| Owner Solicitation Name: | Pavement Marking Repairs
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 775,000' of hot spray thermoplastic pavement
marking; 267,500' of polyurea pavement marking;
120,000 SF of pavement marking removal; traffic
control and protection; mobilization.
|
|
| Owner Solicitation Name: | Pavement Marking Repairs
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 5,500 SF of thermoplastic pavement marking
letters and symbols; 121,100' of thermoplastic
pavement marking line; 557,000' of hot spray
thermoplastic pavement marking lines; 1,800 SF of
epoxy pavement marking letters and symbols;
112,000' of epoxy pavement marking line; 80,000'
of polyurea pavement marking line; 80,000 SF of
pavement marking removal; 2,000 SF of polyurea
pavement marking-letters and symbols (special);
16,000' of polyurea pavement marking line,
special; mobilization.
|
|
| Owner Solicitation Name: | Bridge Joint Repairs
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,131' of silicone joint sealer; 48.4 CF of
polymer concrete; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Structure Fabrication
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing 3,104,160 LBS of structural steel;
furnishing 56 floating bearings; 360 calendar
days storage of structural steel; 360 calendar
days of floating bearings.
|
|
| Owner Solicitation Name: | Routing and Sealing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 750,000' of crack routing (pavement); 300,000 LBS
of crack filling; 83,160' of preformed plastic
pavement marking; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Bridge Cleaning and Painting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and painting 4 steel bridges;
containment and disposal of lead paint cleaning
residues; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Bridge Cleaning and Painting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and painting 3 steel bridges;
containment and disposal of lead paint cleaning
residue; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Bridge Cleaning and Painting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and painting 2 steel bridges;
containment and disposal of lead paint cleaning
residues; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Bridge Cleaning and Painting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and painting 4 steel bridges;
containment and disposal of lead paint cleaning
residue; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Structure Fabrication
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish 2,636,940 KG of structural steel; 3,950
UNITS of storage of structural steel; furnish 78
elastomeric bearing assemblies; 30 calendar days
storage of elastomeric bearing assemblies;
furnish 226 floating bearings; furnish 60 M
modular expansion joint; 4 shop assemblies; 30
calendar days storage of floating bearing
assemblies; 30 calendar days of modular expansion
joints.
|
|
| Owner Solicitation Name: | Drainage Corrections and Pipe Culvert Replacements
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 247' of grading and shaping ditches; 39 TONS of
aggregate surface course; 95 Sy of PCC driveway
pavement; 76 SY of driveway pavement removal; 64
SY of bituminous concrete pavement patches; 183'
of pipe culvert removal; 2 CY of concrete
structures; 161 LBS of reinforcement bars; 206'
of pipe culverts; 98' of saw cutting; traffic
control and protection; mobilization.
|
|
| Owner Solicitation Name: | Patching, Surface Removal and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 547 SF of PCC sidewalk; 18,467 SY of bituminous
surface removal; 84 SY of pavement removal; 170'
of combination curb and gutter removal; 572 SF of
sidewalk removal; 1,515 SY of paved shoulder
removal; 13 SY of pavement patching; 4,492' of
strip reflective crack control treatment; 196
TONS of aggregate shoulders; 1,513 TONS of
bituminous shoulders, superpave; 162' of
combination concrete curb and gutter; 513' of
steel plate beam guardrail; 6 traffic barrier
terminals; 293' of guardrail removal; 50' of
remove and re-erect steel plate beam guardrail;
20,615' of thermoplastic pavement marking line;
232 raised reflective pavement markers; 681' of
electric cable in conduit; 1 steel mast arm
assembly and pole; 15' of concrete foundation; 2
relocate existing signal heads; 1 relocate
existing traffic signal equipment; 88 SY of
bituminous concrete base course widening,
superpave; 1,453 TONS of polymerized bituminous
concrete surface course, superpave, Mix D, N70;
723 TONS of leveling binder, superpave N70;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Construct and Operate a Permanent Tire-Recycling and Composting Facility
|
| Owner Name: | Kankakee, County of
|
| Enginner Name: | Gardner, Carton & Douglas
|
| Plankeeper Name |
|
| Scope: | Construct and Operate a Permanent Tire-Recycling
and Composting Facility.
|
|
| Owner Solicitation Name: | Road Work, Drainage and Lighting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 302 UNITS of tree removal; 400,745 CY of earth
excavation; 113,435 CY of borrow excavation;
10,000 SY of geotechnical fabric for ground
stabilization; 9,421 TONS of riprap; 159,103 SY
of processing lime modified soils; 11,184 TONS of
subbbase granular material; 114,712 SY of
stabilized subbase; 4,879 TONS of aggregate
surface course; 104,039 SY of jointed PCC
pavement; 40,296 SY of pavement removal; 200 SY
of pavement patching; 8,832 TONS of aggregate
shoulders; 5,393 SY of bituminous shoulders,
superpave; 47,568 SY of PCC shoulders; 422 CY of
structure excavation; 296 CY of concrete
structures; 1,171 CY of concrete superstructure;
4,182' of precast prestressed concrete bulb T-
beams; 124,237 LBS of reinforcement bars; 260,770
LBS of epoxy coated reinforcement bars; 1,364' of
steel piles HP 12 x 84; 67,429' of pipe
underdrains; 3,500' of storm sewers; 1,588' of
steel plate beam guardrail; 16 traffic barrier
terminals; 1,815' of guardrail removal; 67,447'
of shoulder rumble strip; 4,573' of paint
pavement marking line; 85,788' of polyurea
pavement marking line; 575 raised reflective
pavement markers; 5,390' of unit duct; 3,769' of
aerial cable; 13,939 SY of bituminous base
course; 146 SY of bituminous concrete base course
widening, superpave; 1,771 TONS of bituminous
concrete surface course, superpave, Mix C, N50;
665 TONS of bituminous concrete surface course,
superpave, Mix D, N70; 355 TONS of bituminous
concrete binder course, superpave, IL-19.0, N50;
482 TONS of leveling binder, superpave; 5,283 SY
of bituminous concrete pavement (full-depth)
superpave; 8,355 CY of earth excavation
(rockfill); 11,000 TONS of rockfill-subgrade;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Road Reconstruction
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 513 CM of earth excavation; 2,061 CM of removal
and disposal of unsuitable material; 5,736 CM of
furnished excavation; 198 CM of trench backfill;
5,800 SM of topsoil; 55 M of grading and shaping
ditches; 0.56 HA of seeding; 202 SM of sodding;
704 SM of subbase granular material; 2,191 SM of
concrete pavement (hinge-jointed); 245 SM of
concrete sidewalk; 886 SM of milling; 570 SM of
pavement removal; 663 M tons of aggregate
shoulders; 44 SM of bituminous shoulders; 9.0 CM
of concrete; 129 M of concrete curb and gutter;
38 M of steel plate beam guardrail; 10.77 SM of
sign panel; 374 M of preformed plastic pavement
marking; 3 intermediate trees; 85 shrubs; 3
evergreens; 939 SM of bituminous base course,
superpave; 218 M tons of bituminous concrete
binder and surface course, superpave, Mix D; 607
SM of bituminous shoulders, superpave; 1.25 UNITS
perennial plants; 2,798 SM of aggregate subgrade;
removal of 5 buildings; 13 SM of coarse sand
placement; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Traffic Signal Upgrade and Lane Construction
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 10 signal heads; 809 SY of bituminous shoulders
remove and replace; 1,200' of pipe underdrain
removal; 303 CY of earth excavation; 2,243 SY of
subbase granular material; 1,335 SY of
continuously reinforced PCC pavement; 792 SF of
PCC sidewalk; 962' of gutter removal; 832 SF of
sidewalk removal; 1,149 SY of bituminous shoulder
removal; 2,804 SY of continuously reinforced PCC
pavement patches; 540 SY of bituminous shoulder,
superpave; 1,200' of pipe underdrains; 819' of
concrete gutter; 48,704' of polyurea pavement
marking line; 2 aluminum traffic signal posts; 4
steel mast arm assemblies and poles; modify
existing controller; 313' of remove and reinstall
electric cable from conduit; traffic control and
protection; mobilization.
|
|
| Owner Solicitation Name: | Road Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2,402 UNITS of tree removal; 95,436 CY of earth
excavation; 3,808 TONS of subbase granular
material; 10,188 TONS of riprap; 1,697 TONS of
aggregate base course; 2,273 SY of preparation of
base; 848 SY of PCC driveway pavement; 50,401
SY of bituminous surface removal; 3,587 SY of
pavement removal; 6,372' of gutter removal; 1,102
SY of bituminous shoulder removal; 1,880 SY of
pavement patching; 49,830' of strip reflective
crack control treatment; 1,669 TONS of aggregate
shoulders; 3,835 SY of bituminous shoulders,
superpave; 4,440 LBS of reinforcement bars; 27 CY
of concrete box culverts; 191' of precast
concrete box culvert; 2,224' of pipe culverts;
8,347' of pipe underdrains; 8,567' of concrete
gutter; 963' of steel plate beam guardrail; 10
traffic barrier terminals; 750' of steel plate
beam guardrail removal; 40 CY of non-special
waste disposal; special waste plans and reports;
6 betx-pnas soil analysis; 2 soil disposal
analysis; 80,597' of paint pavement marking line;
258' of preformed plastic pavement marking line;
328 raised reflective pavement markers; 7,802 SY
of bituminous base course, superpave; 23,658 SY
of bituminous concrete base course widening,
superpave; 7,040 TONS of bituminous concrete
surface course, superpave, Mix C, N50; 4,252 TONS
of leveling binder, superpave, N50; 1,679 TONS of
incidental bituminous surfacing, superpave, N50;
traffic control and protection; mobilization.
|
|
| Owner Solicitation Name: | Intersection Improvements
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | video vehicle detection system; 23 TONS of
bituminous concrete surface course, superpave,
Mix D, N70; 12 TONS of leveling binder; 115 SF of
concrete median removal; 12 signal heads; 140 CY
of earth excavation; 288 SY of subbase granular
material; 274 SY of PCC base course; 409' of
combination curb and gutter removal; 384' of
combination concrete curb and gutter; 1,500 SF of
concrete median surface; 455' of thermoplastic
pavement marking line; 17' of conduit in trench;
112' of conduit augered; full-actuated controller
and cabinet; fiber optic transceiver; 1,062' of
electric cable in conduit; 2 aluminum traffic
signal post; 3' of concrete foundation; 530' of
remove and reinstall electric cable from conduit;
traffic control and protection; mobilization.
|
|
| Owner Solicitation Name: | Widening and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 34 inlets; 39 right of way markers; 28 trees;
1,710 M of storm sewers; 5,340 SM of bituminous
base course, superpave; 408 M tons of leveling
binder (machine method), superpave; 1,956 M tons
of bituminous concrete binder and surface course,
Mix D; 1,287 SM of bituminous concrete pavement
(full depth), superpave; 500 UNITS of tree
removal; 2,046 CM of topsoil excavation and
placement; 1,502 SM of erosion control blanket;
6,915 SM of sodding; 533 M of perimeter erosion
barrier; 630 M of tons stone riprap; 1,875 M of
tons subbase granular material; 309 M of tons
aggregate surface course; 414 SM of bituminous
surface removal-butt joint; 246 M tons of
incidental bituminous surfacing; 1,206 SM of
concrete driveway pavement; 14,015 SM of
bituminous surface removal; 4,500 SM of pavement
removal; 1,765 SM of driveway pavement removal;
242 M of curb removal; 766 M of gutter removal;
214 SM of sidewalk removal; 4,857 SM of
bituminous shoulder removal; 568 SM of patching;
3,750 M crack control treatment; 746 M tons of
aggregate shoulders; 212 M tons of bituminous
shoulders, superpave; 51 M of concrete box
culverts; 249 M of pipe culverts; 20 manholes;
1,578 M of concrete curb and gutter; 6,738 M of
paint pavement marking line; traffic control and
protection; mobilization.
|
|
| Owner Solicitation Name: | Intersection Improvements
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 720 CY of earth excavation; 582 SY of PCC base
course; 162 SY of PCC driveway pavement; 1,387 SF
of PCC sidewalk; 411 SY of bituminous surface
removal; 261 SY of driveway pavement removal;
790' of combination curb and gutter removal;
1,735 SF of sidewalk removal; 7 CY of concrete
structures; 524 LBS of reinforcement bars; 701'
of combination concrete curb and gutter; 6,766'
of paint pavement marking line; service
installation; 800' of conduit in trench; 1 full-
actuated controller and cabinet; 5,714' of
electric cable in conduit; 3 painted steel
traffic signal posts; 3 steel mast arm assemblies
and poles; 1 steel combination mast arm assembly
and pole; 58' of concrete foundations; 12
inductive loop detectors; 1,039' of detector
loop; 1 remove existing traffic signal equipment;
120 TONS of bituminous concrete surface course,
superpave, Mix D, N 50; 10 TONS of leveling
binder, superpave, N 50; 12 signal heads; 10 CY
non-special waste disposal; betx-pnas soil
analysis; soil disposal analysis; traffic control
and protection; mobilization.
|
|
| Owner Solicitation Name: | Surface Removal, Resurfacing and Guardrail Repair
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 15,281 SY of bituminous surface removal; 13 TONS
of aggregate shoulders; 339 TONS of bituminous
shoulders, superpave; 450' of remove and re-erect
steel plate beam guardrail; 9,415' of paint
pavement marking line; 51 raised reflective
pavement markers; 116 TONS of bituminous concrete
surface course, superpave, Mix C, N50; 1,230 TONS
of bituminous concrete surface course, superpave,
Mix C, N50; 31 TONS of bituminous concrete binder
course, superpave, IL-19.0, N50; traffic control
and protection; mobilization.
|
|
| Owner Solicitation Name: | Road Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 59,823 CY of earth excavation; 4,333 CY of
removal and disposal of unsuitable material;
13,483 SY of topsoil; 3 ACRES of seeding; 12,982
SY of stabilized subbase; 10,185 SY of concrete
pavement (jointed); 65 SY of patching; 406 SY of
bituminous shoulders, superpave; 1,314 SY of
concrete shoulders; 8,459' of storm sewers; 32
manholes; 14,093 SF of concrete median surface;
825' of steel plate beam guardrail; 457,910 LBS
of epoxy coated reinforcement bars; 22,325' of
epoxy pavement marking; 12,982 SY of whitewashing
for concrete pavement; 21,345 SY of subbase
granular material; 40' of sleeper slab; 6,929 SY
of temporary pavement; 5,219' of concrete curb
and gutter; 6,231 CY of trench backfill; 13,108
SY of pavement removal; 15,970 LBS of
reinforcement bars; 2,662' of water main; 4 fire
hydrants; 332' of steel casings, jacked; 3,172'
of video taping of sewers; 2,500 LBS of watermain
fittings; 5,300' of trench and backfill; 4,650'
of aerial cable; 3,070' of conduit encased; 7,046
SY of concrete base course; 2,607 TONS of
bituminous concrete binder and surface course,
superpave, Mix D N 70; 12,545 SY of milling; 440
SF of sign panel; removal of 6 existing
structures; 9,862 CY of structure excavation;
3,971 CY of concrete; 12,924 stud shear
connectors; 50,953 SF of untreated timber
logging; 26,469' of soldier piles; 114,577 CF of
drilling and setting soldier piles (in soil);
traffic control and protection; mobilization.
|
|
| Owner Solicitation Name: | Bituminous Concrete Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 532 UNIT of tree removal; 2,190 CY of earth
excavation; 8,151 SY of sodding; 1,258' of
perimeter erosion control; 1,699 SY of subbase
granular material; 2,042 SY of aggregate base
course; 484 SY of concrete base course; 486 TONS
of aggregate surface course; 493 SY of bituminous
surface removal-butt joint; 309 SY of concrete
surface removal-butt joint; 2,060 CY of furnished
excavation; 2,669 SY of concrete pavement; 18,899
SF of concrete sidewalk; 19,639 SY of bituminous
surface removal; 4,260 SY of pavement removal;
2,989' of curb and gutter removal; 14,768 SF of
sidewalk removal; 380 SY of patching; 209 TONS of
bituminous shoulders, superpave; 849 TONS of
aggregate shoulders; 5,288 SY of bituminous
shoulders, superpave; 3,415' of storm sewers; 13
manholes; 76 inlets; 6,550' of curb and gutter;
2,179 SF of concrete median surface; 2,262' of
guardrail; 14,173' of thermoplastic pavement
marking line; 27,898' of paint pavement marking
line; 865' of epoxy pavement marking line; 5,505
TONS of bituminous concrete binder and surface
course, superpave, Mix D; 1,796' of coldmilling;
417 pavement markers; 177' of conduit; 239' of
electric cable; 44 trees; 2 signal heads; traffic
control and protection; mobilization.
|
|
| Owner Solicitation Name: | Milling and Bituminous Concrete Surface
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 9,798 SY of milling; 1,098 TONS of polymerized
bituminous concrete binder and surface course,
Superpave, Mix E, N90; 440' of detector loop;
6,992' of thermoplastic pavement marking;
mobilization traffic control and protection.
|
|
| Owner Solicitation Name: | Milling and Bituminous Concrete Surface
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 27 CY of temporary ramp; 38,016 SY of milling;
520 TONS of aggregate shoulders; 3,193 TONS of
bituminous concrete surface course, Superpave,
Mix C, N50; 32,076' of paint pavement marking;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Milling and Bituminous Concrete Surface
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2,517 SY of milling; 422 TONS of bituminous
concrete binder and surface course, superpave,
Mix C, N 70; 1,408' of paint pavement marking;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Milling and Bituminous Concrete Surface
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 45 CY of furnished excavation; 93,946 SY of
milling; 1,941 SY of patching; 1,368 TONS of
aggregate shoulders; 14,049 TONS of bituminous
concrete surface course, superpave, Mix C, N70;
128,069' of paint pavement marking; mobilization;
traffic control and protection.
|
|
| Owner Solicitation Name: | Bituminous Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2,877 SY of bituminous surface removal-butt joint;
120 TONS of incidental bituminous surfacing;
2,089 TONS of aggregate shoulders; 5,210 TONS of
bituminous concrete surface course, superpave,
Mix D; 4,193 TONS of leveling binder, superpave;
156,178' of paint pavement marking line; 352
pavement markers; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Coldmilling and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 578 SY of bituminous surface removal-butt joint;
38 TONS of incidental bituminous surfacing; 759
TONS of aggregate shoulders; 1,556 TONS of
bituminous concrete leveling binder, superpave;
1,919 TONS of bituminous concrete surface course,
superpave, MIX C; mobilization; traffic control
and protection.
|
|
| Owner Solicitation Name: | Filter Bed Renovation
|
| Owner Name: | Northbrook, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of existing filter beds in filters #1 & 2
and reconstruction of filter beds with new
support gravel and media at Water Filtration
Plant.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,506 CY of earth excavation; 1,585 CY of removal
and disposal of unsuitable material; 33,530 CY of
furnished excavation; 7,077 CY of topsoil
excavation and placement; 29,928 SY of processing
lime modified soils; 4,599 TONS of subbase
granular material; 20,750 SY of stabilized
subbase; 3,303 SY of PCC base course widening;
6,472 SY of jointed PCC pavement; 832 SY bridge
approach pavement; 17,266 SY of continuously
reinforced PCC pavement; 3,194 SY of bituminous
surface removal; 12,998 SY of pavement removal;
9,844 SY of bituminous shoulder removal; 1,803 SY
of bituminous shoulders, superpave; 2 removal of
existing structures; 1,848 CY of structure
excavation; 1,232 CY of concrete structures; 943
CY of concrete superstructure; 633,690 LBS of
structural steel; 13,824 stud shear connectors;
363,240 LBS of epoxy coated reinforcement bars;
6,383' of steel piles HP 12 X 53; 1,423 SF of
temporary sheet piling; 2,403' of storm sewers;
6,708' of pipe underdrains; 2,463' of steel plate
beam guardrail; 8 traffic barrier terminals;
2,563' of guardrail removal; 1,778' of concrete
barrier; 1,985' of shoulder rumble strip; 74' of
overhead sign structure; 44' of overhead sign
walkway; 25,640' of epoxy pavement marking line;
208 raised reflective pavement markers; 78 TONS
of bituminous concrete surface course, superpave,
Mix D, N 105; 472 TONS of bituminous concrete
surface course, superpave, Mix E, N 105; 628 TONS
of bituminous concrete binder course, superpave,
IL 19, N 105; 7,297' of pipe underdrain removal;
961 CY of porous granular embankment; 91 TONS of
leveling binder, superpave, N 105; mobilization;
traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 7,480 CY of earth excavation; 600 CY of furnished
excavation; 640 CY of porous granular embankment;
1,710 CY of topsoil excavation and placement;
13,240 TONS of aggregate base course; 584 SY of
bridge approach pavement; 1,138 SY of bituminous
surface removal; 4,263 SY of pavement removal;
1,453 SY of paved shoulder removal; 630 TONS of
aggregate shoulders; 834 TONS of bituminous
shoulder, superpave; 2 removal of existing
structures; 336 CY of structure excavation; 318
CY of concrete structures; 927 CY of concrete
superstructure; 1,256,510 LBS of structural
steel; 7,392 stud shear connectors; 277,830 LBS
of epoxy coated reinforcement bars; 1,059' of
steel piles HP 10 X 57; 1,677' of steel piles HP
12 X 63; 1,250' of steel plate beam guardrail; 8
traffic barrier terminals; 1,700 ft guardrail
removal; 600' of temporary steel plate beam
guardrail; 310' of preformed plastic pavement
marking line; 25,650' of epoxy pavement marking
line; 16 raised reflective pavement markers;
4,600' of shoulder rumble strip; 205 TONS of
polymerized bituminous concrete surface course,
superpave, Mix D, N 105; 400 TONS of bituminous
concrete binder course, superpave, IL-19.0, N
105; 160 TONS of polymerized bituminous concrete
binder course, superpave, IL-19.0, N 105; 4
temporary traffic barrier terminals;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 280 CY of channel excavation; 235 CY of porous
granular embankment; 470 SY of sodding, salt
tolerant; 452 SY of stone riprap; 300 SY of
bridge approach pavement; 260 SF of sidewalk; 200
SY of pavement removal; 449' of curb and gutter
removal; 558 SF of concrete median surface
removal; 1,299 SY of patching; 9,393' of saw
cuts; 120 CY of concrete superstructure; 420 SY
bridge deck grooving; 20,250 LBS of epoxy
coated reinforcement bars; 247' of curb and
gutter; 715 SF of concrete median; 2,275' of
paint pavement marking line; 31,131' of epoxy
pavement marking; 3,480 dowel bars; mobilization;
traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 42 UNITS of tree removal; 1,320 CY of earth
excavation; 825 CY of channel excavation; 141 CY
of porous granular embankment; 811 SY of riprap;
49 TONS of aggregate base course; 148 SY of base
course widening; 76 TONS of aggregate surface
course; 118 TONS of incidental bituminous
surfacing; 124 SY of bridge approach pavement;
125 SY of bridge approach pavement (special);
1,487 SY of bituminous surface removal; 418 SY
pavement removal; 75 SY of bituminous concrete
pavement patches; 84 TONS of aggregate shoulders;
75 TONS of bituminous shoulders, superpave;
removal of existing structure; 329 CY of
structure excavation; 112 CY of concrete
structures; 390 CY of concrete superstructure;
107,450 LBS of epoxy coated reinforcement bars;
646' of steel piles HP 12x53; 457 SF of temporary
sheet piling; 9 traffic barrier terminals; 408'
of guardrail removal; 63' of remove and re-erect
steel plate beam guardrail; 13' of temporary
steel plate beam guardrail; 3,661' of paint
pavement marking line; 26 raised reflective
pavement markers; 8 shade trees; 4 intermediate
trees; 237 TONS of bituminous concrete surface
course, superpave, Mix C, N50; 291 TONS of
leveling binder, superpave, N50; 810' of steel
piles HP 12x63; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 11 right of way markers; 635 CM of earth
excavation; 404 CM of porous granular backfill;
483 SM of stone riprap; 526 SM of erosion control
fiber blanket; 122 SM of patching; 176 CM of
structure excavation; 53 M concrete box culvert;
41 M paint pavement marking line; traffic control
and protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 84 UNITS of tree removal; 159 CY of earth
excavation; 16 CY of borrow excavation; 721 CY of
porous granular embankment; 174 TONS of riprap;
224 SY of PCC base course; 224 SY of pavement
removal; 236 SY of bituminous shoulder removal;
365 TONS of bituminous shoulders, superpave;
removal of existing structure; 71,380 LBS of
reinforcement bars; 383 CY of concrete box
culvert; 265, of steel plate beam guardrail; 4
traffic barrier terminals; 460' of steel plate
beam guardrail removal; 400' of temporary
concrete barrier; 1,060' of paint pavement
marking line; 360' of temporary soil retention
system; 28 TONS of bituminous concrete surface
course, superpave, Mix D, N90; traffic control
and protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 440 CY of earth excavation; 223 CY of channel
excavation; 862 CY of furnished excavation; 4,908
SY of erosion control blanket; 500' of perimeter
erosion control; 400 SY of bituminous surface
removal-butt joint; 370 SY of pavement removal;
367 TONS of aggregate shoulders; 150 CY of
concrete; 304 SY of bridge deck grooving; 536' of
concrete I beam; 26,810 LBS of epoxy coated
reinforcement bars; 2,610' of paint pavement
marking line; 1,736 SY of bituminous base course,
superpave; 1,750 TONS of bituminous concrete
binder and surface course, superpave, Mix C; 306
bar splicers; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 497 CY of earth excavation; 287 CY of channel
excavation; 1,276 SY of erosion control blanket;
753 SY of stone riprap; 217 TONS of aggregate
surface course; 346 SY of bituminous surface
removal-butt joint; 224 SY of bridge approach
pavement; 272 SY of pavement removal; 346 TONS of
aggregate shoulders; 386 cu yds structure
excavation; 177 CY of concrete; 307 SY of bridge
deck grooving; 56,980 LBS of structural steel;
1,602 stud shear connectors; 31,760 LBS of epoxy
coated reinforcement bars; 755' of metal piles;
550' of guardrail; 2,670' of paint pavement
marking line; 1,475 SY of bituminous base course,
superpave; 943 TONS of bituminous concrete binder
and surface course, Mix C; 373 bar splicers;
traffic control and protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,000 SY of bituminous concrete base course
widening, superpave; 210 TONS of bituminous
concrete surface course, superpave, Mix C, N90;
892 TONS of bituminous concrete binder course,
superpave, IL-19.0, N90; 141 UNITS of tree
removal; 1,438 CY of earth excavation; 426 CY of
channel excavation; 1,535 CY of borrow
excavation; 370 CY of porous granular embankment;
818 SY of riprap; 164 SY of jointed PCC pavement;
251 SY of bridge approach pavement; 426 SY of
pavement removal; 500 SY of paved shoulder
removal; 264 SY of aggregate shoulders; 329 TONS
of bituminous shoulders, superpave; 2 removal of
existing structures; 258 CY of structure
excavation; 33 CY of concrete structures; 104 CY
of concrete superstructure; 59,190 LBS of
structural steel; 1,206 stud shear connectors;
38,850 LBS of reinforcement bars; 25,170 LBS of
epoxy coated reinforcement bars; 454' of steel
piles HP 12 x 53; 1,365 SF of temporary sheet
piling; 243 CY of concrete box culverts; 425' of
steel plate beam guardrail; 11 traffic barrier
terminals; 564' of guardrail removal; 2,570' of
paint pavement marking line; traffic control and
protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 72 UNITS of tree removal; 725 CY of earth
excavation; 365 CY of furnished excavation; 3,855
SY of topsoil; 1,192' of perimeter erosion
control; 220 SY of stone riprap; 685 TONS of
aggregate base course; 394 TONS of aggregate
surface course; 144 SY of bituminous surface
removal-butt joint; 113 TONS of incidental
bituminous surfacing; 204 SY of paved shoulder
removal; 380 SY of patching; 133 TONS of
aggregate shoulders; 502 SY of bituminous
shoulders, superpave; 26,860 LBS of reinforcement
bars; 16 CY of concrete; 209' of pipe culverts;
175' of guardrail; 2,814' of paint pavement
marking line; 389 TONS of bituminous concrete
binder and surface course, superpave, Mix D; 280
bar splicers; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Road Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 279 UNITS of tree removal; 717 CY of earth
excavation; 3,720 SY of sodding; 2,065 SY of PCC
base course; 318 SY of PCC base course widening;
42 TONS of bituminous mixture complete; 361 SY of
PCC pavement; 1,531 SY of PCC driveway pavement;
23,031 SF of PCC sidewalk; 14,016 SY of
bituminous surface removal; 2,664 SY of pavement
removal; 1,600 SY of driveway pavement removal;
2,664' of combination curb and gutter removal;
33,851 SF of sidewalk removal; 592 SY of pavement
patching; 4,994' of combination concrete curb and
gutter; 11,523' of thermoplastic pavement marking
line; 590' of conduit in trench; 8,470' of
electric cable in conduit; 2 sodium vapor
luminaires; 2 full-actuated controllers and
cabinets; 2 16' galvanized steel traffic signal
posts; 4 steel mast arm assemblies and poles; 81'
of concrete foundations; 10 inductive loop
detectors; 45 shade trees; 2 steel combination
mast arm assemblies and poles; 1,286 TONS of
bituminous concrete surface course, superpave,
Mix D, N90; 753 TONS of leveling binder,
superpave, N90; 24 signal heads; traffic control
and protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Cleaning and Painting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3 clean and paint steel bridge; 3 containment and
disposal of lead paint cleaning residues; 310' of
temporary concrete barrier; 610' of relocate
temporary concrete barrier; mobilization; traffic
control and protection.
|
|
| Owner Solicitation Name: | Milling and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 8,800 SY of milling; 986 TONS of bituminous
concrete surface course, superpave, Mix D, N 70;
6,600' of thermoplastic pavement marking;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | PCC Pavement Patching
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 244 SY of PCC pavement patches; 192' of expansion
joints; 192' of preformed joint filler;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Guardrail Installation
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 71 TONS of aggregate shoulders; 3,512' of steel
plate beam guardrail; 6 traffic barrier terminals;
100' of guardrail removal; 54 guardrail markers;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Cleaning and Painting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and painting 4 steel bridges;
containment and disposal of lead paint cleaning
residues; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Bridge Cleaning and Painting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and painting 3 steel bridges;
containment and disposal of lead paint cleaning
residues; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Pavement Patching
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 6,944 LBS reinforcement bars; 170 CY of pavement
removal for patching; 111 CY of pavement
replacement, concrete; 119 CY of pavement
replacement, bituminous; 60 CY of milling (full-
depth); traffic control and protection.
|
|
| Owner Solicitation Name: | Pavement Marking
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 464 raised reflective pavement marker removal;
9,011 replacement reflectors; 4,716 raised
reflective pavement markers; mobilization.
|
|
| Owner Solicitation Name: | Roadside Restoration
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 10,000 SY of seeding, special; mobilization.
|
|
| Owner Solicitation Name: | Roadside Restoration
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 20,000 SY of seeding, special; mobilization.
|
|
| Owner Solicitation Name: | Patching
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 655 SY of patching; 639 SY of patching
reinforcement; 4,414' of saw cutting; 48 dowel
bars; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Patching
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 14,800 LBS of reinforcement bars; 345 CY of
pavement removal for patching; 280 CY of concrete
pavement replacement; 155 CY of bituminous
pavement replacement; 350 barricades; 170 drill
and grout dowel bars; traffic control and
protection.
|
|
| Owner Solicitation Name: | Intersection Reconstruction
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3,151 CY of earth excavation; 5,158 CY of removal
and disposal of unsuitable material; 1,195 CY of
furnished excavation; 35 CY of porous granular
embankment; 57 CY of trench backfill; 17,400 SY
of topsoil; 3 ACRES of seeding; 14,223 SY of
erosion control blanket; 3,177 SY of sodding;
5,940 SY of subbase granular material; 3,400 SF
of concrete sidewalk; 11,057 SY of milling; 602
SY of patching; 2,398 SY of aggregate shoulders;
203 SY of bituminous shoulders; 3.85 CY of
concrete removal; 98.6 CY of structure
excavation; 26.0 CY of concrete; 5,193 LBS of
epoxy coated reinforcement bars; 337' of steel
plate beam guardrail; 2 traffic barrier
terminals; 31.5 SF of sign panel; 12,072' of
thermoplastic pavement marking; 890' of conduit
in trench; 330' of conduit pushed; 850' of trench
and backfill; controller; 6,825' of electric
cable; 3 galvanized steel traffic signal posts; 4
steel mast arm assemblies and poles; 1,700' of
detector loop; 90' of storm sewer (water main
requirements); 200 TONS of coarse aggregate;
5,628 SY of bituminous concrete base course
widening, superpave; 2,303 TONS of bituminous
concrete binder and surface course, superpave,
Mix D, N70; 12 signal heads; mobilization;
traffic control and protection.
|
|
| Owner Solicitation Name: | Widening and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,435 UNITS of tree removal; 25,648 CY of earth
excavation; 1,848 CY of furnished excavation;
12,890 SY of sodding; 32,980 TONS subbase
granular material; 931 TONS of aggregate base
course; 5,322 SY of concrete base course; 1,214
TONS of aggregate surface course; 252 TONS of
incidental bituminous surfacing; 6,144 SY of
concrete driveway; 21,925 SF of concrete
sidewalk; 34,373 SY of pavement removal; 5,908 SY
of driveway pavement removal; 921' of gutter
removal; 11,911' of curb and gutter removal;
22,640 SF of sidewalk removal; 843 SY of pavement
patching; 1,789' of pipe culverts; 2,500 SY of
geotechnical fabric for ground stabilization;
5,128' of storm sewers; 262' of pipe underdrains;
14 manholes; 75 inlets; 16,904' of curb and
gutter; 6,328' of pavement marking tape; 15,374'
of thermoplastic pavement marking line; 611' of
conduit; 6,847' of electric cable; 4 steel mast
arm assemblies and poles; 65' of concrete
foundation; 800' of detector loop; 46 trees;
1,200' of storm sewer (watermain requirements);
825 TONS of bituminous concrete binder and surface
course, superpave, Mix C; 39,647 SY of bituminous
concrete pavement, (full-depth); 11 signal heads;
traffic control and protection; mobilization.
|
|
| Owner Solicitation Name: | Reconstruction
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,006 UNITS of tree removal; 31,199 CY of earth
excavation; 765 CY of furnished excavation; 3,907
CY of trench backfill; 10,689 SY of geotechnical
fabric for ground stabilization; 6,031 SF of
sodding; 18,886 TONS of subbase granular
material; 9,733 TONS of aggregate base course;
11,254 SY of concrete base course; 700 TONS of
aggregate surface course; 465 TONS of bituminous
mixture complete; 1,036 TONS of incidental
bituminous surfacing; 2,228 SY of concrete
driveway; 26,492 SF of concrete sidewalk; 2,544
SY of bituminous surface removal; 32,757 SY of
pavement removal; 3,206' of curb and gutter
removal; 22,161 SF of sidewalk removal; 1,814 SY
of paved shoulder removal; 2,051 TONS of
aggregate shoulders; 953 SY of bituminous
shoulders, superpave; 5,554' of storm sewers;
861' of pipe underdrains; 9 manholes; 57 inlets;
8,409' of concrete curb and gutter; 18,545' of
pavement marking tape; 64 SF of sign panels;
12,310' of thermoplastic pavement marking line;
2,667' of paint pavement marking line; 5,286' of
conduit; 34,501' of electric cable; 4 mast arm
assemblies and poles; 777' of detector loops; 43
trees; 1,584' of storm sewer (watermain
requirements); 1,999 TONS of bituminous concrete
binder and surface course, superpave, Mix C;
16,479 SY of bituminous concrete pavement (full-
depth), superpave; 12 signal heads; 690' of storm
sewer removal; 7,689 SY of geotechnical
reinforcement; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Widening, Concrete Surface and Traffic Signals
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 12,167 CY of earth excavation; 158 CY of trench
backfill; 1.2 ACRES of seeding; 9,011 SY of
sodding; 7,184 TONS of subbase granular material;
786 TONS of aggregate base course; 1,038 SY of
milling; 271 SY of patching; 606 TONS of aggregate
shoulders; 1,458 SY of bituminous shoulders,
superpave; 2 concrete removal; 101 LBS of
reinforcement bars; 3,744' of pipe underdrains;
14 CY of concrete; 2,195' of concrete curb and
gutter; 36 SY of sign panel; 10,496' of polyurea
pavement marking; 195' of conduit in trench; 799'
of conduit pushed; 165' of trench and backfill;
8,346' of electric cable; 4 luminaires; 4 steel
combination mast arm assemblies and poles; 10
signal heads; 1,057' of detector loop; 2 shade
trees; 2 intermediate trees; 304' of storm sewer
(watermain requirements); 4,490 SY of bituminous
base course, superpave; 204 TONS of bituminous
concrete surface course, superpave, MIX C, N50;
1,836 TONS of bituminous concrete binder and
surface course, superpave, MIX D, N50; 101 TONS
of breaker-run crushed stone; mobilization;
traffic control and protection.
|
|
| Owner Solicitation Name: | Concrete Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 882 UNITS of tree removal; 216 CY of furnished
earth excavation; 2,133 SY of erosion control
blanket; 557,316 SY of bituminous surface
removal; 3,416 SY of patching; 1,700 SY of
pavement fabric; 14,518' of saw cuts; 5,103 TONS
of aggregate shoulders; 12,451 TONS of bituminous
shoulder, superpave, Mix C; 402 delineators;
242,343' of shoulder rumble strip; 268,590' of
thermoplastic pavement marking line; 30,292' of
preformed plastic pavement marking line; 3,342
pavement markers; 304' of detector loop; 30
trees; 34,527 TONS of material transfer device;
638' of cables; 34,807 TONS of polymerized
bituminous concrete binder and surface course,
superpave, Mix E; 5,248 dowel bars; 181 tie bars;
traffic control and protection; mobilization.
|
|
| Owner Solicitation Name: | Concrete Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 882 UNITS of tree removal; 216 CY of furnished
earth excavation; 2,133 SY of erosion control
blanket; 557,316 SY of bituminous surface
removal; 3,416 SY of patching; 1,700 SY of
pavement fabric; 14,518' of saw cuts; 5,103 TONS
of aggregate shoulders; 12,451 TONS of bituminous
shoulder, superpave, Mix C; 402 delineators;
242,343' of shoulder rumble strip; 268,590' of
thermoplastic pavement marking line; 30,292' of
preformed plastic pavement marking line; 3,342
pavement markers; 304' of detector loop; 30
trees; 34,527 TONS of material transfer device;
638' of cables; 34,807 TONS of polymerized
bituminous concrete binder and surface course,
superpave, Mix E; 5,248 dowel bars; 181 tie bars;
traffic control and protection; mobilization.
|
|
| Owner Solicitation Name: | Concrete Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 101 CY of furnished excavation; 2,128 SY of
bituminous surface removal-butt joint; 117 SY of
concrete surface removal-butt joint; 899 TONS of
incidental bituminous surfacing; 10,097 SY of
bituminous surface removal; 4,773 TONS of
aggregate shoulders; 168,992' of thermoplastic
pavement marking line; 856 pavement markers;
25,452 TONS of bituminous concrete binder and
surface course, superpave, Mix D; traffic control
and protection; mobilization.
|
|
| Owner Solicitation Name: | Patching, Surface Removal and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 56 UNITS of tree removal; 718 CY of earth
excavation; 776 CY of furnished excavation; 775
SY of riprap; 3,281 TONS of subbase granular
material; 102,393 SY of bituminous surface
removal; 226 SY of pavement removal; 1,055' of
gutter removal; 238 SY of bituminous concrete
surface removal complete; 1,777 SY of pavement
breaking; 925 SY of pavement patching; 1,791 TONS
of aggregate shoulders; 1 removal of existing
structure; 31,290 LBS of reinforcement bars;
27,960 LBS of epoxy coated reinforcement bars;
263 CY of concrete box culvert; 338' of concrete
gutter; 1,338' of steel plate beam guardrail;
1,248' of guardrail removal; 121,092' of paint
pavement marking line; 480 raised reflective
pavement markers; 2,640' of grading and shaping
shoulders; 2,681 SY of bituminous base course,
superpave; 8,918 TONS of bituminous concrete
surface course, superpave, Mix C, N 50; 403 TONS
of bituminous concrete binder course, superpave,
IL 19.0, N 50; 4,460 TONS of leveling binder,
superpave, N 50; 512 TONS of incidental
bituminous surfacing, superpave, N 50; 235 SY of
concrete wearing surface; 336 TONS of bituminous
base course, superpave; 683' of keyway repair;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Widening and Resurfacing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of existing structure; 545 raised
reflective pavement markers; 2 full-actuated
controllers and cabinets; 24 inductive loop
detectors; 2 remove existing traffic signal
equipment; 1,809 UNITS of tree removal;
14,036 CM of earth excavation; 9,337 CM of
furnished excavation; 505 M tons of porous
granular embankment, special; 409 SM of riprap;
28,089 SM of processing lime modified soils;
5,619 SM of aggregate base course; 551 M tons of
incidental bituminous surfacing; 3,024 SM of PCC
driveway pavement; 5,576 SM of PCC sidewalk;
9,763 SM of bituminous surface removal; 2,211 SM
of pavement removal; 8,184 SM of driveway
pavement removal; 427 M gutter removal; 857 SM of
sidewalk removal; 557 SM of bituminous concrete
removal; 4,972 SM of paved shoulder removal; 42
SM of pavement patching; 7,070 M of strip
reflective crack control treatment; 27,450 KG of
reinforcement bars; 237 CM of concrete box
culverts; 2,091 M of storm sewers; 535 SM of
waterproofing membrane system; 4,509 M of
combination concrete curb and gutter; 470 M of
guardrail removal; 11,575 M of thermoplastic
pavement marking line; 533 M of conduit in
trench; 3,084 M of electric cable in conduit; 6
steel mast arm assemblies and poles; 32 M of
concrete foundations; 4,935 SM of temporary
pavement; 3,673 M tons of bituminous concrete
surface course, superpave, Mix E, N 70; 11,799 M
tons of bituminous concrete binder course,
superpave, IL-19.0, N 70; 2,263 M tons of
leveling binder, superpave, N 70; 5,533 SM of
bituminous concrete pavement (full-depth),
superpave; 195 SM of bituminous shoulders,
superpave; 21 signal heads; mobilization; traffic
control and protection.
|
|
| Owner Solicitation Name: | Road Reconstruction
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,878 UNITS of tree removal; 18,431 CY of earth
excavation; 12,399 CY of porous granular
embankment; 45,630 SY of topsoil furnish and
place; 5 ACRES of seeding; 1,701 LBS of fertilizer
nutrients; 48,696 SY of sodding; 1,532 SY of
subbase granular material; 27,053 GALS of
bituminous materials (prime coat); 216 TONS of
aggregate (prime coat); 1,532 SY of PCC driveway
pavement; 56,827 SF of PCC sidewalk; 3,771 CY of
structure excavation; 604 CY of concrete
structures; 74,239 LBS of reinforcement bars,
epoxy coated; 378' of pipe culverts; 22 precast,
reinforced concrete flared end sections; 9,768'
of storm sewers; 586' of water main; 5,411' of
pipe underdrains; 26,004' of combination concrete
curb and gutter; 3,826' of pavement marking tape;
11,694' of thermoplastic pavement marking; 1,204'
of metal posts; 1,118' of conduit pushed; 58
luminaires; 47 shrubs; 2,534 SY of bituminous
base course, superpave 8"; 712 TONS of bituminous
concrete surface course, superpave; 5,713 TONS of
polymerized bituminous concrete surface course,
superpave; 35,954 TONS of bituminous concrete
binder course, superpave; 54,992 SY of aggregate
subgrade; 10,037' of unit duct in trench; 100 CY
of concrete encasement; 1,700 CY of trench
backfill; 300 CY of controlled low strength
materials; 1,030' of cable installation and
connections; traffic control and protection.
|
|
| Owner Solicitation Name: | Road Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 526 tree removal; 4,104 CM of earth excavation;
2,045 CM of furnished excavation; 1,140 CM of
trench backfill; 0.9 HA of seeding; 270 KG of
nitrogen, phosphorus and potassium fertilizer; 58
M TONS of stone riprap, Class B4; 7,398 SM of
aggregate base course, Type B; 12,895 L of
bituminous material (prime coat); 4,495 SM of
pavement removal; 204 CM of structure excavation;
81 SM of precast concrete panel; 7,430 KG of
reinforcement bars; 61.5 CM of concrete box
culverts; 25.5 M of pipe culverts; 776.5 M of
storm sewer, Class A; 1,249.5 M of combination
concrete curb and gutter; 2,964 M of epoxy
pavement marking; 5,714 SM of bituminous concrete
pavement (full depth) superpave; traffic control
and protection.
|
|
| Owner Solicitation Name: | Road Work and Drainage
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 959 tree removals; 57.2 ACRES of seeding; 11,124
LBS of nitrogen, phosphorus and potassium
fertilizer nutrient; 215 TONS of stone riprap,
Class A4; 676 TONS of aggregate surface course;
481 GALS of bituminous materials (prime coat);
152 SY of PCC concrete driveway pavement, 7";
2,316 TONS of aggregate shoulders, type A; 9,762
SY of bituminous shoulder, superpave 6"; 23,040
LBS of reinforcement bars, epoxy coated; 1,506'
of pipe culverts; 18 precast reinforced concrete
flared end sections; 49,254' of temporary
pavement marking.
|
|
| Owner Solicitation Name: | Pavement, Sidewalk, Curb and Gutter and Lighting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | seeding; 2,458 SY of PCC pavement 8"; 1,106 SF of
PCC sidewalk 4"; 2,430 SY of pavement removal; 5
manholes to be adjusted; 355' of combination curb
and gutter; 1,557 SF of patterned concrete
crosswalks treatment; outdoor lighting
improvements; surveillance security equipment;
444' of epoxy pavement marking line;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 21 CY of earth excavation; 141 CY of topsoil;
360 SY of subbase granular material; 272 SY of
concrete base course; 576 SY of bridge approach
pavement; 4,128 SF of concrete sidewalk; 1,710 SY
of milling; 87 SY of pavement removal; 400 SY of
patching; 31 SY of bituminous shoulders; 203 CY
of structure excavation; 2,150.7 CY of concrete;
2,429 SY of bridge deck grooving; 2,705 SF of
formed concrete repair; 6,120 LBS of structural
steel; 246,130 LBS of epoxy coated reinforcement
bars; 330' of steel plate beam guardrail; 4,238'
of epoxy pavement marking; 1,200' of trench and
backfill; 3,850' of electric cable; 750' of
aerial cable; 30 underpass luminaires; 272 SY of
aggregate subgrade; 237 TONS of bituminous
concrete binder and surface course, Superpave,
Mix D, N50; 3,327 SY of protective shield; 1,054'
of removal of asbestos cement conduit;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 112 CY of earth excavation; 89 CY of furnished
excavation; 256 CY of porous granular embankment;
629 SY of erosion control blanket; 1,900 SY of
stone riprap; 528 SY of bituminous surface
removal-butt joint; 224 SY bridge approach
pavement; 116 SF of pavement removal; 396 CY of
structure excavation; 541 CY of concrete; 1,113
SY of bridge deck grooving; 12 elastomeric
bearing assemblies; 258' of driving steel piles;
530' of guardrail; 1,304' of pavement marking
tape; 1,912' of paint pavement marking line; 915
SY of bituminous concrete base course widening,
superpave; 200 TONS of bituminous concrete
surface course, superpave, Mix C; 1,385 bar
splicers; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Bridge Cleaning and Painting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and painting 4 steel bridges;
containment and disposal of lead paint and
cleaning of residues on 4 structures; bridge
cleaning and painting warranty on 4 structures;
traffic control and protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 860 CY of furnished excavation; 199 CY of porous
granular embankment; 587 SY of stone riprap; 54
TONS of aggregate surface course; 498 SY of
concrete surface removal-butt joint; 346 SY of
bridge approach pavement; 192 SY of bituminous
surface removal; 326 SY of pavement removal;
1,697 SY of bituminous shoulder removal; 110
SF of concrete median surface removal; 100 TONS
of aggregate shoulders; 280 CY of structure
excavation; 178 CY of concrete; 374 SY of bridge
deck grooving; 92,880 LBS of structural steel;
1,701 stud shear connectors; 32,840 LBS of epoxy
coated reinforcement bars; 820' of steel piles;
6,553' of pavement marking tape; 1,980' of paint
pavement marking line; 1,587 SY of bituminous
base course widening, superpave; 3,079 TONS of
bituminous concrete binder and surface course,
superpave, Mix D; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 21,456 SY of bituminous concrete removal (deck);
3,379 CY of concrete removal; 507' of neoprene
expansion joints; 8 CY of concrete structures;
2,655 CY of concrete superstructure; 38
elastomeric bearing assemblies; 4,734 SF of
formed concrete repair; 2,204,030 LBS of
structural steel; 28 jack and remove existing
bearings; 520,070 LBS of epoxy coated
reinforcement bars; 1,488 expansion bolts;
19,399' of polyurea pavement marking line; 74
raised reflective pavement markers (bridge); 618
mechanical splices; 17,908 SF of column wrap; 19
foundation wall dowel modifications; 1,976
stiffener intersection modifications; 514 bolt
replacements; 28 crack extension modifications;
3,668 vertical web stiffener removals; 23,728 SY
of concrete bridge deck scarification; 513 SY of
deck slab repair; drainage system; 237' of fabric
reinforced elastomeric trough; 23,728 SY of
bridge deck microsilica concrete overlay; traffic
control and protection; mobilization.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 50 UNITS of tree removal; 1,020 CY of earth
excavation; 50 CY of channel excavation; 1,542 SY
of aggregate base course; 3,108 SY of bituminous
surface removal; 207 SY of pavement removal; 300
SY of paved shoulder removal; 17 SY of pavement
patching; 2,548' of strip reflective crack
control treatment; 788 SY of aggregate shoulders;
718 SY of bituminous shoulders, superpave;
28,170 LBS of reinforcement bars; 679 SF of
temporary sheet piling; 147 CY of concrete box
culverts; 425' of steel plate beam guardrail; 4
traffic barrier terminals; 254' of guardrail
removal; 2,703' of thermoplastic pavement marking
line; 17 raised reflective pavement markers; 56
shade trees; 736' of storm sewers; 1,384 SY of
bituminous base course, superpave; 378 TONS of
bituminous concrete surface course, superpave,
Mix D, N 70; 1,301 TONS of bituminous concrete
binder course, superpave, IL-19.0, N 70;
mobilization; traffic control and protection.
|
|
| Owner Solicitation Name: | Bridge Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 115 tree removals; 500 CY of earth excavation;
7,500 CY of furnished excavation; 10,400 CY of
removal and disposal of unsuitable material;
2,685 CY of trench backfill; 660 CY of topsoil
excavation and placement; 0.55 ACRE of seeding;
3,761 SY of erosion control blanket; 6,600 CY of
porous granular embankment; 432 SY of stone
riprap; 4,600 SY of pavement removal; 7,640 CY of
structure excavation; 3,093 CY of concrete
structures; 1,606 SY of bridge deck grooving;
2,103' of furnish and erect precast prestressed
concrete I-beams, 48"; 555,330 LBS of
reinforcement bars, epoxy coated; 1,976' of
aluminum railing; 8,893' of furnish and drive
steel piles; 2,057' of storm sewers; 1,600' of
concrete curb and gutter; 160' of steel plate
beam guardrail; 6,850' of thermoplastic pavement
marking; 1,650 SY of bituminous base course,
superpave, variable depth; 5,156 SY of bituminous
concrete pavement (full-depth) superpave, 15";
5,300 SY of aggregate subgrade 12"; mobilization;
traffic control and protection.
|
|
| Owner Solicitation Name: | Signal Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 140 LED signal face retrofit, red ball; 134 LED
signal face retrofit, green ball; 32 LED signal
face retrofit, walk/don't walk signal; 171 LED
signal face retrofit, yellow ball; 74 LED signal
face retrofit, yellow arrow; 84 LED signal face
retrofit, green arrow; 8 LED signal face
retrofit, walk signal; 8 LED signal face
retrofit, don't walk signal; 4 LED signal face
retrofit, yellow/green bimodal arrow; 16 LED
signal face retrofit, red arrow; 15 battery
backup system with cabinet; 3 LED signal
retrofit, optically programmed, red; 4 LED signal
retrofit, optically programmed, yellow; 4 LED
signal retrofit, optically programmed, green; 16
traffic signal cabinet load switch; mobilization.
|
|
| Owner Solicitation Name: | Highway Lighting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 294' of conduit; 3,821 of trench and backfill;
4,115' of unit duct; 16 luminaires; 12 light
poles; 12 light pole foundations; 48 breakaway
devices; mobilization.
|
|
| Owner Solicitation Name: | Pavement Marking
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 100' of aerial speed check marking; 110,000' of
thermoplastic pavement marking; 207,000' of hot
spray thermoplastic pavement marking; 386,000' of
epoxy pavement marking; 79,500' of polyurea
pavement marking; 17,500' of polyurea pavement
marking, special; mobilization.
|
|
| Owner Solicitation Name: | Building Demolition
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 4,662 SM of topsoil; 0.48 HA of seeding; 0.48 HA
of mulch; removal of 9 buildings; 253 SM of
concrete sidewalk; removal and disposal of
friable asbestos in 1 building; removal and
disposal of non-friable asbestos in 9 buildings;
mobilization.
|
|
| Owner Solicitation Name: | Road Work
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 112 UNITS of tree removal; 17,341 CY of earth
excavation; 21,585 SY of topsoil; 950 SY of
erosion control blanket; 1,583' of perimeter
erosion barrier; 186 SY of stone riprap; 5,967
TONS of subbase granular material; 2,052 TONS of
aggregate base course; 1,594 SY of concrete base
course widening; 347 TONS of aggregate surface
course; 107 TONS of bituminous mixture complete;
7,294 SY of pavement removal; 127 SY of patching;
1,213 TONS of aggregate shoulders; 1,645 SY of
bituminous shoulders, superpave; 460' of pipe
culverts; 7,509' of thermoplastic pavement
marking line; 2,547' of paint pavement marking
line; traffic control and protection;
mobilization.
|
|
| Owner Solicitation Name: | Routing, Cleaning and Sealing
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 196,389' of crack routing (pavement); 81,828 LBS
of crack filling; 407,430' of paint pavement
marking; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Planting
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 296 shade trees; 30 shrubs; 816 seedlings; 318
sugar maple trees; 841 northern white pine trees;
634 eastern red cedar trees; 75 tulip trees; 130
redbud trees; 218 white oak trees; 184 red oak
trees; 78 snow drift crabapple trees; 243 bald
cypress trees; 380 overcup oak trees; 50
crabapple trees; mobilization.
|
|
| Owner Solicitation Name: | Building Demolition
|
| Owner Name: | Illinois Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 8 building removals; removal and disposal of
friable and non-friable asbestos; .50 acre
seeding; mobilization; traffic control and
protection.
|
|
| Owner Solicitation Name: | Vegetation Capture of Dust: Development, Validation, and Incorporation of Capture Algorithms Into Current Regulatory Dispersion Models
|
| Owner Name: | Vicksburg Consolidated Contracts Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Validate past estimates of vegetative fugitive
dust capture and use available data to build
capture algorithms for inclusion into existing
dispersion models use for regulatory purposes.
|
|
| Owner Solicitation Name: | Maintenance Garage Construction
|
| Owner Name: | Wildwood Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of maintenance garage.
|
|
| Owner Solicitation Name: | Centennial Park Skate Facility - Skate Facility Development
|
| Owner Name: | Naperville Park District, Planning & Development Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site grading, concrete flatwork, fencing, site
furnishings, and landscaping.
|
|
| Owner Solicitation Name: | Energy Performance Contract
|
| Owner Name: | Southern Illinois University School of Medicine
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Implemenation of energy equipment and services in
Buildings.
|
|
| Owner Solicitation Name: | Assist in Data Conversion
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide temporary resources to assist in data
conversions from a Sybase or DB2 environment to
an Oracle server.
|
|
| Owner Solicitation Name: | Centennial Park Sidewalk Construction
|
| Owner Name: | Winnetka Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sidewalk Construction.
|
|
| Owner Solicitation Name: | Sanitary Sewer Rehabilitation - Cured-In-Place
|
| Owner Name: | Bloomingdale, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitate approximately 300 LF of existing 8"
clay sanitary sewer, 610 LF and 495 LF.
Utilizing the Cured-in-Place Pipe (CIPP)
process. Flexible felt impregnated with an
approved epoxy resin which is inserted into an
existing pipe. The curing may be accomplished by
circulating heated water throughout the length
of tube extending from manhole to manhole. The
resin should cure as a solid lining which
conforms to all applicable ASTM specifications
and tests. The interior of the Finished Pipe
should be smooth from all defects and tight
fitting with the existing pipe.
The available flows from the lined pipe should
be 100% of the host's pipe original capacity.
|
|
| Owner Solicitation Name: | Relief Sewer Project - Phase IX, Contract B
|
| Owner Name: | Northfield, Village of
|
| Enginner Name: | MWH Americas, Inc.
|
| Plankeeper Name |
|
| Scope: | Approximately 5,464 LF of 8" to 30" diameter
sewers to be installed by open-cut construction;
restrictor installation; manholes; catch basins;
inlets; services; site restoration, street
restoration and appurtenant work.
|
|
| Owner Solicitation Name: | Sanitary Sewer
|
| Owner Name: | Royalton, Village of
|
| Enginner Name: | Lawrence A. Lipe & Associates
|
| Plankeeper Name |
|
| Scope: | Open cut replacement of 3,083 LF of 12" and 15"
PVC Sanitary Sewer, 11 EA Manholes, and related
appurtenances.
|
|
| Owner Solicitation Name: | Replacement Fire Hydrants
|
| Owner Name: | Skokie, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement Fire Hydrants
|
|
| Owner Solicitation Name: | Capital Fund Program Improvements
|
| Owner Name: | Winnebago County Housing Authority
|
| Enginner Name: | Tyson and Billy Architects, P. C.
|
| Plankeeper Name |
|
| Scope: | Restroom remodel for 2 story, 36 units
apartment.
|
|
| Owner Solicitation Name: | West Grand Avenue Fullerton Avenue to Narragansett
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Approximately 1/2 mile of roadway reconstruction
including pavement removal and replacement,
sidewalk removal and replacement, curb & gutter
removal and replacement, minor landscaping,
realignment of intersection, street lights and
new traffic signals at 2 intersections, demolish
1 small building and apshalt resurfacing of
entire roadway.
|
|
| Owner Solicitation Name: | Stratford Lane - Street Improvements
|
| Owner Name: | North Shore School District 112
|
| Enginner Name: | Mechanical Services Associates Corp.
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of asphalt paving and
concrete work.
|
|
| Owner Solicitation Name: | Painting of Northeast Waterworks Standpipe and North Elevated Tank
|
| Owner Name: | Naperville Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Painting the 2 M.G. standpipe and 500,000 gallon
elevated tank. The work involves high pressure
water blasting (5,000 to 10,000 PSI), spot power
tool cleaning, spot prime and recoat of the
exterior with an epoxy polyurethane paint system;
abrasive blast cleaning of the wet interior roof,
rafters and top three feet of sidewall and
application of a three part epoxy system,
miscellaneous interior steel repairs and fitting
and dry interior and pit piping painting.
|
|
| Owner Solicitation Name: | Maxcell 3", 3 Cell Flexible Fabric Innerduct (19,000 LF)
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maxcell 3", 3 Cell Flexible Fabric Innerduct
(19,000 LF). *Please see attached file for
further details.
|
|
| Owner Solicitation Name: | Removal and Replacement of Field House Bleachers
|
| Owner Name: | Fenton Community High School District 100
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of field house bleachers
and related work.
|
|
| Owner Solicitation Name: | Demolish Approximately 13 Residential and Commercial Structures
|
| Owner Name: | Northeast Illinois Regional Commuter Railroad Corporation (METRA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolish Approximately 13 Residential and
Commercial Structures.
|
|
| Owner Solicitation Name: | Demolition of 2016 Johnson Street
|
| Owner Name: | Alton, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition.
|
|
| Owner Solicitation Name: | Conley Avenue Roadway Improvements Length 660 LF
|
| Owner Name: | Wood River, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Concrete curb and gutter, aggregate base course,
bituminous binder and surface courses, and other
miscellaneous items of construction.
|
|
| Owner Solicitation Name: | Wide Area Network
|
| Owner Name: | Oswego Community Unit School District 308
|
| Enginner Name: | Dietrich Lockard Group, Inc.
|
| Plankeeper Name |
|
| Scope: | Furnish, install and support a district-wide high-
speed Wide Area Network solution that will
provide IP connectivity (Internet and Intranet)
to current and future district facilities using
fiber, wireless, carrier-based or other viable
technologies.
|
|
| Owner Solicitation Name: | Construct Garage / Storage Area
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | C. R. Williams Architect
|
| Plankeeper Name |
|
| Scope: | Construct Garage / Storage Area.
|
|
| Owner Solicitation Name: | Repair / Replace Roofing Systems
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair / Replace Roofing Systems.
|
|
| Owner Solicitation Name: | Restoration of Ottawa Tollhouse
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Edward Bailey Design
|
| Plankeeper Name |
|
| Scope: | Restoration.
|
|
| Owner Solicitation Name: | Professional Design Engineering Consulting Services for the Department of Water Management
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Design Engineering Consulting
Services.
|
|
| Owner Solicitation Name: | Signage For Main Campus
|
| Owner Name: | Joliet Junior College District #525
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Signage.
|
|
| Owner Solicitation Name: | Renovations & Life Safety Remodeling Tefft Middle School
|
| Owner Name: | Elgin School District U-46, Plant Operations Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovations & Life Safety Remodeling.
|
|
| Owner Solicitation Name: | 2004 Project Outdoor Stadium Bleacher Replacement (Maine South)
|
| Owner Name: | Maine Township High School District 207
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Outdoor Stadium Bleacher Replacement.
|
|
| Owner Solicitation Name: | Replace East Balcony, Doors, Light Poles and Windows
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Poirier Associates, P. C.
|
| Plankeeper Name |
|
| Scope: | Replace East Balcony, Doors, Light Poles and
Windows.
|
|
| Owner Solicitation Name: | 34 Decorative Cast Iron Street Light Poles
|
| Owner Name: | Aurora, City of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 34 Decorative Cast Iron Street Light
Poles.
|
|
| Owner Solicitation Name: | Miscellaneous Computer Software
|
| Owner Name: | Regional Transportation Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Miscellaneous Computer Software.
|
|
| Owner Solicitation Name: | Telecommunications Services and Internal Connections
|
| Owner Name: | Moline School District #40
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Telecommunications Services and Internal
Connections.
|
|
| Owner Solicitation Name: | Upgrade Electrical
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Raymond Professional Group
|
| Plankeeper Name |
|
| Scope: | Electrical.
|
|
| Owner Solicitation Name: | Brush Pick Up
|
| Owner Name: | Bloomingdale, Township of, Highway Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Brush pick up.
|
|
| Owner Solicitation Name: | DHS/Alton/Plumbing services
|
| Owner Name: | Illinois Dept. of Human Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Plumbing services.
|
|
| Owner Solicitation Name: | Upgrade Roofing System
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Jackson Architects LLC
|
| Plankeeper Name |
|
| Scope: | Upgrade Roofing System.
|
|
| Owner Solicitation Name: | Upgrade Boiler Stacks and Exterior
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | Henneman Raufeisen and Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Upgrade Boiler Stacks and Exterior.
|
|
| Owner Solicitation Name: | Replace Vault Toilets
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace Vault Toilets.
|
|
| Owner Solicitation Name: | Rehabilitate Aqueducts #4 and #6
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | McClure Engineering Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Painting and crack sealing of app. 340 LF of
aqueducts, concrete filling, regrading and
reseeding of the area.
|
|
| Owner Solicitation Name: | Fire Alarm Replacement
|
| Owner Name: | Illinois State University, Normal
|
| Enginner Name: | CBT Companies
|
| Plankeeper Name |
|
| Scope: | The removal and replacement of the existing zoned
fire alarm system with a new addressable fire
alarm system with voice notification. Provide
smoke detectors. Electrical.
|
|
| Owner Solicitation Name: | Architectural/Engineering Services for Facilities Assessment
|
| Owner Name: | Lake County Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Document existing physical conditions. Assess
physical needs and lifecycle duration of the
overall structure (including but not limited to
roof, windows, doors) and major system components
(including but not limited to electrical and
HVAC systems). A current roof assessment report.
Prioritize physical needs and recommend Capital
Improvement Plan timeline. Determine the capital
needs at each facility and develop a recommended
scope of rehabilitative work to successfully
address such needs. Establish cost estimates for
rehabilitative work identified as top priority
that you recommend need to be completed within 1
year. Produce a summary of physical conditions
and needs to be integrated with the county's work
order and management information systems.
|
|
| Owner Solicitation Name: | LIQ for Professional Consulting Services to Provide Vehicle Engineering Services for New Bus Procurement Inspection and General Engineering Support
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Consulting Services to provide
Vehicle Engineering Services for New Bus
Procurement Inspection and General Engineering
Support.
|
|
| Owner Solicitation Name: | Chicago O’Hare International Airport- Low Voltage Distribution Equipment Replacement Building 5
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Low Voltage Distribution Equipment Replacement.
|
|
| Owner Solicitation Name: | Selected Fencing at John Robinson and Villa Griffins Homes
|
| Owner Name: | East St. Louis Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing services and material for the
installation of ornamental fencing. Approximately
575 LF of fencings with 6 gates and 1,145 LF of
fencings with 5 gates.
|
|
| Owner Solicitation Name: | 59TH Street Viaduct over I-90/94
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Street Viaduct
|
|
| Owner Solicitation Name: | Mowing and Trimming Thomson Causeway Recreation Area
|
| Owner Name: | US Army Corps of Engineers, Rock Island District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mowing and Trimming.
|
|
| Owner Solicitation Name: | 27 Air Conditioners and Installation Kits
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 27 Air Conditioners and installation
kits.
|
|
| Owner Solicitation Name: | Cleaning Services
|
| Owner Name: | Winnebago, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning Services.
|
|
| Owner Solicitation Name: | Model Strong Wall
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish a one fifth scale model of a strong wall.
|
|
| Owner Solicitation Name: | Sidewalk Installation
|
| Owner Name: | Palatine, Village of, Engineering Department
|
| Enginner Name: | Civiltech Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Addition of sidewalk.
|
|
| Owner Solicitation Name: | Traffic Signal Modifications
|
| Owner Name: | Palatine, Village of, Engineering Department
|
| Enginner Name: | Civiltech Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Addition of pedestrian signals and crosswalks to
the existing traffic signals.
|
|
| Owner Solicitation Name: | Roof Replacement of Fire Station #2
|
| Owner Name: | Decatur, City of, Engineering and Public Works Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof Replacement.
|
|
| Owner Solicitation Name: | Roof Replacement of Fire Station #4
|
| Owner Name: | Decatur, City of, Engineering and Public Works Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof Replacement.
|
|
| Owner Solicitation Name: | Roof Replacement of Fire Station #5
|
| Owner Name: | Decatur, City of, Engineering and Public Works Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof Replacement.
|
|
| Owner Solicitation Name: | LPG Powered Fork Truck
|
| Owner Name: | Decatur, City of, Engineering and Public Works Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | LPG Powered Fork Truck.
|
|
| Owner Solicitation Name: | 2004 Parkway Tree Maintenance
|
| Owner Name: | Winnetka, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Parkway tree trimming, tree removal and disposal
of all debris.
|
|
| Owner Solicitation Name: | Parking Lot Improvements Proesel Park Pool
|
| Owner Name: | Lincolnwood, Village of
|
| Enginner Name: | Gewalt Hamilton Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Rehabilitation of an at grade bituminous concrete
parking lot containing approximately 47 spaces.
Work includes pavement removal, concrete curb and
gutter, pavement widening, bituminous concrete
surface and all other related work.
|
|
| Owner Solicitation Name: | Rehabilitation of City Facilities
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitation of City Facilities.
|
|
| Owner Solicitation Name: | 75th Street Viaduct over I-90/94
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Street Viaduct.
|
|
| Owner Solicitation Name: | 76th Street Viaduct Over I-90/94
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Street Viaduct
|
|
| Owner Solicitation Name: | Pre-qualification Proposal Notice: Construction Management at Risk Services
|
| Owner Name: | Glenview, Village of
|
| Enginner Name: | Sente Rubel Bosman Lee Architects, Ltd. (SRBL)
|
| Plankeeper Name |
|
| Scope: | Provide CM at Risk services required for the
construction of the proposed new Headquarters
Police Station, to be located at the northwest
corner of the intersection of East Lake Avenue
and Shermer Road, Glenview Illinois, 60025. The
scope of construction shall consist of, but not
necessarily be limited to the following: All
related general trades, site demolition,
mechanical, plumbing, fire protection, and
electrical work required to construct a new
approximate 84,300 SF facility consisting of
general and private offices, locker rooms, secure
interview rooms, secure prisoner transfer,
holding cells, indoor parking for police,
evidence and property storage, firing range,
lobby, reception, community room, conference
rooms, lunch room, toilets, kennels, all
auxiliary support items, generator with
enclosure, exterior storage and, fenced and
secured outdoor parking, utilities and site
improvements.
|
|
| Owner Solicitation Name: | Purchase and installation of Enterprise Storage Server
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase and installation of Enterprise Storage
Server to store and manage the physical disk
space for the failover environment and an
Enterprise Storage Server to store and manage the
physical disk space for the production
environment.
|
|
| Owner Solicitation Name: | Maintenance for the Avaya IR Sun Blade Switchboard System
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide maintenance for the Avaya IR Sun Blade
Switchboard System as well as other components of
the System as required for a period of 24 months.
|
|
| Owner Solicitation Name: | Carpeting
|
| Owner Name: | Peoria County Auditor
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Carpeting.
|
|
| Owner Solicitation Name: | Winnetka Water Treatment Plant Sandblasting and Painting
|
| Owner Name: | Winnetka, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sandblasting and painting.
|
|
| Owner Solicitation Name: | Turf Equipment for Springbrook Golf Course
|
| Owner Name: | Naperville Park District, Springbrook Golf Course
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Turf Equipment.
|
|
| Owner Solicitation Name: | Pumps Repairs
|
| Owner Name: | Naperville Park District, Springbrook Golf Course
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repairs to 3 vertical turbine pumps currently
installed in the irrigation pump station.
Mobilization(s) of the contractor's pump service
equipment to and from the site; pulling the pumps
completely to the surface; sandblasting pump
component parts that may be considered for
reinstallation; inspection; protective column
coating, furnish repair parts as needed;
reinstalling the pumps after modifications and
repairs; and satisfactory startup of each pump.
|
|
| Owner Solicitation Name: | Phase 3 Monitors / Information Display System
|
| Owner Name: | Triton College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3 Monitors / Information Display System.
|
|
| Owner Solicitation Name: | RFQ - Life Safety Improvements Project
|
| Owner Name: | Illinois State University, Normal
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Planning and design services for improvements to
life safety features. Installation of fire/smoke
detection system and a new sprinkler system. Work
will also include a major asbestos abatement
effort along with upgrades to finishes and
lighting, repairs to the mechanical systems, and
modest program improvement.
|
|
| Owner Solicitation Name: | Marquette Park Lagoon Rehabilitation: Phase I - REBID
|
| Owner Name: | Chicago Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of prarie scrubber area;
installation of new water supply & circulation
systems; installation of stone & vegatative
shoreline stabilization treatments; various
landscape improvements (ornamental & native
plantings, selective tree removal, habitat
improvements, etc.); installation of old-time
screenings, pathways & benches; and ADA
modifications of various paths.
|
|
| Owner Solicitation Name: | Install, Service and Maintain Public Coin Operated Telephones
|
| Owner Name: | Chicago Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish labor, material, equipment, insurance &
supervision required to install, service &
maintain public coin operated telephones, which
includes star one (*1) functionality at various
locations.
|
|
| Owner Solicitation Name: | Playground Equipment for Parkwood Elementary School
|
| Owner Name: | Elgin School District U-46, Plant Operations Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Playground Equipment.
|
|
| Owner Solicitation Name: | Water Supply Well No. 11 Pumping Equipment
|
| Owner Name: | Rochelle, City of
|
| Enginner Name: | Baxter & Woodman Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | Providing and installing submersible
pumping equipment for an 1,800 gpm capacity well
complete in place including a submersible
motor, power cable, column pipe, line check
valves, air lines, pitless unit, pumping test,
disinfection and other miscellaneous items of
work.
|
|
| Owner Solicitation Name: | Electrical Feeder Replacement/Upgrade to 12kV
|
| Owner Name: | Southern Illinois University, Plant and Service Operations
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | DESIGN-BUILD. Continue to replace electrical
feeders and associated equipment in the campus
distribution system that is at high risk of
failure due to deterioration. Replacement feeders
and equipment will be sized to convert the
electrical distribution from 5kV to 12kV, which
will greatly improve the efficiency of the system
and result in significant savings over the long
term in the purchase of electricity.
|
|
| Owner Solicitation Name: | Transportation Education Center
|
| Owner Name: | Southern Illinois University, Plant and Service Operations
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | By providing a new facility that serves several
functions including: classrooms,
library/reference rooms, labs, student lounges
and a computer center.
|
|
| Owner Solicitation Name: | RFQ - Life Safety Improvements Project
|
| Owner Name: | Illinois State University, Normal
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Planning and design services for improvements to
life safety features. Installation of fire/smoke
detection system and a new sprinkler system. Work
will also include a major asbestos abatement
effort along with upgrades to finishes and
lighting, repairs to the mechanical systems, and
modest program improvement.
|
|
| Owner Solicitation Name: | Well 2A Fishing
|
| Owner Name: | Elgin Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Well Fishing.
|
|
| Owner Solicitation Name: | Landscape Maintenance
|
| Owner Name: | Vernon Hills Park District, Administrative Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Landscape Maintenance.
|
|
| Owner Solicitation Name: | Centennial Beach Bathhouse-Prefabricated Modular Shower System and Installation
|
| Owner Name: | Naperville Park District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Prefabricated modular shower system and includes
an alternate for installation.
|
|
| Owner Solicitation Name: | Renovate Dietary / Stores at Locust Hall
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | STR Partners, LLC
|
| Plankeeper Name |
|
| Scope: | Renovation.
|
|
| Owner Solicitation Name: | Renovate Dietary / Stores at Locust Hall
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | STR Partners, LLC
|
| Plankeeper Name |
|
| Scope: | Plumbing. Heating. Ventilation. Electrical.
|
|
| Owner Solicitation Name: | Aster Lane Generator and Automatic Transfer Switch of 100KW Nominal Rating
|
| Owner Name: | Hoffman Estates, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Aster Lane Generator and Automatic Transfer
Switch of 100KW Nominal Rating.
|
|
| Owner Solicitation Name: | Generating System for the Forward Repair System
|
| Owner Name: | Rock Island Arsenal, Attn: SOSRI-CT
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Cummins/Onan Diesel powered standby
generating systems for the Forward Repair System
(F RS). Minimum quantities: base year 15 each,
1st through 4th option years 15 each. Maximum
quantities: base year 127 each, 1st through 4th
option years 127 each. Diesel powered standby
generating system, 35 KW @ 60 HZ or 25 KW @ 50 HZ
prime rating, 120/208 VAC, 3 Phase (Broad range),
Dual output 50/60 HZ. Engin 4 cylinder in-line, 4
cycle, fuel consumption U.S. 3.0 GAL/HR. Provide
and install in housing battery tray in accordance
with drawing RIA149135 for 2 each 12 V GSA
batteries, NSN 614000X975115. Battery cables with
MS7500 4-1/MS75004-2 terminal ends. Rubber
vibration isolators (between frame and generator)
|
|
| Owner Solicitation Name: | Administration Building Women's Locker/Shower Facility and P&M Building Shop Expansion Kirie Water Reclamation Plant
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Administration Building Women's Locker/Shower
Facility and P&M Building Shop Expansion Water
Reclamation Plant.
|
|
| Owner Solicitation Name: | Weller Hall Air Conditioning and Triad Utilities Replacement - General and Electrical
|
| Owner Name: | Eastern Illinois University, Charleston
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of through-the-wall air conditioning
units in each dormitory room, complete with wall
openings, wall sleeves, power distribution,
upgrading of power service, modifications and
additions to temperature controls for the
existing heating systems, replacement of exhaust
systems, installation of rooftop make-up air
units, abatement and removal of underground
steam, condensate and water piping, installation
of new steam, condensate and domestic water
piping and installation of underground electrical
raceway as shown on the construction documents.
Project also includes associated site work and
asbestos abatement.
|
|
| Owner Solicitation Name: | Remodeling for Mattoon City Hall
|
| Owner Name: | Mattoon, City of
|
| Enginner Name: | Hance, Utz & Associates, LLC
|
| Plankeeper Name |
|
| Scope: | Remodeling for City Hall.
|
|
| Owner Solicitation Name: | Services to Inspect and Maintain T.A.R.P. Electrical Control Chambers and Tide Gate Monitoring System at Various Locations
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Services to Inspect and Maintain Electrical
Control Chambers and Tide Gate Monitoring System.
|
|
| Owner Solicitation Name: | Services of Augers with Operators at the Calumet Water Reclamation Plant
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Services of Augers with Operators.
|
|
| Owner Solicitation Name: | Furnishing a Slackline Cableway/Clamshell System and Dredge Loading System with Crews at the Calumet Water Reclamation Plant
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing a Slackline Cableway/Clamshell System
and Dredge Loading System with Crews.
|
|
| Owner Solicitation Name: | Furnishing and Delivering Allen-Bradley PLC Modules to the Stickney Water Reclamation Plant
|
| Owner Name: | Greater Chicago Metropolitan Water Reclamation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing and Delivering Allen-Bradley PLC
Modules.
|
|
| Owner Solicitation Name: | Coles School MCR Project
|
| Owner Name: | Chicago Public Schools, Procurement & Contracts
|
| Enginner Name: | Mann Gin Dubin & Frazier, Ltd.
|
| Plankeeper Name |
|
| Scope: | Major capital renovation (MCR).
|
|
| Owner Solicitation Name: | New Chillers Jefferson H.S.
|
| Owner Name: | Rockford School District 205
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New Chillers.
|
|
| Owner Solicitation Name: | Asbestos Abatement with Removal of Windows
|
| Owner Name: | Illinois Capital Development Board
|
| Enginner Name: | H. Michael Bohnsack Architects
|
| Plankeeper Name |
|
| Scope: | Asbestos Abatement with Removal of Windows.
|
|
| Owner Solicitation Name: | 2 Step Vans and 2 Trucks (Cabs and Chassis) with Up-Fitted 16 Ft. Van Body
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2 Step Vans and 2 Trucks (Cabs and Chassis) with
Up-Fitted 16 Ft. Van Body.
|
|
| Owner Solicitation Name: | Demolition of Buildings
|
| Owner Name: | Southern Illinois University Carbondale
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide all general work for the demolition of
two buildings. Removal and disposal of buildings
and debris.
|
|
| Owner Solicitation Name: | 6 Electric Neighborhood Cars and 4 Electric Neighborhood Trucks
|
| Owner Name: | University of Illinois at Urbana-Champaign, Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 6 Electric Neighborhood Cars and 4 Electric
Neighborhood Trucks. This is for new 2004 models,
four-passenger cars and two-door, two-passenger
longbed trucks.
|
|
| Owner Solicitation Name: | Skate Park/Tennis Courts Project
|
| Owner Name: | Lisle Park District
|
| Enginner Name: | Williams Development, Ltd.
|
| Plankeeper Name |
|
| Scope: | Skate Park/Tennis Courts.
|
|
| Owner Solicitation Name: | Replacement of Stage Floor at the Hemmens Cultural Center
|
| Owner Name: | Senior Services Associates, Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of Stage Floor.
|
|
| Owner Solicitation Name: | 2 New 61" Commercial Mid Mount Riding Mowers and 2 New 61" Commercial Three Wheel Front Mount Riding Mowers or Equal
|
| Owner Name: | Kane County Forest Preserve District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2 New 61" Commercial Mid Mount Riding Mowers and
2 New 61" Commercial Three Wheel Front Mount
Riding Mowers or Equal.
|
|
| Owner Solicitation Name: | Lawn Fertilization & Weed Control Services
|
| Owner Name: | Naperville Community Unit School District 203
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Lawn Fertilization & Weed Control Services.
|
|
| Owner Solicitation Name: | Houbolt Road (Longford-Cathy) Sidewalk Improvements
|
| Owner Name: | Joliet, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3,624 SF sidewalk, 2,600 SF modular block
retaining wall, 605' fence installation, 700
SY Topsoil and sod, and 550 LF storm sewer with
drainage structures.
|
|
| Owner Solicitation Name: | Carpet & Vinyl Tile
|
| Owner Name: | Naperville Community Unit School District 203
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply, deliver and install Carpet & Vinyl Tile
for a three year period.
|
|
| Owner Solicitation Name: | Westinghouse High School DEM Project
|
| Owner Name: | Chicago Public Schools, Procurement & Contracts
|
| Enginner Name: | NIA Architects
|
| Plankeeper Name |
|
| Scope: | DEM Project.
|
|
| Owner Solicitation Name: | Sludge Cake Disposal Contract
|
| Owner Name: | North Shore Sanitary District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing dewatered sludge cake disposal services
for District and Plant.
|
|
| Owner Solicitation Name: | Marine Power Pedestals
|
| Owner Name: | Rock Island, City of, Public Works Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Marine Power Pedestals.
|
|
| Owner Solicitation Name: | Section 01-00169-06-BR -Sunset Avenue UP RR Bridge
|
| Owner Name: | Lake, County of, Division of Transportation
|
| Enginner Name: | Hanson Professional Services Inc
|
| Plankeeper Name |
|
| Scope: | Extending the existing railroad bridge,
excavating the north pier, removing and
reconstructing the existing slope wall and
repairs to existing concrete structures. QTY
2,800; Unit CY, major bid item earth excavation
QTY 1; Unit l sum; major bid item furnishing and
erecting structural steel QTY 672; UNIT feet;
major bid item driving and filing shells QTY
2500; Unit pound major bid item reinforcement
bars QTY 115; Unit SY major bid item slope wall
4".
|
|
| Owner Solicitation Name: | Additions to Antioch Senior Center
|
| Owner Name: | Antioch, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Additions to building.
|
|
| Owner Solicitation Name: | Weller Hall Air Conditioning and Triad Utilities Replacement - Heating
|
| Owner Name: | Eastern Illinois University, Charleston
|
| Enginner Name: | KM2 Design Group, P.C. - Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | Installation of through-the-wall air conditioning
units in each dormitory room, complete with wall
openings, wall sleeves, power distribution,
upgrading of power service, modifications and
additions to temperature controls for the
existing heating systems, replacement of exhaust
systems, installation of rooftop make-up air
units, abatement and removal of underground
steam, condensate and water piping, installation
of new steam, condensate and domestic water
piping and installation of underground electrical
raceway as shown on the construction documents.
Project also includes associated site work and
asbestos abatement.
|
|
| Owner Solicitation Name: | Chicago Midway Airport – Elevated Parking Structure General Repairs
|
| Owner Name: | Chicago Purchases Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Airport – Elevated Parking Structure General
Repairs
|
|
| Owner Solicitation Name: | Metal Re--roofing of Sallie Logan Library
|
| Owner Name: | Sallie Logan Library
|
| Enginner Name: | White & Borgognoni Architects, PC
|
| Plankeeper Name |
|
| Scope: | Tear-off of the area of existing single-ply over
insulation on built up roofing systems down to
the existing deck, installation of new| metal
roofing on metal truss system and new metal
flashing.
|
|
| Owner Solicitation Name: | Group Exercise Rooms
|
| Owner Name: | Northeastern Illinois University, Purchasing Department
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Converting two under-utilized racquetball courts
to multi-level space for group exercise rooms.
General work will include selective demolition to
create a second floor within the existing space,
new finishes to match existing, repair of
existing finishes, a new sports floor covering,
and miscellaneous furnishings. Heating and
venilation work will include modification of
existing venilation system, extending the heating
system, and providing new cooling units. No
plumbing or fire protection work is required.
Electrical work includes removal of existing high
intensity discharge (HLD) fixtures, installation
of new fluorescent fixtures and controls, and new
power and data controls.
|
|
| Owner Solicitation Name: | Acrux Enterprise Resource Planning (ERP) Software Implementation Services
|
| Owner Name: | Illinois Mathematics and Science Academy
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consultant services to assist with the
implementation of the Acrux ERP (student and
financial) software system.
|
|
| Owner Solicitation Name: | BIC Interim Improvement Project
|
| Owner Name: | College of DuPage, Purchasing Dept.
|
| Enginner Name: | OTA Partnership
|
| Plankeeper Name |
|
| Scope: | Installation of vinyl cushion flooring, wall,
door, frame, and brick painting of all the
corridors of the Instructional Center.
|
|
| Owner Solicitation Name: | Broadcast Test & Measurement Equipment
|
| Owner Name: | College of DuPage, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Broadcast Test & Measurement Equipment.
|
|
| Owner Solicitation Name: | 2004 Sewer Rehabilitation Lining Project
|
| Owner Name: | Elgin Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sewer Rehabilitation by Cured-in-Place Lining
and an alternate with a total length of 323 LF
of 8"; 4,031 LF of 15"; and 340 LF of 24"
sanitary sewer for lining repair along with
other appurtenant work and
materials necessary to complete the project.
|
|
| Owner Solicitation Name: | 2004 Paving Program
|
| Owner Name: | Milton, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Paving.
|
|
| Owner Solicitation Name: | 1 - 2004 4x4, 2 Door, Compact, Extended Cab Pickup Truck
|
| Owner Name: | Streamwood, Village of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1 - 2004 4x4, 2 Door, Compact, Extended Cab
Pickup Truck.
|
|
| Owner Solicitation Name: | Pre-Purchase of Unit Ventilators/ Condensing Units
|
| Owner Name: | Hononegah Community High School District 207
|
| Enginner Name: | Richard L. Johnson Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Pre-Purchase of Unit Ventilators/ Condensing
Units.
|
|
| Owner Solicitation Name: | 7 Digital Audio/Video Recording, Vmeeting Workstations with Software
|
| Owner Name: | Decatur Public Building Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 7 Digital Audio/Video Recording, Vmeeting
Workstations with Software.
|
|
| Owner Solicitation Name: | Architectural/Engineering, Construction Administration Services for a City Auto Test Track
|
| Owner Name: | Naperville Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide professional services for the design of
Auto Test Track.
|
|