| Owner Solicitation Name: | Bridge Rehabilitation and Replacement
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge rehabilitation and replacement.
|
|
| Owner Solicitation Name: | Repair Various MQ’s (Phase 3),
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply of labour, material, supervision and
equipment necessary to complete repairs.
|
|
| Owner Solicitation Name: | Slope Stabilization
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Slope stabilization - the length: 0.3 KM, the
work involves 27 000 T of 600 mm rip-rap, 1,000 T
of granular base course & installation of
300 M of cable guardrail.
|
|
| Owner Solicitation Name: | 2004 Sewer Cleaning and Inspection for Residential and Regional Streets to be Rehabilitated in 2004
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Dillon Consulting Ltd.
|
| Plankeeper Name |
|
| Scope: | Sewer cleaning, wastewater sewer, reverse set-up
cleaning, catch basin cleaning, solid derbis
cutting, addition solid derbis cutting, removal
of intruding services, sewer inspection, land
drainage sewer, manhole inspection, reserse set-
up inspection.
|
|
| Owner Solicitation Name: | Fairfield Park Local Improvement District Stormwater Retention Pond and Appurtenances
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clearing, grubing, excavation and disposal of
eatrh, supply and installation of land drainage
sewer, manhole, riser, catch basins, catch bain
leads, LDS plugs, outfalls, concrete collar,
culvert, abandon existing manholes, abandon &
plug control structures, abandon existing
culvert, regrade existing ditch, revetment, stone
rip-rap, vehicle access to the lake.
|
|
| Owner Solicitation Name: | Road Improvements
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The length of the project is 2.0 KM. The work
involves 16,000 M3 of solid rock excavation,
50,000 T of shot rock, 20,000 M3 of waste
excavation, 9,000 T of granular fill & 4,500 T of
supplied traffic gravel.
|
|
| Owner Solicitation Name: | Redevelopment and Expansion of the City of Brandon Sportsplex
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Redevelopment and expansion.
|
|
| Owner Solicitation Name: | Demolition of 1375 Fairfield Avenue
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of the house.
|
|
| Owner Solicitation Name: | Temporary Salt Storage Facility
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Including demolition of site, Portland cement
concrete paving, steel and concete reinforcement,
cast-in-place concrete, 100 mm curbs, slabs and
ramps, formwork, noid forms, sleeves, anchors,
mics. metal, masonry, concrete paving, minor
electrical demolition and remodeling.
|
|
| Owner Solicitation Name: | Salt Storage Facility
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of temporary salt storage facility,
including portal cement and concrete paving,
concrete reinforcement, cast-in-pace conrete,
curbs, slas, ramps, masonry, joint sealers, minor
elektrical demelition for remodeling.
|
|
| Owner Solicitation Name: | Renovate Equipment Storage Building
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of concrete foundation and
construction of new concrete floor, replacement
of overhead doors, carpentry and electrical work.
|
|
| Owner Solicitation Name: | Replace Intrusion and Fire Alarm Detection System
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work includes, but is not necessarily limited
to the supply of labour, material, supervision
and equipment necessary to install prepurchased
equipment, supply of all additional material,
labour, software and supervision to replace the
existing fire alarm system, central monitoring
and control systems software, computers, local
control units, intermediate control units, and
communication links of the existing intrusion
alarm and detection system.
|
|
| Owner Solicitation Name: | Upgrade POL Facilities
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work includes, but is not necessarily limited
to the supply of labour, material, supervision
and equipment necessary to upgrade facility by
moving two self contained fuel tanks from an
existing site to the new site complete with
gravel pad.
|
|
| Owner Solicitation Name: | Supply and Delivery of Welding, Rods and Gases
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | CSA Approved wire - rod MIG mild steel, hard
surfacing rods, stainless steel specialty rods,
welding gases.
|
|
| Owner Solicitation Name: | Stockpiling Traffic Gravel
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves 8 000 M3 of aggregate.
|
|
| Owner Solicitation Name: | Contract B - Kirkcaldy Underground
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and installation of watermain, wastewater
sewer, land drainage piping and associated work.
|
|
| Owner Solicitation Name: | Supply and Delivery of Lumber
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of Lumber.
|
|
| Owner Solicitation Name: | Bituminous Pavement
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The length of the project is 14.0 KM. The work
involves 22,900 T of granular fill, 58,000 T of
granular base course & 19,300 T of bituminous
pavement.
|
|
| Owner Solicitation Name: | Riverbank Work and Conrete Dock Facilities
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Scatliff+Miller+Murray
|
| Plankeeper Name |
|
| Scope: | Construction of a permanent concrete dock
structure, including site development work, such
as earthwork, grading, asphalth paving and suplly
and installation of tyndall block retaining wall.
|
|
| Owner Solicitation Name: | Demolition of Five (5) Married Quarters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work includes, but is not necessarily limited
to the supply of labour, material, supervision
and equipment necessary to demolish five (5)
Married Quarters.
|
|
| Owner Solicitation Name: | Water Treatment Facility Waste Residuals Utilization Program
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Water Treatment Facility Waste Residuals
Utilization Program.
|
|
| Owner Solicitation Name: | Supply and Installation of HotWater System Piping
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Installation of HotWater System Piping.
|
|
| Owner Solicitation Name: | Pruning Services - Exchange District
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Tree Pruning Services.
|
|
| Owner Solicitation Name: | Aquaatic Risk Management Plan
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Aquaatic Risk Management Plan.
|
|
| Owner Solicitation Name: | Strathmillan/Moorgate Combined Sewer Relief Contract 4
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | UMA Engineering Ltd.
|
| Plankeeper Name |
|
| Scope: | Land drainage sewer, manhole, new manholes, cath
basins, cath pits, sewer services, sewer service
risers, manhole and catchbasin repairs,
connecting existing catchbasin and sewers,
forcemain connection, abandoning existing
manholes, catchbasin, plugging existing sewer and
sewer services smaller than 300 MM, abandoning
existing sewer with flowable fill, removal of
existing manholes, comminutor chamber, junction
chamber inc. 400 MM, sewer inspection,concrete
pipe, cement stabilized fill, riprap, concrete
and asphalt pavement, replacement of concrete and
asphalt pavement, installation of iron lifter
ring inserts, hot mix asphaltic concrete pavement
and lanscaping.
|
|
| Owner Solicitation Name: | Consulting Services to Review the City of Brandon's Benefit Program
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consulting Services to Review the Benefit Program.
|
|
| Owner Solicitation Name: | Rough in of Plumbing - Rough in of Electrical - Rough in of Heating System - General Carpentry
|
| Owner Name: | Riverton, Village of - Transportation & Heritage Centre Inc
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rough in of plumbing, rough in of electrical,
rough in of heating system, general carpentry.
|
|
| Owner Solicitation Name: | 2003 Outfall Maintenance Program - Outfall Repairs and Riverbank Stability Improvements
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site development and restoration, supply and
installation of hand rails, supply and
installation of 1219 MM diameter derbis grate,
rockfill riprap, soding using imported topsoil,
supply and installation of 450 MM CMP pipe,
clearing and grubing, remove existing 1050 MM
diameter CMP and replace with new 2.8 MM 1050 CMP
pipe, geotextile, excavation,
|
|
| Owner Solicitation Name: | Demolition of 527 Pacific Avenue and 810 Wellington Avenue
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of 2 houses.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance and minor improvement work on family
housing units, carpentry, roofing, concrete and
foundation repair.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Minor cleaning work on family housing units.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Minor electrical work on family housing units.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Minor heating work on family housing units.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Minor hardwood flooring work on family housing
units.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Minor landscaping & tree pruning work on family
housing units.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Minor plumbing work on family housing units.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Minor painting work on family housing units.
|
|
| Owner Solicitation Name: | Maitenance and Minor Improvements Services on Married Military Quaters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Minor vinyl flooring and carpeting work on family
housing units.
|
|
| Owner Solicitation Name: | Replacement of the Montcalm Pumping Station River Crossing
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of Pumping Station River Crossing by
directional drilling.
Mobilization and demolization to the site, 600
diameter HDPE by horizontal directional drilling,
connecting HDPE forcemain to existing discharge
manhole, connecting HDPE forcemain to existing
piping at the pumping station, abandon existing
forcemain, shaft excavation at the pumping
station, shaft excavation at the discharge
manhole.
|
|
| Owner Solicitation Name: | Depositing and Stockpiling Aggregate
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves 24,850 T of aggregate.
|
|
| Owner Solicitation Name: | Supply and Delivery of Cement, Portland (Bagged) - Type 10 & 50 in 40 KG bags
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of Cement, Portland 40 KG,
225 bag and cement type 50 sulphate resistant
Portland 40 KG 750 bag.
|
|
| Owner Solicitation Name: | Supply and Delivery of Aluminum Sign Blanks
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of Aluminum Sign Blanks.
|
|
| Owner Solicitation Name: | Construction of Lake 4-10 Lakeshore Revetment Maintenance Work
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Revetment surface course placement 660T,
preparation of sub-grade 396 M3, supply and
installation of fabric blanket 1,760 M2, sodding
using imported top soil 320 M2.
|
|
| Owner Solicitation Name: | Replace Electrical, Various Married Quarters
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace Electrical.
|
|
| Owner Solicitation Name: | Supply and Delivery of A Cutaway Van Body with Chassis
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of A Cutaway Van Body with
Chassis.
|
|
| Owner Solicitation Name: | Depositing and Stockpiling Aggregate
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves 23,425 t of aggregate.
|
|
| Owner Solicitation Name: | Jacking Concrete Culverts
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work invloves 2 installations of 1,350 MM
diamter x 34 M concrete culverts.
|
|
| Owner Solicitation Name: | Depositing and Stockpiling Aggrerate
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves 28,385 T of aggregate.
|
|
| Owner Solicitation Name: | Electrical Service Upgrade Phase 2, Various Schools
|
| Owner Name: | Winnipeg School Division No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical Service Upgrade Phase 2 at Various
Schools.
|
|
| Owner Solicitation Name: | Supply of Boulevard Sod for the Year 2004
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply of Boulevard Sod, 15,000 SM Mineral Sod.
|
|
| Owner Solicitation Name: | Sayisi Dene First Nation - New Water and Sewer System
|
| Owner Name: | Association of Manitoba Municipalities
|
| Enginner Name: | UMA Engineering Ltd.
|
| Plankeeper Name |
|
| Scope: | Construction of approximately 5,100 M of
watermain, 2,700 M of gravity sewer, 1,200 M of
forcemain, 2 lift stations, 75 service
connections, sludge beds, modifications to the
community's supply system and related works.
|
|
| Owner Solicitation Name: | Richardson Centre for Functional Foods and Neutraceuticals
|
| Owner Name: | University of Manitoba
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | PRE-QUALIFICATION.
General, Mechanical and Electrical Contractors to
for the new Centre. The new three storey, approx
55,000 SF building.
|
|
| Owner Solicitation Name: | Hauling and Land Application of Biosolids from the North End Water Pollution Control Centre
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hauling, road gravel, ditch cleaning, ditch
crossing, dust control.
|
|
| Owner Solicitation Name: | Ammonia Ice Plant Replacement at Eric Coy Arena - 535 Oakdale Drive
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | DESIGN-BUILD.
Evaluation of the existing ice plant components
and operation, desing a new complete ice plant
utilizing new existing components based on
operating conditions provided for this
facilities, demolition, construction,
installation and commissioning of all new and
existing components for the provided facilities,
demolition, construction, installation and
commissioning of all new and existing components
for the complete ice plant replacement.
|
|
| Owner Solicitation Name: | Supply and Delivery of Electrical, Remanufactured Components (Transit Parts) - Armature, Solenoid Kit, Stator, Coil
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of Electrical, Remanufactured
Components (Transit Parts) - Armature, Solenoid
Kit, Stator, Coil
|
|
| Owner Solicitation Name: | Supply One (1) Landfill Compactor and Sale of Two (2) Used Landfill Compactors
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply One (1) Landfill Compactor and Sale of Two
(2) Used Landfill Compactors.
|
|
| Owner Solicitation Name: | Six (6) New 1/2 Ton Trucks, Extended Cab, Short Box
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Six (6) New 1/2 Ton Trucks, Extended Cab, Short
Box.
|
|
| Owner Solicitation Name: | Supply and Delivery of 28 Horsepower Outfront Mowers
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of 28 HP Outfront Mowers with
Rear Discharge and 60" deck, 28 HP Outfront
Mowers with Rear Discharge and 72" deck completed
set of all tires, rollers, wheels and scalping
rollers, completed with applicable rims for
tractor and mower deck.
Snowblower and Enclosed Cab.
Type of tractor: KUBOTA F 3060, John Deere 1445,
Toro 328 - D.
|
|
| Owner Solicitation Name: | Garden Hill Nursing Station Renovation and New Residence Construction
|
| Owner Name: | Garden Hill First Nation
|
| Enginner Name: | Ingram Consulting Ltd.
|
| Plankeeper Name |
|
| Scope: | Renovations to the existing Nursing Station and
construction of a new residence project.
|
|
| Owner Solicitation Name: | Jacking Concrete Culverts
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves supplying & installing 62.2 M
of 750 MM diameter pipe.
|
|
| Owner Solicitation Name: | Pole Digging and Installations for the 2004 Season
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pole Digging and Installations.
|
|
| Owner Solicitation Name: | M102 / WATC Consolidation
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work includes, but is not necessarily limited
to the supply of labour, material,supervision and
equipment necessary to renovate.
|
|
| Owner Solicitation Name: | Community of Brochet Water Treatment Plant and Sewage Lagoon
|
| Owner Name: | Barren Lands First Nation
|
| Enginner Name: | Ininew Project Management Ltd
|
| Plankeeper Name |
|
| Scope: | The project consists of: lake intake and
pumphouse, a 9.2 L/S water treatment plant with
concrete reservoir, interconnecting piping,
modifications to water distribution system
including heat recovery, and related work and
sewage lagoon with 122,000 CM. of stripping,
60,000 CM. of common excavation, and a 133,000
SML, approximately 950 M of gravity sewer and
5,600 M of forcemain and other underground
piping, 3 lift stations, 2 bay truck garage,
decommissioning the existing lagoon and EA sewage
plant, and related work.
|
|
| Owner Solicitation Name: | Demolish Headingley TX Building at RM of Headingley, 17 Wing
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work includes, but is not necessarily limited
to the supply of labour, material, supervision
and equipment necessary for the demolition of
building and foundations. To backfill all
demolished and removed areas. All areas to have
positive land drainage and slope once complete
and to remove all hazardous materials as
indicated.
|
|
| Owner Solicitation Name: | Jacking Concrete Culverts
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supplying & installing 41.5 m of 900 mm diameter
pipe.
|
|
| Owner Solicitation Name: | Miscellaneous Metal
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supplying & fabricating 6,000 KG of miscellaneous
metal for a bridge.
|
|
| Owner Solicitation Name: | Install UV/IR System, Hangar 11
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply of labour, material, supervision and
equipment necessary for the furnishing of all
labour, materials, equipment and supervision
required to install fully complete UV/IR system
for a fire alarm detector.
|
|
| Owner Solicitation Name: | Disposal of Side Loading Refuse Packers
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Disposal of Side Loading Refuse Packers.
|
|
| Owner Solicitation Name: | Two (2) New Loaders 2.5 Y with Trade-Ins or Sale of Two (2) Used Loaders
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Two (2) New Loaders 2.5 Y with Trade-Ins or Sale
of Two (2) Used Loaders.
|
|
| Owner Solicitation Name: | One (1) New Articulating Motor Grader
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | One (1) New Articulating Motor Grader.
|
|
| Owner Solicitation Name: | One (1) New Track Type Excavator 20,000 KG Class and One Trade-In or Sale of Used Unit
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | One (1) New Track Type Excavator 20,000 KG Class
and One Trade-In or Sale of Used Unit.
|
|
| Owner Solicitation Name: | Supply One (1) New Class 8 Tandem Axle Truck Cab & Chassis with Trade-In or Sale of One Used Truck
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply One (1) New Class 8 Tandem Axle Truck Cab
& Chassis with Trade-In or Sale of One Used Truck.
|
|
| Owner Solicitation Name: | Supply and Install HVAC System – N118
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply of labour, material, supervision and
equipment necessary to replace the HVAC system.
|
|
| Owner Solicitation Name: | Depositing and Stockpiling Aggregate
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Depositing and Stockpiling Aggregate, The work
involves 30,500 T of aggregate.
|
|
| Owner Solicitation Name: | Supply and Delivery of a 100 Foot, Rescue Ladder Platform Fire Truck
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of a 100 F, Rescue Ladder
Platform Fire Truck, Thermal Imager, 1 - 100 F,
8 - 13/4' (45 MM) Jump Line c/w Pistol Grip
Nozzle, 8 - 50 F lenghts of 21/2' Hose, 10 - 50 F
lenghts of 21/2' Hose, 6 - 50 F lenghts of 5'
Hydrant Connection hose, one water Thief - 2 1/2
to 2X 1 1/2 and 1X 1/2 gated, one 4' ti 2 1/2'
gated "Y", 2 - double male 2 1/2' adapters, 2 -
double famele adapters, 2 - 4' to 5' storz
adapters, 4' storz to 3 1/2' male adapters 2 1/2
to 1 1/2' reducer, 3 - hose hangers, 2 - 2 1/2'
Akron Fog nozzle, 4' storz to 1 1/2', hydrand
gate, 7 - assorted Storz keys, 3 - 2 1/2 keys,
little giant ladder, 2- 16 F roof Ladder, 10 F
folding ladder, 2 - 6 F pike poles, 2 - 8 F pike
poles, 2 - 12 F pike poles, 2 - 24 F extension
ladder, square head sholves, stokes rescue
basket, 4 - MSA SCBA 4500 psi, hydraulic spreader
with connector hose, hydraulic saw, hydraulic cut
off tool 20 F of hydraulic hose and manifold,
hydrant connecton.
|
|
| Owner Solicitation Name: | Supply and Installation of Closed Circuit Security Camera System Brady Road Landfill
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Earth Tech In.
|
| Plankeeper Name |
|
| Scope: | Supply and Installation of Closed Circuit
Security Camera System as follows: digital video
system and matrix switchers, vidoe vault
containing 12 camera rack mounted digital video
recorder with 17" monitor, power conditioning
UPC, console equipment and racking, RS232 to
RS422 converter, training set-up and programming
od equipment, supply and installation 1 interior
high resolution colour camera, 2 exterior high
resolution colour cameras with enviromental
enclosures, existing cameras, presently mounted
on the office building, to remain in current
position. This camera to be connected to the new
digital video vault equipment. Supply and
installation of two exterior cameras to be
located on a mound east of main entrance area.
Provide all mounting brackets and connections.
Camera to be highly resolution colour with
enviromental enclosures, suitable for tower or
pole mounting with fibre optic connection to main
digital vault equipment. Tower camera to be
complete with fibre optic transmitter and
receiver, electronid box, fibre optics
terminations and patch cables.Provide 120 V power
supply from office building to towre and install
in trech with fibre optic cables.
|
|
| Owner Solicitation Name: | Depositing and Stockpiling Aggregate
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves 36,215 T of aggregate.
|
|
| Owner Solicitation Name: | Supply Recast Prestressed Concrete Panels - Bridge Rehabilitation over Fairford River
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply Recast Prestressed Concrete Panels -
Bridge Rehabilitation.
|
|
| Owner Solicitation Name: | Miscellaneous Metal and Structural Steel Bridge Rehabilitation over Fairford River
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Miscellaneous Metal and Structural Steel Bridge
Rehabilitation. The work invoves 9,808 KG of
Structural Steel.
|
|
| Owner Solicitation Name: | Liquid and Solid Garage Pit Waste
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pumping out and disposing of liquid and solid
waste from garage pits and lift stations.
Section A - removal of liquid and solid waste non-
petroleum contaminated material, petroleum
contaminated material, disposal of non-petroleum
contaminated solid waste, disposal of petroleum
contaminated liquid waste, disposal of non-
petroleum contaminated liquid waste.
Section B - Fire paramedic lift station, remove
and dispose of waste water and related material,
clear a block drain of roos or other obstructions.
Removing sand and sludge from the various
separatos and holding tanks, skim diesel fuel
from the separator tank into a 250 gallon holding
tank.
|
|
| Owner Solicitation Name: | Road Grading and Snow Plowing
|
| Owner Name: | Cornwallis, Rural Minicipality of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Approximately 200 Miles of graveled roadway and 9
miles of hard surfaced roadway.
|
|
| Owner Solicitation Name: | Supply and Delivery of Traffic Signal Heads, Bracket Arm and Shoe Assembly
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of 1,000 Traffic Signal
Heads, Bracket Arm and Shoe Assembly.
|
|
| Owner Solicitation Name: | Sewer and Water Works
|
| Owner Name: | God's Lake First Nation
|
| Enginner Name: | SEG Engineering Inc.
|
| Plankeeper Name |
|
| Scope: | Watermains, gravity sewers, water & sewer
services, rock blasting, a sewage lift station,
sewage forcemain, miscellaneous road works, water
treatment plant, and sewage treatment plant.
|
|
| Owner Solicitation Name: | Four New Outdoor Playground Structures (Two Types/Styles A and B)
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Four New Outdoor Playground Structures.
|
|
| Owner Solicitation Name: | Interior Renovations at Red River College
|
| Owner Name: | Red River College
|
| Enginner Name: | Friesen Tokar Architects
|
| Plankeeper Name |
|
| Scope: | Interior renovations of approximately 600 SM.
|
|
| Owner Solicitation Name: | Supply of Trees & Shrubs
|
| Owner Name: | Portage la Prairie, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply of Trees & Shrubs.
|
|
| Owner Solicitation Name: | Supply of Used 1/2 T Truck Extended Cab 4x4
|
| Owner Name: | Portage la Prairie, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply of Used 1/2 T Truck Extended Cab 4x4.
|
|
| Owner Solicitation Name: | Bituminous Pavement
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The length of the project is 21.7 KM. The work
invovles 48,000 M3 of excation, 84,200 T of
granular base course and 49,250 T of bituminous
pavement.
|
|
| Owner Solicitation Name: | Moveable Modular Classroons
|
| Owner Name: | Government of Manitoba - Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Moveable Modular Classroons.
|
|
| Owner Solicitation Name: | Supply and Installation of Cured-in-Place Pipe Bracket (CIPP)
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | UMA Engineering Ltd.
|
| Plankeeper Name |
|
| Scope: | Supply and installation of CIPP to perform sewer
rehabilitation by trenchless methods.
|
|
| Owner Solicitation Name: | Supply and Delivery of Four Wheel Drive Garden Tractor
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Four Wheel Drive Garden Tractor, 47front mount
blower, 60" rear mount blade, 50" rotarybroom,
cab. Four Wheel Drive Garden Tractor, 54", 3Blade
mid mount mower, front end loader, 50" roraty
broom.
|
|
| Owner Solicitation Name: | Supply and Delivery of Asphalt, Hot Mix for Paving Operations
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asphalt, Hot Mix type 1A - 25,000 T, Asphalt, Hot
Mix type 2 - 1,000 T, Asphalt, recycle mix 10%
Rap - 500 T.
|
|
| Owner Solicitation Name: | Supply of Asphalt, Hot Mix for Patching Operations
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1,000 T asphalt, type IA, 4,000 T asphalt, type
2, 50 T asphalt, type 3.
|
|
| Owner Solicitation Name: | Dr. Morley R. Kare Park New Planting and Site Improvements
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove existing gravel paved area, timber edging,
relocation of 2 benches and supply and install
new sod, remove soccer goal posts and repair sod
damade, supply and construct new dedication
plaza, new viewing platform and park entrances,
Colorado spruce tree 1,200 MM - 40, Colorado
spruce tree 1,830 MM - 15, Backhills spruce trees
1,220 MM - 35, Scots pine trees 1,220 MM - 24,
Siberian larch trees 1,220 MM - 41, Manchurian
ash trees 50 MM - 35, Patmore ash trees 50 MM -
2, Northwest poplar trees 50 MM - 10, plains
cottonwood tree 50 MM - 10, black walnut trees 50
MM - 8, butternut trees 50 MM - 7, Laurel leaf
willow trees 1,220 HT - 22, Golden willow trees
1,220 HT - 7, Northern foutain weeping willow
treees 1,220 MM - 8, Ameerican mountain ash trees
50 MM - 5, Japanese tree lilac 1,830 << - 8, Amur
maple 1,830 MM - 24, Common hackberry seedlings
300 MM - 18, Bur oaf seedlings 300 MM - 60,
Littleleaf lilac 500 MM - 9, Dwarf burningbush
500 MM - 20.
|
|
| Owner Solicitation Name: | Supply and Delivery of Cement, Portland Concrete
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3,000 CM type 1 concrete - hand placement, 100 CM
with fly ash, 1,400 CM type 2 concete, 100 CM
with fly ash, 1,000 CM concrete for early
opening. 500 CM - 72 huor, 2,000 concrete for
temporaly restoration of utility cuts, 2,000 CM
cement stablilized fill no fly ash, 25 CM with
fly ash, 50 CM sulphate resistant mix type A
structural, 35 CM type B other, 25 CM paving
stone mix, 25 CM flow able fill.
|
|
| Owner Solicitation Name: | PRHA - Primary Health Units
|
| Owner Name: | Parkland Health Region - Swan River Valley Health Centre
|
| Enginner Name: | Friesen Tokar Architects
|
| Plankeeper Name |
|
| Scope: | The construction of a wood frame, one storey
(crawlspace) Primary Health Unit, of
approximately 140 SM (1,500 SF).
|
|
| Owner Solicitation Name: | Supply and Delivery of Asphalt, Emulsified
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 200 T Asphalt emulsified HF 150 S, 60,000 L
asphalt emulsified RS 1, 10,000 L asphalt
emulsified RS 1 winter blend, 2,050 L asphalt
emulsified SS 1, 10 drum deposit.
|
|
| Owner Solicitation Name: | Marj Edey Park Landscape Plantings and Granular Walk Instalation
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Installtion of trees and granular
walkways. 600 SM crushed limestone paving, 2
corrugated steel pipe culvetrs, 4 wood bollards,
15 colorado spruce tree, 1,220 MM, 8 colorado
spruce tree, 1,830 MM, 26 American basswood
trees, 50 MM, 10 Dropmore linden trees 50 MM, 29
fallgold black ash tree 50 MM, 16 summit ash
treet 50 MM, 6 manchurian ash tree 50 MM, 25
patmore ash tree 50 MM, 17 northern treasure ash
trees 50 MM, 23 northwest poplar tree 50 MM,
common hackberry tree 50 MM, 17 golden willow,
1,220 MM, 7 northern fountain weeping willow,
1,220 MM.
|
|
| Owner Solicitation Name: | Supply and Installation of Records Management Software
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Software must include licences for two
application administrators and minimun of 60 end-
users, the capability to print both black an
dwhite and colour coded stip labels with
barcodes. The system must have standard feature
to batch select and print labels using the
criteria of the individual who the record and
then via date created, must allow the users to
select from multiple label design, the alibity to
do QBE searchers, with ability to save the search
criteria, ability to export data into CSV or HTML
format, ability to assign individual user
security rights for all levels of funcionality
across the system, must have Reservation Request
funcionality, must have Reservation Request Log,
must be abl eto print, pick list and out guide
slips, must have Library of standards reports,
refine the scope of the data t be reported on,
the reports must have the option to display via
screen and print or to just print, must interface
with Crustal Reports for ad-hoc reporting, must
have User Definable Retection, must scheduled
record destruction and ability to automaticlly
mark items that have been destroyd with date of
destruction, must keep the complete audit of all
folders an dbox movements, must have the option
to be deployed via a Web Edition that Utilizes
Microsoft IIS and standard Internet browser, must
utilize either MSDE or MS-SQL databeze,
capability of automated exchanges of data between
ODBC compliant database, must have solution to
allow for additional EDMS and additional record
management funcionality .
|
|
| Owner Solicitation Name: | Supply and Delivery of a Fork Lift
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Delivery of One Fork Lift (04-007),
new 2003, Propane Powered. Shall be equipped with
normal 60 HP, water cooled engine, c/w catalic
muffer. Transmission - automatic, single speed
rofward and reverse, cooling system - automative,
style radiotor with pump, winterized to 25
Celsius, propane fuel tank - lines and regulatoe
required, tank not required, alternator - nominal
80 AMP, battery - minimum 800 CCA, three stage
mest, with minimum lift 15 F, hydraulic and lift
chain, lift capacity of 6,000 Pounds, fork -
nominal extension of 42 ", witk 4 wheels, c/w
pneumatic tires, brakes - self adjasting, self
energizing, 4 wheel drum brakes, capable to
operate in warehouse with 11 F aisle, hydraulic
suspension, comparment shoul be wide, ease
access, anti slip steps, and hand grips, both
sides, removable roof, heavy duty floor matting,
heater (minimum 20,000 BTU)to have defrosting
capability, lighting, seat fully adjustable, fork
lift shall be passing under 8 F, back - up arm
required, equipped with Standard Instrumantation
such as hour meter, fuel gauge, water temperature
gauge, oil temperature indicator, audible alarms.
|
|
| Owner Solicitation Name: | Alexander Dock - South Half Dock Rehabilitation
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mobilization and demobilization, 9,000 SF removal
and disposal of existing deck, supply and
installation of new stringers (4"x10" - 16'
span), 9,000 SF supply and installation of new
deck planks, replacement of slipway sidewalls,
275 LM installation of waterside curb, re-
anchoring of existing bollars, removal of timber
guard fence and chainlink fence, 1,600 SF
replacement od damaded waterside skirting, 2,800
LF supply and installation of timber piles,
removal and re-installation of timber pilecap
beams, removal of timber pilecap beams, supply
and installation of W200x27, excavation and
disposal of riverbank material below dock.
|
|
| Owner Solicitation Name: | Construction of the Water and Sewer Extensions
|
| Owner Name: | Cross Lake First Nation
|
| Enginner Name: | SEG Engineering Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of 1,200 M of watermains, 1,200 M of
wastewater sewers, 41 building services.
|
|
| Owner Solicitation Name: | St. Anthony's Hospital Security System Upgrades
|
| Owner Name: | NOR-MAN Regional Health Authority
|
| Enginner Name: | MCW/AGE Consulting Professional Engineers
|
| Plankeeper Name |
|
| Scope: | Hospital Security System Upgrades.
|
|
| Owner Solicitation Name: | Edward Shindleman Park Landscape Plantings and Gravel Walk Installation
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Crushed limestone paving, CSP culvert, 300 MM x
4,800 MM, CSP culvert, 400 MM x 7,200 MM,
relocate one wood bollard and install chain over
vehicle access pt, 38 Colorado spruce terr, 1,220
MM, 24 Colorado spruce tree, 18,300 MM, 10
American basswood trees, 50 MM caliper, 10
Dropmore linden trees, 50 MM caliper, 8
Manchurian ash trees, 50 MM caliper, 10 Patmore
ash trees, 50 MM caliper, 11 Northwest poplar
trees, 50 MM caliper, Install 2 picnic table,
grnular paving, supply and install 85 SM
interlocking paved entarnce plaza to existing
playstructure area.
|
|
| Owner Solicitation Name: | Reconstruct N-114, Parking Area and Louisburg Drive
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply of labour, material, supervision and
equipment necessary to reconstruct parking area
and to replace water/sewer lines, road, sidewalks
and driveways.
|
|
| Owner Solicitation Name: | Heating System Upgrade Benito School
|
| Owner Name: | Swan Valley School Division
|
| Enginner Name: | MCM Architects Inc
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of unit Ventilators,pumps
and piping and boilers,including asbestos
abatement.
|
|
| Owner Solicitation Name: | Drain Cleanig
|
| Owner Name: | Defence Construction Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance and minor improvement work on family
housing units.
|
|
| Owner Solicitation Name: | Hauling of Granular Construction Materials
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hauling of Granular Construction Materials.
|
|
| Owner Solicitation Name: | Supply and Delivery of Engine Additive Coolant (Pencool)
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 20 Supply and Delivery of Engine Additive Coolant
(Pencool)and 20 Drum deposit.
|
|
| Owner Solicitation Name: | Depositing and Stockpiling Aggregate
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves 41,000 T of aggregate.
|
|
| Owner Solicitation Name: | 2004 Bridge Maintenance - Assiniboine Park Pedestrian Bridge North Approach, Remedial and Related Works
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge North Approach, Remedial and Related Works.
|
|
| Owner Solicitation Name: | Removal and Pruning of Trees
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pruning of Trees and Removal to a designed
landfill site. chip and remove, burn, complrtely,
on site, the burning site must be acceplable ( in
writting) to proper owner and burning permit must
be obtained.
|
|
| Owner Solicitation Name: | Supply and Application of Dust Control Products for the Gravel Roads, Shoulders and Lanes
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and Application of Dust Control Products
for the Gravel Roads, Shoulders and Lanes.
|
|
| Owner Solicitation Name: | One new Four Post Transport Wheel Lift
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | One new Four Post Transport Wheel Lift.
|
|
| Owner Solicitation Name: | Fairgrove Bay Park - Parking Lots Development
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and removal, asphaltic paving, line
paving, bumper curbs, sodding, supply and
installation of wood bollards fencing.
Installation of asphalt parking areas, for 44
stalls, completed with pre-cast concrete bumper.
|
|
| Owner Solicitation Name: | Provision of Elm Tree Injections
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pruning of therapeutically injected trees,
including prunning, proper removal of all
incidental derbits resulting from operation and
disposal of all incidental debris.
|
|
| Owner Solicitation Name: | Supply and Install Freight Elevator
|
| Owner Name: | Public Works & Government Services Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and installation of a freight elevator
that will service two floors and a mezzanine in
the P block mechanical building. The elevator
will be installed utilizing the existing elevator
pit, mechanical room, and steel structure
constructed at the time of the original building
construction. Included in this project is the
construction of the rated elevator shaft.
|
|
| Owner Solicitation Name: | 2004 Watermain Renewals Contract No. 1 Logan Avenue, Trinity Street to Rita Street
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Watermain Renewal - 150 MM, trechless
installation, Class B sand bedding, Class 3
backfill, 200 MM trechless installation, Class B
sand bedding, Class 3 backfill, 250 MM trechless
installation, Class B sand bedding, Class 3
backfill, 300 MM trechless installation, Class B
sand bedding, Class 3 backfill.
Hydrant assemby, watermanain valve, 150 MM, 200
MM, 250 MM, 300 MM.
Watermain valve on existing watermain, 250 MM.
Fittings - crosses, 300 MM x 300 MM x 250 MM x
250 MM and 300 MM x 300 MM x 300 MM x 300 MM.
Tees - 300 MM x 300 MM 150 MM, 300 MM x 300 MM x
200 MM, 300 MM x 300 MM x 250 MM, 300 Mm x 300 MM
x 300 MM.
Bends - 150 MM, 250 MM, 300 MM. Reducers - 200
MM - 150 MM, 250 MM - 150 MM, 300 MM - 150 MM,
300 MM - 250 MM, 450 MM - 300 MM, 500 MM - 300
MM. Connection to existing watermains, in-line
connection, no plug existing, connecting to
existing watermains with tapping sleeves ansd
valves, water service, corporation stops, curbs
stops, curbs stops boxes, continuity bonding,
sacrificial zinc anodes on metalic watermains,
regrading existing sewer services, salvage
existing 500 MM gate valve, maintaining curb stop
excavations, cement stabilized backfill material,
full depth partial patches, removal 150 MM and
200 MM reinforce concrete pavement, installation
150 and 200 MM reinforce concrete pavement,
concrete slab removal, sidewalks, construction of
temporary concrete patch, asphaltic concrete
overlay, paving, sodding.
|
|
| Owner Solicitation Name: | 2004 Residential Street Renewals - Part 1
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Excavation, sub-grade compaction, crushed sub-
base material - 1,390 T 50 MM limestone, 230 M3
supply and place base course material, 1,275
grading, 2,550 separation and reinforcement
geotextile fabric, roadworks, concrete pavement,
drilled tie bars, concrete slab renewal,
sidewalks, adjustment od precast sidewalk blocks,
supply of precast sidewalk blocks, construction
of asphaltic concrete overlay, tie-in approches,
planning and pavement, median slabs, bull-noses,
curb and gutter, spalsh strips, construction of
barrier, modified barrier, rapm curb, limb curb,
joint and crack sealing, reflective crack
maitenance, drainage, catch basin, sewer service,
manhole frame, monhole cover, connecting
existinf sewer, 250 MM PVC pipe, 300 MM concrete
storm sewer, 375 MM concrete combined sewer,
removal existing catchbasin, installation of sub
drains, adjustmnet of existing catchbasin and
manholes, existing watermain, installation of
watermain valve box, adjustable of existing curb
stop boxes, sooding and landscaping, slab
replacement.
|
|
| Owner Solicitation Name: | Supply and Delivery of Grass Seed
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 250 KG Athletic ground and golf course fairways,
a mixture composition, 8,375 KG general parks
areas, boulevards, median, a mixture composition,
11 KG Pencross - Bentgrass, 1,500 KG 100%
perennial ryegrass.
|
|
| Owner Solicitation Name: | Sapotaweyak Cree Nation Teacherage New Construction
|
| Owner Name: | Association of Manitoba Municipalities
|
| Enginner Name: | MMP Architects Inc
|
| Plankeeper Name |
|
| Scope: | Construction of 15 new teacherage units (1,523 SM
total).
|
|
| Owner Solicitation Name: | Installation of Lighting at Dellwood Green Tot Lot
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Connection to power supply, suplly and
installation of electrical trenching, conduit and
conductor cable, lighting, including luminaries,
lamps, pole and concrete base.
|
|
| Owner Solicitation Name: | 2004 Residential Street Renewals - Part 1 and Part 2
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earth work, excavation, limestone, renewal of
existing sidewalks, paving, installation of
subdrains, catchbasin and connection pipe,
placement of separation and reinforcement fabric,
adjustment of pavement and structure,
construction of concrete barriere and pavement,
boulevard restoration, crack sealing of existing
concrete pavement, loandscaping and sodding.
|
|
| Owner Solicitation Name: | Consulting Services for the Redevelopment and/or Expansion of Sportsplex from a Competitive Aquatic Facility to an Aquatic Leisure Facility
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Consulting Services for the Redevelopment and/or
Expansion.
|
|
| Owner Solicitation Name: | Provision of Grading and Sodding of Boulevards
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sodding of Boulevards and Grading of Boulevards.
|
|
| Owner Solicitation Name: | Supply and Delivery of Aggregate Material
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 2,550 T Granular A-base, 2,500 T traffic gravel
(19 MM), 1,000 T traffic gravel (16 MM), 4,000 T
Seal coat chips, 2,500 T Pit run material, 1,000
T sand fill material.
|
|
| Owner Solicitation Name: | Various Projects, Fort Garry Campus, Mechanical Contractors
|
| Owner Name: | University of Manitoba
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Various Projects, Mechanical Contractors.
Chilled Water Distribution, Construction of new
valve chamber connected to the existing Tunnel
Storm Water Upgrade, Steam, Condensate,
Compressed Air & Natural Gas Distribution,
construction of utility tunnel system with steam
condensate and compressed air services and
Precast cast Utility trench.
|
|
| Owner Solicitation Name: | Equipment Services for the Brady Road Sanitary Landfill for the period of July 1, 2004 to June 30, 2007
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Equipment Services for Road Sanitary Landfill.
2,550 Crawler tractor with blade, 100 Crawler
tractor with ripper, 5,100 Crawler tractor with
13.8 CM capacity scrapers.
|
|
| Owner Solicitation Name: | Renovate Equipment Storage
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovation of a 40' x 120' equipment storage
building.
|
|
| Owner Solicitation Name: | Construct and Renovate Sand and Salt Sheds
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a new 50' x 80' sand/salt
shed & the reconstruction of an existing 50' x
60' salt bin.
|
|
| Owner Solicitation Name: | Restoration of Boulevard Cuts
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sodding, short notice sodding, embankment
sodding, sodding gas service inspection holes,
seeding, grading, supply of precast sidewalk
blocks, regrading of existing insterlocking
paving stones.
|
|
| Owner Solicitation Name: | 2004 Watermain Renewals - Contract 7
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Watermain installation by trechless methods,
abandoment of existing watermains and valve
chambers, installation of gate valve and hydrant
assembleies, reconnection of renewal of water
service connections, relocation or replacement of
existing catchbasin, restoration of pavement
areas.
|
|
| Owner Solicitation Name: | Five (5) Year Maintenance for Pneumatic Temperature Control Systems for Three City Buildings
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Five (5) Year Maintenance for Pneumatic
Temperature Control Systems for Three City
Buildings.
|
|
| Owner Solicitation Name: | Bituminous Pavement
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves 60 300 T of granular base
course, 62 800 T of bituminous pavement & 8 600
M2 of asphalt surface treatment.
|
|
| Owner Solicitation Name: | Supply and Delivery of Utility Trailers
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Two 24'Beavertail and One 16' Beavertail trailers.
|
|
| Owner Solicitation Name: | Disreali Overpass - Structural Steel Deck Repairs
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 48 Regular deck channel splice and 24 sidewalk
support channel splice.
|
|
| Owner Solicitation Name: | Supply of A Street Sweeper
|
| Owner Name: | Portage la Prairie, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply of A Street Sweeper.
|
|
| Owner Solicitation Name: | 2004 Main Street - Roadway Reconstruction (Southbound) and Streetscaping (Westside) -Lombard Avenue to Disraeli Freeway
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Stantec Consulting, Ltd.
|
| Plankeeper Name |
|
| Scope: | Earth and base works, excavation, crushed
material, limestone, supply and place base course
material, removal existing concrete bases,
separation and reinforcement geotextile fabric,
pavement removal, slab placement, partial slab
patches, drilled dowes, drilled tie bars, misc.
concrete slab removal, misc. concrete slab
installation, misc. concrete slab renewal,
concrete slab renewal, construction of asphaltic
concrete overlay, planing pavement, construction
of concrete pavement, joint and crack sealing,
drainage and underground works, adjustment of
existing catchbasin and manholes, installation of
iron ring, adjustment of watermain valve boxes,
landscaping and sodding, fencing, trenching,
backfilling, sign support, traffic diversion,
streetscaping, tree wells and covers, shrub bed
and planter preparation, plant material.
|
|
| Owner Solicitation Name: | Supply and Installation of 30 Mil. Vinyl Swimming Pool Liner at Freight House C.C
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of one Triac plain blue, 30 mil.,
vinyl pool liner completed with new faceplate,
gaskets and T type PVC beuaty stripping.
Drain or pump out all the water, removal and
disposal of all existing face plates and pool
liner, pact, repair and smooth sand and cement
pool base surface, sand, clean, rust proof where
required, caulk and retape all steel panels
joints, pressure test underground suction and
return plumbing lines.
|
|
| Owner Solicitation Name: | Provision of Building Cleaning Services at Various Locations
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Entrance, lobbies, wainting areas, corridors,
rooms, meeting and confrence rooms, common areas,
coffe stations, coffe-lunch room areas,
baesments, storage rooms.
|
|
| Owner Solicitation Name: | Grant Avenue - Shaftsbury Boulevard to Kenaston Boulevard - Concrete Repairs and Asphalt Overlay
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Earth and base works, excavation, grading,
crushed material, limestones, supply and place
base course material, removal of concrete bases,
roadworks, joint crach sealing, associated
drainage and underground works, connecting to
existing manhole and catch basin, adjustment od
existng ctchbasin and manholes, installation of
cast iron lifter ring, landscaping, sodding.
|
|
| Owner Solicitation Name: | Roof Replacement at Bronx C.C. - 131 Chelsea Place
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Dimensional lumber, plywood sheathing, vapor
barriere, roofing insulation, insulation
ashesive, pourable sealer, modified bitumen
membrance, modified primer, rubberrized mastic,
cauling, aluminium paint, vent stacks, metal
flashing, accessories, slash pads.
|
|
| Owner Solicitation Name: | Construction of a 150 MM Residential Sewer Service and a Packaged Duplex Sewage Pumping System and 50 MM Low Pressure Sewer Service
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sewer services trechless installation, Class A
sand bedding, Class 3 backfill, plugging existing
sewer and sewer connection, connecting new sewer
service to existing sewer service, construction
of concrete patches, low pressure sewer service,
supply and installation of aspahlt patches,
supply and installation of packaged duplex sewage
pumping system, surfacing materials, limestones,
sidewalks removal, concrete slab installation.
|
|
| Owner Solicitation Name: | Strathmillan/Moorgate Combined Sewer Relief - Contract 7
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Land drainage sewers and appurtenannces, surface
restoration, pavement, sodding, sewer service,
replacement existing manhole covers, patching
existing manhole, replacing existing manhole or
catch basin rungs, replace existing catch basin
hoods, adjustment of existing manholes and catch
basins, connection to existing manhole,
connection to existing sewer, abandoning existing
sewer with cement, abandoning existing sewer
service under pavement, abandoning existing
manholes, abandoning existing catch basin,
concrete pipe, sewer inspection, concrete,
installation of cast iron lifter ring insert,
asphaltic concret pavement, hot mix asphaltic
concret pavement,
|
|
| Owner Solicitation Name: | Street Renewal McPhillips Street Southbound, Macray Avenue to Mapleglen Drive
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Excavation, sub-grade compaction, cruched sud-
base material 50 MM - limestone, grading, removal
of precast sidewalks blocks, pavement removal,
concrete pavement, asphalt pavement, slab
replacement, patrial slab patches, drilled
dowels, drilled tie bars, misc. concrete slab
removal and sidewalks, misc,concrete slab
installation, bullnose, concrete curb removal and
installation, barrier, modified barrier, supply
and installation of dowel assemblies, regrading
existing interlocking paving stones, construction
of asphaltic concrete overlay, planing of
pavement, construction of concrete pavement,
supply and placing of limestone, longitudinal
joint and crack filling, removal and replace of
catch basin, sewer service, replace existing
manhole frames and covers, backfill materials,
installation of cast iron lifter ring inserts,
precast concrete rings, watermains valves,
installation of watermain valve box, adjustment
of curb stop baxes, patching existing manholes,
landscaping, sodding.
|
|
| Owner Solicitation Name: | Stockpile Aggregate
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work invovles 118,800 T of aggregate.
|
|
| Owner Solicitation Name: | Roof Replacement at Westdale C.C. - 550 Dale Blvd
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof Replacement.
|
|
| Owner Solicitation Name: | Bituminous Pavement
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The length of the project is 26.8. The work
involves 4-500 T of granular base course 83,500 T
of bituminous pavement.
|
|
| Owner Solicitation Name: | Asphalt Resurfacing and Associated Works
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asphalt Resurfacing and Associated Works: asphalt
and concrete panning, full depth concrete
repairs, renewal of existing curb and gutter,
construct splash strip in median lane utilizing
slip form paving, construct asphaltic concrete
pedestrial and cycle path, grading of ditches,
placement asphalt overlay, sodding,
streetscaping, including trees and shrubs,
adjustment of existing manholes and catchbasin,
excavation, joint and crack sealing, associated
drainage and undergroung works.
|
|
| Owner Solicitation Name: | Elevator Consultant to Provide Inspection Services
|
| Owner Name: | Winnipeg Regional Health Authority (WRHA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elevator Consultant to Provide Inspection
Services.
|
|
| Owner Solicitation Name: | Supply and Installation of Portable Aquatic Pool Lift
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Portable aquatic pool lift, 2 deck anchors,
caddie, 2 anchor caps, 2 anchor cap wreches, 2
armrests, batterry extra.
|
|
| Owner Solicitation Name: | Depositing and Stockpile Aggregate
|
| Owner Name: | Manitoba Transportation & Government Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The work involves 74,765 T of aggregate.
|
|
| Owner Solicitation Name: | Installation of Underground Traffic Signal Services and Associated Works
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of Polyethylene, concrete bases,
service boxes, installation of conduit,
sawcutting, removal of concrete bases, rebuilg of
concrete bases and service boxes, chargeble
excavation.
|
|
| Owner Solicitation Name: | Supply and Delivery of Cab and Chassie Trucks
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1 - 11,000 lb GVWR Cab and Chassis, 84" CA reg
cab gas eng 4x4.
6 - 15,000 lb GVWR Cab and Chassis, 60' CA crew
cab die eng 2WD.
1 - 17,500 lb GVWR Cab and Chassis Ford - F -
550, 4x4.
|
|
| Owner Solicitation Name: | Construction of Roof Replacement at Weston C.C
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Dimensional lumber, plywood sheating, insulation
fasteners, vaspour barrier, roofing insulation,
pourable sealer, modified bituman membrane,
caulking, aluminiun paint, roof drains, vent
stacks, metal flashing, siding, splash pad.
|
|
| Owner Solicitation Name: | Exterior Painting of Daly House Museum
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Exterior Painting of Museum.
|
|
| Owner Solicitation Name: | 2004 Local Improvements Program Lloyd Street/St. Mary's Road Lanes and Chevrier Boulevard Concrete Pavement Construction
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | ND LEA
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Concrete pavement construction, excavation,
installation of catchbasin and connection pipe,
placement of sub-base and base cousre material,
construct 150 MM concrete pavement, boulevard
restoration, construction of temporary bypass and
access road, installation of subdrains,
compaction of existing sub-grade, installation of
new land drainage sewer pipe and manholes,
installation of catchbasis and connection pipes,
placement of separation and reinforcement fabric,
placement of sub-base base cousre material, new
concrete sidewalks and boulevard restoration.
|
|
| Owner Solicitation Name: | Provision of Asphalt Repairs and Paving
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Mobilization, removal of aphalt paving, grading
and compaction of base, excavation and removal,
supply and placing of limestone, supply and
placing of base course, supply and placing of
asphalt, asphalt speed bumps, machine extruded
asphalt curbs, joint and crack maintenance,
supply and installation of pre-cast parking
curbs, relocation of existing pre cast curbs.
|
|
| Owner Solicitation Name: | 16th Street Booster Station
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Booster Station.
|
|
| Owner Solicitation Name: | Design, Supply, Installation and Commissioning of an Emergency Generator
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design, Supply, Installation and Commissioning of
an Emergency Generator.
|
|
| Owner Solicitation Name: | MacDonald Building, Long Term Elevator Maintenance
|
| Owner Name: | Public Works & Government Services Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Long term elevator maintenance (twenty-five
years) for three electric and one hydraulic
elevators.
|
|
| Owner Solicitation Name: | Long Term Elevator Maintenance at Stanley Knowles Federal Building
|
| Owner Name: | Public Works & Government Services Canada
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Long term elevator maintenance (twenty-five
years) for two electric and one hydraulic
elevators.
|
|
| Owner Solicitation Name: | Partial Roof Replacement - Roof Area 'A' Only
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | strip existing roof to deck, provide and install
newperimeter blocking, new cap projection
flashing at parapet and other works, adjust roof
projection to accomodate for changes in roof
insulation, supply and install new cap flashing
and parapet.
|
|
| Owner Solicitation Name: | Water Treatment Plant Expression of Interest and Qualifications
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | DESIGN-BUILD of Water Treatment Plants.
Design consultant will be generally responsible
for the preliminary and detailed design,
preparation od drawings and specifications,
construction inspection and commisioning.
The opeartional consultants will be responsible
for an operational perspective, assistance with
engagement anf training of operating staff,
assistance with plant commissioning and advice
regarding workplace safety and health
consideration.
|
|
| Owner Solicitation Name: | Pembina Highway Bridge over the LaSalle River - Bridge Bearing Modifications
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Bridge Bearing Modifications and replace PTFE
disc, suface preparation, pavement, removal and
replace concave and convex plates, reinstall
bearing.
|
|
| Owner Solicitation Name: | Contract A - Underground and Surface Works
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name | RS-MERX
|
| Scope: | Underground and Surface Works.
|
|
| Owner Solicitation Name: | Ceiling Asbestos Abatement, Russell Building
|
| Owner Name: | University of Manitoba
|
| Enginner Name: |
|
| Plankeeper Name | University of Manitoba
|
| Scope: | Removal of asbestos containing materials, partial
replacemnt of ceiling systems, lighting and other
systems modification and upgrades.
|
|
| Owner Solicitation Name: | St. Boniface Industrial Park Road Construction, Camiel Sys Street and Debaets Street
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Wardrop Engineering
|
| Plankeeper Name | Wardrop Engineering
|
| Scope: | Pavement construction and related work, removal
of existing asphalt pavement, installation of
cachbasin and connection pipe, adjustment of
existing water valves and manholes, excavation
and base construction, grading and sodding.
|
|
| Owner Solicitation Name: | 2004 Intersection Improvements
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | SEG Engineering Inc.
|
| Plankeeper Name | SEG Engineering Inc.
|
| Scope: | Removal of existing pavement, excavation,
compaction of existing sub-grade, placement and
separation and reinforcement fabric, placement of
sub-base and base course materials, adjustment of
existing manholes, construct 200 MM concrete
pavement, construct safety 180 MM barrier curbs,
construct safety madian and monolitic concrete
median slab, asphalt overlay, boulevard
restoration.
|
|
| Owner Solicitation Name: | Province of Manitoba and City of Winnipeg 2004 Residential Street Renewal Program - Part 1
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Wardrop Engineering
|
| Plankeeper Name | Wardrop Engineering
|
| Scope: | Crack and seating of existing concrete pavement,
major rehabilitation of existing concrete
pavement, pavement reconstruction, sewer repairs,
|
|
| Owner Solicitation Name: | 2004 Watermain Renewals - Contract 3
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Watermain installation by trechless methods,
installation of existing watermain and valve
chambers, installation of gate valve and hydrant
assemblies, reconnection or replacement of
existing catchbasins, restoration of pavement and
boulevard area.
|
|
| Owner Solicitation Name: | Upgrading The Herman Prior Centre Fire Sprinkler System
|
| Owner Name: | Portage la Prairie, City of
|
| Enginner Name: |
|
| Plankeeper Name | Portage la Prairie, City of
|
| Scope: | Upgrading Fire Sprinkler System.
|
|
| Owner Solicitation Name: | City of Winnipeg and Province of Manitoba - 2004 Residential Street Renewal Program - Part 1, Part 2 and Part 3 - Sewer Works
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Dillon Consulting Ltd.
|
| Plankeeper Name | Dillon Consulting Ltd.
|
| Scope: | Pavement reconstruction, major rehabilitation,
crack and seating pavement rehabilitation, sewer
works, combined sewer renewal, external point
repair, excavation, installation of subdrains,
insulation of water services, replace curb inlets
with catchpits, placement of separation and
reinforcement fabric, placement of sub-base and
base course materials, complete sidewalk
reneawal, construct concrete curb and gutter
utilizing slip form paving, placement asphalt
paving and boulevard restoration.
|
|
| Owner Solicitation Name: | Strathmillan/Moorgate Combined Sewer Relief Contract 6
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | UMA Engineering Ltd.
|
| Plankeeper Name | UMA Engineering Ltd.
|
| Scope: | Construction of approx. 2,000 M of land drainage
and storm relief sewer ranging in the sixe from
250 MM to 750 MM diameter by trechless methods,
abandonment of existing catchbasins connetions to
the combined sewer, rehabilitation of existing
catchbasins and installation of new catchbasins
and connections to the land drainage sewer,
surface restoration and related works.
|
|
| Owner Solicitation Name: | Ready-Mixed Concrete
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name | Brandon, City of, Purchasing
|
| Scope: | Ready-Mixed Concrete.
|
|
| Owner Solicitation Name: | Province of Manitoba and City of Winnipeg 2004 Residential Street Renewals - Part 1 and Part 2
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | ND LEA
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Pavement reconstruction: removal of existing
pavement, excavation, compaction od existing sub-
grade, placement of sud-base and base course
materials, placement asphalt pavement, boulevard
restoration.
Major rehabilitation: complete pavement patching,
removal of existing curb material, complete curb
renewal, renewal of existing sidewalk, adjust odf
drainage inlets and manholes, placement asphalt
overlay, boulevard restioration.
|
|
| Owner Solicitation Name: | 2004 Watermain Renewal - Contract 5
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Earth Tech In.
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Watermain renewal by trechless methods,
reconnection or renewal of water services,
installation of hydrants and valves, restoration
of boulevard and pavements, abandoning of
existing watermains.
|
|
| Owner Solicitation Name: | Landscape and Site Furnishing Enhancements, to Six School Sites
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Ken Rech Landscape Architects Inc.
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Landscape planting improvements and supply and
installation of various site furniture.
|
|
| Owner Solicitation Name: | Construction of 2.4 M Ashpalt Pathways in Papoose Park
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Site restoration, excavation, sub-grade
compaction, geotexteli fabric material, crushed
limestone sub base course material 20 and 50 MM,
asphaltic pavement, crack sealing, quality
control for hard surface areas, topsoil and
seeding, topsoil and sodding.
|
|
| Owner Solicitation Name: | Concrete Street Reconstruction
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Earth Tech In.
|
| Plankeeper Name | Earth Tech In.
|
| Scope: | Surface restoration, sawcutting, concrete
pavement joints, adjustment of existing
catchbasins, excavation, aluminium balanced
barrier, insulation of subdrains and catchbasins
excavations, sand supply, reinforcing steel,
sidewalk renewal, concrete curbs, existing street
car track bedding, adjustment of existing
drainage inlets, manholes and water valve boxes,
construction of new monolitic curb and sidewalk,
boulevard resoration and side clean up.
|
|
| Owner Solicitation Name: | Strathmillan/Moorgate Combined Sewer Relief Contract 5
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Construction of 2,400 M of land drainage sewer
ranging in size from 250 MM to 900 MM diameter by
trechless methods, abandonment of existing
catchbasin connection to the combined sewer,
rehabilitation of existing catchbasin and
installation of new catchasins and connections to
the land drainage sewer, surfase restoration and
related works.
|
|
| Owner Solicitation Name: | Tree Pruning and Removal Services
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Pruning of approximately 5,800 boulevard trees at
various locations.
|
|
| Owner Solicitation Name: | Photocopiers Various School Locations
|
| Owner Name: | Frontier School Division
|
| Enginner Name: |
|
| Plankeeper Name | Frontier School Division
|
| Scope: | Supply and installation of photocopiers at
various school locations.
|
|
| Owner Solicitation Name: | Province of Manitoba and City of Winnipeg- 2004 Residential Street Renewals, Part 1 and Part 2
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | SEG Engineering Inc.
|
| Plankeeper Name | SEG Engineering Inc.
|
| Scope: | Pavement reconstruction: removal existing
pavement, excavation, installation of subdrains,
compaction of existing sub-grade, installation of
catchbasins and connetion pipe, placement of
separation and reinforcement fabric, placement of
sub-base and base course materials, adjusting
manholes, construct 150 MM concrete pavement, 150
MM barrier curbs utilizing slip-form paving
equipment, complete sidewalk renewal, bouleward
restoration.
Crack and seating of existing concrete pavement:
complete sawcutting for curbs and gutter, Crack
and seating of existing pavement, remove existing
pavement for curbs and gutter, complete sidewalk
renewal, complete sidewalk renewal, installation
of catchbasins and connetion pipe, construct
gutter and curbs utilizing slip-form paving
equipment, patching of pavement, curb renewal at
intersections, placement asphalt overlay
completewith moisture and stress absorption
fabric, bouleward restoration.
Major pavement rehabilitation: planing of
existing asphalt pavement, full depth slab
patching, renewal gutter and curbs utilizing slip-
form paving equipment, complete curb renewal at
intersections, adjustment of drainage inlets and
manholes.
|
|
| Owner Solicitation Name: | One (1) New SW314D or Refurbished SW324D Runway Sweeper or Equivalent
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name | Brandon, City of, Purchasing
|
| Scope: | One (1) New SW314D or Refurbished SW324D Runway
Sweeper or Equivalent.
|
|
| Owner Solicitation Name: | Province of Manitoba and City of Winnipeg 2004 Residential Street Renewal Program, Part 1, Part 2, Part 3 - Combined Sewer Renewal
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: | Earth Tech In.
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Pavement reconstruction, excavation, installation
of subdrains, compation of existing subdrains,
installation of catchbasin and connection pipe,
placement of separation and reinforcement fabric,
sub base and base course materials, boulwvard
restoration, construction of 100 MM monolithic
curband concrete sidewalk, major rehabilitation,
combined sewer renewal and repairs, renewal od
sidewalks, placement of asphalt 50 MM thickness,
full segment comdined sewer renewal, installation
manholes and catchbasins, renewal of sewer
service, abandonment of existing sewer, manholes
and catchbasin, repair of combined sewer by open
trench, reconnection of sewer service.
|
|
| Owner Solicitation Name: | Demolition of Buildings - Restaurant & Duplex
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Demolition of Buildings.
|
|
| Owner Solicitation Name: | Supply and Delivery of Forklift
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Supply and Delivery of Forklift.
|
|
| Owner Solicitation Name: | Supply and Delivery of Utility Trailer
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Supply and Delivery of Utility Trailer, narrowed
83", beavertail a minimum of two F in addition o
the 20 F deck, trailer tounge deck extension area
of minimum 18" with 12" highbumper stop, steel
mesh vehicle loading ramps, 15,000 LB jack,
trailer wiring and lightingshall meet all
regulation, licence plate bracket c/w lighr, 2-
6,000 LB axles, electric brakes, 4-215-85-R16
tires on 16"-5 bolt wheels, 2 5/16" ball hitch, 4
leaf spring suspension, galvanized steel
construction, treated wood floor, spare tire
mounted on a rim and heavu duty winch mounted to
the trailer.
|
|
| Owner Solicitation Name: | General Carpentry, Individual Building of Deck, Rails, Boardwork and Ramps; Drilling of Fresh Water Well and Hook-up; Sewage Connection; Drywall Board
|
| Owner Name: | Riverton, Village of - Transportation & Heritage Centre Inc
|
| Enginner Name: |
|
| Plankeeper Name | Riverton, Village of - Transportation & Heritage Centre Inc
|
| Scope: | General Carpentry, Individual Building of Deck,
Rails, Boardwork and Ramps; Drilling of Fresh
Water Well and Hook-up; Sewage Connection;
Drywall Boarding and Taping; Plumbing; Flooding.
|
|
| Owner Solicitation Name: | Tec-Voc High School Window Replacement Phase 1
|
| Owner Name: | Winnipeg School Division No. 1
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg School Division No. 1 - Building Dept
|
| Scope: | Window Replacement Phase 1 at School.
|
|
| Owner Solicitation Name: | Enclosure of Basement Exit at Chief Peguis School
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Supply and install exit 2 concrete piles and
columns, concrete grade beam and walls, concrete
apron slab, repair of existing metal handrails in
the stair, masonry sidewalls, metal roof, supply
and install new steel door into new pressed steel
frame, exit sign on staircase and light fixture
in stair.
|
|
| Owner Solicitation Name: | Canada and Manitoba Infrastructure Works - RM of Whitemouth - Construction of a Lagoon
|
| Owner Name: | Association of Manitoba Municipalities
|
| Enginner Name: | J.R. Cousin Consultants Ltd.
|
| Plankeeper Name | J.R. Cousin Consultants Ltd.
|
| Scope: | Common excavation of approximately 31,000 M3,
Seeding of approximately 4.5 HA, Construction of
a truck turnaround and concrete spillway, Supply
and install approximately 1,250 M of 4 strand
barbed wire fencing, Supply and install
approximately 100 T of A-base and 140 T of C-base
granular material, Supply and install
approximately 70 M of forcemain including 1 gate
valve.
|
|
| Owner Solicitation Name: | Existing Air Terminal Building Outbound Baggage Handling System & Hold Baggage Screening
|
| Owner Name: | Winnipeg Airport Authority, Inc., Purchasing
|
| Enginner Name: | Marshall Macklin Monaghan Ltd. - Head Office
|
| Plankeeper Name | Winnipeg Airport Authority, Inc., Purchasing
|
| Scope: | DESIGN-BUILD.
Existing Air Terminal Building Outbound Baggage
Handling System & Hold Baggage Screening.
Assume full responsibility for system
engineering, shop drawing preparation,
coordination, field layout, quality control,
labour, supervision, management, material,
temporary works, construction plant, equipment,
transportation, taxes and duties of
whatsoever kind, permits and licenses and other
items necessary for and incidental to
the performance of the Work including the design,
coordination, fabrication, installation,
testing, commissioning, training, as-built
drawings, Operation and Maintenance manuals,
spare parts and warranty of the systems.
Obtain and pay for all permits, inspection fees,
and certificates relative to the BHS
installation. Provide complete, operable and
maintainable systems, including all supports,
hangers, cabinets, anchors, trim, framing,
disconnects, motor starters, motors, push-buttons,
120 V controls, walkways, catwalks, ladders,
stairs, wiring, conduit. Engineering and
manufacturing capacities to perform and complete
the installation of the BHS equipment including
the required controls, fault monitoring, and
accessories. Integration with other systems such
as CATSA-supplied screening units, security
systems and fire alarm system. Fault monitoring
and system reports using ‘off the shelf’ software
solutions. Participate in Owner and CATSA
testing, commissioning, certification and audits.
Provide information required to ensure BHS
compatibility with separate building
modifications contract within 2 weeks of contract
award. WAA will provide successful proponent with
drawings. Proponent will be responsible for the
cost of any building modification required if
missed during this review.
|
|
| Owner Solicitation Name: | Russell Building - Foundation Waterproofing
|
| Owner Name: | University of Manitoba
|
| Enginner Name: |
|
| Plankeeper Name | University of Manitoba
|
| Scope: | Foundation Waterproofing.
|
|
| Owner Solicitation Name: | Supply and Delivery of Database Replication Software
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Supply and Delivery of Database Replication
Software.
|
|
| Owner Solicitation Name: | St. Anthony Hospital, IT Room Mechanical and Electrical
|
| Owner Name: | NOR-MAN Regional Health Authority
|
| Enginner Name: | MCW/AGE Consulting Professional Engineers
|
| Plankeeper Name | MCW/AGE Consulting Professional Engineers
|
| Scope: | Hospital, IT Room Mechanical and Electrical.
|
|
| Owner Solicitation Name: | Supply and Delivery of Utility Trailer
|
| Owner Name: | Winnipeg, City of - Materials Management Division
|
| Enginner Name: |
|
| Plankeeper Name | Winnipeg, City of - Materials Management Division
|
| Scope: | Trailer must not be narrower than 83", beavertail
shall be a minimum of two 2 F in addition to 25 F
deck, trailer tounge deck extension area shall be
a minimum of 18" with 12" high bumper stop, steel
mesh vehicle loading ramps, 12,000 LB fack,
trailer wiring and lighting shall meet all
regulation as recommended, 2-215-85-R16 tires on
16"-5 bolt wheels, 2 5/16 ball hitch, 4 leaf
spring suspension, galvanized chain and hoods,
spare tire mounted on rim, heavy duty winch
mounted to the trailer, fitted with nylon strap,
capable of pulling 2,000 LB and tie down side of
the trailer.
|
|
| Owner Solicitation Name: | Water Treatment Plant High Lift Pump Replacement & UV Disinfection
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name | RS-MERX
|
| Scope: | Water Treatment Plant High Lift Pump Replacement
& UV Disinfection.
|
|
| Owner Solicitation Name: | Removal and Disposal of Scrap Metal
|
| Owner Name: | Brandon, City of, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name | Brandon, City of, Purchasing
|
| Scope: | Removal and Disposal of Scrap Metal.
|
|