| Owner Solicitation Name: | Prescription Monitoring Program
|
| Owner Name: | State of Maine, Dept. of Behavioral and Developmental Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Develop and maintain an electronic -prescription
monitoring program. The primary goals of the
Prescription Monitoring Program will be to reduce
the quantity of controlled substances obtained by
fraud on doctors and pharmacies, and reduce the
adverse effects of pharmaceutical controlled
substance abuse. A second goal of the program is
to assist law enforcement officers, specifically,
investigators for the Maine Boards of Pharmacy
and Licensure in Medicine, and other health care
licensing boards, in the identification of
prescription drug diverters.
|
|
| Owner Solicitation Name: | Website Development
|
| Owner Name: | Maine Department of Finance & Administration, Division of Purchases
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Website Development that will allow school
districts, Child Development Services
contractors, and Vocational Education Centers to
complete their annual funding Applications
electronically.
|
|
| Owner Solicitation Name: | Light Fairway Mowers for Riverside Golf Course
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Light Fairway Mowers.
|
|
| Owner Solicitation Name: | Street Paving
|
| Owner Name: | Farmingdale, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Street Paving
|
|
| Owner Solicitation Name: | Cemetery Maintenance
|
| Owner Name: | Farmingdale, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cemetery maintenance.
|
|
| Owner Solicitation Name: | Wastewater Treatment Facility Upgrade
|
| Owner Name: | Southwest Harbor, Town of
|
| Enginner Name: | James W. Sewall Company
|
| Plankeeper Name |
|
| Scope: | Wastewater treatment facility upgrade.
|
|
| Owner Solicitation Name: | Wastewater System Upgrades
|
| Owner Name: | Southwest Harbor, Town of
|
| Enginner Name: | James W. Sewall Company
|
| Plankeeper Name |
|
| Scope: | Wastewater pump station upgrade.
|
|
| Owner Solicitation Name: | EUT Technology Services
|
| Owner Name: | Maine Department of Finance & Administration, Division of Purchases
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Computer/printer/networking equipment maintenance
and repair.
|
|
| Owner Solicitation Name: | Grinding of Clean Brush and Leaf Waste
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grinding of Clean Brush and Leaf Waste.
|
|
| Owner Solicitation Name: | Intersection Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Excavation, hot mix asphalt, CMP, catch basin,
concrete, erosion control, seeding, pavement
marking, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Trees, bridge work, excavation, hot mix asphalt,
culvert pipe, guardrail, riprap, pavement
marking, grader, field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Milling, Hot Mix Asphalt Overlay, Maintenance Surface Treatment and Strut Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hot mix asphalt, RCP, riprap, truck, field
office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Enviromental Protection Consulting Services
|
| Owner Name: | Maine Department of Finance & Administration, Division of Purchases
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consultant to demonstrate that the proposed
project will not have an unreasonable adverse
impact on visual quality or existing scenic and
aesthetic uses, respectively. Third party review
of visual assessment information provided by
applicants may be required, depending on the
complexity and scope of the proposed project and
submissions. Services are on an as-needed basis
over a two-year contract period, Februar y 1,
2004 through January 31, 2006. Contracts may be
renewed for up to an additional two years.
|
|
| Owner Solicitation Name: | Pump Station Replacements and Treatment Plant Improvements
|
| Owner Name: | Calais, City of
|
| Enginner Name: | Olver Associates, Inc
|
| Plankeeper Name |
|
| Scope: | Replacement of three wastewater pumping stations
with new pumping stations and the installation of
grating modifications and minor improvements at
the WTP including all required sitework,
demolition, site clearing, earthwork, erosion
control, paving, sewerage and drainage pipe, wet
wells and manhole structures, masonry, concrete,
metals, pump station equipment, mechanical,
electrical, HVAC work, and incidentals required
for a complete and working project.
|
|
| Owner Solicitation Name: | Wastewater Treatment Process Upgrade
|
| Owner Name: | Passamaquoddy Tribe
|
| Enginner Name: | Olver Associates, Inc
|
| Plankeeper Name |
|
| Scope: | Upgrade wastewater treatment facility including
the upgrade of an existing wet well mounted
wastewater pumping station to increase its
capacity with new dual wet well and larger pump
motors and controls; about 250 LF of new 6" O
PVC force main and 400 LF of new 6" O gravity
sewer; a new plant headworks building including
a dual parabolic grit chamber, Parshall flume
and flow meter, relocation and upgrade of
existing channel grinder, new bypass screen; a
new influent mixing chamber; a new selector
basin and mixer; a new fine bubble diffused
aeration system for the plant's exisitng
oxidation ditch; new aeraton blowers; an upgrade
of the plant's sludge thickener; a new aerobic
sludge digester required site work, concrete,
masonry work, sewerage and drainage, precast
structures, fencing, thermal and moisture
protection, doors and windows, finish work,
equipment and fixtures, mechanical,
electrical, HVAC, instrumentation, and
incidentals required for the complete process
upgrade of the facility.
|
|
| Owner Solicitation Name: | Pump Control Design Proposal
|
| Owner Name: | Bangor, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design and engineering services for upgrade of
the wastewater pump drives and control system.
|
|
| Owner Solicitation Name: | Purchase of Traffic Signal Equipment
|
| Owner Name: | Bangor, City of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Pelco SE-0503 Tri-stud adapter 50 EA,
Pelco SE-5035SS Tri-stud hardware kit 50 EA,
Pelco SE-3119 Tri-stud mast arm assembly 50 EA,
Pelco SE-5058 Monostud break-away tether 50 EA,
Pelco Astro-Brac AB-0125-4-29 20 EA, Pelco Astro-
Brac AB-0110-4-29 replacement lense with gasket
20 EA, Vehicle signals, 12” dark green
polycarbonate, with tunnel visors supplied
without lamp reflectors, sockets or lenses 20 EA.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay and Milling
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hot mix asphalt, catch basin, sidewalk, seeding,
pavement marking, excavator, field office,
signage, mobilization, sewer manhole.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Elm Street Water Main Replacement
|
| Owner Name: | Guilford Sangerville Water District
|
| Enginner Name: | Sevee & Maher Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Open cut 4,400 LF 12" DIP water line.
|
|
| Owner Solicitation Name: | Brighton, Montrose & Belfield Street Sewer Separation
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 4,000 LF Sewer Separation.
|
|
| Owner Solicitation Name: | Tree Cutting
|
| Owner Name: | Lebanon, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cutting of approximately 100 plus or minus dead
trees at the Lebanon Transfer Station. The trees
must be cut and removed along with all brush at
the bidders expense.
|
|
| Owner Solicitation Name: | Health and Physical Education Facility
|
| Owner Name: | University of Maine Systems, Strategic Procurement Dept.
|
| Enginner Name: | SMRT, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction Managers interested in signing a
two-phase Construction Manager at Risk Contract
for construction of a new Health and Physical
Education Facility. The project will include a
multipurpose structure of approximately 45,000
SF and a parking area. Included in the building
will be a gymnasium, swimming pool,
locker/shower rooms, and fitness area.
Construction features of the building include
exterior and interior unit masonry, steel and
concrete structure, elevator, resilient and
ceramic tile, air conditioning, EPDM roof,
composition sports flooring, lockers, and
casework.
|
|
| Owner Solicitation Name: | Maintenance Dredging 11-Ft, 9-Ft, and 6-Ft Channels, 11-Ft, 9-Ft & 6-Ft Anchorages, 6F Turning Basin
|
| Owner Name: | USPFO for Connecticut - Purchasing and Contracting
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance dredging. Approximately 184,000 CY of
primarily silts, clays, sawdust and sawmill waste
will be dredged by mechanical bucket dredge. The
project will also require removal of boulders and
debris from several areas. The dredged material
will be placed in scows and disposed of.
|
|
| Owner Solicitation Name: | Cutting the Dead Trees.
|
| Owner Name: |
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cutting the dead trees.
|
|
| Owner Solicitation Name: | Construction Manager at Risk Services for the Student Union Addition and Alterations in Castine
|
| Owner Name: | Maine Maritime Academy, Bureau of General Services
|
| Enginner Name: | WBRC Architects/Engineers
|
| Plankeeper Name |
|
| Scope: | The project consists of a new 14,000 square foot,
2-story addition to the existing Student Union,
2,700 square feet renovation in the existing
building. Scope includes selective demolition,
earthwork, site utilities, site improvements,
paving, landscaping, and the construction of the
Student Union addition. The addition includes a
steel frame structure with brick masonry veneer
on metal studs, concrete floors, gypsum board on
metal stud interior walls and complete fire
protection and detection systems, electrical, and
HVAC systems complete and ready for use.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Milling and Safety Improvements in the cities of CARIBOU and PRESQUE ISLE, the town of FORT FAIRFIELD and T16-R5 WELS and T17
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hot Mix Asphalt Overlay, Milling and Safety
Improvements
|
|
| Owner Solicitation Name: | Anderson Hall Automatic Sprinkler System, University of Southern Maine at Gorham, Maine
|
| Owner Name: | Board of Trustees University of Maine System c/o Mr. David Schurman
|
| Enginner Name: | Associated Constructors of Maine (ACM)
|
| Plankeeper Name |
|
| Scope: | Fire protection sprinkler system within existing
5 story concrete and brick facility housing
student rooms, offices and laundry.
|
|
| Owner Solicitation Name: | Public Works & Recycling Area Improvements
|
| Owner Name: | Gray, Town of
|
| Enginner Name: | Taylor Engineering Associates
|
| Plankeeper Name |
|
| Scope: | The work to be done under this contract consists
of the construction of a 82' x 170' salt/sand
shed and four bay bulky waste dumpster retaining
wall and associated amenities.
|
|
| Owner Solicitation Name: | Dickman Street Parking Garage A/E Project
|
| Owner Name: | Augusta City of
|
| Enginner Name: | WBRC Architects/Engineers
|
| Plankeeper Name |
|
| Scope: | Sitework, street improvements, utilities,
foundations, elevator, ADA ramps, and an
elevated precast parking garage deck consisting
of 163 spaces of at-grade and elevated parking
upon project completion.
|
|
| Owner Solicitation Name: | Tennis Court Proposals
|
| Owner Name: | Old Town City Manager
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | DESIGN and RECONSTRUCT two tennis courts.
|
|
| Owner Solicitation Name: | Rubbish Packer and Dump Trucks for Public Works
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rubbish Packer and Dump Trucks for Public Works.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Milling, Drainage and Safety Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pavement, RCP, culvert pipe, manhole, bridge
work, guardrail, riprap, seeding, pavement
marking, excavator, field office, signage,
mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, excavation, HMA, pile driving,
concrete, reinforcing steel, guardrail, riprap,
seeding, pavement marking, excavator, field
office, signage, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Highway Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Trees, manhole, excavation, gravel, HMA, culvert
pipe, bridge work, guardrail, concrete, riprap,
pavement marking, excavator, field office,
signage, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Sokokis Storm Drain Replacement
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Storm drain replacement.
|
|
| Owner Solicitation Name: | Window Shades for Mahoney Middle School
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Window Shades.
|
|
| Owner Solicitation Name: | Water Main Replacement
|
| Owner Name: | Randolph, Town of
|
| Enginner Name: | A. E. Hodsdon Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | Water main replacement, road reconstruction, all
open cut.
|
|
| Owner Solicitation Name: | Town Salt/Sand Storage Shed
|
| Owner Name: | Corinna Town of
|
| Enginner Name: | James W. Sewall Company
|
| Plankeeper Name |
|
| Scope: | Construction of the Town Salt/Sand Storage Shed.
|
|
| Owner Solicitation Name: | Loader with Plowgear
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Loader with plowgear for public works.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Drainage Improvements, Shoulder Reclaim and Guardrail Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Shoulder rehab, RCP, culvert pipe, concrete,
guardrail, riprap, seeding, pavement marking,
excavator, field office, signage, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Cold in-Place Recycled Asphalt Pavement, Drainage Improvements, Guardrail Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asphalt pavement, guardrail, riprap, pavement
marking, excavator, field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Maintenance, Repair Grounds, Utilities, Paved Surfaces
|
| Owner Name: | Dept. of the Navy, Naval Facilities Engineering Command, Engineering Field Activity, Northeast, ROICC Brunswick
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide, unless otherwise specified, all labor,
materials, equipment, transportation, facilities,
utilities, supervision, and management, unless
otherwise specified herein, provide and secure
maintenance and repair of bituminous concrete
pavements and Portland concrete pavements,
replacement of underground piping, accomplishment
of various excavation and earthwork and any
incidental related work.
|
|
| Owner Solicitation Name: | Pump Stations Construction of Wells
|
| Owner Name: | Brunswick Topsham Water District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction, development and testing of a 24"
naturally developed well and a 24" gravel packed
well.
|
|
| Owner Solicitation Name: | Sewage Pump Stations Upgrade
|
| Owner Name: | Caribou Utilities District
|
| Enginner Name: | Dufresne-Henry, Inc.
|
| Plankeeper Name |
|
| Scope: | Rehabilitation of up to six (6) existing sewage
pumping stations, furnishing and installing new
pumping units, electrical service and controls,
piping and valves, telemetry equipment, wetwell
modifications and other miscellaneous
improvements.
|
|
| Owner Solicitation Name: | 2004 Medium Duty Utility Truck
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2004 Medium Duty Utility Truck.
|
|
| Owner Solicitation Name: | Jackson and Taylor Pump Stations Construction of Wells
|
| Owner Name: | Brunswick Topsham Water District
|
| Enginner Name: | Wright-Pierce
|
| Plankeeper Name |
|
| Scope: | Construction, development and testing of a 24"
naturally developed well and a 24" gravel packed
well.
|
|
| Owner Solicitation Name: | Construction of Alamoosook Lake Pump Station
|
| Owner Name: | U.S. Fish and Wildlife Service - R5 Contracting & General Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a new Pump Station and intake
pipeline. Demolition of the existing pump
station. Site preparation, sheeting and shoring,
construction of a new 2,400 gpm pump station
including foundation and wet well, installation
of three variable speed drive vertical turbine
pumps, masonry and all utilities, electrical,
mechanical and process piping work required to
provide a fully operational facility.
Construction of a new intake pipeline into the
lake (approximately 250 lf) and demolition of the
existing pump station and intake pipeline.
|
|
| Owner Solicitation Name: | City of Brewer Parallel Road
|
| Owner Name: | Brewer, City of
|
| Enginner Name: | Civil Engineering Services, Inc. (CES)
|
| Plankeeper Name |
|
| Scope: | Construction of 7,600 LF of roadway with
associated ditching and utilities, and detention
pond modifications.
|
|
| Owner Solicitation Name: | Bus Garage Construction
|
| Owner Name: | Fort Fairfield Schools, MSAD #20
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of an 8,000 SF bus garage.
|
|
| Owner Solicitation Name: | Windsor Road Reconstruction Project
|
| Owner Name: | Chelsea, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing & replacing approximately 2800 SY of
pavement. Apply Tack-Coat, shim and overlay with
2" bituminous pavement: shim to average 1" -
surface pavement to average 1". Grind all joints
on ends. Grade and gravel all shoulders to meet
new pavement. (Gravel driveways to be matched
with gravel and paved driveways to be matched
with pavement to a minimum distance of 2' into
the paved drive way). Contractor will be
responsible for traffic control including placing
all construction traffic control signs including
low shoulder' reflector markings. Contractor
responsible for providing notice of excavation to
Dig Safe', Tack-coat, Sweeping, Joint grinding.
|
|
| Owner Solicitation Name: | Lighting Fictures for Main Library
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Public library lighting upgrade.
|
|
| Owner Solicitation Name: | Truck Chassis & Cab
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Truck Chassis & Cab.
|
|
| Owner Solicitation Name: | Rehabilitation of Masonry/Wood Framed Building
|
| Owner Name: | Old Town City Manager
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 28,550 SF masonry/wood framed building. Interior
structural renovation including new elevator and
shaft; major finishes rehabilitation including
floors, ceilings and walls; mechanical upgrades
including new boilers, air conditioning and
sprinkler system; total electrical replacement
including new service and emergency generator,
replacement of all existing electrical devices
and lighting, new fire alarm system; slate roof
and metal flashing repair; minor site work.
|
|
| Owner Solicitation Name: | Tractor with Loader and Backhoe
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Tractor with Loader and Backhoe.
|
|
| Owner Solicitation Name: | Trees for City Planting
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish Trees.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pavement surface, shoulder aggregate, pipe
cleaning, underdrain, grader, field office,
signage, mobilization.
Please see attached file.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Drainage and Safety Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Trees, shoulder rehabilitation, HMA, pipe
cleaning, guardrail, concrete, erosion control,
seeding, truck, field office, mobilization.
Please see attached file.
|
|
| Owner Solicitation Name: | Sand/Salt Storage Buildings
|
| Owner Name: | Jonesboro, Town of
|
| Enginner Name: | Civil Engineering Services, Inc. (CES)
|
| Plankeeper Name |
|
| Scope: | Excavation and backfill, drainage, paving,
foundation, lighting and electrical service,
access road construction, and construction of a
60 foot by 72 foot laminated wood arch building
to contain approximately 1,500 CY of material and
construction of a 60' by 48' laminated wood arch
building to contain approximately 750 CY of
material.
|
|
| Owner Solicitation Name: | Marine Engineering and Consulting
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Marine Engineering and Consulting.
|
|
| Owner Solicitation Name: | Construction of Renovations and the Addition to Dyer Elementary School Pre-Qualification of General Contractors
|
| Owner Name: | South Portland City School.
|
| Enginner Name: | HKTA Architects
|
| Plankeeper Name |
|
| Scope: | Construction of renovations of approximately
29,000 SF to the entire existing one-story load
bearing school building and a one-story addition
of approximately 3,000 SF. Interior demolition of
partitions and existing woodwork, case work and
fixtures and selective exterior building and slab
demolition, earthwork, site utilities and site
improvements, paving, and landscaping. Work also
includes concrete foundations, slab-on-grade,
steel structure, steel joists and decking, roof
membrane over roof insulation, complete
replacement of existing roof desk and existing
roof membrane system, sheet metal, masonry load
bearing walls, minor renovations to existing
masonry work, replacement of existing wood
windows with metal clad windows, metal stud
partitions, insulation, gypsum board walls and
ceilings, ceramic tile, acoustical ceilings,
resilient flooring, carpeting, custom cabinets
and fixtures, carpentry, glass storefront system,
painting, metal doors, wood doors, metal frames,
door hardware, overhead coiling grilles, metal
fabrications, toilet partitions and accessories,
signage, lockers, fire protection and detection
systems, electrical, technology, heating,
ventilating, and air conditioning.
|
|
| Owner Solicitation Name: | Parkside Neighborhood Center & Affordable Housing
|
| Owner Name: |
|
| Enginner Name: | TFH Architects
|
| Plankeeper Name |
|
| Scope: | The work consists of two-three story buildings
with a basement/office level in Building 'A',
a 'neighborhood center' on the first floor, and
four family housing units on each of the upper
two floors. Building 'B' consists of eight family
housing units on three levels over basement
mechanical/storage space.
|
|
| Owner Solicitation Name: | Financial & Human Resource Management Enterprise Software System
|
| Owner Name: | Biddeford, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Financial & Human Resource Management Enterprise
Software System.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services
|
| Owner Name: | Eastern Maine Community College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Architectural and engineering services for
heating plant upgrades, window replacement,
ceiling replacement and interior installation
projects. Site analysis, programming, design and
construction administration duties on a 96,000 SF
classroom and administration building.
|
|
| Owner Solicitation Name: | Deering Tennis Courts Reconstruction
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Deering Tennis Courts Reconstruction.
|
|
| Owner Solicitation Name: | General Waterfront Repairs at Piers
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | General Waterfront Repairs at Piers.
|
|
| Owner Solicitation Name: | Engineering Services
|
| Owner Name: | Brunswick Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering services for design and construction
administration for a complete rehabilitation of
Pedestrian Bridge. Preparing construction
restoration bid documents for this historic
bridge.
|
|
| Owner Solicitation Name: | Construction of the East Belfast School Pre-Qualification
|
| Owner Name: |
|
| Enginner Name: | Lewis + Malm Architecture
|
| Plankeeper Name |
|
| Scope: | Construction of a 7,500 SF addition and
renovation of an existing 14,000 SF K-5 school,
with about 700 SF of mechanical mezzanine. New
addition will be steel and masonry construction.
Mechanical and Electrical.
|
|
| Owner Solicitation Name: | Structural Stabilization
|
| Owner Name: | The Friends of St. Lawrence Church
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bracing, posting and reinforcing tall walls and
roof.
|
|
| Owner Solicitation Name: | Forest Fire Aerial Detection
|
| Owner Name: | Maine State Planning Office, Div. of Purchases
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Forest Fire Aerial Detection.
|
|
| Owner Solicitation Name: | Computer System Upgrade and Service Plan
|
| Owner Name: | New Gloucester, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Upgrade the town's existing computer network
system. Hardware/software maintenance Service
Plan and support services for ongoing maintenance
and administration of the system.
|
|
| Owner Solicitation Name: | Replace/Rehabilitate Elevators Bldg. 205 & 206
|
| Owner Name: | Dept. of Veterans Affairs Medical and Regional Office Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide professional Architect/Engineering
services to restore and rehabilitate existing
personnel elevators, wheelchair lifts outside of
Chapel and a new personnel elevator. Prepare
construction plans, specifications, prepare cost
estimate and design development program for
subject project. Complete and submit a
preliminary investigation to verify the project
scope and current working estimate to include
alternatives for reuse of existing components
and/or systems as appropriate. Provide
construction supervision services to include
review of submittals/shop drawings and three (3)
site visits to assist the VA during the
construction phase of the project.
|
|
| Owner Solicitation Name: | Microsurfacing
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Microsurfacing, pavement marking, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, excavation, granular borrow, HMA,
concrete, reinforcing steel, railing, drainage,
riprap, seeding, pavement marking, excavator,
field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Rail Line Rehabilitation
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Special work #1 lighting and emergency lighting.
|
|
| Owner Solicitation Name: | Intersection Reconstruction
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Excavation, gravel, HMA, culvert pipe, concrete,
erosion control, seeding, pavement marking,
excavator, field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Resurfacing
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Excavation, shoulder rehabilitation, catch basin,
manhole adjusting, guardrail, concrete, erosion
control, seeding, pavement marking, excavator,
field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Overlay and Guardrail Safety Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | HMA, catch basin and manhole cleaning, guardrail,
concrete, excavator, field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Eastern Waterfront Garage Bid #: 4504
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Waterfront Garage
|
|
| Owner Solicitation Name: | Telecommunication Network Service Provider
|
| Owner Name: | Cumberland, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Telecommunication Network Service Provider.
|
|
| Owner Solicitation Name: | Construction of Improvements to Route 202
|
| Owner Name: | Windham School Department
|
| Enginner Name: | DeLuca Hoffman Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Site preparation, excavation and backfill,
drainage, erosion control measures, roadway
widening, curbs, sidewalks, guide rails, turf
establishment, and related work required by the
contract documents. Minor traffic signal
modifications are included with the work.
|
|
| Owner Solicitation Name: | Contract Number 1 - Kenniston Hill Reservoir
|
| Owner Name: | Boothbay Region Water District
|
| Enginner Name: | Wright-Pierce
|
| Plankeeper Name |
|
| Scope: | Reservoir construction.
|
|
| Owner Solicitation Name: | Front End Loader
|
| Owner Name: | Westbrook, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Front End Loader.
|
|
| Owner Solicitation Name: | Traffic Line Markings (Paint)
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Traffic Line Markings (Paint)
|
|
| Owner Solicitation Name: | Waterboro Recycling Center
|
| Owner Name: | Waterboro, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing all materials, labor and equipment to
complete building construction work for a new
Recycling Facility.
|
|
| Owner Solicitation Name: | Design and Construct a Mobile-Educational Display
|
| Owner Name: | Sunrise County Economic Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | DESIGN-BUILD. Design and Construct a Mobile-
Educational Display.
|
|
| Owner Solicitation Name: | Personal Computer System
|
| Owner Name: | Maine State Planning Office, Div. of Purchases
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Standard desktop systems. Desktop and
laptop/notebook/thin client/tablet pc systems and
peripherals including printers, memory, scanners,
disk drives, multifunction PDA devices, (A
desktop system shall, at a minimum, consist of
the CPU, 3.5" floppy disk drive (optional per
user?s request), CD ROM drive, DVD/CD burner,
fixed disk drive and controller, video
controller, power supply, expansion slots,
parallel and serial ports, USB & firewire ports,
keyboard, mouse or pointing device, network card,
sound card, minimum 15" monitor, all necessary
cables, and operating system software consisting
of multi-tasking windows environment compatible
with existing state owned equipment. Respondents
will be limited to Value Added Resellers (VARs)
who, at a minimum, sell products made by
manufacturers, which the state has frequently
purchased (IBM, HP, Compaq, Dell, and Gateway).
The VAR may have additional product lines that
they offer but they must have the selected ones.
|
|
| Owner Solicitation Name: | Pre-Qualification on Belfast High School - Fine Arts Center Addition
|
| Owner Name: | School Admin Dist 34
|
| Enginner Name: | WBRC Architects/Engineers
|
| Plankeeper Name |
|
| Scope: | 14,174 +/- SF 2-story addition to the existing
School. Work includes but is not limited to,
earthwork, site utilities, site improvements and
paving. Work also includes concrete foundations
and slab-on-grade, steel structure, steel joists
and decking, roof membrane over roof insulation,
sheet metal flashings, masonry veneer, metal stud
partitions, insulation, gypsum board walls and
ceilings, ceramic tile, acoustical ceilings,
resilient flooring, carpeting, cabinetry and
fixtures, carpentry, glass storefront system,
painting, metal doors, wood doors, metal frames,
door hardware, metal fabrications, toilet
accessories, fire protection and detection
systems, electrical, and heating, ventilating,
and air conditioning complete and ready for use.
|
|
| Owner Solicitation Name: | Belfast Area High School Fine Arts Addition
|
| Owner Name: | School Admin Dist 34
|
| Enginner Name: | WBRC Architects/Engineers
|
| Plankeeper Name |
|
| Scope: | 14,174 +/- SF 2-story addition to the existing
School. Work includes but is not limited to,
earthwork, site utilities, site improvements and
paving. Work also includes concrete foundations
and slab-on-grade, steel structure, steel joists
and decking, roof membrane over roof insulation,
sheet metal flashings, masonry veneer, metal stud
partitions, insulation, gypsum board walls and
ceilings, ceramic tile, acoustical ceilings,
resilient flooring, carpeting, cabinetry and
fixtures, carpentry, glass storefront system,
painting, metal doors, wood doors, metal frames,
door hardware, metal fabrications, toilet
accessories, fire protection and detection
systems, electrical, and heating, ventilating,
and air conditioning complete and ready for use.
|
|
| Owner Solicitation Name: | 2003 Fine Cut Riding/ Rotary Mower, 2003 Wide Area Riding Rotary Mower and Utility Truckster
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2003 Fine Cut Riding/ Rotary Mower, 2003 Wide
Area Riding Rotary Mower and Utility Truckster.
|
|
| Owner Solicitation Name: | Gymnasium Floor
|
| Owner Name: | Bangor, City of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish, deliver and install a new gymnasium
floor. Cover an area of approximately 6,026 SF.
This new flooring must be installed over existing
vinyl asbestos floor tile.
|
|
| Owner Solicitation Name: | Highway Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clearing, manhole, concrete, excavation, shoulder
rehabilitation, aggregate base course, culvert
pipe, CMP, pipe cleaning, guardrail, fence,
riprap, seeding, pavement marking, excavator,
field office, mobilization, PVC sanitary sewer,
DIP, water main, trenching, insulation.
Please see attached file.
|
|
| Owner Solicitation Name: | Hydroseeding and Planting Services
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hydroseeding and Planting Services.
|
|
| Owner Solicitation Name: | ¾" Hot Mix Asphalt Overlay
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | HMA, manhole, pavement marking, excavator,
mobilization.
Please see attached file.
|
|
| Owner Solicitation Name: | ¾" Hot Mix Asphalt Overlay
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | HMA, manhole, pavement marking, excavator,
mobilization.
Please see attached file.
|
|
| Owner Solicitation Name: | Building Renovation Project
|
| Owner Name: | East Millinocket, Town of
|
| Enginner Name: | D&S Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Creation of a light manufacturing facility
through the renovation of the vacant space in an
existing, erected metal building by installing
concrete floors, creating an enclosed
manufacturing area, office, showroom and utility
rooms, installation of electrical, plumbing and
heating services and associated equipment.
|
|
| Owner Solicitation Name: | Structural Improvements and Re-Roofing and Shop Area Renovations at Van Buren Junior/Senior High School
|
| Owner Name: | School Administrative District - MSAD#24, Superintendent of School
|
| Enginner Name: | Lincoln, Haney Engineering Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Improvements to increase the snow load capacity
of the roof structure (adding new steel joists,
replacing approximately 13,000 SF of new EPDM,
providing new polyisocyanurate roof insulation
and replacing approximately 1,800 SF of existing
T1-11 siding with new aluminum siding. Other work
within the Shop Areas includes the replacement of
windows and two overhad doors, a new acoustical
tile ceiling, new lighting and mechanical
improvements to improve ventilation. There are
two alternates. Alternate No. 1 at the Auditorium
involves reinforcing several existing steel roof
beams, replacing the existing EPDM roof membrane
with approximately 4,800 SF of new EPDM,
providing new polyisocyanurate roof insulation
and replacing approximately 1,800 SF of T1-11
siding with new aluminum siding. Alternate No. 2
at the Administration Wing involves installing
new steel roof beams, replacing existing built-up
roofing with approximately 11,300 SF new EPDM
membrane and providing new polyisocyanurate roof
insulation.
|
|
| Owner Solicitation Name: | Personal Computers
|
| Owner Name: | Penobscot County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Personal Computers.
|
|
| Owner Solicitation Name: | Sand-Salt Storage Facility - Town of Islesboro
|
| Owner Name: | Islesboro, Town of
|
| Enginner Name: | Plymouth Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | New 3,750-SF, sand-salt storage building;
concrete retaining wall perimeter; pre-fabricated
wood roof truss and wood-framed wall
superstructure, paneled sheet metal roofing; and
board-and-batten siding; associated site grading;
limited paving; electrical (power and lighting),
and mechanical ventilation systems.
|
|
| Owner Solicitation Name: | Mount Jefferson Junior High School Electrical and Mechanical Renovations
|
| Owner Name: | MSAD # 30
|
| Enginner Name: | James W. Sewall Company
|
| Plankeeper Name |
|
| Scope: | Replacement of existing boiler and renovations to
electrical system.
|
|
| Owner Solicitation Name: | Weatherization Materials
|
| Owner Name: | Aroostook County Action Program, Inc. (ACAP)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide weatherization materials.
|
|
| Owner Solicitation Name: | Grounds Maintenance
|
| Owner Name: | Bar Harbor, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Routine maintenance of certain grounds, parks,
and other areas.
|
|
| Owner Solicitation Name: | Topsham Sewer District Main Street and Pleasant Street Sewer Pipe Relining
|
| Owner Name: | Topsham Sanitary District
|
| Enginner Name: | Wright-Pierce
|
| Plankeeper Name |
|
| Scope: | Relining of approximately 4,170 LF of 12" diameter
asbestos cement pipe by CIPP or Fold & Form,
reinstatement of approximately 46 service
laterals, and associated items.
|
|
| Owner Solicitation Name: | General Civil Engineering Consultant Services
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Survey, CADD, Design, Bid Ready Plans and
Specifications, Construction Management.
|
|
| Owner Solicitation Name: | Airport Improvement Programs for Architectural and Engineering Services
|
| Owner Name: | Bangor, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Architectural and Engineering Services.
|
|
| Owner Solicitation Name: | Septic Systems
|
| Owner Name: | Georgetown, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish materials for and install two septic
systems.
|
|
| Owner Solicitation Name: | Deck Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, concrete, excavation, HMA, tack coat
applied, reinforcing steel, metal fabrication,
riprap, pavement marking, excavator, lighting,
field office, signage, mobilization.
Please see attached file.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Full Depth Recycled Pavement With Foamed Asphalt and Drainage Improvments
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Shoulder rehabilitation, excavation, HMA, culvert
pipe, riprap, seeding, excavator, field office,
mobilization.
Please see attached file.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Milling and Guardrail Safety Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Shoulder widening, HMA, culvert pipe, guardrail,
seeding, pavement marking, excavator, field
office, signage, mobilization.
Please see attached file.
|
|
| Owner Solicitation Name: | Water Main Replacements
|
| Owner Name: | Portland Water District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish and install approximately 3,700 LF of 8"
& 4" ductile iron water main and appurtenances.
Furnish and maintain temporary water systems.
Open cut.
|
|
| Owner Solicitation Name: | Road/Utility Construction, Phase 1 Brickhill Redevelopment
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of 550 LF new roadway, 680 LF
gravel road, 550 LF each of storm sewer,
sanitary sewer, water main, electrical,
telephone cabling, along with a storm water
detention pond.
|
|
| Owner Solicitation Name: | East Boothbay Interconnection and Booster Pump Station
|
| Owner Name: | Boothbay Region Water District
|
| Enginner Name: | Wright-Pierce
|
| Plankeeper Name |
|
| Scope: | Interconnection and Pump Station.
|
|
| Owner Solicitation Name: | Grounds Maintenance
|
| Owner Name: | Belfast, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Regular mowing & trimming and shrub maintenance-
that includes planting, pruning, mulching, and
raking.
|
|
| Owner Solicitation Name: | Technical Classroom Addition
|
| Owner Name: | University of Maine at Augusta
|
| Enginner Name: | WBRC Architects/Engineers
|
| Plankeeper Name |
|
| Scope: | Technical Classroom Addition.
|
|
| Owner Solicitation Name: | RFQ - Consultant Services in Municipal Airport Design-Build Projects
|
| Owner Name: | Old Town City Manager
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consultant Services.
|
|
| Owner Solicitation Name: | Elm Street Water Main Replacement
|
| Owner Name: | Milo Water District
|
| Enginner Name: | Dirigo Engineering
|
| Plankeeper Name |
|
| Scope: | Open cut installation of approximately 5,200 LF
of 12" DIP water main.
|
|
| Owner Solicitation Name: | Pre- Qualification Lincolnville Central School
|
| Owner Name: | Lincolnville School Dept.
|
| Enginner Name: | Oak Point Associates
|
| Plankeeper Name |
|
| Scope: | Excavation; concrete foundations; steel
structure; brick veneer and unit masonry work;
building insulation; doors, frames and wood
windows; aluminum storefront entrances; roofing;
interior partitions and finishes; hydraulic
elevator; and complete plumbing, mechanical,
electrical and fire protection systems, including
all associated incidental work for a 47,000 SF,
two story building.
|
|
| Owner Solicitation Name: | Detention Pond Project
|
| Owner Name: | North Berwick, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Excavating and construction of multi-purpose
playing fields along with associated storm
drains, catchbasins and all other work.
|
|
| Owner Solicitation Name: | Utility Pickup Truck for Parks and Rec.
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish Utility Pickup Truck for Parks and Rec.
|
|
| Owner Solicitation Name: | Level 2 Resurfacing
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Shoulder widening, HMA, culvert pipe, manhole,
guardrail, erosion control, seeding, excavator,
field office, signage, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, excavation, aggregate base course,
HMA, steel, pile driving, concrete, guardrail,
riprap, seeding, excavator, field office,
mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, excavation, HMA, concrete,
reinforcing steel, drainage, guardrail, riprap,
seeding, pavement marking, excavator, field
office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, excavation, HMA, concrete,
reinforcing steel, drainage, guardrail, riprap,
seeding, pavement marking, excavator, field
office, mobilization, pile driving, welding.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Rubber Removal
|
| Owner Name: | Bangor Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rubber Removal.
|
|
| Owner Solicitation Name: | Lewiston City Building South Exterior Wall Rehabilitation Project
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Spot re-pointing, patching, cleaning and
waterproofing exterior masonry and stone walls,
re-caulk and paint exterior wood and metal
windows and doors as needed and all other
incidental work.
|
|
| Owner Solicitation Name: | Narragansett Elementary School Re-Roofing
|
| Owner Name: | Gorham School Dept.
|
| Enginner Name: | Lincoln, Haney Engineering Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Replacing approximately 43,200 SF of existing
gravel surface asphalt built-up roofing with
standing seam metal roofing.
|
|
| Owner Solicitation Name: | Facilities Review Study
|
| Owner Name: | Maine School Administrative District MSAD No. 31
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Review is intended to prescribed repairs and
renovations to existing facilities and inform the
construction of a newly constructed facility.
|
|
| Owner Solicitation Name: | Turnout Gear
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Turnout Gear.
|
|
| Owner Solicitation Name: | Asbestos Abatement at Aroostook Hall
|
| Owner Name: | University of Maine Systems
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of approximately 19,000 SF of asbestos
containing ceiling materials in 104 rooms in the
student dormitory, with alternates to remove
approximately 19,000 SF of flooring materials and
2,400 LF of TSI in the same rooms.
|
|
| Owner Solicitation Name: | Asbestos Abatement at Kennebec Hall
|
| Owner Name: | University of Maine Systems
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of approximately 20,000 SF of asbestos
containing ceiling materials in 107 rooms in the
student dormitory, with alternates to remove
approximately 20,000 SF of flooring materials and
2,500 LF of TSI in the same rooms.
|
|
| Owner Solicitation Name: | CDBG Grant Engineering Services
|
| Owner Name: | Mars Hill, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Development of final design and bid
specification, cost control estimates, and
construction monitoring.
|
|
| Owner Solicitation Name: | New Biddeford Road Culvert and the Dyke Road Culvert
|
| Owner Name: | Kennebunkport, Town of
|
| Enginner Name: | CLD Consulting Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of two existing pipe arch
culverts with new culverts.
|
|
| Owner Solicitation Name: | Pre-Qualification on Construction of the East Belfast School
|
| Owner Name: | School Admin Dist 34
|
| Enginner Name: | Lewis + Malm Architecture
|
| Plankeeper Name |
|
| Scope: | Construction of a 7,500 SF addition and
renovation of an existing 14,000 SF school, with
about 700 SF of mechanical mezzanine. New
addition will be steel and masonry construction.
|
|
| Owner Solicitation Name: | Perkins Cove Steel Piling Bulkhead Replacement
|
| Owner Name: | Ogunquit, Town of
|
| Enginner Name: | Attar Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Install approximately 150 LF of a new steel sheet-
piling bulkhead. Installation of helical screw
anchors, walers, and a sheet pile cap. An
alternate item will involve relocating the
existing guardrail from the timber guardrail to
the new steel pile cap, removing the timber
bulkhead to below existing grade and expanding
the existing improvements (walkways, parking
areas) over the filled area.
|
|
| Owner Solicitation Name: | Bridge Replacement Brighton Avenue Underpass
|
| Owner Name: | Maine Turnpike Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clearing, grading, drainage, base, pavement,
guardrail, fencing, structural steel, concrete,
and all other work.
|
|
| Owner Solicitation Name: | Pavement Rehabilitation
|
| Owner Name: | Maine Turnpike Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Milling and resurfacing with bituminous concrete
the two 12 LF wide lanes and adjacent shoulders
in locations 1 and 2, and milling and resurfacing
with bituminous concrete the passing land (12 LF
width) in locations 3 and 4. Drainage, pavement
markings, maintenance of traffic.
|
|
| Owner Solicitation Name: | Bridge Replacement and Widening
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, concrete, excavation, granular
borrow, reinforcing steel, manhole adjusting,
guardrail, riprap, seeding, pavement marking,
excavator, field office, signage, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Shoulder Rehab and Guardrail Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pavement, excavation, gravel, culvert pipe,
guardrail, concrete, riprap, seeding, excavator,
field office, mobilization, sewer manhole.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Milling and Intersection Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pavement, excavation, gravel, culvert pipe,
manhole adjusting, guardrail, concrete, erosion
control, seeding, pavement marking, excavator,
field office, signage, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Traffic Signal Equipment
|
| Owner Name: | Bangor Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Traffic Signal Equipment.
|
|
| Owner Solicitation Name: | Demolition 482 Canal St.
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition.
|
|
| Owner Solicitation Name: | Mowing Services for the Highland Avenue Landfills
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mowing Services.
|
|
| Owner Solicitation Name: | Exterior Waterproofing at Public Safety Building
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Exterior Waterproofing at Public Safety Building.
|
|
| Owner Solicitation Name: | Barron Center Window Replacement
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Window Replacement.
|
|
| Owner Solicitation Name: | Line Striping for Bituminous and Portland Cement Concrete Pavements
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Line Striping for Bituminous and Portland Cement
Concrete Pavements.
|
|
| Owner Solicitation Name: | Precast Structures
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Precast Structures.
|
|
| Owner Solicitation Name: | Work Zone Traffic Control (Flaggers)
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Work Zone Traffic Control (Flaggers) for various
construction and/or maintenance projects.
|
|
| Owner Solicitation Name: | Gravel, Loam and Crushed Stone
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Aggregate Base shall be screened or crushed
gravel consisting of hard
durable particles which are free from vegetable
matter, lumps or balls of clay and other
deleterious substances.
|
|
| Owner Solicitation Name: | Rough Rotary Mower
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | One (1) 4-wheel drive, rubber tired, diesel
powered, hydrostatic drive Five Deck Rough Rotary
Mower. Possible acceptable machines would be:
Jacobson AR2500, Toro 4500D, John Deere 3245C
or approved equal.
|
|
| Owner Solicitation Name: | Boiler Replacement at Morton Avenue Elementary School
|
| Owner Name: | MSAD #68
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Boiler Replacement. Design, build, which must be
a steam system convertible to water. The boiler
will be sectional Smith boiler. Removal of the
existing Cleaver Brooks boiler and debris from
site. Identification of asbestos containing
materials which would require remediation.
Upgrading of pneumatic system. Containment for
the three oil tanks located in the boiler room.
Demolition and replacement with new materials of
existing steam condensate return and fuel oil
piping. Concrete paid or baserail. Oil and
ventilation modifications.
|
|
| Owner Solicitation Name: | John Deere 332 Tractor and one Trac-Vac Grass Collection System
|
| Owner Name: | Mount Desert Elementary School
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | John Deere 332 Tractor and one Trac-Vac Grass
Collection System.
|
|
| Owner Solicitation Name: | Installed Weatherization Measures
|
| Owner Name: | Penquis C.A.P., Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installed Weatherization Measures.
|
|
| Owner Solicitation Name: | Fosters Point Water Main
|
| Owner Name: | Bath Water District
|
| Enginner Name: | Wright-Pierce
|
| Plankeeper Name |
|
| Scope: | Open cut 3,500 LF 12" DIP water main and house
services.
|
|
| Owner Solicitation Name: | Cooler/Freezer
|
| Owner Name: | Penobscot County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal/ disposal of the existing walk-in
cooler/freezer from the jail kitchen and the
installation of a new walk-in cooler/freezer.
|
|
| Owner Solicitation Name: | Hauck Auditorium Renovations
|
| Owner Name: | University of Maine Systems
|
| Enginner Name: | Gordon Stanley Architecture
|
| Plankeeper Name |
|
| Scope: | Existing fixed seating and carpeting will be
removed and replaced with new. The entire space
will be painted.
|
|
| Owner Solicitation Name: | Furnish and Install Overhead Doors for Fire Station
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish and Install Overhead Doors.
|
|
| Owner Solicitation Name: | Demolition of the East End School
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition.
|
|
| Owner Solicitation Name: | Biddeford Middle School
|
| Owner Name: | Biddeford School Department
|
| Enginner Name: | Harriman Associates
|
| Plankeeper Name |
|
| Scope: | Construction of a new middle school complex of
approximately 144,000 SF, including multi-story
steel frame building with masonry veneer, which
will contain classrooms, library, gymnasium,
auditorium, cafeteria, kitchen, and offices,
associated mechanical, electrical, sprinkler and
site work.
|
|
| Owner Solicitation Name: | Expansion of Baggage Claim at Jetport
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Expansion of Baggage Claim.
|
|
| Owner Solicitation Name: | Space Needs Analysis and Master Plan for O'neil Street Complex
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Space Needs Analysis and Master Plan.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, manhole, catch basin, excavation,
granular borrow, tack coat, pile driving, steel,
concrete, seeding, pavement marking, excavator,
field office, mobilization, sanitary sewer.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Manhole Risers
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Manhole Risers.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay, Cold in-Place Recycling Asphalt Pavement, Drainage and Safety Improvements
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Shoulder aggregate, asphalt pavement, excavation,
guardrail, culvert pipe, RCP, manhole, concrete,
riprap, seeding, pavement marking, excavator,
field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Rehabilitate Runway 11-29
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitate Runway.
|
|
| Owner Solicitation Name: | Public Works Garage Improvements
|
| Owner Name: | Old Orchard Beach, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Re-roofing, window replacement, overhead door and
fascia improvements, painting, electrical,
lighting and ventilation work, fire suppression
system.
|
|
| Owner Solicitation Name: | Police Department Re-Roofing
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Re-Roofing.
|
|
| Owner Solicitation Name: | Middle School Addition and Renovations Pre-Qualification
|
| Owner Name: | MSAD 1
|
| Enginner Name: | WBRC Architects/Engineers
|
| Plankeeper Name |
|
| Scope: | Includes 31,900 SF of new construction, 3,300 SF
of full renovation and 20,700 SF of soft
renovation (floor finishes w/ new cove base).
Selective exterior and interior removals,
earthworks, site drainage, foundation
waterproofing and drainage, landscaping & hard
surfaces, Concrete slabs, concrete and steel
structure, metal decking, reinforced concrete
decks, metal stud exterior framing, building
insulation, exterior gypsum and wooden sheathing,
fair faced clay masonry, EDPM roofing with
tapered insulation, standing seam metal roof and
facades, replacement and new insulated wooden
clad windows, metal storefront, metal door
frames, metal and glazed exterior doors, HVAC
mechanical, electrical, sprinkler and plumbing
installations, interior gypsum wallboard
assemblies, hollow metal interior window and door
frames, interior hardwood doors, door hardware,
suspended acoustic tile and gypsum ceilings, 2
stop hydraulic elevator, diverse finishes in
carpet, VCT, ceramic and porcelain floor & wall
tile, hardwood finish carpentry, interior
paintworks, toilet partitions, toilet
installations and accessories, auditorium
seating, stage curtains & rigging, etc.
|
|
| Owner Solicitation Name: | Roofing Services
|
| Owner Name: | University of Maine Systems
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Snow removal, cleaning drains, repairing leaks,
and other forms of roof repair and maintenance.
|
|
| Owner Solicitation Name: | Construction of Enhanced Effluent Treatment Systems at Casco, Enfield and Palermo
|
| Owner Name: | Maine Bureau of General Services
|
| Enginner Name: | Wright-Pierce
|
| Plankeeper Name |
|
| Scope: | Limited demolition, installation of piping, pump
systems, rotary drum screen, treatment building,
clarifier, solids storage tank, site works, work
within and adjacent to existing concrete fish
rearing raceways, grading and restoration.
Treatment plants and associated work at existing
fish rearing raceways will be installed during
operations.
|
|
| Owner Solicitation Name: | Ingineering Inspection Services for the Whiting's Hill 1.38 Million Gallon Storage Tank Project
|
| Owner Name: | Brewer Water Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Be present during all critical aspects of the
construction, and communications with Design
Engineers.
|
|
| Owner Solicitation Name: | Furnish and Install Carpet at the Barron Center
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish and Install Carpet.
|
|
| Owner Solicitation Name: | Sprinkler Installation, Fire Alarm Upgrade, and Ceiling Replacement at Aroostook Hall University of Maine
|
| Owner Name: | University of Maine Systems
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of a fire suppression sprinkler
system and upgrade to the existing fire alarm
system in the entire buildings as well as
installation of new ceiling and light fixtures in
the student rooms. There are alternates to
install floor tiles and pipe insulation within
the same rooms.
|
|
| Owner Solicitation Name: | Sprinkler Installation, Fire Alarm Upgrade, and Ceiling Replacement at Kennebec Hall University of Maine
|
| Owner Name: | University of Maine Systems
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of a fire suppression sprinkler
system and upgrade to the existing fire alarm
system in the entire buildings as well as
installation of new ceiling and light fixtures in
the student rooms. There are alternates to
install floor tiles and pipe insulation within
the same rooms.
|
|
| Owner Solicitation Name: | 2004 Street Opening Final Repair
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair.
|
|
| Owner Solicitation Name: | Concrete Reservoir
|
| Owner Name: | Fort Fairfield Utilities District
|
| Enginner Name: | A. E. Hodsdon Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | Concrete Reservoir.
|
|
| Owner Solicitation Name: | New Transmission Main
|
| Owner Name: | Fort Fairfield Utilities District
|
| Enginner Name: | A. E. Hodsdon Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | 5,800 LF 12" Class 51 DIP water line, 600 LF
3/4" copper service, Bore 60 LF 12" water line
under railroad.
|
|
| Owner Solicitation Name: | Wastewater Treatment Facility Improvements
|
| Owner Name: | Presque Isle Sewer District
|
| Enginner Name: | Wright-Pierce
|
| Plankeeper Name |
|
| Scope: | Wastewater Treatment Facility Improvements.
|
|
| Owner Solicitation Name: | Fleet Maintenance and Repair
|
| Owner Name: | Penquis C.A.P., Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fleet Maintenance and Repair.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, excavation, HMA, pile driving,
concrete, reinforcing steel, welding, RCP, catch
basin, riprap, pavement marking, field office,
signage, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Highway Improvement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clearing, excavation, aggregate subbase, HMA,
culvert, RCP, guardrail, concrete, riprap,
seeding, pavement marking, grader, field office,
mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, excavation, aggregate subbase, HMA,
pile driving, concrete, reinforcing steel,
culvert pipe, guardrail, riprap, seeding,
pavement marking, excavator, field office,
instrumentation, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Overlay and Resurfacing
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Shoulder rehabilitation, aggregate subbase,
culvert pipe, manhole, guardrail, concrete,
erosion control, seeding, pavement marking,
excavator, field office, signage, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Hot Mix Asphalt Overlay
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Shoulder widening, HMA, concrete, culvert pipe,
guardrail, erosion control, seeding, pavement
marking, excavator, field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Crack Sealing
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asphalt Rubber Crack Sealer, Applied - 339,360
LB, Work Zone Traffic Control, Mobilization.
|
|
| Owner Solicitation Name: | Crack Sealing
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asphalt Rubber Crack Sealer and Routing Applied -
39,000 LB, Work Zone Traffic Control,
Mobilization.
|
|
| Owner Solicitation Name: | Re-use/Development of School Admin. Blg.and Grnds
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Re-use/Development of School Admin. Blg.and Grnds.
|
|
| Owner Solicitation Name: | Winding Way Pumpstation Stand-By Generator
|
| Owner Name: | South Portland Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pumpstation Stand-By Generator.
|
|
| Owner Solicitation Name: | Demolition 400 Canal Street
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and removal of structure.
|
|
| Owner Solicitation Name: | Wheeled Loader
|
| Owner Name: | Lewiston, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Wheeled Loader.
|
|
| Owner Solicitation Name: | Greely Middle School Furniture/Equipment
|
| Owner Name: | MSAD #51 Superintendents Office
|
| Enginner Name: | Stephen Blatt Architects
|
| Plankeeper Name |
|
| Scope: | Purchase of classroom and office furniture.
|
|
| Owner Solicitation Name: | Road Striping and Related Services
|
| Owner Name: | Greater Portland Council of Governments
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Road Striping and Related Services.
|
|
| Owner Solicitation Name: | Maine Stay Nursing Home Renovations
|
| Owner Name: | Caring Unlimited
|
| Enginner Name: | Joy & Hamilton Architects, Inc.
|
| Plankeeper Name |
|
| Scope: | Home Renovations.
|
|
| Owner Solicitation Name: | Furnish/Install Fence at VariousAthleticFacilites
|
| Owner Name: | Portland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish/Install Fence at
VariousAthleticFacilites .
|
|
| Owner Solicitation Name: | Plant Mixed Recycled Asphalt with Foamed Asphalt (Stockpiled)
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Plant Mixed Recycled Asphalt Pavement with Foamed
Asphalt (Stockpiled) - 12,000 CY, Mobilization.
|
|
| Owner Solicitation Name: | Crew Quarters Building
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 26x60 crew quarters building and other incidental
work. Wood frame building with a wood truss
constructed roof.
|
|
| Owner Solicitation Name: | Bridge Replacement
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, excavation, HMA, pile driving,
steel, mobilization, concrete, drainage,
guardrail, riprap, seeding, pavement marking,
excavator, field office, signage.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Overlay
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | HMA, excavator, field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Bridge Rehabilitation
|
| Owner Name: | Maine State Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge work, railings, excavation, structural
steel, fabrication, riprap, seeding, excavator,
field office, mobilization.
Please see attached file for the entire list of
bid items.
|
|
| Owner Solicitation Name: | Janitorial and Mechanical Maintenance Services at the U.S. Border Station in Jackman
|
| Owner Name: | General Services Administration
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial and Mechanical Maintenance Services.
|
|
| Owner Solicitation Name: | Portland Hall Life Safety Fire Alarm Upgrade University of Southern Maine
|
| Owner Name: | Board of Trustees University of Maine System c/o Mr. David Schurman
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install Fire Alarm and Security Upgrade.
|
|
| Owner Solicitation Name: | Dirigo Drive Reconstruction
|
| Owner Name: | Old Orchard Beach, Town of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Reconstruction of 2,800 LF of road involving the
installation of aggregate subbase, aggregate
base, bituminous pavement, rip rap, ditching,
culverts, erosion control measures, loam and
seed, the raising of existing utilities.
|
|