| Owner Solicitation Name: | Pipe Installations
|
| Owner Name: | Municipal Authority of Westmoreland County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install approximately 19,680 LF 8" C900 CL150
Pipe and 5,100 LF 8" C900 CL200 Pipe along
Various Roads.
|
|
| Owner Solicitation Name: | Pipe Installations
|
| Owner Name: | Municipal Authority of Westmoreland County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install approximately 3,000 LF 8" C900 CL150
Pipe.
|
|
| Owner Solicitation Name: | Pipe Installations
|
| Owner Name: | Municipal Authority of Westmoreland County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install approximately 1,070 LF 8" C900 CL150.
|
|
| Owner Solicitation Name: | Replace 18" Transite Pipe
|
| Owner Name: | Municipal Authority of Westmoreland County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace 18" Transite Pipe with the installation
of 280 LF 20" DI Pipe.
|
|
| Owner Solicitation Name: | Fiber-Based Connectivity Service
|
| Owner Name: | Central Dauphin School District, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Fiber-Based Connectivity Service.
|
|
| Owner Solicitation Name: | Renovations to McLean Hall
|
| Owner Name: | Shippensburg University of the State System of Higher Education
|
| Enginner Name: | STV Architects
|
| Plankeeper Name |
|
| Scope: | Renovations: replacement of windows, storefront,
ceilings, lights, unit ventilators, bathroom
improvements and ADA upgrades.
|
|
| Owner Solicitation Name: | East Brady Playground
|
| Owner Name: | East Brady, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Playground Construction.
|
|
| Owner Solicitation Name: | Interior Drainage Improvements at Friendship Apartments
|
| Owner Name: | Armstrong County Housing Authority
|
| Enginner Name: | Senate Engineering Company, U-PARC
|
| Plankeeper Name |
|
| Scope: | Interior Drainage Improvements.
|
|
| Owner Solicitation Name: | 1,800 Tons Processed Cinders Type 1A
|
| Owner Name: | Upper Burrell, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 1,800 Tons Processed Cinders Type 1A.
|
|
| Owner Solicitation Name: | Roberts Valley Road - Sanitary Sewer Extension, Susquehanna Township Authority
|
| Owner Name: | Susquehanna, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sanitary sewer extension - construction
approximately 1,300 LF for 8" gravity sewer and
appurtenances; 240 LF of 6" service laterals,
and installing 8 manholes. Constructing
approximately 180 LF of 6" standpipe for fire
department use. Approximately 150 LF of the
sanitary sewer main and all of the standpipe is
required to be bored under 2 rail tracks.
Performing air testing on the sanitary sewer
main, service materials, and performing vacuum
testing on the manholes.
|
|
| Owner Solicitation Name: | Root Control Treatment Services for Susquehanna Township Authority
|
| Owner Name: | Susquehanna, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing and applying chemical root control
agent to various main line sanitary sewers
(maximum 22,000 LF).
|
|
| Owner Solicitation Name: | Dump Truck
|
| Owner Name: | Fairview Township
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase 26,000 gross weight Dump Truck.
|
|
| Owner Solicitation Name: | Retaining Wall Removal and Embankment Reconstruction
|
| Owner Name: | East Brady, Borough of
|
| Enginner Name: | Gray-Warnick Engineering
|
| Plankeeper Name |
|
| Scope: | Demolition of existing retaining wall and
reconstruction of roadway and embankment.
|
|
| Owner Solicitation Name: | Used Truck Purchase
|
| Owner Name: | Ernest, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of used V-8 gas or diesel truck, 5-
speed, power steering and brakes, 10-ton payload,
12-foot dump, hitch, A/C and ninety (90) day
warranty.Bids shall include a complete
description of the truck, including without
limitation, make, model, year, mileage and prior
ownership and extraordinary repairs and
replacements. The anticipated remaining useful
life of the truck must be at least 5 years.
|
|
| Owner Solicitation Name: | Professional Architectural and Engineering Services
|
| Owner Name: | Philadelphia School District, Department of Design and Construction Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional Architectural and Engineering
Services.
|
|
| Owner Solicitation Name: | Tree Trimming
|
| Owner Name: | Derry, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Tree trimming in various roads.
|
|
| Owner Solicitation Name: | Pavement Resurfacing and Underground Storage Tank Removal
|
| Owner Name: | Littlestown Area School District
|
| Enginner Name: | James E. Baumgardner
|
| Plankeeper Name |
|
| Scope: | Contract A: Pavement Resurfacing; Contract B:
Underground Storage Tank Removal.
|
|
| Owner Solicitation Name: | 1A Cinders and Bulk Road Salt
|
| Owner Name: | Oakland Township Board of Supervisors
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 1500 Tons more or less of type 1A
Cinders and 50 Tons Sodium Chloride (Bulk Road
Salt).
|
|
| Owner Solicitation Name: | WWTP SCADA System
|
| Owner Name: | Greater Greensburg Sewage Authority
|
| Enginner Name: | KLH Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Integration of a new SCADA system into an
existing wastewater treatment plant. The new
system shall replace an existing operating
system. The new system shall communicate over a
combination of copper/fiber optic Ethernet
network. New items include: two fully configured
HMI PC's, seven PLC control panels complete with
local operator interfaces and interconnecting
cable and conduit. Existing instrumentation shall
be reused.
|
|
| Owner Solicitation Name: | Maintenance and Repair of Digital HVAC System
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance and Repair of Digital HVAC System
from 04/01/03 to 03/31/03 with an option to renew
for up to three additional one year periods.
|
|
| Owner Solicitation Name: | Boiler Replacements
|
| Owner Name: | Washington County Housing Authority
|
| Enginner Name: | Shaeffer & Madama, Inc.,
|
| Plankeeper Name |
|
| Scope: | Boiler replacements.
|
|
| Owner Solicitation Name: | Chiller Replacement
|
| Owner Name: | Washington County Housing Authority
|
| Enginner Name: | Shaeffer & Madama, Inc.,
|
| Plankeeper Name |
|
| Scope: | Chiller replacement.
|
|
| Owner Solicitation Name: | Maintenance, Repair and Calibration of Video Pipeline Inspection
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance, Repair and Calibration of Video
Pipeline Inspection. Contract term from 04/01/04
to 03/31/05.
|
|
| Owner Solicitation Name: | Abandoned Mine Land Reclamation Project
|
| Owner Name: | Pennsylvania Dept. of Environmental Protection, Construction Contracts Section
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 25,000 CY of grading and 6.5 acres of seeding.
|
|
| Owner Solicitation Name: | Electrical Renovations to Phila City Hall
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | City hall electrical renovations.
|
|
| Owner Solicitation Name: | Renovations to Phila City Hall 7th Floor
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | City hall renovations.
|
|
| Owner Solicitation Name: | Mechanical Renovations to Phila City Hall 7th Floor
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Building mechanical renovations.
|
|
| Owner Solicitation Name: | Plumbing Renovations to Phila City Hall 7th Floor
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Plumbing renovations.
|
|
| Owner Solicitation Name: | Manayunk/Schuylkill Canal Restoration Project, Phase III - Landscaping & Lighting Electrical Constr.
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Landscaping and Lighting electrical construction
canal restoration work.
|
|
| Owner Solicitation Name: | Manayunk/Schuylkill Canal Restoration Project, Phase III - Lanscaping & Lighting General Constr.
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Canal restoration project landscaping and
lightning general construction.
|
|
| Owner Solicitation Name: | Resurface/Repair Tennis Courts
|
| Owner Name: | Millersville University of Pennsylvania
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Resurface/repair tennis courts.
|
|
| Owner Solicitation Name: | Home Improvement Program / Lead V - Rehabilitation of Properties Located in the City of Harrisburg
|
| Owner Name: | Harrisburg, City of, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Home improvement program - rehabilitation of
properties.
|
|
| Owner Solicitation Name: | Mt. Pleasant Street Sewer Relocations
|
| Owner Name: | Greater Greensburg Sewage Authority
|
| Enginner Name: | KLH Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Relocation of sewers in 3 separate areas. Area
A - Relocation of a 20" combined sewer involving
186 LF of 21" PVC pipe and 2 manholes.
Construction of a combined sewer overflow
chamber, 21" PVC outfall pipe, 12" PVC connector
sewer, and interceptor manhole, demolition of a
combined sewer overflow chamber and various
manholes and abandoned sewers. Area B -
Relocation of an 8" sanitary sewer involving
construction of 137 LF of 8" DIP and 2 manholes,
demolition and abandonment of various manholes
and sewers, C - Relocation of a 10" sanitary
sewer involving 200 LF 10" concrete encased PVC
and 2 manholes, replacement of 8" combined sewer
involving 103 LF 18" concrete encased PVC and 2
manholes, demolition and abandonment of various
manholes and sewers.
|
|
| Owner Solicitation Name: | Uninterruptable Power Supply System
|
| Owner Name: | North Hills School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and delivery of Uninterruptable Power
Supply System.
|
|
| Owner Solicitation Name: | Insulation of Ductwork and Piping
|
| Owner Name: | Coatesville Area School District
|
| Enginner Name: | Spotts Stevens & McCoy, Inc.
|
| Plankeeper Name |
|
| Scope: | Providing and installing new insulation on
existing ductwork and existing piping.
|
|
| Owner Solicitation Name: | CNC Router and Software
|
| Owner Name: | Shaler Area School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of CNC router and software.
|
|
| Owner Solicitation Name: | Janitorial Supplies
|
| Owner Name: | Cambria County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial supplies.
|
|
| Owner Solicitation Name: | Electrical Service Contract - Fire Alarm and Emergency Systems Repair
|
| Owner Name: | School Reform Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical Service Contract - Fire Alarm and
Emergency Systems Repair.
|
|
| Owner Solicitation Name: | Maintenance of Passenger Elevators
|
| Owner Name: | Parking Authority of the City of Lancaster
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintenance of Passenger Elevators.
|
|
| Owner Solicitation Name: | Code Enforcement Demolition Project
|
| Owner Name: | Washington County Redevelopment Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and site clearance of certain
buildings and auxiliary structures.
|
|
| Owner Solicitation Name: | 2001 or Newer Heavy-Duty 3/4 Ton Truck
|
| Owner Name: | Aliquippa School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of 2001 or Newer Heavy-Duty 3/4 Ton
Truck.
|
|
| Owner Solicitation Name: | Traction Elevator Modification/Repair
|
| Owner Name: | Millersville University of Pennsylvania
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Modify/repair (1) one existing traction elevator.
|
|
| Owner Solicitation Name: | Norton Antivirus Software Renewal
|
| Owner Name: | Millersville University of Pennsylvania
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide renewals of the Norton Antivirus
software.
|
|
| Owner Solicitation Name: | Exterior Lighting Upgrades Macintosh Regency
|
| Owner Name: | Bucks County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Exterior Lighting Upgrades.
|
|
| Owner Solicitation Name: | Construction of the Copeechan Creek Bridge Replacement at the Copeechan Road
|
| Owner Name: | North Whitehall, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of the existing structure, diverting
traffic, traffic control, sedimentation and
erosion controls, installation of precast bridge
replacement, installation of storm sewer system.
|
|
| Owner Solicitation Name: | Secondary School Turf and Landscape Maintenance
|
| Owner Name: | Central Dauphin School District, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Turf and Landscape Maintenance.
|
|
| Owner Solicitation Name: | Additions and Renovations to Eastern Lebanon County Middle School
|
| Owner Name: | Eastern Lebanon County School District
|
| Enginner Name: | Foreman Architects Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | This Project has the following separate prime
construction contracts: General Construction,
General Casework, Construction Roofing,
Construction Bleachers, Construction Acoustical,
Drywall, and Plaster Construction, Plumbing
Construction, Hardwood Gymnasium, Flooring
Construction, HVAC Construction Resilient
Flooring and Carpeting Construction, Electrical
Construction, Food Service Equipment.
|
|
| Owner Solicitation Name: | High School Renovations
|
| Owner Name: | Interboro School District
|
| Enginner Name: | JAED Architect & Engineers
|
| Plankeeper Name |
|
| Scope: | General construction, site work, mechanical,
electrical, plumbing.
|
|
| Owner Solicitation Name: | Water Damage Repairs
|
| Owner Name: | Lehigh County, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repairs include carpeting, ceiling, drywall,
wallpaper and vinyl flooring.
|
|
| Owner Solicitation Name: | Classroom Carpets
|
| Owner Name: | Harrisburg School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Classroom carpets.
|
|
| Owner Solicitation Name: | Weatherization Assistance Program
|
| Owner Name: | South Central Community Action Programs, Inc.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Cellulose Insulation Fiberglass
Insulation Mobile Home Replacement Doors &
Windows Inside Application Storm Window
Materials.
|
|
| Owner Solicitation Name: | Lancaster Industrial Park Project - Industrial Arts Building
|
| Owner Name: | Lancaster, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Building construction.
|
|
| Owner Solicitation Name: | Underground Storage Tanks Removal and Installation and Misc. Items
|
| Owner Name: | West Shore School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Grass Seed, Granular Fertilizers,
Insecticides, Fungicides, and Herbicides. Removal
and Installation of Underground Storage Tanks.
|
|
| Owner Solicitation Name: | New 2004 3/4 ton Four Wheel Drive Pickup Truck
|
| Owner Name: | State College Borough Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of New 2004 3/4 ton Four Wheel Drive
Pickup Truck.
|
|
| Owner Solicitation Name: | New 2004 Super/Heavy Duty Four Wheel Drive Truck
|
| Owner Name: | State College Borough Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of New 2004 Super/Heavy Duty Four Wheel
Drive, Super Cab, Single Rear Wheel, Short Bed
Pickup Truck with or without Snow Plow.
|
|
| Owner Solicitation Name: | New Super/Heavy Duty T-Tag Dump Truck
|
| Owner Name: | State College Borough Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of New 2004 Super/Heavy Duty T-Tag Dump
Truck.
|
|
| Owner Solicitation Name: | New 2004 Super/Heavy Duty Four Wheel Drive Super Cab
|
| Owner Name: | State College Borough Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of new 2004 Super/Heavy Duty Four Wheel
Drive Super Cab.
|
|
| Owner Solicitation Name: | Construction Plan Review for the Office of Code Enforcement
|
| Owner Name: | Erie, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction Plan Review for the Office of Code
Enforcement.
|
|
| Owner Solicitation Name: | Upper Macungie Park Borrow Excavation Project
|
| Owner Name: | Upper Macungie, Township of
|
| Enginner Name: | Keystone Consulting Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Excavation and removal of fill material,
construction of stormwater drainage structures,
sedimentation basins and detention basins and
placement of topsoil, final seeding and site
stabilization. This project is estimated to
provide 150,000 CY of fill material that
would be available to the contractor to be used
offsite for his use.
|
|
| Owner Solicitation Name: | Traffic Signal Repairs
|
| Owner Name: | Allentown, City of, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Traffic Signal Repairs.
|
|
| Owner Solicitation Name: | Maintenance Truck
|
| Owner Name: | Leechburg Area School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of a maintenance truck.
|
|
| Owner Solicitation Name: | Electric Upgrade - Chambersburg Housing Units
|
| Owner Name: | Franklin County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electric Upgrade.
|
|
| Owner Solicitation Name: | Removal of Timber
|
| Owner Name: | Dayton - Wayne - Rural Valley Landfill (DWRL)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of timber on approximately 171 acres.
|
|
| Owner Solicitation Name: | General Construction for Elevator Upgrades
|
| Owner Name: | Northampton, County of, Purchasing Dept.
|
| Enginner Name: | W2A Design Group, Wallace & Watson-Associates, P.C.
|
| Plankeeper Name |
|
| Scope: | Sprayed fire-resistive system, metal stud gypsum
board assemblies, metal doors and frames,
interior finishes, wet-pipe sprinkler system,
ductless split-system air conditioners, manual
transfer switches, fire alarm system expansion,
related mechanical, plumbing and electrical work
and coordination with elevator upgrades.
|
|
| Owner Solicitation Name: | 2004 Sanitary Sewer Rehabilitation
|
| Owner Name: | Union Sewer & Disposal Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Rehabilitation 4,555 LF of 8" diameter clay
sanitary sewer including service lateral grouting
and testing between 1-8 LF into the laterals.
Sewer rehabilitation to consist of one of the
following methods: (A) installation of a resin
impregnated flexible felt tube, (B) installation
of a folded and formed polyethylene (PE) liner
pipe, or (C) installation of a folded and formed
polyvinyl chloride (PVC) liner pipe.
|
|
| Owner Solicitation Name: | General Electrical Services
|
| Owner Name: | F.M. Kirby Center for the Performing Arts
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | General Electrical Services related to the
replacement of the stage dimmer system.
|
|
| Owner Solicitation Name: | 1/2 Ton Pick Up
|
| Owner Name: | Commission on Economic Opportunity of Luzerne County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | One (1) new 1/2 ton pickup truck.
|
|
| Owner Solicitation Name: | Plumbing HVAC Program Equipment and Instructional Supplies
|
| Owner Name: | Lebanon County Career & Technology Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Plumbing HVAC Program equipment and instructional
supplies.
|
|
| Owner Solicitation Name: | Gas Blower Unit
|
| Owner Name: | Lycoming County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase, delivery and installation of gas blower
unit on a landfill site.
|
|
| Owner Solicitation Name: | New Domestic Well Development
|
| Owner Name: | Tunkhannock Borough Municipal Authority
|
| Enginner Name: | Milnes Engineering Inc.
|
| Plankeeper Name |
|
| Scope: | Drilling and test pumping of a test well and a
production well.
|
|
| Owner Solicitation Name: | Low Sulfur Diesel Fuel and Regular 87 UL Octane Fuel
|
| Owner Name: | South Buffalo, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 8000 gallons of low sulfur diesel fuel AND 5000
gallons of regular 87 UL Octane Fuel.
|
|
| Owner Solicitation Name: | Collingdale Community Improvements
|
| Owner Name: | Collingdale, Borough of
|
| Enginner Name: | Vollmer Associates
|
| Plankeeper Name |
|
| Scope: | 1,415 SY asphalt court area, 400 SY of path
repair, 2,100 SY paving overlayment, installation
300 SY new paved and widened pathway, under-drain
system, lighting improvements including pathway
lighting, electrical system upgrade and 450 LF
fence replacement.
|
|
| Owner Solicitation Name: | Upland Municipal Park Improvements
|
| Owner Name: | Upland, Borough of
|
| Enginner Name: | Catania Engineering Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Municipal Park Improvements.
|
|
| Owner Solicitation Name: | 30 Mobile Traffic Transponders
|
| Owner Name: | West Reading, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase and installation of 30 mobile traffic
transponders as well as 2 handheld traffic
transponders. The 30 mobile units must have a
minimum activation distance of 2500 feet and all
units must be from the same manufacturer and they
must be compatible. The units must be weather
tight and must have built in diagnostics.
|
|
| Owner Solicitation Name: | Etter Health Center, ADA Entry Re-Roof, Mechanical Upgrades
|
| Owner Name: | Shippensburg University of the State System of Higher Education
|
| Enginner Name: | STV Architects
|
| Plankeeper Name |
|
| Scope: | ADA sidewalk and stairs, storefront replacement,
renovations, re-roof and mechanical upgrades,
HVAC.
|
|
| Owner Solicitation Name: | Process Control - Scada System PH II
|
| Owner Name: | Easton Area Joint Sewer Authority
|
| Enginner Name: | Rummel, Klepper & Kahl Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | Expansion of a Process Control/SCADA System,
modifications to Motor Control Centers, a new
Emergency Generator and other miscellaneous
instrumentation.
|
|
| Owner Solicitation Name: | Re-bid: Vasper Street Water and Sewer Improvemetns
|
| Owner Name: | Lock Haven, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Open cut installation of approximately 500 LF of
8" PVC sanitary sewer main, 225 LF of 6" PVC
sewer laterals, manholes and all associated
appurtenances for the sanitary sewer system of
street; completion of water service installation
previously performed; pavement and sidewalk
restoration. Alternate for Sliplined
installation.
|
|
| Owner Solicitation Name: | Long Distance Telecommunications Services, Cellular Telephone Services and Pager Services
|
| Owner Name: | Lancaster Lebanon School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Long Distance Telecommunications Services,
Cellular Telephone Services and Pager Services.
|
|
| Owner Solicitation Name: | Residential Property Extensive Renovation
|
| Owner Name: | Dauphin County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Residential Property Extensive Renovation.
|
|
| Owner Solicitation Name: | Pre-Packaged, Microprocessor-Based Pump Station
|
| Owner Name: | Pine, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of pre-packaged, microprocessor-based
pump station.
|
|
| Owner Solicitation Name: | Land Management Services
|
| Owner Name: | Hazleton, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Watershed forestry management plan for
approximately 880 acres of land.
|
|
| Owner Solicitation Name: | Vacant Unit Painting
|
| Owner Name: | Lebanon County Housing & Redevelopment Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Vacant Unit Painting.
|
|
| Owner Solicitation Name: | High Street Curb and Sidewalk
|
| Owner Name: | Red Lion, Borough of
|
| Enginner Name: | C. S. Davidson, Inc.
|
| Plankeeper Name |
|
| Scope: | Replacement of curb and sidewalk.
|
|
| Owner Solicitation Name: | Furnishing of Seven (7) New Vehicles
|
| Owner Name: | Fayette County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | purchase of three (3) new 2004 4x2 compact Pickup
Trucks; two (2) new 2004 4-Door Sport Utility
Vehicles; two (2) new 4 door compact cars and
trading two (2) used 4x2 Pickup Trucks - one (1)
1989 Ford and one (1) 1992 Ford. F-150 and three
compact cars; two (2) 1993 Ford Escorts and one
(1) 1995 Mercury Tracer And one 91) 2000 Ford
Explorer Limited.
|
|
| Owner Solicitation Name: | Demolition and Removal of Condemned Structures
|
| Owner Name: | Franklin Township Supervisors
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and removal of condemned structures
for two (2) separate projects.
|
|
| Owner Solicitation Name: | Chainlink Fence - Pop Warner Football Field
|
| Owner Name: | East Lycoming School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Chainlink Fence.
|
|
| Owner Solicitation Name: | Center for Alumni and Development Construction
|
| Owner Name: | Clarion University of Pennsylvania, Pennsylvania State System of Higher Education
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a new office building. This 8,740
SF , two story Federalist Style building will
have a gable roof and dormers, a brick veneer, a
structural system of wood stud framing, concrete
block, and wood roof trusses. The building will
contain office, conference rooms, and restrooms.
The HVAC system - DX cooling, split systems air
handlers, and gas fired furnaces. Construction -
plumbing installations and electrical equipment
and wiring including installation of telephone
and data cabling. Landscape development in the
areas not occupied by the building or parking lot
will be part of the general contract.
|
|
| Owner Solicitation Name: | General Construction of Taxiway "E" at Northeast Philadelphia Airport
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | General Construction of Taxiway.
|
|
| Owner Solicitation Name: | Electrical Construction Work of Taxiway "E" at the Northeast Philadelphia Airport
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical Construction Work of Taxiway.
|
|
| Owner Solicitation Name: | Exterior Wall Repair at the Morrison Towers
|
| Owner Name: | Harrisburg Housing Authority
|
| Enginner Name: | Brinjac Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Exterior Wall Repair.
|
|
| Owner Solicitation Name: | Stormwater Repairs at Hillside Village
|
| Owner Name: | Harrisburg Housing Authority
|
| Enginner Name: | Brinjac Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Stormwater Repairs.
|
|
| Owner Solicitation Name: | Sound Insulation Modifications to 39 Residential Dwelling Units
|
| Owner Name: | Lehigh-Northampton Airport Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sound insulation modifications to 39 residential
dwelling units.
|
|
| Owner Solicitation Name: | Abandoned Mine Reclamation Project
|
| Owner Name: | Pennsylvania Dept. of Environmental Protection, Construction Contracts Section
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Abandoned Mine Reclamation - approximate
quantities include 97,350 CY grading and 7.5
acres seeding.
|
|
| Owner Solicitation Name: | Little Neshaminy Creek Sewage Pump Station, Contract 02-4G
|
| Owner Name: | Horsham Water and Sewer Authority
|
| Enginner Name: | Carroll Engineering Corporation
|
| Plankeeper Name |
|
| Scope: | Creek Sewage Pump Station.
|
|
| Owner Solicitation Name: | General Construction Contract 02-4E, Electrical
|
| Owner Name: | Horsham Water and Sewer Authority
|
| Enginner Name: | Carroll Engineering Corporation
|
| Plankeeper Name |
|
| Scope: | Electrical.
|
|
| Owner Solicitation Name: | Vinyl Composition Floor Tile Replacement
|
| Owner Name: | Danville Area School District
|
| Enginner Name: | Anthony H. Visco, Jr., Architects
|
| Plankeeper Name |
|
| Scope: | Removal of existing flooring and furnishing and
installing new vinyl composition floor tile and
rubber base.
|
|
| Owner Solicitation Name: | Southern Farms Sanitary Sewer Replacement - 2004
|
| Owner Name: | Shrewsbury Borough
|
| Enginner Name: | James R. Holley & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Replacement of approximately 1,850 LF of 8"
sewer mains and 1200 LF of 4" sewer laterals,
related appurtenances and paving restoration.
|
|
| Owner Solicitation Name: | Exterior General Conservation Work of the Phila City Hall Tower Sculptures
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Exterior General Conservation Work of Tower
Sculptures.
|
|
| Owner Solicitation Name: | Grassmowing and Related Services
|
| Owner Name: | O'Hara, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grassmowing and Related Services.
|
|
| Owner Solicitation Name: | New Single Axle Dump Truck
|
| Owner Name: | Forward, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New Single Axle Dump Truck 37,600 gvw.
|
|
| Owner Solicitation Name: | Mowing Contract
|
| Owner Name: | Conestoga Valley School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3 years grass mowing and trimming contract
beginning spring 04.
|
|
| Owner Solicitation Name: | Installation of an Emergency Generator and Associated Facilities
|
| Owner Name: | Tinicum Township
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of an Emergency Generator and
Associated Facilities.
|
|
| Owner Solicitation Name: | New Running Track and Related Improvements
|
| Owner Name: | West Shore School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | New Running Track and Related Improvements.
Running Track Resurfacing and Related
Improvements.
|
|
| Owner Solicitation Name: | Glass Block & Stainless Steel Wall System
|
| Owner Name: | Southeastern Pennsylvania Transportation Authority (SEPTA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply Glass Block & Stainless Steel Wall System
|
|
| Owner Solicitation Name: | Bituminous Overlay, ID-3, SRL-E between Milepost 56.38 and Milepost
|
| Owner Name: | Pennsylvania Turnpike Commission
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Milling and paving the roadway, performing
bituminous and concrete pavement patching and
slab stabilization, installing Sonic Nap Alert
Pattern and Snowplowable Raised Pavement Markers.
|
|
| Owner Solicitation Name: | Renovations to Phila City Hall 7th Floor - Sprinkler System
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sprinkler system renovations.
|
|
| Owner Solicitation Name: | Upgrade of Fire Alarm System at Upper Moreland Middle School
|
| Owner Name: | Upper Moreland Township School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Upgrade of Fire Alarm System
|
|
| Owner Solicitation Name: | Air Conditioner Units
|
| Owner Name: | Bucks, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase and installation of air conditioning
units.
|
|
| Owner Solicitation Name: | Gasoline, Diesel Fuel and Fuel Oil #2
|
| Owner Name: | York County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Gasoline, Diesel Fuel and Fuel Oil #2
dairy products and baked goods.
|
|
| Owner Solicitation Name: | Electrical Testing
|
| Owner Name: | Harrisburg Area Community College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical testing.
|
|
| Owner Solicitation Name: | Removal, Transportation and Disposal of Sludge
|
| Owner Name: | Schwenksville, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal, Transportation and Disposal of Sludge
from the WWTP.
|
|
| Owner Solicitation Name: | Fire Engine - Pumper
|
| Owner Name: | Derry Township Municipal Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of fire engine - pumper.
|
|
| Owner Solicitation Name: | Technology Contract for New Construction
|
| Owner Name: | Harrisburg School District
|
| Enginner Name: | Alexander Constructors, Inc.
|
| Plankeeper Name |
|
| Scope: | Technology Contract for School New Construction.
|
|
| Owner Solicitation Name: | Civil - Structural Engineering Services
|
| Owner Name: | Lehigh County, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Civil - Structural Engineering Services.
|
|
| Owner Solicitation Name: | Mechanical - Electrical Professional Services
|
| Owner Name: | Lehigh County, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mechanical - Electrical Professional Services.
|
|
| Owner Solicitation Name: | Janitorial Service
|
| Owner Name: | Bucks, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial Service. This contract will begin on
or about March 1, 2004 and run for one year.
|
|
| Owner Solicitation Name: | Fall Detection & Notification Systems
|
| Owner Name: | Bucks, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of fall detection and notification
systems.
|
|
| Owner Solicitation Name: | High Speed Internet Service
|
| Owner Name: | Bethlehem Area School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide High Speed Internet Service (10 Mb to 100
Mb).
|
|
| Owner Solicitation Name: | Cat 5E Cable Maintenance Contract
|
| Owner Name: | Bethlehem Area School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cat 5E cable maintenance contract to cover hourly
rate for additions (up to 150 cables) and
maintenance (up to 1000 existing cables).
|
|
| Owner Solicitation Name: | Cat 5E Patch Cords and Fiber Patch Cords
|
| Owner Name: | Bethlehem Area School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Cat 5E patch cords (up to 1000) and
fiber patch cords (up to 100).
|
|
| Owner Solicitation Name: | Manhole Cover Adjustments
|
| Owner Name: | Lancaster Area Sewer Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform all work necessary for or incidental to,
the adjustment of the manhole covers. Work to be
performed consists of the location, exposure and
adjustment of the manhole covers.
|
|
| Owner Solicitation Name: | HVAC System for the Collision Repair
|
| Owner Name: | Lancaster County Career and Technology Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of HVAC system, Brick, sand & mortar -
materials only hardwood flooring, tile and grout -
materials only and carpet - materials and
installation.
|
|
| Owner Solicitation Name: | Facilities HVAC Upgrade - All Campuses
|
| Owner Name: | Lancaster County Career and Technology Center
|
| Enginner Name: | Moore Engineering Company
|
| Plankeeper Name |
|
| Scope: | HVAC Upgrade.
|
|
| Owner Solicitation Name: | Plumbing, Heating and Fire Protection Services at Transfer Stations #1 & #3
|
| Owner Name: | Delaware County Solid Waste Authority (DCSWA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Plumbing, Heating and Fire Protection Services.
|
|
| Owner Solicitation Name: | Electrical Supplies
|
| Owner Name: | White Township
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical supplies.
|
|
| Owner Solicitation Name: | Site Development Contract
|
| Owner Name: | Amity, Township of
|
| Enginner Name: | Vitillo Group, Inc
|
| Plankeeper Name |
|
| Scope: | Site Development Project.
|
|
| Owner Solicitation Name: | Tree’s for Parks
|
| Owner Name: | Lancaster, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Tree’s for Parks.
|
|
| Owner Solicitation Name: | Partial Exterior Restoration
|
| Owner Name: | Norwood, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bulding restoration.
|
|
| Owner Solicitation Name: | Installation of Water Mains and Irrigation Connectors
|
| Owner Name: | Penn Manor School District
|
| Enginner Name: | ELA Group, Inc.
|
| Plankeeper Name |
|
| Scope: | Installation of 4,000 LF 4" PVC (with alternate
for DICL) water line, 250 LF 1" PE water line,
1,000 LF 2.5" PVC water line, meter pit
requiring high hazard box, and irrigation
connectors.
|
|
| Owner Solicitation Name: | Asbestos Removal and Additions and Alterations
|
| Owner Name: | Conneaut School District
|
| Enginner Name: | Foreman Architects & Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Additions and Alterations Project has the
following separate prime construction contracts:
General Construction, Roofing Construction,
General Casework Construction, Plumbing
Construction, HVAC Construction, Electrical
Construction, Deposits for the Additions and
Alterations.
|
|
| Owner Solicitation Name: | Replace Windows at Monococy Tower
|
| Owner Name: | Bethlehem Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacing windows at building - 11 story high
rise building.
|
|
| Owner Solicitation Name: | Building Handicapped Accessibility Improvements
|
| Owner Name: | South Central Community Action Programs, Inc.
|
| Enginner Name: | Gary W. Shaffer
|
| Plankeeper Name |
|
| Scope: | Contract 01: General Construction; Contract 02:
Wheelchair Lift.
|
|
| Owner Solicitation Name: | Fort Zeller Elementary School Additions and Renovations
|
| Owner Name: | Eastern Lebanon County School District
|
| Enginner Name: | Foreman Architects & Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | This Project has the following separate prime
construction contracts: General Construction,
Roofing Construction, Acoustical, Drywall, and
Plaster Construction, Hardwood Gymnasium,
Flooring Construction, Resilient FLooring and
Carpeting, Construction Food Service Equipment,
Construction General Casework, Construction
Plumbing Construction, HVAC Construction
Electrical Construction.
|
|
| Owner Solicitation Name: | Additions and Renovations to Ben Franklin PreK-8 School, Phase II
|
| Owner Name: | Harrisburg School District
|
| Enginner Name: | Bink Partnership, Inc.
|
| Plankeeper Name |
|
| Scope: | School building additions and renovations.
|
|
| Owner Solicitation Name: | Maintenance and Emergency Repairs to Wastewater Collection System and Water Distribution system
|
| Owner Name: | Dillsburg Area Authority
|
| Enginner Name: | CET Engineering Services, Inc.
|
| Plankeeper Name |
|
| Scope: | The work generally consists of routine sanitary
sewer line replacement, installation of water
services, rising of manhole frames for Township
paving each year and possible emergency repairs
to the system.
|
|
| Owner Solicitation Name: | Roof Replacement at Millcreek Education Center
|
| Owner Name: | Millcreek Township School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof Replacement.
|
|
| Owner Solicitation Name: | Swivel Mounted Valve & Vac System
|
| Owner Name: | East Hempfield, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Swivel Mounted Valve & Vac System.
|
|
| Owner Solicitation Name: | MSA Orion Gas Monitor & MSA Sampling Pump
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of MSA Orion Gas Monitor & MSA Sampling
Pump .
|
|
| Owner Solicitation Name: | Demolition of 15-17 E. Baltimore Pike
|
| Owner Name: | Media, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition and site restoration.
|
|
| Owner Solicitation Name: | Crestmont Pool Resurfacing
|
| Owner Name: | Abington, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pool Resurfacing.
|
|
| Owner Solicitation Name: | Engineering/Architectural Services for the Beaver Avenue Parking Structure Project
|
| Owner Name: | State College, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering/Architectural Services for the design
and construction of a multi-level parking
structure containing approximately 500 parking
spaces and 10,500 SF of commercial space.
|
|
| Owner Solicitation Name: | Boilers, Water Heaters, Baseboard and Heating Materials
|
| Owner Name: | Scranton Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Boilers, Water Heaters, Baseboard and
Heating Materials.
|
|
| Owner Solicitation Name: | Fire and Security Alarm System Maintenance
|
| Owner Name: | York Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fire and Security Alarm System Maintenance.
|
|
| Owner Solicitation Name: | FQ Hartman Stadium Demolition Project
|
| Owner Name: | Danville Area School District
|
| Enginner Name: | Anthony H. Visco, Jr., Architects
|
| Plankeeper Name |
|
| Scope: | Selected demolition of the existing structures.
|
|
| Owner Solicitation Name: | Renovations to 4th Floor Offices
|
| Owner Name: | Erie County Controller
|
| Enginner Name: | Kern & Grab Architects
|
| Plankeeper Name |
|
| Scope: | General Construction, Plumbing & HVAC, and
Electrical.
|
|
| Owner Solicitation Name: | Demolition of Residential Buildings
|
| Owner Name: | Highspire, Borough of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Conduct demolition work for the following three
(3) residential properties A: A two and one-half
story residential structure which is a two car
cinder block garage; B: A two and one-half story
wood frame residential structure which is
contaminated with mold. Also included is a large
wood frame storage shed; C: A one story modular
home. Also included is a small wood frame
accessory building. The winning bidder will be
responsible for utility termination, demolition
and disposal of all accessory buildings,
demolition and disposal of all principal
buildings, removal of rubbish, and final grading
and seeding.
|
|
| Owner Solicitation Name: | Remodeling/ Renovation/ Finish Work
|
| Owner Name: | West Vincent Township
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repair, Replace & Install Lamps & Ballast Kits.
|
|
| Owner Solicitation Name: | Old Towne Malvern Streetscape Improvements For Miner Street, Valley View Road and Old Lincoln Highway
|
| Owner Name: | Malvern Borough
|
| Enginner Name: | Edward B. Walsh & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Streetscape Improvements. General Construction:
and for Electrical Work and Street Lamp
Installation.
|
|
| Owner Solicitation Name: | Repairs to Concrete Flood Wall
|
| Owner Name: | Sunbury Municipal Authority
|
| Enginner Name: | Uni-Tec Consulting Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Replacement of cementitious plugs at the form tie
locations in the concrete walls and replacement
of the above grade sealant at the vertical
expansion and control joints in the concrete
walls.
|
|
| Owner Solicitation Name: | Landscaping/Irrigation and Related Work
|
| Owner Name: | Susquehanna Area Regional Airport Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Projec engineering, furnishing and planting of
trees, shrubs, ground cover, perennials, and
vines; furnishing and installation of all
planting accessories; and the design and
installation of an irrigation system. Plant
materials shall include one-year care and
replacement period.
|
|
| Owner Solicitation Name: | Elevator Renovation at Parkview Apartments
|
| Owner Name: | Armstrong County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Completion of Elevator Renovation.
|
|
| Owner Solicitation Name: | Elevator Renovations for Armstrong Court
|
| Owner Name: | Armstrong County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Completion of Elevator Renovations.
|
|
| Owner Solicitation Name: | Provide & Install Athletic Fields Fencing
|
| Owner Name: | Council Rock School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide & Install Athletic Fields Fencing.
|
|
| Owner Solicitation Name: | Geology Lab - Weyandt Hall Renovation
|
| Owner Name: | Indiana University of Pennsylvania, Engineering and Construction Office
|
| Enginner Name: | Engineering and Construction Group (IUP)
|
| Plankeeper Name |
|
| Scope: | Work will include but is not limited to removal
of existing ceilings, cabinets, lighting, wiring,
outlets, etc., furnishing and installing new
doors, air handling system, exhaust fans, fume
hood, wiring, conduit, lighting, outlets,
electrical service, etc.
|
|
| Owner Solicitation Name: | Design, Construction & Management of Municipal Websites
|
| Owner Name: | Allentown, City of, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design, Construction & Management of Municipal
Websites.
|
|
| Owner Solicitation Name: | Hiller Fire Hall Area Sanitary Sewer Replacement
|
| Owner Name: | Brownsville Borough Municipal Authority
|
| Enginner Name: | Fayette Engineering Company, Inc.
|
| Plankeeper Name |
|
| Scope: | 315 LF 12" sewer (6'-8'depth), 250 LF 12" sewer
(8'-10'depth), 30 LF 12" sewer (10'-12'depth), 5
EA 4' sanitary sewer manholes (0-6'depth), 12 VF
additional depth standard manholes, 60 LF 6" PVC
laterals, 3 EA 6" inspection ports, 110 LF
bituminous pavement replacement, 375 LF stone
paving replacement, 100 CY rock excavation, 25
EA underground utility coordination.
|
|
| Owner Solicitation Name: | Proposed Exterior and Interior Painting
|
| Owner Name: | Erie, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Exterior and interior painting.
|
|
| Owner Solicitation Name: | Heating, Plumbing, General Construction, Boiler & Piping Replacement
|
| Owner Name: | Sayre Area School District
|
| Enginner Name: | Vollmer Associates
|
| Plankeeper Name |
|
| Scope: | Separate contracts for Plumbing & Piping
Replacement, General Construction, Boiler &
Piping Replacement.
|
|
| Owner Solicitation Name: | Park Sewage System
|
| Owner Name: | Chestnuthill, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Park Sewage System construction.
|
|
| Owner Solicitation Name: | Construction of Northampton Water Treatment Plant
|
| Owner Name: | Northampton, Borough of
|
| Enginner Name: | Gannett Fleming, Inc.
|
| Plankeeper Name |
|
| Scope: | Construction of an 8 million gallon per day
water treatment plant including improvements to
existing raw water intake; increasing capacities
of two raw water pumping stations; construction
of new raw water main, carbon contact basins;
pre-treatment facilities including pre-treatment
chemicals; flocculators; plate settler process
units; filters; 1.0 million gallon clearwell and
post-treatment chemicals and UV disinfection;
high service pump station; wastewater
equalization basins; wastewater pumps and
sanitary waste facilities; new electrical
service; emergency power generator; power
distribution; HVAC and plumbing work; new
distributive control and data acquisition system
for operation of facility; laboratory,
administration facilities and garage and a new
carbon storage/feed facility. Open cut
installation of approximately 7,000 LF 4"-24"
piping.
|
|
| Owner Solicitation Name: | Handicap Access/Wayfinding & Social Room Renovations
|
| Owner Name: | Dept. of Veterans Affairs Medical Center, Acquisition Management
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovate the main entrance, corridor and Social
Room. Site work including roads, parking spaces,
sidewalks and site lighting. Architectural work
includes new entrances, doors and finishes.
Structural work will be required for the new
entrances. Lead paint and asbestos abatement work
will be included. Piping work including service
main relocations, toilet room piping and
sprinkler work will be required. Mechanical work
including ductwork renovations and Fan Coil Unit
installation are also part of this project.
Electrical work includes branch circuits and
service upgrades, fire alarm and toilet room
nurse call work.
|
|
| Owner Solicitation Name: | Fitness Center Renovations
|
| Owner Name: | Titusville YMCA
|
| Enginner Name: | Weber Murphy Fox, Inc.
|
| Plankeeper Name |
|
| Scope: | General Construction, Floor Finishes, Electrical
Construction.
|
|
| Owner Solicitation Name: | HVAC Renovations Whitmyre Hall
|
| Owner Name: | Indiana University of Pennsylvania, Engineering and Construction Office
|
| Enginner Name: | Engineering and Construction Group (IUP)
|
| Plankeeper Name |
|
| Scope: | Demolition of existing steam heating and hot
water systems and installation of new HVAC
Systems including: hot and chilled water piping,
packaged domestic and heating water systems,
packaged chilled water pumping system, fan coils,
air handling units, ductwork and controls, motors
starters, panels, etc.
|
|
| Owner Solicitation Name: | Air Conditioners, Room, Window and Wall-Mounted
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of air conditioners, room, window and
wall mounted.
|
|
| Owner Solicitation Name: | West First Street Sanitary Sewer Rehabilitation
|
| Owner Name: | Blawnox, Borough of
|
| Enginner Name: | Senate Engineering Company
|
| Plankeeper Name |
|
| Scope: | Contract A: Cured-in-Place 478 LF 15" sewer, 28
reconnection services, LS televising, LS traffic
control, LS bypass pumping, 55 VF manhole
rehabilitation.
Contract B is for Fold & Form rehabilitation of
the above quantities.
|
|
| Owner Solicitation Name: | Janitorial Services for the Cumberland County Government Buildings
|
| Owner Name: | Cumberland County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Janitorial services.
|
|
| Owner Solicitation Name: | Water Treatment Plant Upgrade
|
| Owner Name: | Charleroi Borough
|
| Enginner Name: | Chester Engineers
|
| Plankeeper Name |
|
| Scope: | Construction of the Water Treatment Plant
Upgrade: 92-W- general construction, 93-W-
electrical construction.
|
|
| Owner Solicitation Name: | New Stadium Field House
|
| Owner Name: | Harrisburg School District
|
| Enginner Name: | Hayes Large Architects
|
| Plankeeper Name |
|
| Scope: | Construction of a New Stadium Field House.
|
|
| Owner Solicitation Name: | Boiler Replacement at the Lewisburg High School
|
| Owner Name: | Lewisburg Area School District
|
| Enginner Name: | Larson Architectural Group, Inc.
|
| Plankeeper Name |
|
| Scope: | Boiler Replacement.
|
|
| Owner Solicitation Name: | Comprehensive Improvements to Existing Facilities
|
| Owner Name: | Bradford Housing Authority
|
| Enginner Name: | Thomas J. Freeman
|
| Plankeeper Name |
|
| Scope: | Comprehensive Improvements to Existing Facilitie.
New flooring, base, drywall, kitchen cabinets and
concrete patios s. EIFS repair, concrete patios,
concrete curbs and landscaping. Plumbing
Construction - Remove and reinstall kitchen sinks
and faucets. Electrical Construction - Mount
existing electrical boxes and replace devices.
Install new ceiling fans.
|
|
| Owner Solicitation Name: | 2004 Cleaning and Television Inspection and Cured-in-Place Lining
|
| Owner Name: | Oley Township Municipal Authority
|
| Enginner Name: | Spotts Stevens & McCoy, Inc.
|
| Plankeeper Name |
|
| Scope: | Clean and install cured-in-place liner and to
perform pre and post-construction televising of
sanitary sewer mains indicated in the project
specifications. All sanitary sewer mains under
this contract are 8" VCP. The total linear
footage of lining is estimated to be 2,385 LF.
Work includes reinstatement of all service
connection laterals and line access at manholes.
|
|
| Owner Solicitation Name: | Resilient Wedge Gate Valves & Tapping Valves
|
| Owner Name: | North Wales Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Resilient Wedge Gate Valves & Tapping
Valves, 4" - 12".
|
|
| Owner Solicitation Name: | Resilient Wedge Gate Valves & Tapping Valves
|
| Owner Name: | North Wales Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Resilient Wedge Gate Valves & Tapping
Valves, 16"-20".
|
|
| Owner Solicitation Name: | Ductile Iron Tapping Sleeves
|
| Owner Name: | North Wales Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Ductile Iron Tapping Sleeves, 8"-24".
|
|
| Owner Solicitation Name: | Iron Valve Boxes, Curb Boxes and Accessories
|
| Owner Name: | North Wales Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Iron Valve Boxes, Curb Boxes and
Accessories.
|
|
| Owner Solicitation Name: | Brass Corporations, Curb Boxes and Accessories
|
| Owner Name: | North Wales Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Brass Corporations, Curb Boxes and
Accessories.
|
|
| Owner Solicitation Name: | Compact Ductile Iron Mechanical Joint Fittings
|
| Owner Name: | North Wales Water Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of Compact Ductile Iron Mechanical Joint
Fittings.
|
|
| Owner Solicitation Name: | Janitorial Services
|
| Owner Name: | Fairview, Township of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Full janitorial services at three (3) locations.
|
|
| Owner Solicitation Name: | Resurfacing and Overlays
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 11,758 LF of milling and resurfacing, superpave
asphalt wearing course and guide rail update,
signing and pavement markings.
|
|
| Owner Solicitation Name: | Relocation and New Construction
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal of two existing bridges and their
reconstruction with single span replacements;
54,000 SF of roadway consisting of subbase, base,
binder, and wearing courses of various superpave
asphalt mix designs; 9,900 SF of plain cement
concrete pavement of various depths; 6,000' of
RCP of various sizes; traffic signalization;
sanitary sewer relocations; demolition; pavement
markings; and miscellaneous construction.
|
|
| Owner Solicitation Name: | Resurfacing and Overlays
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 25,146' of surfacing roadway with combinations of
superpave asphalt mixture design, HMA base
course, HMA binder course, HMA wearing course,
SRL-L and SRL-G, PG 58-28, 22 feet in width with
5' shoulders right and left; minor repairs to six
structures, drainage and guide rail improvements,
seeding, pavement markings and miscellaneous
construction.
|
|
| Owner Solicitation Name: | Slide Correction
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Slide repair including benching, rock placement,
subbase, superpave base, binder, and wearing
courses, drainage, removal of existing guide
rail, and other related work.
|
|
| Owner Solicitation Name: | Relocation and New Construction
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Four lane limited access arterial relocation;
including 2 interchanges, 3 signalized
intersections on the mainline, side road
construction and 5 signalized intersections, 3
single span bridge structures, one three span
bridge structure, 4 box culverts, 2 sound
barriers, one retaining wall and sign structures.
|
|
| Owner Solicitation Name: | Vegetation Management and Landscaping
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roadside development, furnishing and placement of
trees, shrubs, topsoil, mulch, erosion control
mats, herbicide spraying, pest control, seeding
and mowing within a length of 103,530 LF.
|
|
| Owner Solicitation Name: | Resurfacing and Overlays
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Widening, excavation, guide rail updates,
drainage improvements, seeding and soil
supplements, signing updates, and pavement
markings.
|
|
| Owner Solicitation Name: | Resurfacing and Overlays
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 3.328 MILES of resurfacing bituminous roadway.
|
|
| Owner Solicitation Name: | Bridge Painting
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge and ramp painting, crack retro-fit,
expansion dam repair, downspout cleaning and
repair, and other miscellaneous construction.
|
|
| Owner Solicitation Name: | Resurfacing and Overlays
|
| Owner Name: | Commonwealth of Pennsylvania Dept. of Transportation (PennDOT)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Milling and resurfacing, shoulders, base repair,
drainage, and other miscellaneous construction.
|
|
| Owner Solicitation Name: | Ford F550 4X4
|
| Owner Name: | Derry Township Municipal Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of new Ford F550 4X4 regular cable
chassis.
|
|
| Owner Solicitation Name: | Sullivan Run System - PH I Sewer Cleaning and Televising
|
| Owner Name: | Butler Area Sewer Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cleaning and internal television inspection of
approximately 272,500 LF of 6" through 18"
sanitary, and approximately 1.660 service
laterals with 15,000 LF of 6" and 67,000 LF of 4"
pipe.
|
|
| Owner Solicitation Name: | Demolition - Jefferson Square
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition work.
|
|
| Owner Solicitation Name: | Wayne Junction Railyard South Yard Remediation Project
|
| Owner Name: | Southeastern Pennsylvania Transportation Authority (SEPTA)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Excavation, transportation and disposal of PCB
soil within three (3) areas.
|
|
| Owner Solicitation Name: | Site Work/Paving
|
| Owner Name: | Wesley House Community Corporation, c/o CAADC
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Paving, site work.
|
|
| Owner Solicitation Name: | Roberts Valley Road Sanitary Sewer Extension
|
| Owner Name: | Susquehanna, Township of
|
| Enginner Name: | CET Engineering Services, Inc.
|
| Plankeeper Name |
|
| Scope: | construct approximately 1,300 LF of 8" gravity
sewer and appurtenances, 240 LF of 6" service
laterals, and installing eight manholes. In
addition the Work includes constructing
approximately 180 LF of 6" standpipe for fire
department use. Approximately 150 LF of the
sanitary sewer main and all of the standpipe is
required to be bored under two rail tracks. The
Work includes performing air testing on the
sanitary sewer main, service laterals, and
performing vacuum testing on the manholes.
|
|
| Owner Solicitation Name: | Transient Non-Community Water System Technical Assistance
|
| Owner Name: | Vermont Dept. of Buildings and General Services, Purchasing and Contract Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The vendor will provide technical assistance to
TNCs following positive total coliform samples,
potential contamination issues, and treatment
options and help with collecting water quality
samples time permitting.
|
|
| Owner Solicitation Name: | Demolition of 21 Properties
|
| Owner Name: | Berks County Redevelopment Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolition of 21 Properties.
|
|
| Owner Solicitation Name: | Purchase Of Plumbing Tools And Parts
|
| Owner Name: | Philadelphia Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase Of Plumbing Tools And Parts.
|
|
| Owner Solicitation Name: | Demolition - Ludlow
|
| Owner Name: | Philadelphia Procurement Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demilition work items.
|
|
| Owner Solicitation Name: | Sanitary Sewers Contract
|
| Owner Name: | Markleysburg Borough
|
| Enginner Name: | EADS Group, Inc.
|
| Plankeeper Name |
|
| Scope: | 1,180 LF of 10" PVC SDR35 gravity sewer lines,
21,560 LF of 8" PVC SDR35 gravity sewer line,
2,140 LF of 6" PVC SDR35 gravity sewer laterals,
14 grinder pumps and 1,800 LF of
2" pressure sewer and appurtenances.
|
|
| Owner Solicitation Name: | Sewage Plant
|
| Owner Name: | Markleysburg Borough
|
| Enginner Name: | EADS Group, Inc.
|
| Plankeeper Name |
|
| Scope: | General Contract includes the construction of a
75,000 GPD extended aeration sewage treatment
plant. Work on the sewage treatment plant
includes, but is not limited to, the construction
of a pump station, package treatment plant,
headworks structure, control building, air and
process piping, site work, and fencing.
Electrical Contract includes the construction of
electrical work for the sewage treatment plant.
Work includes, but is not limited to, power and
control wiring, emergency generator, panels,
motor starters, lighting and system controls.
|
|