipment for four
vehicles.
|
|
| Owner Solicitation Name: | Semi-Annual Inspection, Repairing, Recharging, and Hydrostatic Pressure Testing of Various Fire Suppression Systems
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Semi-Annual Inspection, Repairing, Recharging,
and Hydrostatic Pressure Testing of Various Fire
Suppression Systems.
|
|
| Owner Solicitation Name: | Lords Park Elementary School - Renovations
|
| Owner Name: | Board of Education of Elgin School District U-46
|
| Enginner Name: | B & H Industries
|
| Plankeeper Name |
|
| Scope: | Building renovations.
|
|
| Owner Solicitation Name: | Temperature Control Circuit Boards
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Temperature control circuit boards.
|
|
| Owner Solicitation Name: | Fire Alarm Installation & Wiring Work at Multiple Sites
|
| Owner Name: | Township High School District 211
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fire Alarm Installation & Wiring Work at Multiple
Sites.
|
|
| Owner Solicitation Name: | Mowing Services
|
| Owner Name: | DuPage County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform weekly, bi-weekly, or seasonal mowing
services. Mowing the various lots to a specified
grass height dependant upon the lot. The total
mowing acreages for the entire season is as
follows: 1. Short Mowing Height - 575 acres
(total acres to be mowed during season)
2. Long Mowing Height - 70 acres (total acres to
be mowed during season). Debris removal, brush
pick-up, or tree removal before mowing.
|
|
| Owner Solicitation Name: | Services to Repair PLC Modules for the Stickney Water Reclamation Plant
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Services to Repair PLC Modules.
|
|
| Owner Solicitation Name: | Miscellaneous Electrical Parts and Supplies (Rebid)
|
| Owner Name: | McHenry, County of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish miscellaneous electrical parts and
supplies.
|
|
| Owner Solicitation Name: | Miscellaneous Lumber, Hardware, Building Supplies, Other Commodities (Rebid)
|
| Owner Name: | McHenry, County of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish miscellaneous lumber, hardware, building
supplies, and other commodities.
|
|
| Owner Solicitation Name: | Graphic Design Services for 3 Dimensional Exterior Signs
|
| Owner Name: | Putnam County Community Unit School District No 535
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Graphic Design Services for 3 Dimensional
Exterior Signs.
|
|
| Owner Solicitation Name: | Parkway Tree Trimming 2004
|
| Owner Name: | Vernon Hills, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Tree Trimming.
|
|
| Owner Solicitation Name: | Replacement of Valves and Actuators at Gurnee, Waukegan & Clavey Road Sewage Treatment Plants
|
| Owner Name: | North Shore Sanitary District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of 4 plug valves and pneumatic
actuators, 10 pinch valves and electric
actuators, 6 pneumatic actuators for plug valves.
Furnish and install 1 30" butterfly valve and
install 1 30" butterfly valve.
|
|
| Owner Solicitation Name: | Waterworks Contractual Services
|
| Owner Name: | Rockford, City of, Purchasing Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Motor rewinding, well and pump servicing, and
electrical wiring services on a contracted basis.
|
|
| Owner Solicitation Name: | 40 20.1" LCD Monitors
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 40 20.1" LCD Monitors.
|
|
| Owner Solicitation Name: | Upgrade Computer Room and Electrical System (Re-bid)
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Steckel Parker Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Upgrade Computer Room and Electrical System.
|
|
| Owner Solicitation Name: | Computer Hardware
|
| Owner Name: | Carterville Community Unit School District 5
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Computer Hardware.
|
|
| Owner Solicitation Name: | Summer 2004 General Construction, Roofing, Plumbing, and Mechanical Life Safety Alterations
|
| Owner Name: | Franklin Park School District 84
|
| Enginner Name: | Sven Dahlquist Architecture, Inc.
|
| Plankeeper Name |
|
| Scope: | General Construction, Roofing, Plumbing, and
Mechanical Life Safety Alterations.
|
|
| Owner Solicitation Name: | Sanitary Sewer Lift Station Repair and Maintenance
|
| Owner Name: | Naperville Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3 year contract to provide maintenance and
repair services for 19 sanitary sewer lift
stations.
|
|
| Owner Solicitation Name: | Roof Replacement/Repair
|
| Owner Name: | Frederick County Public Schools, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair and/or replacement of roof sections for
all buildings.
|
|
| Owner Solicitation Name: | Hawthorne Hills Nature Center Construction
|
| Owner Name: | Elgin Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a 4,600 SF Nature Center, parking
lot and entry drive, trail system and other site
amenities.
|
|
| Owner Solicitation Name: | Wooden Barricades
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Wooden Barricades.
|
|
| Owner Solicitation Name: | Architectural Qualifications for Stone Repair
|
| Owner Name: | Northern Illinois University, Office of Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Program analysis, preliminary design, estimation
and preparation of plans and specifications for
bidding. Estimate of anticipated construction
costs. Alternative program solutions.
Construction documents for bidding. On-site
observation during construction.
|
|
| Owner Solicitation Name: | Information for Engineering Qualifications
|
| Owner Name: | Northern Illinois University, Office of Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Program analysis, preliminary design, estimation
and preparation of plans and specifications for
bidding. Within the scope of work is replacement
of aging electrical switch gear equipment in
various buildings. Estimate of anticipated
construction costs. Alternative program solutions.
Construction documents for bidding. On-site
observation during construction.
|
|
| Owner Solicitation Name: | Engineering Qualifications for an ADA Fire Alarm Upgrade
|
| Owner Name: | Northern Illinois University, Office of Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Program analysis, preliminary design, estimation
and preparation of plans and specifications for
bidding. Within the scope of work are replacement
of aging fire alarm systems, installation of ADA-
compliant visual alarms and integration of alarm
systems in the building. Estimate of anticipated
construction costs. Alternative program solutions.
Construction documents for bidding. On-site
observation during construction.
|
|
| Owner Solicitation Name: | Luggage Rack Panel
|
| Owner Name: | Northeast Illinois Regional Commuter Railroad Corporation (METRA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Luggage Rack Panel.
|
|
| Owner Solicitation Name: | Chevrolet Truck
|
| Owner Name: | College of Lake County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Chevrolet Truck (or approved alternate).
|
|
| Owner Solicitation Name: | Renewable Energy Program
|
| Owner Name: | Naperville Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Assist the City in the development,
implementation, and compilation of a Renewable
Energy Program.
|
|
| Owner Solicitation Name: | 2004 Tree Planting Program
|
| Owner Name: | Bloomingdale, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and installing trees and shrubs in
parkways, front yards and municipal sites at
various locations.
|
|
| Owner Solicitation Name: | Architectural/Engineering Services for Downtown Office Renovation
|
| Owner Name: | Rockford Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Architectural/Engineering Services for Downtown
Office Renovation.
|
|
| Owner Solicitation Name: | Upgrades for the Middle School, North Elementary, South Elementary & Kindergarten
|
| Owner Name: | Hawthorn Community Consolidated School District 73
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Interior & Exterior Demolition. Masonry. Steel.
General Trades. Glass & Aluminum. Metal Studs,
Drywall, Paint. Acoustical Ceilings. Finish
Flooring & Base. Lockers. Casework, Science
Equipment, Display Cases. Plumbing. HVAC.
Electrical & Low Voltage.
|
|
| Owner Solicitation Name: | Quartzite Track Ballast
|
| Owner Name: | Northeast Illinois Regional Commuter Railroad Corporation (METRA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Quartzite Track Ballast.
|
|
| Owner Solicitation Name: | Architectural/Engineering Services for Downtown Office Renovation
|
| Owner Name: | Rockford Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Architectural/Engineering Services for Downtown
Office Renovation.
|
|
| Owner Solicitation Name: | Lighting Upgrade- Shawnee Library System
|
| Owner Name: | Shawnee Library System
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Retrofitting current fixtures with electronic
ballasts and T8 lamps and replacing exit lights.
|
|
| Owner Solicitation Name: | Anti-virus Software Solution
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase a proven anti-virus software solution.
System is to provide for efficient administration
and management and capabilities of providing a
secure virus/worm-free environment.
|
|
| Owner Solicitation Name: | Sanitary Sewer Rehabilitation and Replacement
|
| Owner Name: | Petersburg, City of
|
| Enginner Name: | Crawford Murphy & Tilly, Inc.
|
| Plankeeper Name |
|
| Scope: | Cured-in-place relining of approximately 1,012
LF of 12" diameter sanitary sewer,
rehabilitation of 3 manholes, construction of
approximately 516 LF of 12" PVC diameter
sanitary sewer, 6 manholes and related work.
|
|
| Owner Solicitation Name: | Health Life Safety Work 2004 Interior Remodeling Galena
|
| Owner Name: | Galena Unit School District 120
|
| Enginner Name: | Durrant Group
|
| Plankeeper Name |
|
| Scope: | Miscellaneous remodeling projects in the high
school as well as carpet removal and replacement
in the primary school.
|
|
| Owner Solicitation Name: | Athletic Field Lighting
|
| Owner Name: | Glen Ellyn Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Athletic Field Lighting.
|
|
| Owner Solicitation Name: | HP Laser Jet Printer/Copier/Scanner/Fax Machines
|
| Owner Name: | Pace Suburban Bus Board
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | HP Laser Jet Printer/Copier/Scanner/Fax Machines.
|
|
| Owner Solicitation Name: | Window Replacement
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of windows on the north exterior of
the Architectural Building.
|
|
| Owner Solicitation Name: | Well 16
|
| Owner Name: | Lake in the Hills, Village of
|
| Enginner Name: | Earth Tech Inc.
|
| Plankeeper Name |
|
| Scope: | Construction and testing of Well.
|
|
| Owner Solicitation Name: | 2004 Sign Bucket Truck and 2 Each 2004 Tandem Axle Dump Trucks
|
| Owner Name: | McHenry, County of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1 each 2004 Sign Bucket Truck. 2 each 2004 Tandem
Axle Dump Trucks. Please see attached file for
detailed scope and specifications.
|
|
| Owner Solicitation Name: | Asbestos Abatement (Re-bid)
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Matocha Associates
|
| Plankeeper Name |
|
| Scope: | Asbestos Abatement.
|
|
| Owner Solicitation Name: | Replace Doors, Flooring and Repair Walls (Re-bid)
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Matocha Associates
|
| Plankeeper Name |
|
| Scope: | Replace Doors, Flooring and Repair Walls.
|
|
| Owner Solicitation Name: | Construction and Testing of Well 16 for the Village
|
| Owner Name: | Lake in the Hills, Village of
|
| Enginner Name: | Earth Tech, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction and Testing of Well 16.
|
|
| Owner Solicitation Name: | Spline Ceilings, Light Fixtures, HVAC Diffusers Installation
|
| Owner Name: | 69 West Washington Management Company, LLC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of existing 1' X 1' spline ceilings,
1' X 4' light fixtures, HVAC diffusers, etc. and
the installation of new 2' X 2' ceilings, 2' X
4' light fixtures, new HVAC diffusers, etc. for
approximately 20 floors containing approximately
18,000 SF per floor.
|
|
| Owner Solicitation Name: | Wastewater Treatment System at Carlyle Lake
|
| Owner Name: | US Army Engineer District, Saint Louis Civil Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing all labor, equipment and material
necesary to operate, repair, maintain, and
perform tests for a wastewater treatment plant, a
wastewater land treatment system, lift stations,
pressure sewers, gravity sewers, and implement
beach sampling and testing, and potable water
sampling at public use areas located on public
lands.
|
|
| Owner Solicitation Name: | Crow Bottoms WRP
|
| Owner Name: | Illinois State Office, Dept. of Agriculture, Natural Resources Conservation Service
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Enchance and/or create wetland areas by creating
pot holes, excavating sloughs and constructing
berms. Pot hole excavating (est 40,300 cy),
excavating slough areas (est 21,900 cy), wetland
berm construction (est 14,900 cy), installation
of two water control structures, installation of
500 T of road pack materials, 120 LF of
corrugated metal pipe installation, 7.0 acres of
seeding and mulching of the berms and
installation of 50 conservation signs.
|
|
| Owner Solicitation Name: | Request for Information for Illini Orange Remodel at the University of Illinois at Urbana-Champaign
|
| Owner Name: | University of Illinois at Urbana-Champaign, Division of Planning, Construction & Maintenance
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | A feasibility study. The planned remodeling will
demolish the entire first floor allowing for the
additions of: a convenience store, a food service
outlet, expanded restrooms, student organization
offices, a computer service and training center,
and a multi-function conference space.
Mechanical, electrical, telecom and fire alarm
systems are to be updated also. The building
exterior may receive some enhancements to allow
for use of the south patio area as well as add
some patio space to the north side. There may be
changes in the fenestration. The basement is to
receive minimal updates and finish work.
|
|
| Owner Solicitation Name: | Rehabilitation of 2 Vacant Apartment Units
|
| Owner Name: | Oak Park, Village of
|
| Enginner Name: | Metropolis Architects
|
| Plankeeper Name |
|
| Scope: | Rehab with new electric, plumbing, heating,
kitchens, baths, and windows.
|
|
| Owner Solicitation Name: | Mowing Services
|
| Owner Name: | Machesney Park, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mowing Services.
|
|
| Owner Solicitation Name: | Request for information for Roger Adams Laboratory Master Plan
|
| Owner Name: | University of Illinois at Urbana-Champaign, Division of Planning, Construction & Maintenance
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Assist in developing a comprehensive master plan
for the third and fourth floors of Laboratory.
Work with owner’s designated personnel to
establish and understand goals and objectives,
develop a short range and long range program for
the noted project areas, develop design concepts,
prepare a master plan report, and prepare
schematic design level drawings. In addition, an
understanding of existing building systems will
be imperative, and long-range systems planning
will also be included in the scope of this study.
There will also be a need to assess existing
electrical systems and capacities, with emphasis
on determining appropriate upgrades.
|
|
| Owner Solicitation Name: | 2004 Yukon XL 3/4 Ton Truck
|
| Owner Name: | Bensenville Elementary School District #2
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase or lease of a 2004 Yukon XL 3/4 Ton
Truck (or similar). 4 Wheel Drive, with 4-speed
Automatic heavy-duty transmission Selected Style -
SLE 1SB Exterior - Deep Blue Metallic Interior -
Vinyl/Leather Suspension Package Snow Plow Prep
Package Snow Plow, ultra mount 8" Engine - Vortec
6000 V8 SFI.
|
|
| Owner Solicitation Name: | Mailing System
|
| Owner Name: | Western Illinois University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mailing System.
|
|
| Owner Solicitation Name: | Indoor Aquatics Facility Construction
|
| Owner Name: | Fox Valley Park District
|
| Enginner Name: | R.C. Wegman
|
| Plankeeper Name |
|
| Scope: | Approximately 10,000 SF indoor aquatics facility
to include an eight lane lap pool, indoor leisure
pool and a therapy pool.
|
|
| Owner Solicitation Name: | Miscellaneous Bids
|
| Owner Name: | Rock Island, County of, County Engineer/Highway Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1/Stone, 2/Signs, 3/County Highway 79,
Bituminous Resurfacing, 4/Blackhawk Road District
50th Street Bituminous Resurfacing, 5/Seal Coat
Various Townships, 6/Rubber Tire Backhoe Loader.
|
|
| Owner Solicitation Name: | Undergrounding of Overhead Utilities Part A
|
| Owner Name: | Downers Grove, Village of, Department of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | This project consists of the installation of
approximately 1,400 LF of 1-1/4” to 5” diameter
PVC conduit by open trenching and directional
boring. Work will include, but not be limited to
removal and replacement of pavement, sidewalk,
driveway and curb and gutter; restoration and
other miscellaneous work.
|
|
| Owner Solicitation Name: | Miscellaneous Local Moving Services (Rebid)
|
| Owner Name: | Northeast Illinois Regional Commuter Railroad Corporation (METRA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Moving Services.
|
|
| Owner Solicitation Name: | Removal of Asbestos Containing Flooring Materials
|
| Owner Name: | Elmhurst Community Unit School District 205
|
| Enginner Name: | Wight & Company Architectural Group
|
| Plankeeper Name |
|
| Scope: | Removal of Asbestos containing flooring
materials.
|
|
| Owner Solicitation Name: | Removal of Asbestos Containing Thermal Insulation
|
| Owner Name: | Elmhurst Community Unit School District 205
|
| Enginner Name: | Wight & Company Architectural Group
|
| Plankeeper Name |
|
| Scope: | Removal of Asbestos Containing Thermal Insulation.
|
|
| Owner Solicitation Name: | Schroeder Building Splash Pad
|
| Owner Name: | Broadview Park District
|
| Enginner Name: | Edwards and Kelcey
|
| Plankeeper Name |
|
| Scope: | Building Splash Pad.
|
|
| Owner Solicitation Name: | Illinois Water Works Improvements Elgin-Bartlett Interconnection
|
| Owner Name: | Elgin Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Tapping connections and vaults to existing water
mains, installation of 200 LF new water main &
appurtenances, construction of a new cast-in-
place concrete meter vault complete with flow
meter assembly, piping, fittings, valves,
miscellaneous metals, and all associated HVAC,
electrical and instrumentation, and site work.
|
|
| Owner Solicitation Name: | Irrigation Pumps
|
| Owner Name: | Elk Grove Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Irrigation Pumps.
|
|
| Owner Solicitation Name: | West Campus Chilled Water Distribution Building Conversion - Phase II
|
| Owner Name: | University of Illinois, Facilities Management, Physical Plant Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Connecting existing buildings’ chilled water
system to the new campus chilled water system.
Replacing the existing 3-way chilled water
control valves with new 2-way control DDC,
connecting existing building’s chilled water
system to the campus distribution system,
providing new DDC temperature controls to
monitor and control the system, and providing an
interface in the cogeneration plant.
|
|
| Owner Solicitation Name: | Clark Hall 3rd and 4th Floor Remodel at the Urbana Campus
|
| Owner Name: | University of Illinois at Urbana-Champaign, Division of Planning, Construction & Maintenance
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Complete interior demolition. Remodeling of
floors.
|
|
| Owner Solicitation Name: | Security Camera Systems at Zion-Benton Township High School
|
| Owner Name: | Zion-Benton Township High School District 126 - Business Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Security Camera Systems.
|
|
| Owner Solicitation Name: | Front-End Loader and Attachments
|
| Owner Name: | Wayne, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Front-End Loader and Attachments.
|
|
| Owner Solicitation Name: | 40-50 HP Diesel Tractor, Rotary Cutter, and Other Attachments
|
| Owner Name: | Wayne, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 40-50 HP Diesel Tractor, Rotary Cutter, and Other
Attachments.
|
|
| Owner Solicitation Name: | Fitness Center Equipment for Madison Junior High School
|
| Owner Name: | Naperville Community Unit School District 203
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply, deliver, and install Fitness Center
Equipment.
|
|
| Owner Solicitation Name: | RFQ 35kV Insulated Conductors
|
| Owner Name: | Naperville Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Submit their qualifications to be pre-qualified
to bid on 25,000 LF of 35kV insulated cable.
|
|
| Owner Solicitation Name: | Road Stone, CA-6
|
| Owner Name: | US Army Corps of Engineers, Rock Island District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Road Stone, CA-6.
|
|
| Owner Solicitation Name: | MCR Project for Webster School
|
| Owner Name: | Chicago Public Schools, Procurement & Contracts
|
| Enginner Name: | Creative Engineering Company
|
| Plankeeper Name |
|
| Scope: | Major capital renovation (MCR) Project.
|
|
| Owner Solicitation Name: | Construct Post Genomic Institute
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | C U H 2 A Inc.
|
| Plankeeper Name |
|
| Scope: | General construction, plumbing, heating,
ventilation, electrical, temperature control,
sprinkler, lanscaping.
|
|
| Owner Solicitation Name: | Plumbing Work for Fire Protection Systems for University Court Apartments, Phase II
|
| Owner Name: | Eastern Illinois University, Charleston
|
| Enginner Name: | CBT Companies, Inc.
|
| Plankeeper Name |
|
| Scope: | Capping existing mains, tapping existing city
domestic water mains, and installing new water
mains to six buildings. The alternate bid will
include tapping an existing city water main and
installing a new fire protection main. It also
includes excavation, backfill and site
restoration.
|
|
| Owner Solicitation Name: | Steam Turbine Inspection, Testing, and Repair Support Services
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Steam turbine inspection, testing, and repair
support services.
|
|
| Owner Solicitation Name: | Services to Retube 2 Plant Steam Boilers at the North Side Water Reclamation Plant
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Services to Retube 2 Plant Steam Boilers.
|
|
| Owner Solicitation Name: | BJ Ward (Summer 2004 Renovations) Group NO. 2
|
| Owner Name: | Valley View Public Schools Community Unit District 365-U
|
| Enginner Name: | Wight Construction Services, Inc.
|
| Plankeeper Name |
|
| Scope: | Demolition. Masonry. Misc. Steel. General
Carpentry. Millwork. FRP Doors. Glazing/Aluminum
Windows/Storefront Framing. Acoustical Ceiling
Tile. Flooring. Painting.
|
|
| Owner Solicitation Name: | Water System Improvements, Phase II CDAP
|
| Owner Name: | North City, Village of
|
| Enginner Name: | Lawrence A. Lipe & Associates
|
| Plankeeper Name |
|
| Scope: | 39,612 LF of 4" SDR26 PVC Water Main,
Directional Bore in several locations totaling
400 LF 4" water main, 9 Water Valves, 5
Fire Hydrants, 37 New Services and Service
Transfers and related appurtenances.
|
|
| Owner Solicitation Name: | Roof Repairs at Hoffman Estates High School
|
| Owner Name: | Township High School District 211
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof Repairs.
|
|
| Owner Solicitation Name: | Vitro House Fire Reconstruction
|
| Owner Name: | Illinois State University, Normal
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Shoring up and replacing damaged materials such
as vent hood, roof, studs, rafters, top plates to
sound material, exterior sheathing, fiberglass
insulation, drywall and fire tape drywall joints,
Tyvek wrap, metal siding, and Plexiglass. This
will include disconnecting and reconnecting air
and gas lines as well as conduit wiring as
needed, and install three new fans, four
controllers and switches for the glass furnaces
and exhaust.
|
|
| Owner Solicitation Name: | Various Improvements at Pace West Division
|
| Owner Name: | Pace Suburban Bus Board
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Various Improvements.
|
|
| Owner Solicitation Name: | State Street Subway Lake/Randolph Station
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Subway Station.
|
|
| Owner Solicitation Name: | Tree Cutting and Removal Services at Various Locations
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Tree Cutting and Removal Services.
|
|
| Owner Solicitation Name: | Webster School MCR Project
|
| Owner Name: | Chicago Public Schools, Procurement & Contracts
|
| Enginner Name: | Creative Engineering Company
|
| Plankeeper Name |
|
| Scope: | Major capital renovation (MCR) Project.
|
|
| Owner Solicitation Name: | Single Mode Fiber Optic Cable
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Single Mode Fiber Optic Cable. Please see
attached file for detailed scope and
specifications.
|
|
| Owner Solicitation Name: | Fire Extinguisher Service (Rebid)
|
| Owner Name: | McHenry, County of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Inspection, testing and servicing fire
extinguishers.
|
|
| Owner Solicitation Name: | Pavement Modifications & Traffic Signal Installation
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: | Gewalt Hamilton Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Reconstruction of roadways including, but not
limited to, earth excavation, milling, bituminous
surface and binder, PCC base course, curb and
gutter, storm sewer, pavement markings, traffic
signal installation, (temporary and permanent)
and other items needed to complete proposed
improvements. Includes widening for left and
right turn lanes.
|
|
| Owner Solicitation Name: | 3 Electric Riding Scrubbers
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 3 electric riding scrubbers.
|
|
| Owner Solicitation Name: | Installation of 2 Carbon Monoxide and Toxic Fume Removal Systems
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide material, labor, delivery and
installation of 2 carbon monoxide and toxic fume
removal systems.
|
|
| Owner Solicitation Name: | Compact Mobile Shelving System
|
| Owner Name: | Southern Illinois University Carbondale
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide and deliver shelving from approved
manufacturers. The system shall consist of
mechanical assisted moveable steel shelving on
rails that carry four post common shelving, end
panels and accessories. Combination of moveable
and stationary carriages, all on tracks which are
surface mounted on the floor. Ranges contain 4-
post storage shelving with 36" deep x 42" (clear
distance between posts) common shelving.
|
|
| Owner Solicitation Name: | 3 New Current Model 9,700 GVWR 4 X 4 Chassis Standard Cab Truck with Snow Plow
|
| Owner Name: | Park Ridge, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivering 3 New Current Model
9,700 GVWR 4 X 4 Chassis Standard Cab Truck with
Snow Plow.
|
|
| Owner Solicitation Name: | ADA Project for McPherson School
|
| Owner Name: | Chicago Public Schools, Procurement & Contracts
|
| Enginner Name: | Ilekis Associates
|
| Plankeeper Name |
|
| Scope: | ADA Project.
|
|
| Owner Solicitation Name: | Ground Maintenance Equipment
|
| Owner Name: | Winnebago, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Ground Maintenance Equipment.
|
|
| Owner Solicitation Name: | Prime Design Consultant at Various CHA Locations
|
| Owner Name: | Chicago Housing Authority, Procurement & Contract Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design Consultant
|
|
| Owner Solicitation Name: | GIS Database Update Services
|
| Owner Name: | Naperville Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Assist in Geographic Information System (GIS)
landbase development. Update of an existing large-
scale land database that supports the City's
distributed, enterprise-wide GIS.
|
|
| Owner Solicitation Name: | Arena Carpeting - Special Events
|
| Owner Name: | Mark of the Quad Cities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Carpeting.
|
|
| Owner Solicitation Name: | Renovate Unit 4 Residential Units, Phase IV
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Harley Ellis
|
| Plankeeper Name |
|
| Scope: | Plumbing, Ventilation, Electrical, Sprinkler.
|
|
| Owner Solicitation Name: | Renovate Unit 4 Residential Units Asbestos Abatement
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Harley Ellis
|
| Plankeeper Name |
|
| Scope: | Asbestos Abatement.
|
|
| Owner Solicitation Name: | 9-1-1 Telephone System for Ducomm
|
| Owner Name: | DuPage County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish and deliver Telephone System.
|
|
| Owner Solicitation Name: | Sprinkler Work for Fire Protection Systems for University Court Apartments
|
| Owner Name: | Eastern Illinois University, Charleston
|
| Enginner Name: | CBT Companies, Inc.
|
| Plankeeper Name |
|
| Scope: | Install a wet pipe sprinkler system in six
residential apartments on campus at Court
Apartments. The work involves installation of a
wet pipe sprinkler system, connection to
existing fire alarm system, installation of new
domestic water main in each building,
construction and installation of metal soffits
to enclose pipe, and installation of one
interior door.
|
|
| Owner Solicitation Name: | Chicago O’Hare International Airport Fire Protection of Miscellaneous Buildings
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Airport Fire Protection of Miscellaneous
Buildings.
|
|
| Owner Solicitation Name: | Polk Street Stream Line Replacement at Chicago Campus
|
| Owner Name: | University of Illinois, Facilities Management, Physical Plant Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacing approximately 330 LF of 8” HPS (High
Pressure Steam) and 6” CPD (Condensate Pump
Discharge) and 190 LF of 4” HPS and 3” CPD,
along with one pre-cast manhole with
installation of sump pump in the new manhole.
Piping will be direct buried pre-insulated steel
pipe and the contractor shall be responsible for
all piping, excavation, backfill, landscaping
and sitework.
|
|
| Owner Solicitation Name: | Skid-Steer Loader
|
| Owner Name: | Park Ridge, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and delivering 1 New Current Model
Skid-Steer Loader, Bobcat Model 553 or equal.
|
|
| Owner Solicitation Name: | F-350 Truck or Equivalent
|
| Owner Name: | Skokie Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | F-350 Truck or Equivalent.
|
|
| Owner Solicitation Name: | Authority-Wide Facade Inspections
|
| Owner Name: | Chicago Housing Authority, Procurement & Contract Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Facade Inspections
|
|
| Owner Solicitation Name: | Renovations Marklund Children's Home
|
| Owner Name: | Marklund Charities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The project consists of renovations to the
existing two-story masonry building. Trades:
Demolition, Wood Windows, and Hydraulic Elevator.
|
|
| Owner Solicitation Name: | Winnetka Water Treatment Plant Liquid Chemical Feed System
|
| Owner Name: | Winnetka, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing a chemical storage system for hyper ion
and hydrofluosilicic acid.
|
|
| Owner Solicitation Name: | Tree Planting Service Contract (Re-bid)
|
| Owner Name: | Schaumburg, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Tree Planting.
|
|
| Owner Solicitation Name: | Window Replacement and Miscellaneous Improvements
|
| Owner Name: | Jackson County Housing Authority
|
| Enginner Name: | Eggemeyer Associates Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Window Replacement and Miscellaneous
Improvements.
|
|
| Owner Solicitation Name: | Construct Parking Lot
|
| Owner Name: | Jackson County Housing Authority
|
| Enginner Name: | Eggemeyer Associates Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Construct Parking Lot.
|
|
| Owner Solicitation Name: | Pioneer Parking Structure Expansion (Parking Deck)
|
| Owner Name: | Rockford, City of, Purchasing Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Parking Structure Expansion.
|
|
| Owner Solicitation Name: | Demolition of F.E. Marsh School
|
| Owner Name: | Joliet Township High School District 204, Business Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition.
|
|
| Owner Solicitation Name: | Professional Design Engineering Consulting Services for the Department of Water Management
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Design Engineering Consulting
Services.
|
|
| Owner Solicitation Name: | Carpet Removal and Replacement at Vernon Hills High School
|
| Owner Name: | Libertyville Community High School District 128
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Carpet Removal and Replacement.
|
|
| Owner Solicitation Name: | Upgrade Water Plant
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Donohue & Associates
|
| Plankeeper Name |
|
| Scope: | Rehabilitate existing water treatment plant,
including modifications to pre-engineered
building, high service pump replacement, piping
replacement, repainting piping & tankage, new
chlorine shelter, new backwash sewer, and new
softener for Shower Building.
|
|
| Owner Solicitation Name: | Development of the University's Environmental Management System
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide consulting services. Assistance in
formulating a design framework and program plan
that will be used to develop and implement an
environmental management system.
|
|
| Owner Solicitation Name: | Replacement of Air Handling Units
|
| Owner Name: | Western Illinois University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of Air Handling Units.
|
|
| Owner Solicitation Name: | 2004 Ravine Repair Program, Phase I
|
| Owner Name: | Highland Park Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Embankment, Clay 410 CY. Furnishing Top Soil 4"
250 SY. Sodding 520 SY. Seeding CL 1A Complete &
CL 4A/5A 734 SY. Erosion Control Blanket 310 SY.
Hercules Block Retaining Wall 200 SF. Rock Filled
Gabions Mats, PVC Coated (1.5 LF) 24 CY.
Rock Filled Gabions Walls, PVC Coated (3.0 LF) 24
CY. CA-6 Stone Base 30 CY. Outfall Riprap (1.5
LF) 16 CY. Stream Riprap, 10" Boulders 100 SY.
Precast Conc Manhole, 60" Dia, TY A, Ditch Grate
2 each. Precast Conc Manhole, 48" Dia., TY A,
Ditch Grate 1 each. Precast Conc. Flared End 24"
Dia Inc Galv. Stl. Grate 2 each. Traffic Control
2 lump sum.
Option A ( TY 1 CL 52, DIP Sewers ):
Storm Sewers, 24" Dia. 71 LF. Storm Sewers, 18"
Dia. 10 LF. Storm Sewers, 12" Dia. 86 LF.
Option B (TY 2 Class III RCCP Sewers):
Storm Sewers, 24" Dia. 71 LF. Storm Sewers, 18"
Dia. 10 LF. Storm Sewers, 12" Dia. 86 LF.
Option B (ADS N 12 HDPE Sewers):
Storm Sewers, 24" Dia. 71 LF. Storm Sewers, 18"
Dia. 10 LF. Storm Sewers, 12" Dia. 86 LF.
|
|
| Owner Solicitation Name: | Asbestos Abatement at Morris Library, Phase II
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Upchurch Group, Inc.
|
| Plankeeper Name |
|
| Scope: | Ventilation. Electrical. Asbestos Abatement.
|
|
| Owner Solicitation Name: | Joliet Township High School Central Campus Vocational Tech Lab Addition
|
| Owner Name: | Joliet Township High School District 204, Business Office
|
| Enginner Name: | Wight Construction Services, Inc.
|
| Plankeeper Name |
|
| Scope: | Structural Steel. Precast Concrete Panels.
|
|
| Owner Solicitation Name: | Asbestos Abatement Laurel Hill Elementary School
|
| Owner Name: | Young Women's Christian Association of Elgin (YWCA)
|
| Enginner Name: | Midwest Engineering Services, Inc.
|
| Plankeeper Name |
|
| Scope: | Asbestos Abatement.
|
|
| Owner Solicitation Name: | Millennium Park Bicycle Station
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bicycle Station
|
|
| Owner Solicitation Name: | Beach Park Drainage District Ditch Cleaning
|
| Owner Name: | Beach Park Drainage District
|
| Enginner Name: | Bleck Engineering
|
| Plankeeper Name |
|
| Scope: | Removing all junk, dead/fallen trees, brush, and
obstucting debris within the ditch banks, removal
of sediment from the channel bottom to form a
uniform flow line and disposing off-site.
|
|
| Owner Solicitation Name: | Asbestos Abatement Project # 2-32345 Laurel Hill Elementary School 1750 Laurel Avenue, Hanover Park, Illinois 60133
|
| Owner Name: | Board of Education of Elgin School District U-46
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asbestos Abatement.
|
|
| Owner Solicitation Name: | Water Treatment Plant 4" Piping Removal & Replacement
|
| Owner Name: | Winnetka, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement approximately 50 feet of
4" piping.
|
|
| Owner Solicitation Name: | Janitorial Services, Illinois Waterway Visitor Center
|
| Owner Name: | US Army Corps of Engineers, Rock Island District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial Services.
|
|
| Owner Solicitation Name: | F-350 Truck Chassis with Dump Body and Equipment Packages Including Installation
|
| Owner Name: | Kane, County of, Transportation Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | F-350 Truck Chassis with Dump Body and Equipment
Packages Including Installation.
|
|
| Owner Solicitation Name: | 2004 Tandem Truck Cab and Chassis
|
| Owner Name: | Kane, County of, Transportation Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2004 Tandem Truck Cab and Chassis.
|
|
| Owner Solicitation Name: | Installation for 2004 Tandem Axle Cab and Chassis
|
| Owner Name: | Kane, County of, Transportation Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation for 2004 Tandem Axle Cab and Chassis.
|
|
| Owner Solicitation Name: | Profesional Engineering Services for Various Projects
|
| Owner Name: | Northeast Illinois Regional Commuter Railroad Corporation (METRA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Engineering Services.
|
|
| Owner Solicitation Name: | Erosion Control and Landscaping
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 182 UNIT tree removal; 3 ACRE tree removal; 50
UNIT supplemental watering; 816 CY earth
excavation; 468 CY furnished excavation; 1,463 SY
topsoil furnished and replacement; 418 ACRE
mowing; 23,061 SY erosion control blanket; 117
selective mowing stakes; 390' perimeter erosion
barrier; 1,524 TON stone riprap; 314' chain link
fence; 31 trees; 12 evergreens; 129 tree care;
2,542 SY revetment mat removal; 250' pipe drain
removal; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Building Demolition
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | .50 ACRE seeding; 3 building removals; removal
and disposal of friable and non-friable asbestos;
mobilization.
|
|
| Owner Solicitation Name: | Professional Engineering Services for Various Projects
|
| Owner Name: | Northeast Illinois Regional Commuter Railroad Corporation (METRA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Engineering Services.
|
|
| Owner Solicitation Name: | Statement of Qualifications for the Purpose of Selecting a Qualified Environmental Education/History Curriculum Development Firm
|
| Owner Name: | Lake County Forest Preserves
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Selecting a qualified Environmental
Education/History Curriculum Development Firm to
provide the Services to Complement the Natural
Resources.
|
|
| Owner Solicitation Name: | Demolition and Removal of a House
|
| Owner Name: | Mercer County Nursing Home
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and Removal of a House.
|
|
| Owner Solicitation Name: | Turf Mowing Services
|
| Owner Name: | New Lenox Community Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Turf Mowing Services
|
|
| Owner Solicitation Name: | RFQ McCormick Boulevard Improvements (Emerson Street to Green Bay Road) (Phase II Engineering and Phase III Construction)
|
| Owner Name: | Northfield, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | RFQ.
|
|
| Owner Solicitation Name: | Home Depot Alleys Design and Construction Inspection
|
| Owner Name: | Northfield, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design and Construction Inspection.
|
|
| Owner Solicitation Name: | Asbestos Abatement Tefft Middle School
|
| Owner Name: | Young Women's Christian Association of Elgin (YWCA)
|
| Enginner Name: | Midwest Engineering Services, Inc.
|
| Plankeeper Name |
|
| Scope: | Asbestos Abatement.
|
|
| Owner Solicitation Name: | Four-Wheel Drive Backhoe/Loader
|
| Owner Name: | Palatine Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Four-Wheel Drive Backhoe/Loader.
|
|
| Owner Solicitation Name: | Asbestos Abatement Project # 2-32276 Tefft Middle School 1100 Shirley Avenue, Streamwood, Illinois 60107
|
| Owner Name: | Board of Education of Elgin School District U-46
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asbestos Abatement Project
|
|
| Owner Solicitation Name: | Milling and Bituminous Concrete Surface
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 23,913 SY of milling; 200 UNITS of grading and
shaping shoulders; 3,283 SY of patching; 542 TONS
of aggregate shoulders; 3,013 TONS of bituminous
concrete binder and surface course, superpave,
Mix C; 32,371' of thermoplastic pavement marking;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Coldmilling and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 416 SY of bituminous surface removal-butt joint;
333 SY of concrete surface removal-butt joint;
15,195 SY of bituminous surface removal; 961 SY
of patching; 1,082 TONS of aggregate shoulders;
40,796' paint pavement marking; 226 pavement
markers; 8,123 TONS of bituminous concrete binder
surface course, superpave, Mix D; traffic control
and protection; mobilization.
|
|
| Owner Solicitation Name: | Pavement Reconstruction and Traffic Signal Installation
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 8,700 CY of removal and disposal of unsuitable
material; 1,500 CY of subbase granular material;
2,950 CY of porous granular embankment; 7,360 SY
of topsoil furnish and place 4"; 4,073' of
perimeter erosion barrier; 1,500 TONS of
aggregate base repair; 8,000 SY of pavement
removal; 2,775' of combination concrete curb and
gutter; 28,100 SY of area reflective crack
control treatment; 2,100 SY of bituminous
shoulders, superpave 8"; 6 CAL MO engineers field
office; 19,998' of thermoplastic pavement marking-
line; 448' of conduit pushed; 6,906' of electric
cable in conduit; 3 steel mast arm assembly; 775'
of detector loop; 387' of storm sewers; 7,075
TONS of bituminous concrete binder and surface
course; 13 signal head LED; 29,750 SY of
bituminous surface removal 2 ¾"; 500 HR trainees.
|
|
| Owner Solicitation Name: | Roadway Reconstruction and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 83 UNIT tree removal; 2,549 CY of earth
excavation; 4,050 SY of sodding; 28 inlet and
pipe protection; 177 TON of aggregate surface
course, Type B; 1,323 GALS of bituminous
materials (prime coat); 8,719 SF of PCC sidewalk;
7,414 SY of bituminous surface removal; 327 SY of
Class D patches; 43.2 CY of concrete structures;
4,030 LBS reinforcement bars; 804' of storm
sewers; 361' of pipe underdrains; 13 catch
basins; 3,276' combination curb and gutter; 19 SF
of sign panel; 11,756' of thermoplastic pavement
marking; 3,190' trench and backfill for
electrical work; 3,080' of unit duct; 16
luminaires; 709' of electric cable in conduit;
210' of detector loop; 6,340 SY of aggregate
subgrade; 94 SY of bituminous base course,
superpave; 1,511 TONS of bituminous concrete
surface course, superpave; 2,528 TONS of
bituminous concrete binder course, superpave; 434
TONS of leveling binder; 1,949 SF of permanent
steel sheet piling; 11,200 SF of plant control;
traffic control and protection.
|
|
| Owner Solicitation Name: | Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 14,903 TONS of bituminous mixture complete;
83,111 SY of area reflective crack control
treatment; 3,740 TONS of aggregate shoulders;
114,761' of paint pavement marking-line 4";
railroad protection liability insurance.
|
|
| Owner Solicitation Name: | Road Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 993 tree removal; 14,310 CY of earth excavation;
600 CY of removal and disposal of unsuitable
material; 11,515 CY of borrow excavation
furnished by contractor; 7,465 CY of topsoil
excavation and placement; 4.40 ACRES of seeding,
Class 2; 1,188 LBS of nitrogen, phosphorous and
potassium fertilizer; 3,375' of perimeter erosion
barrier; 10,266 TONS of subbase granular
material, Type B; 5,133 TONS of aggregate base
course, Type A; 82.5' of pipe culverts, Class A,
Type 1; 4 precast reinforced concrete flared end
sections; 138' of storm sewers, Class A, Type 1-
12"; 1,230 TONS of breaker-run crushed stone;
mobilization.
|
|
| Owner Solicitation Name: | Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,919 TONS of leveling binder (machine method);
3,670 TONS of bituminous concrete surface course;
594 TONS of bituminous shoulders; 10,194'
thermoplastic pavement marking line 4";
construction layout; 2,501 SY of bituminous
surface removal (butt joint); traffic control and
protection.
|
|
| Owner Solicitation Name: | Pavement Construction, Storm Sewer and Sidewalks
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 647 tree removal; 5,060 CY of earth excavation;
2,335 CY of trench backfill; 2.8 ACRE seeding;
1,700' of perimeter erosion barrier; 14,715 SY of
processing lime modified soils, 12"; 700 TONS of
aggregate surface course; 11,780 SY of PCC
pavement 8"; 29,323 SF of PCC sidewalk 4"; 3,110'
storm sewers, rubber gasket; 435' of watermain
6"; 9 manholes; 33 inlets, special; 7,214'
combination concrete curb and gutter.
|
|
| Owner Solicitation Name: | Road Reconstruction
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 200 tree removal; 17,640 CY of earth excavation;
10,765 CY of furnished excavation; 15 ACRE
seeding; 2,320' of perimeter erosion barrier; 690
TONS of stone riprap; 15,400 TONS of aggregate
base course; 1,500 TONS of cover and seal coat
aggregate; 5,370 TONS of aggregate shoulders;
17 precast reinforced concrete flared end
sections; 1,276' of pipe culverts 15"-72"; 1,025'
of steel plate beam guardrail; 48,770' of paint
pavement marking-line 4"; traffic control and
protection.
|
|
| Owner Solicitation Name: | Road Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3,090 CY of earth excavation; 5,463 SY of
sodding; 8,870 SY of subbase granular material;
7,744 SF of PCC sidewalk 4"; 3,075' of storm
sewer; 270' of adjusting water main; 6 manholes;
22 inlets; 3,997' of combination concrete curb
and gutter; 682' of preformed plastic pavement
marking-line; 111' of electric cable in conduit;
1,639 TONS of bituminous concrete binder and
surface course; construction layout; traffic
control complete.
|
|
| Owner Solicitation Name: | Pavement Reconstruction and Storm Sewers
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 167 LBS of fertilizer nutrients; 2,000' perimeter
erosion barrier; 7,741 TONS of aggregate base
course; 763 SY of PCC base course, 6"; 1,698 TONS
of bituminous concrete surface course, superpave,
Mix C, N50; 2,035 TONS of bituminous concrete
binder course; 7,687 SF of PCC sidewalk, 4";
16,382 SY of pavement removal; 125 SY Class C
patches; 3,882' of storm sewers; 15 manholes; 37
inlets; 11,711' of concrete curb;
|
|
| Owner Solicitation Name: | Pavement Patching, Surface Removal and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 58,521 SY of bituminous surface removal; 924 SY
of bituminous concrete pavement patches; 3,240
TONS of aggregate shoulders; 46,312' paint
pavement marking line; 309 raised reflective
pavement markers; 3,031 TONS of bituminous
concrete surface course, superpave, Mix D, N90;
985 TONS polymerized bituminous concrete surface
course, superpave, Mix D, N90; 1,516 TONS
leveling binder, superpave, N90; 436 TONS of
polymerized leveling binder, superpave, N90; 690
TONS of incidental bituminous surfacing,
superpave, N50; 1,415 TONS of bituminous
shoulders, superpave; mobilization; traffic
control and protection.
|
|
| Owner Solicitation Name: | Pavement Construction
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 476 tree removals; 1,640 CY of earth excavation;
1.5 ACRES of seeding; 384 TONS of subbase
granular material; 9,539 SY of aggregate base and
surface course; 6,352 SY of PCC pavement 8";
9,082 SY of protective coat; 7,651 SF of PCC
sidewalk 4"; 377' of pipe culverts 24"-42";
2,945' of storm sewers, rubber gasket 12"-24"; 13
restricted depth manholes; 46 inlets; 4,691' of
combination concrete curb and gutter; 9,501' of
paint pavement marking-line 4"-24"; 8,592' of
temporary pavement marking-line 4"; 995 CY of
furnished excavation; 4 reinforced concrete pipe
tees; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 19.9 CY of concrete removal; 32.3 CY of concrete;
350 SF of formed concrete repair; 15,940 LBS of
structural steel; 270 stud shear connectors;
12,950 LBS of structural steel removal; 2,160 LBS
of structural steel repair; 3,720 LBS of epoxy
coated reinforcement bars; 133' of pedestrian
railing; 62' of epoxy crack sealing; beam
straightening; 84 SY of protective shield;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 402 CY of earth excavation; 116 CY of channel
excavation; 566 CY of furnished excavation; 600
SY of erosion control blanket; 1,214 SY of stone
riprap; 504 TONS of aggregate surface course;
586 SY of bituminous surface removal-butt joint;
224 SY of bridge approach pavement; 248 SY of
pavement removal; 430 SY of slope wall removal;
102 CY of structure excavation; 143 CY of
concrete; 397 SY of grooving; 2,088 stud shear
connectors; 33,420 LBS of epoxy coated
reinforcement bars; 116' of pipe culverts; 2,980'
of paint pavement marking line; 1,870 TONS of
bituminous concrete binder and surface course,
Superpave, Mix C; 416 bar splicers; mobilization;
traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 164 CY of channel excavation; 203 Cy of furnished
excavation; 300' of perimeter erosion barrier;
533 SY of riprap; 52 TONS of subbase granular
material; 226 SY of subbase granular material;
454 SY of bituminous surface removal-butt joint;
214 SY of bridge approach pavement; 444 SY of
bituminous surface removal; 251 SY of pavement
removal; 503 SY of bituminous shoulder removal;
310 SY of bituminous shoulders, superpave; 156 CY
of concrete; 300 SY of grooving; 39,248 LBS of
structural steel; 1,728 stud shear connectors;
31,120 LBS epoxy coated reinforcement bars;
1,353' of steel piles; 1,124' of paint pavement
marking line; 82 TONS bituminous concrete binder
and surface course, superpave, Mix C; 384 bar
splicers; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,165 CY of earth and channel excavation; 1.3
ACRES of seeding, Class 2 (special); 262 TONS of
riprap, special; 1,959 TONS of aggregate base
course; 62 TONS of aggregate surface course;
1,135 GALS of bituminous materials (prime coat);
3,864 SF of PCC deck beams (21" depth); 5,740 LBS
of reinforcement bars; 1,449' of driving and
furnishing steel piles; 326' of pipe culverts;
414' of portland cement mortar fairing course; 2
traffic barrier terminals; 493 tons bituminous
concrete surface course, Class B modified.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 302 CY of earth excavation; 0.07 ACRE seeding;
873 SY of aggregate base course; 834 SF of PCC
sidewalk 5"; 27,372 LBS of furnishing and
erecting structural steel; 57,880 LBS of
reinforcement bars epoxy coated; 156' of driving
and filling shells; 4,470 SF of steel sheet
piling; 253' of chain link fence 5’; 6,020 SF of
pedestrian truss superstructure; 42' of drilled
shaft in rock 42"; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 210 CY of earth excavation; 380 CY of channel
excavation; 436 CY of furnished excavation; 0.5
ACRE of seeding, Class 2 (special); 0.5 ACRE of
mulch, method 1; 50 LBS of temporary erosion
control seedings; 840' of perimeter erosion
barrier; 351 TONS of riprap, special; 272 TONS of
aggregate base course, Type B; 237.5' of steel
plate beam guardrail, Type A; 331 SY of pavement
removal; 35 TONS of aggregate shoulders, Type B;
34 CY of concrete structures; 2,280 SF of precast
prestressed concrete deck beams; 3,760 LBS of
reinforcement bars; 320' of metal pile shells
14"; 120' of pipe culverts, Class D, Type 1; 8
traffic barrier terminals; 4 terminal markers-
direct applied; 102 TONS of bituminous concrete,
superpave; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 48 CY of earth excavation; 164 SY of bituminous
shoulders 8"; removal of existing structures; 121
CY of structure excavation; 24.1 Cy of concrete
structures; 2,036 SF of precast prestressed
concrete deck beams; 2,850 LBS of reinforcement
bars; 570' of driving steel piles; 864 SF of
temporary sheet piling; 6 traffic barrier
terminal; 132 TONS of bituminous concrete binder
and surface course; 255 SY of grouted riprap;
traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 664 CY of earth excavation; 292 CY of furnished
excavation; 0.6 ACRE of seeding, Class 2; 162 LBS
of nitrogen, phosphorus, and potassium fertilizer
nutrients; 0.6 ACRE of mulch, Method 2; 400' of
perimeter erosion barrier; 562 TONS of aggregate
surface course, Type B; 21,600 LBS of
reinforcement bars; 55' of steel railing, Type
S1; 104.3 CY of concrete box culverts; 34' pipe
culverts.
|
|
| Owner Solicitation Name: | Scour Repairs, Debris Removal and Riprap Replacement
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 100 LBS of temporary erosion control seedings;
3,912 TONS of stone riprap; 19 CY of concrete
structures; debris removal; traffic control and
protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Deck Repair
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 461 SY of PCC base course widening; 160 SY of
bituminous surface removal; 3,402 SY of
bituminous concrete removal (deck); 996 SY of
bituminous concrete surface removal complete; 30
SY of PCC pavement patches; 29 TONS of aggregate
shoulders; 40 CY of concrete removal; 45 CY of
concrete superstructure; 995 SY of concrete
wearing surface; 51 SF of formed concrete repair;
3,283 LBS of structural steel; 20,860 LBS of
epoxy coated reinforcement bars; 88' of steel
plate beam guardrail; traffic barrier terminal;
100' of guardrail removal; 4,904' of paint
pavement marking line; 23 raised reflective
pavement markers; 3,402 SY of concrete bridge
deck scarification; 242 TONS of bituminous
concrete surface course, superpave, Mix C, N50;
3,402 SY of bridge deck microsilica concrete
overlay; 1,901' keyway repair; traffic control
and protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 7 CY of earth excavation; 284 CY of channel
excavation; 0.15 ACRE of seeding; 15 TONS of
aggregate surface course; 1,752 SF of precast
prestressed concrete deck beams (27" depth);
3,290 LBS of furnishing and erecting structural
steel; 584' of steel railing; 8 traffic barrier
terminals; 1,752 SF of removal of existing
precast prestressed concrete deck beams; 119 TONS
of bituminous concrete surface course, superpave,
Mix C, N50; 8 traffic barrier terminals; 1,752'
of keyway repair; 584' of portland cement mortar
fairing course; 21.2 CY of concrete removal.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,064 CY of earth and channel excavation; 0.2
ACRE of seeding; 175 TONS of stone dumped riprap;
20 TONS of aggregate surface course; 60 CY of
structure excavation; 24.8 CY of concrete
structures; 2,025 SF of PCC deck beams (33"
depth); 2,980 LBS of reinforcement bars; 252' of
furnishing and driving steel piles; test pile;
3.4 CY of concrete encasement; name plates; 4
traffic barrier terminal.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 115 CY of channel excavation; 120 TONS of stone
dumped riprap; 281 TONS of aggregate surface
course; removal of existing structure; 100.2 CY
of concrete structure; 748 SF of precast
prestressed concrete deck beams; 17,025 LBS of
reinforcement bars; 352' of driving steel piles;
4 traffic barrier terminal; 2 underwater
structure excavation protection; traffic control
and protection.
|
|
| Owner Solicitation Name: | Signal Modernization
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 244' of thermoplastic pavement marking line; 759'
of conduit; 5 handholes; 193' of trench and
backfill; 8,861' of electric cable; 4 luminaires;
4 mast arm assemblies and poles; 83' of concrete
foundations; 16 signal heads; traffic control and
protection; mobilization.
|
|
| Owner Solicitation Name: | Pavement Marking Replacements
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 5,637 raised reflective marker removal; 37,584
replacement reflectors; 5,637 raised reflective
pavement marker; mobilization; traffic control
and protection.
|
|
| Owner Solicitation Name: | Pavement Marking Repairs
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 349,000' of thermoplastic pavement marking;
156,000' of hot spray thermoplastic pavement
marking; 1,620' of preformed plastic pavement
marking; 2,700' of preformed thermoplastic
pavement marking; 91,000' of polyurea pavement
marking; 166,000 SF of pavement marking removal;
35,000' of polyurea pavement marking, special;
traffic control and protection; mobilization.
|
|