| Owner Solicitation Name: | Electrical Repair Services
|
| Owner Name: | Ben Franklin Transit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical Repair Services.
|
|
| Owner Solicitation Name: | Tenant Improvement Project - Architectural Planning Services
|
| Owner Name: | Thurston, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide architectural space planning and design,
including construction document preparation, for
a remodel of approximately 30,770 SF of county
building office space, located in three locations
in or near the courthouse.
|
|
| Owner Solicitation Name: | Consultant Services for Cost Recovery and User Fee Study
|
| Owner Name: | Thurston, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Conduct a cost recovery and user fee study that
will assess and analyze the full costs of land
and building development review; environmental
health on site septic and well permitting;
building permit review and inspections; and all
related functions and produce fee rate/structure
alternatives that would recover appropriate costs.
|
|
| Owner Solicitation Name: | Infrastructure Planning for Water Systems in Lopez Village Urban Growth Area
|
| Owner Name: | San Juan County Permit Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Infrastructure Planning for Water Systems.
|
|
| Owner Solicitation Name: | Services to Repair Cummins Generator
|
| Owner Name: | Naval Undersea Warfare Center Division Keyport
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install new cylinder liners, pistons, piston
rings, rod bearings, main bearings, recondition
cylinder heads, recondition injectors and all
related seals and gaskets for a Cummins
Generator, Model No. VTA1710GS.
|
|
| Owner Solicitation Name: | Asbestos Removal
|
| Owner Name: | Grays Harbor PUD No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Assessment of existing conditions; design of all
necessary enclosures and air monitoring; securing
all needed permits; and furnishing all labor,
materials, and equipment necessary to perform the
removal of asbestos containing materials in the
operations building.
|
|
| Owner Solicitation Name: | Improvement of Herring Bridge on Smith Springs Road
|
| Owner Name: | Walla Walla County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removing an existing concrete bridge and
constructing an aluminum box culvert, removing
existing asphalt concrete pavement, grading,
placing crushed surfacing, paving with asphalt
concrete, and other work.
|
|
| Owner Solicitation Name: | Pole Testing and Treating
|
| Owner Name: | Douglas County PUD #1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pole Testing and Treating.
|
|
| Owner Solicitation Name: | Drive Sheet Piling
|
| Owner Name: | Marshland Flood Control Dist.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Drive sheet piling into the ground upland of the
high water mark of the River in order to mitigate
erosive subsurface action as well as stabilize
and reinforce the bank of the River, especially
during periods of high water.
|
|
| Owner Solicitation Name: | Construction Engineering Services
|
| Owner Name: | Mossyrock, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Develop plans, specifications, estimates and, if
performance is satisfactory, provide construction
engineering for the Transportation Improvement
project, Phase 1.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services - Van Asselt Community Center Expansion
|
| Owner Name: | Seattle Parks and Recreation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide architectural and engineering services
for the Community Center expansion. Provide site
planning; and design and construction
supervision. The project calls for expansion of
an existing community center with a multipurpose
room, kitchen, and activity rooms.
|
|
| Owner Solicitation Name: | Upgrade E-911 ANI ALI Controller, Telephone Consoles, Radio Consoles, and Management Information System
|
| Owner Name: | Lewis County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Upgrade E-911 ANI ALI controller, telephone
consoles, radio consoles, and management
information system.
|
|
| Owner Solicitation Name: | Administration Campus Asphalt Replacement and Overlay
|
| Owner Name: | Kent School District No. 415
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asphalt Replacement and Overlay.
|
|
| Owner Solicitation Name: | Benton County Employee Parking Lot
|
| Owner Name: | Benton County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct an additional employee parking lot,
approximately 38,640 SF.
|
|
| Owner Solicitation Name: | Street Improvements of Lacey Street from Hartson Avenue to 5th Avenue
|
| Owner Name: | Spokane Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of approximately 405 CY of
excavation and embankment, 140 LF of sidewalk,
1,980 SY of 3" thick asphalt pavement, sundry
utility adjustments, and other related
miscellaneous items.
|
|
| Owner Solicitation Name: | Freya Street Sprague Avenue to Alki Avenue
|
| Owner Name: | Spokane Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of approximately 12,920 SY of
Portland Cement Concrete Pavement, 5,271 CY of
excavation and embankment, 1,150 LF of concrete
curb, relocation of approximately 765 LF of
railroad spur, replacement of traffic signal
equipment, sundry utility adjustments, and other
related miscellaneous items.
|
|
| Owner Solicitation Name: | One (1) or More Crack Sealing Machines
|
| Owner Name: | Kitsap County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of One (1) or More Crack Sealing
Machines.
|
|
| Owner Solicitation Name: | 750 tons Annual Use of CRS-2P Bitumels
|
| Owner Name: | Yakima, City of, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply 750 tons of CRS-2P bitumels (liquid
asphalt) for the Streets Division.
|
|
| Owner Solicitation Name: | Residential Lead-Based Paint Testing and Inspection Services
|
| Owner Name: | Spokane Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Residential Lead-Based Paint Testing and
Inspection Services.
|
|
| Owner Solicitation Name: | Design and Install a Permitted Fire Alarm System in the Newporter Apartments
|
| Owner Name: | King County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design and install a fire alarm system in an
apartment building. Provide for design; permit
review; and installation and covering with
architectural crown molding to cover wire.
Alternate No. 1 includes installation of a 110-
volt carbon monoxide detector in each apartment.
Alternate No. 2 includes installation of a 110-
volt smoke detector in each apartment.
|
|
| Owner Solicitation Name: | Colfax School District Addition & Modernizations
|
| Owner Name: | Colfax School Dist. 300
|
| Enginner Name: | Architects West, Inc.
|
| Plankeeper Name |
|
| Scope: | School District Addition & Modernizations.
|
|
| Owner Solicitation Name: | Ridgeway Omega Residence Hall Renovation
|
| Owner Name: | Western Washington University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Residence Hall Renovation.
|
|
| Owner Solicitation Name: | Cowlitz County Jail Annex
|
| Owner Name: | Cowlitz County Commissioners
|
| Enginner Name: | DLR Group
|
| Plankeeper Name |
|
| Scope: | County Jail Annex.
|
|
| Owner Solicitation Name: | 248-AE-04-001
|
| Owner Name: | Dept. of Health & Human Services, Indian Health Service
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | A) Design of four reinforced concrete treatment
cells, an effluent tank, a fiberglass deck and
rail system, a concrete block building,
electrical controls, electrical service, standby
power and lighting for a 200,000 GPD wastewater
treatment plant. B) Design of a 120,000 gallon
reinforced concrete flocculation/sedimentation
tank, a 100,000 gallon reinforced concrete
chlorine contact tank, a concrete block building,
electrical controls, electrical service,
integration of existing tank level controls,
sizing of standby power and lighting for a 500
GPM filtration water treatment plant.
|
|
| Owner Solicitation Name: | Energy Service Company Services
|
| Owner Name: | Wilbur Consolidated School Dist. 200
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide energy service company (ESCO) services
that involves boiler and temperature control
replacement for the existing campus. The ESCO
will be responsible to calculate energy savings;
design the new boiler and controls; remove the
existing boiler and controls; install the new
boiler(s) and controls; and commission the new
boiler system. The existing boiler system is
known to contain hazardous materials, and
abatement prior to demolition is the
responsibility of the ESCO.
|
|
| Owner Solicitation Name: | Chiller Retrofit
|
| Owner Name: | University of Washington, Purchasing/Accounting Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Chiller Retrofit.
|
|
| Owner Solicitation Name: | Aldercrest Annex Gym Rehabilitation
|
| Owner Name: | Shoreline School District 412
|
| Enginner Name: | Northwest Architectural Company
|
| Plankeeper Name |
|
| Scope: | Gym Rehabilitation.
|
|
| Owner Solicitation Name: | Door Replacement and Bedroom Floor Covering
|
| Owner Name: | Kitsap Consolidated Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Door Replacement and Bedroom Floor Covering.
|
|
| Owner Solicitation Name: | Overhead Door On-Call Maintenance, Repair, Replacement, and Installation Services
|
| Owner Name: | Spokane County, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Overhead door on-call maintenance, repair,
replacement, and installation services.
|
|
| Owner Solicitation Name: | Electrical On-Call Maintenance, Repair, Replacement, and Installation Services
|
| Owner Name: | Spokane County, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical on-call maintenance, repair,
replacement, and installation services.
|
|
| Owner Solicitation Name: | King County International Airport - South Stormwater Pump Station Upgrade
|
| Owner Name: | King County Professional/Construction, Contracts Counter
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove the existing stormwater pumps, motors, and
electrical controls; provide and install new
submerged pumps and motors; and provide and
install new electrical controls at the
International Airport. The project is to replace
the existing above ground pumping system with
four new 10,025 gpm submersible pumps and
associated electrical control systems.
Subcontracting opportunities include mobilization
and site preparation; pump replacement; and
installation of new controllers.
|
|
| Owner Solicitation Name: | Engineering Services - Convention Center Expansion
|
| Owner Name: | Spokane Public Facilities District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Geotechnical, Environmental, Miscellaneous Civil,
Structural, Mechanical and Electrical
Engineering, Special Inspection and
Commissioning. Project includes a 100,000 SF
exhibit hall, an elevated loading dock/mezzanine
parking garage and an elevated enclosed walkway
between the Exhibit Hall and the existing
Convention Center. The CCX project also includes
substantial renovation and remodel of the
existing Convention Center and development of a
surface parking lot on the block due south of the
Convention Center.
|
|
| Owner Solicitation Name: | Value Engineering
|
| Owner Name: | Olympia School District #111
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Study and evaluate the design of modernized and
expanded school facilities. The studies should
comply with WAC 180-27-080 and also must
generally conform in scope, content, and product
with Superintendent of Public Instruction (SPI)
guidelines.
|
|
| Owner Solicitation Name: | Greater Tacoma Convention Center Hardscape and Landscape BP 215
|
| Owner Name: | Tacoma Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hardscape and Landscape.
|
|
| Owner Solicitation Name: | Landscape Design Services Emphasizing Resource Efficient Demonstration Gardens for Four New Tacoma Police Substations
|
| Owner Name: | Tacoma Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Landscape design services required include
concepts, design development and construction
document production for the landscape design of
four new Police Substations.
|
|
| Owner Solicitation Name: | Telephone System
|
| Owner Name: | Kirkland Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide new voice systems and services. The owner
will replace telephone systems and centralized
voice messaging service for all locations
currently connected to City Hall, and will add
some locations. The acquisition will include IP
or TDM/IP Hybrid telephony architecture (VoIP)
systems.
|
|
| Owner Solicitation Name: | Sunset Drive to McLeod Road ES-236 Engineering Design Services
|
| Owner Name: | Bellingham Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide professional engineering design services
for the road improvement project. The project
consists of widening the road to accommodate four
lanes of traffic, curbing, sidewalks, street
lights, landscaping, and drainage.
|
|
| Owner Solicitation Name: | Medium Voltage Cable Replacement
|
| Owner Name: | Western Washington University
|
| Enginner Name: | Kenneth Kok, PE
|
| Plankeeper Name |
|
| Scope: | Medium Voltage Cable Replacement.
|
|
| Owner Solicitation Name: | Friday Harbor Ferry Terminal Preservation Project
|
| Owner Name: | Washington Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Extension of the trestle and installation of new
towers, headframe,transfer span, wingwalls,
dolphins and a restroom in the holding lanes,
repair of the bulkhead and renovation of the
terminal building, traffic control and other work.
Approximate Quantities: 1 EA oil/grit separator,
58 LF molded trench drain, 10517 fabricating
coated st piling, 130 EA driving st pile, 8 EA
unanchored micropile, 9 EA anchored micropile, 17
EA micropile shell, 5 EA drilled shaft, 84115 LB
epoxy -coated st rebar, 226 CY conc CL 4000 for
struct, 3108 SF precast prestressed channel
beams, 53 MBM timber and lumber – treated, 11 MBM
timber and lumber – untreated, 350 T HMA CL ½ IN
PG 64-22. Lump Sum Bids for: Clean exist drainage
struct, sanitary sewer sys, temp transfer span,
towers and headframe, main slip span, towers and
headframe, remove and re-install gangway,
relocate 2 pile dolphin, temp protective dolphin,
struct carbon st - temp struct, main slip struct,
wingwalls, dolphins, cast st bridge shoes, bubble
curtain, fiberglass decking, non-skid surface
coating, slipresistant coating for wood, marine
fenders, polyethylene rubbing face, marine
lantern and reflective triangle, birdwire sys and
birdpoint 3, misc items, temp traffic control
devices, ADA parking stall, reconstruct exist ped
walkway, surveying, basic electrical
requirements, transfer span power and control sys
requirements, packaged 5 engine generator sys,
heat tape, customer metering, hoist and
counterweight cable sys, hydraulic sys for vehicle
transfer spans, mechanical and controls
integration, water supply sys, insulation,
maintenance and protection of traffic, security
gates and fencing, restroom building, terminal
building and canopy.
|
|
| Owner Solicitation Name: | Saint Edward State Park Seminary Building Earthquake Repairs
|
| Owner Name: | Washington State Parks & Recreation Commission, Engineering Services Dept.
|
| Enginner Name: | Reid Middleton, Inc.
|
| Plankeeper Name |
|
| Scope: | Repair plaster, window glass, ceiling tiles, and
painting. Major exterior work includes repairing
damaged brick masonry and fabricating two
ornamental concrete arches; resetting loose
concrete capstones; reinstalling damaged veneer;
reconstructing the chimney; and installing copper
flashing.
|
|
| Owner Solicitation Name: | Consulting Services for Headquarters Campus Stormwater Optimization Study
|
| Owner Name: | Pierce Transit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide environmental planning and engineering
consultant services.
|
|
| Owner Solicitation Name: | Architect-Engineer Indefinite Delivery Type Contract for Multi-Discipline Services
|
| Owner Name: | US Army Corps of Engineers, Seattle District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide multi-discipline Architect-Engineer (A-E)
services for electrical and mechanical design,
abbreviated design, and construction support
services.
|
|
| Owner Solicitation Name: | Water Distribution System Replacement Project, Phase I
|
| Owner Name: | Ione, Town of
|
| Enginner Name: | Thomas, Dean & Hoskins, Inc.
|
| Plankeeper Name |
|
| Scope: | Open cut install 8,000 LF of 8" and 1,000 LF of
6" PVC water distribution main with various
fittings,
valves, and connections; install 120 water
services including saddles, corporation stops,
service lines, meter boxes and lids, meters,
meter setters and connections to existing
service lines; and install of 20 new fire
hydrants and auxiliary valves along with the
removal of existing hydrants.
|
|
| Owner Solicitation Name: | Electrical Work for One New Two-Classroom Portable Units at Ilalko Elementary School
|
| Owner Name: | Auburn School Dist. 408
|
| Enginner Name: | Hargis Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Electrical Work for One New Two-Classroom
Portable Units at Elementary School.
|
|
| Owner Solicitation Name: | MP 3.87 to Ski Park Road - Safety Improvements
|
| Owner Name: | Washington Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Requires: Removing miscellaneous traffic items,
sawcutting and removing existing shoulder,
planing bituminous pavement, placing crushed
surfacing base course and hot mix
asphalt, permanent signing, pavement markings,
traffic control and other work. 10 Working days.
Involves 26 items. 140 CY rdwy excav incl haul,
132 T crushed surface base course, 1180 SY plane
bit pvmt, 240 T HMA CL ½ IN PG 58-22, 2600 LF
paint line, 132 SF const signs.
|
|
| Owner Solicitation Name: | Roofing Package #5
|
| Owner Name: | Richland School District, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roofing.
|
|
| Owner Solicitation Name: | SR 106 to Brockdale Rd.
|
| Owner Name: | Washington Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pavement repair, preleveling, overlaying with hot
mix asphalt, bridge expansion joint
modifications, guardrail nesting, permanent
signing, traffic control and other work. 25
Working days. Involves 42 items. 48 LF expansion
joint mod, 6 MI shoulder finish, 3447 SY plane
bit pvmt, 8390 T HMA PG 58-22, 426 LF sawcut and
seal bridge joint, 71800 LF paint line, 54 EA
plastic drainage marking, 25000 LF
temp pvmt marking, 3 EA port change mess sign,
395 SF const Signs CL A, 5 EA adjust junction box.
|
|
| Owner Solicitation Name: | Roosevelt High School - Terra Cotta and Brick Masonry Preservation and Restoration, Determination of Eligibility
|
| Owner Name: | Seattle School District, Contracting Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide terra cotta and brick masonry
preservation and restoration for the High School
renovation. The project consists of a renovation
and modernization of an existing 175,000 SF
structure built in 1922, and construction of an
approximately 120,000 SF addition.
|
|
| Owner Solicitation Name: | Columbia Theatre Motorized Line-Shaft Rigging Installation
|
| Owner Name: | Longview, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of the existing rigging suspending
the four lighting battens above the theatre stage
with a new motorized line-shaft rigging system
and all associated electrical work and such other
work as may be necessary in connection therewith.
|
|
| Owner Solicitation Name: | Columbia Theatre Marquee
|
| Owner Name: | Longview, City of
|
| Enginner Name: | Michael Jones Architect, PS
|
| Plankeeper Name |
|
| Scope: | Structural steel framing, decorative finish,
illumination, reader board and installation of
metal art work.
|
|
| Owner Solicitation Name: | Ice Harbor Lock and Dam 121KV Circuit Breakers
|
| Owner Name: | US Army Engineer District, Walla Walla
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install seven (7) Government furnished outdoor
sulfur hexafluoride (SF6) gas circuit breakers
rated 121 kV, 2000 amperes. Breakers will be
three-pole, single-throw, fully automatic,
outdoor dead tank type with single pressure
interrupter units using the puffer princip le and
with pneumatic, hydraulic, or spring operating
mechanism. Remove and dispose of the associated
conduit and control, power, instrumentation, and
relaying wiring to the existing breaker control
cabinet. Remove and dispose of the existing seven
(7) o il circuit breakers including oil, bushings
and breaker tanks. Furnish and install new molded-
case air circuit breakers and operating
mechanisms in the Government Unit Control Boards
SU1, SU2 and SU3. Furnish and install new
conduits from the existing tr ansformer deck
conduits to the control cabinets of the new
circuit breakers. Furnish, install, and test new
cables for control, relaying, and power for the
new circuit breaker. Remove and dispose of the
excess existing circuit breaker oil in the
project storage tanks, approximately 4500
gallons.
|
|
| Owner Solicitation Name: | Additions and Alterations to Wenatchee High School
|
| Owner Name: | Wenatchee School Dist. 246
|
| Enginner Name: | DOH Associates, PS
|
| Plankeeper Name |
|
| Scope: | Demolish exterior walks, ramps, and stairs;
demolish the exterior entries near the Commons
and Auditorium which consist of brick masonry
colums, walls, and precast concrete roof
sections; and demolish the existing storefront
and masonry walls along with some interior
demolition, all as required to perform the new
work. The new construction will consist of an
addition of approximately 11,350 GSF for the
Commons and 2,650 GSF for the new Entry and
Administration Offices. Renovation will include
approximately 13,900 GSF of interior space for
the Commons, Entry, and Office area(s). Exterior
site work will include approximately 36,000 GSF
of ramps, walks, and stairs along with planted
lawn/grass and planting beds. In addition,
parking lot islands and adjacent planters total
approximately 12,500 GSF.
|
|
| Owner Solicitation Name: | North Hall Building 7 and Mortuary Building Demolition
|
| Owner Name: | Western State Hospital
|
| Enginner Name: | Northwest Architectural Company
|
| Plankeeper Name |
|
| Scope: | Building Demolition.
|
|
| Owner Solicitation Name: | Main Pier Repair and Float Replacement
|
| Owner Name: | Friday Harbor, Port of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform repair and maintenance to an existing
timber dock; replace approximately 2,000 SF of
marina floats; remove approximately 20 timber
pile; install approximately 15 new steel piles;
three new timber pile; install timber cross
bracing; and replace two existing timber pile
caps.
|
|
| Owner Solicitation Name: | Issaquah Ninth Grade Campus
|
| Owner Name: | Issaquah School District #411
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct a new Campus, including all site
development, off-site improvements, and an
approximately 110,000 SF two-story building.
|
|
| Owner Solicitation Name: | Fine Arts Building Re-Roof
|
| Owner Name: | Western Washington University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fine Arts Building re-roof.
|
|
| Owner Solicitation Name: | Athletic Field, Track, and Court Surfacing
|
| Owner Name: | King County Directors' Association, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide athletic field, track, and court
surfacing.
|
|
| Owner Solicitation Name: | Evaluation of Development Permitting Process
|
| Owner Name: | Pierce County, Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Analyzing development regulations and permitting
processes.
|
|
| Owner Solicitation Name: | Architectural Services - CRC Plaza Deck Roof and Skylight Repair
|
| Owner Name: | Evergreen State College, Office of Facilities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide design and construction administration
services to replace about 7,000 SF of asphalt
modified urethane waterproofing membrane below
the plaza deck paver system at the Recreation
Center, and repair or replacement of leaking
glass skylights. Provide a full range of
architectural and engineering services including
needs verification; design; cost estimating;
construction documents; permitting; bidding; and
construction administration.
|
|
| Owner Solicitation Name: | Kopachuck Middle School, Key Peninsula Middle School, and Voyager Elementary School Mechanical Improvements
|
| Owner Name: | Peninsula School Dist. 401
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mechanical Improvements at two Middle Schools and
one Elementary School.
|
|
| Owner Solicitation Name: | Day Road to Bainbridge Island City Hall Wide Area Network (WAN)
|
| Owner Name: | Kitsap County PUD #1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction/installation and testing of various
strand count single-mode fiber optic cable,
building entrances and other associated materials.
|
|
| Owner Solicitation Name: | Redmond Way Access Improvements
|
| Owner Name: | Redmond City Clerk
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform clearing and grubbing; demolish existing
curb, gutter, and sidewalk; remove pavement;
remove traffic signal; remove trees; construct
roadway widening; new traffic signals; traffic
signal modification; lighting; drainage
improvements; waterline replacements and other
utility work; paving; curbing; driveways;
landscaping; and striping.
|
|
| Owner Solicitation Name: | New Federal Way City Hall Tenant Improvements - Low Voltage Data and Voice Cabling
|
| Owner Name: | Federal Way, City of
|
| Enginner Name: | David A. Clark Architects PLLC
|
| Plankeeper Name |
|
| Scope: | Low Voltage Data and Voice Cabling.
|
|
| Owner Solicitation Name: | Irvine Slough Pump Station Upgrade
|
| Owner Name: | Stanwood, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform work that includes a new stormwater pump
and electrical system upgrade.
|
|
| Owner Solicitation Name: | HVAC and Roof Replacement at Arlington Elementary School - Rebid
|
| Owner Name: | Spokane School Dist. 81
|
| Enginner Name: | Bernardo-Wills Architects, PC
|
| Plankeeper Name |
|
| Scope: | HVAC and Roof Replacement at Elementary School.
|
|
| Owner Solicitation Name: | HVAC and Roof Replacement at Sheridan Elementary School - Rebid
|
| Owner Name: | Spokane School Dist. 81
|
| Enginner Name: | Bernardo-Wills Architects, PC
|
| Plankeeper Name |
|
| Scope: | HVAC and Roof Replacement at Elementary School.
|
|
| Owner Solicitation Name: | Kent Springs Telemetry and Controls Upgrade
|
| Owner Name: | Kent, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Upgrade each site with a Siemens S7 Programmable
Logic Controller (PLC); Siemens Operator
Interface Terminal (OIT); radio modem; modified
communications connections; and other items.
|
|
| Owner Solicitation Name: | HVAC and Roof Replacement at Willard Elementary School - Rebid
|
| Owner Name: | Spokane School Dist. 81
|
| Enginner Name: | Bernardo-Wills Architects, PC
|
| Plankeeper Name |
|
| Scope: | HVAC and Roof Replacement at Elementary School.
|
|
| Owner Solicitation Name: | Spokane County Fire District #1 Station #8
|
| Owner Name: | Spokane County Fire Dist. #1
|
| Enginner Name: | Lindquist Architects
|
| Plankeeper Name |
|
| Scope: | Construction of new Fire Station.
|
|
| Owner Solicitation Name: | Engineering, Design, and Construction Management for Federal Aviation Administration-Sponsored Projects
|
| Owner Name: | Bellingham, Port of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The capital project functions include survey;
geotechnical investigation and evaluation;
engineering; conceptual design with alternatives;
cost estimating and scheduling; detail design;
FAA design report; permitting; bid documents;
construction management; and FAA grant and
project closeout documentation. The project will
be engineered and designed in 2004 with the
construction to take place in 2005. The project
generally consists of reconstructing and/or
overlaying three taxiways, and the northern
portion of the commercial apron. The project will
also include relocating the affected taxiway edge
lights and signage.
|
|
| Owner Solicitation Name: | Design, Supply, and Services for Installation of Draft Tube Gate Hoist Equipment - Main Canal Headworks Power
|
| Owner Name: | Grand Coulee Hydroelectric Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply gate hoist equipment for bulkhead gate
weighing approximately 132,000 pounds; and design
and supply gate hoist equipment in accordance
with application industry standards, regulatory
requirements, and owner-supplied specifications
and services of supervising erector for on-site
installation.
|
|
| Owner Solicitation Name: | Architect-Engineering Services for Hydrographic Survey and Mapping Services
|
| Owner Name: | US Army Engineer District, Walla Walla
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | (1) High order accuracy multi-beam bathymetric
surveys for dam stilling basin analysis,
navigation channel status and quantity
determinations; (2) Hydrographic transect and
topographic surveys designed for riverbed
condition analysis, profiling and quantity
determinations; (3) Real time global positioning
system (GPS) control surveys for hydrophone and
transducer instrumentation monitoring in support
of fish behavioral studies. (4) Conventional land
surveying encompassing geodetic control,
cadastral and boundary surveys, standard and
valley type transect surveys, topographic,
engineering design, and construction surveys; (5)
Photogrammetric control surveys for pre-mark
panel establishment with three dimensional
positioning in support of Standard, Aerial Global
Positioning System, and Light Detection and
Ranging (LIDAR) surveys; (6) Utilization of
aircraft, dual frequency gps, electronic
directional and leveling instruments, automated
data collection, and fully integrated echo
sounding equipment and positioning systems with
22 to 26' survey vessel is required. Specified
bathymetric work may require the incorporation of
side-scan sonar, acoustic doppler profiler or
other water quality instrumentation to meet
Government requirements; (7) Mapping in two and
three dimensions explicit to required
conventional and hydrographic surveys; (8)
Photogrammetric mapping services consisting of
stereo and/or analytical compilation, digital
orthophotgraphy production, aerial photo
processing, generation and/or scanning of vector
drawings from photos and raster files, and
Geographics Information Services (GIS) including
digital file translations to alternate formats;
(9) Automated data processing with Computer-Aided
Design and Drafting (CADD) systems employing
standard to the industry equipment, hardware and
software. Resulting graphic data sets and file
formats must be completely compatible with, and
be capable of being loaded directly to, the
Bentley Systems Inc. “Microstation" (DGN)
processing software; (10) Production and
recordation of cadastral/boundary maps and
documents according to appropriate State and
County requirements.
|
|
| Owner Solicitation Name: | Campground Maintenance
|
| Owner Name: | Colville, Okanogan and Wenatchee National Forests
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Campground Maintenance.
|
|
| Owner Solicitation Name: | Snowberry Bowl Campground Shelter, Chelan Ranger District
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-6 Eastern Washington ZAP, Wenatchee NF
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of an open-air, treated timber
picnic shelter with a hardened, native material
floor. Site work, concrete, carpentry, metal
shake roofing, installation of Government-
furnished picnic tables and construction of
hardened, native material access trails from
hearby group camp sites. Construction of a native-
stone fireplace with concrete pad.
|
|
| Owner Solicitation Name: | Construction Management Services
|
| Owner Name: | Nine Mile Falls School Dist. 325
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide construction management services in
connection with proposed elementary additions and
modernizations, high school science room
expansion, and other district related projects.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services
|
| Owner Name: | Nine Mile Falls School Dist. 325
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide architectural and engineering services in
connection with proposed elementary additions and
modernizations and high school science room
expansion, as well as providing general services
as required by the district for the next five
years.
|
|
| Owner Solicitation Name: | Architectural Services
|
| Owner Name: | Everett School Dist. No. 2, Purchasing
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide architectural services for a new bus
maintenance operations facility, and a parking
expansion at High School.
|
|
| Owner Solicitation Name: | Fire Alarm Testing Services
|
| Owner Name: | King County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fire alarm testing services.
|
|
| Owner Solicitation Name: | Water Utility Materials
|
| Owner Name: | Port Angeles, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Schedule A: Provide water meters; and Schedule B:
Provide water pipes and fittings.
|
|
| Owner Solicitation Name: | Main Jail Chilled Water Modification
|
| Owner Name: | Pierce County Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Connect chilled water piping from the fifth floor
of the County-City Building to the chilled water
piping of the main jail. Reconfigure the piping
in the fifth floor jail mechanical room to
accommodate the piping changes. Reconfigure the
main jail HVAC controls system to be compatible
with the existing chilled water system and feed
from the County-City building’s chilled water
system. Balance the chilled water and condensing
water systems. Alternate No. 1: Remove existing
Coats electric boiler and wiring. Remove the
electrical service to the boiler back to the
electrical distribution center panel; Alternate
No. 2: Replace the existing Honeywell XL 500
control components with Lon-based hardware,
connected to the nearest existing Tridium Jace
controller. The location is on the fourth floor
of the Jail and West of the Mechanical Room
approximately 50'. Program the new controller to
retain the necessary existing operation
sequences, and the modifications specified
herein. Reprogram the operator’s interface with
control graphics for the system so the end result
is similar to that previously specified;
Alternate No. 3: Provide and install new BTU
Monitor. Connect to existing Tridium Lon network
and create graphics to display all available data
at Tridium workstation. Set up trend logs to
capture BTU consumption data hourly; Alternate
No. 4: Remove one of the two chillers (Model
HR19. 180 ton) in the Main Jail. This chiller
contains R-11 refrigerant, which must be removed
and properly disposed. Remove the electrical
service for chiller 2 back to the existing panel
board. Remove all control wiring back to the
Honeywell panel; support beams for chiller are to
remain; Alternate No. 5: Install Two Variable
Speed Drives to pumps. This includes connection
and programming to the existing Honeywell DDC
system base bid or as specified with Alternate
Bid No. 2.
|
|
| Owner Solicitation Name: | Remote Site Security System
|
| Owner Name: | Clark County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remote Site Security System.
|
|
| Owner Solicitation Name: | Supply and Install a Digital Video Surveillance System
|
| Owner Name: | Tonasket School Dist. 404
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and install a digital video surveillance
system.
|
|
| Owner Solicitation Name: | Pre-Design, Design, Contract Administration and Related Professional Services
|
| Owner Name: | Puyallup School District #3, Facilities Dept./Construction Div.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide pre-design, design, contract
administration, and related professional services
for elementary, secondary (junior high and senior
high), and other misc projects.
|
|
| Owner Solicitation Name: | ESB Skylight Modification Project at the Environmental Services Building
|
| Owner Name: | Pierce County Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fabrication and installation of fabric baffles
between and perpendicular to Kalwall panels to
create a troffer-like baffle matrix in order to
limit direct sunlight penetration.
|
|
| Owner Solicitation Name: | Centralia Family Housing
|
| Owner Name: | Centralia Family Housing
|
| Enginner Name: | Environmental Works
|
| Plankeeper Name |
|
| Scope: | 46 units of new construction. The project will
consist of five buildings of type V-1 hour
construction and one building of type VN
construction.
|
|
| Owner Solicitation Name: | Bentley Carpet
|
| Owner Name: | University of Washington, Purchasing/Accounting Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Carpet Installation.
|
|
| Owner Solicitation Name: | Engineering Services to Develop a Coordinated Capital Facilities Plan
|
| Owner Name: | Rock Island, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Develop a coordinated capital facilities plan
(CCFP) for infrastructure improvements; develop a
coordinated set of planning documents which
evaluate water, sewer, street, and drainage
system needs; and produce a final CCFP document
which will compile and prioritize water, sewer,
street, and drainage system needs into a single,
coordinated plan.
|
|
| Owner Solicitation Name: | Engineering and Representative Services
|
| Owner Name: | Tacoma, Port of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide design, planning, programming, and
engineering services for a Communications Network
Infrastructure Upgrade; Security and Alarm System
Integration; and Security Command Center
Enhancement. Qualifications submitted may also be
used to select a separate person or firm to
assist the owner during the design phase as the
owner's representative and to provide project
management services.
|
|
| Owner Solicitation Name: | Recreation Software
|
| Owner Name: | Asotin County Aquatic Center Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide recreation software.
|
|
| Owner Solicitation Name: | Tri-Cities Airport Improvements, Runway 30 Reconstruction - Rebid
|
| Owner Name: | Tri-Cities Airport/Port of Pasco
|
| Enginner Name: | JUB Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | Reconstruct 3,850 LF of Runway, to include:
Pavement removal; rotomilling; excavation; cement
treated base; asphalt surfacing; and striping.
|
|
| Owner Solicitation Name: | NEPA Consultant Services
|
| Owner Name: | Port of Vancouver
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Assist the owner in selecting a qualified
consultant to provide technical support and
assistance in preparing the required permits and
transitioning into the National Environmental
Policy Act (NEPA) for the Columbia Gateway
development.
|
|
| Owner Solicitation Name: | IBM z900 Model 2064-104 Processor
|
| Owner Name: | Washington Dept. of Information Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide an IBM 2064-104 computer processor, with
a three-year Extended Maintenance Option.
|
|
| Owner Solicitation Name: | Engineering Services - Parking Expansion
|
| Owner Name: | Thurston, County of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide civil engineering services for
construction of a parking expansion. Establish
program requirements; prepare plans and
specifications; evaluate alternative solutions;
and produce comparative cost estimates for those
alternative solutions.
|
|
| Owner Solicitation Name: | Medium Duty Diesel Trucks with Body and Lift
|
| Owner Name: | King County Library System
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide two medium duty diesel trucks with body
and lift.
|
|
| Owner Solicitation Name: | Traffic Paint
|
| Owner Name: | Lewis County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Traffic Paint.
|
|
| Owner Solicitation Name: | Centralia Alpha Road Resurfacing
|
| Owner Name: | Lewis County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Road Resurfacing.
|
|
| Owner Solicitation Name: | Surface Mine Reclamation Program's Remote Sensing Project
|
| Owner Name: | Washington State Dept of Natural Resources, Geology Div
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fly and produce, from a digital or film-based
camera, true color, +/- 12' horizontal accuracy,
12" pixel resolution, ortho-rectified aerial
imagery, for approximately 290 surface mine
reclamation permit areas in during the months of
April through Sept. 2004. Images will primarily
be used to measure the area of disturbance of
surface mine sites. At the completion of the
project, a final photo flight report must be
delivered that includes the raw digital images,
airborne GPS data, aerial triangulation data,
airborne IMU data, post-processed GPS data (X, Y,
Z), post-processed IMU data (omega, phi, kappa),
and metadata for all images delivered.
|
|
| Owner Solicitation Name: | Pearson Elementary School Modernization, Building B
|
| Owner Name: | North Kitsap School Dist. 400
|
| Enginner Name: | Harthorne Hagen Architects
|
| Plankeeper Name |
|
| Scope: | Modernize an approximately 17,000 SF school
building; upgrade office space; install new
lighting systems; and upgrade HVAC systems.
|
|
| Owner Solicitation Name: | Four-Post Surface Vehicle Mounted Lift
|
| Owner Name: | Grays Harbor County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply one or more four-post surface vehicle
mounted lifts, current year model.
|
|
| Owner Solicitation Name: | New Federal Way City Hall Tenant Improvements - PBX Upgrade / Office Phone Systems Move & Audio/Visual Systems and Cabling
|
| Owner Name: | Federal Way, City of
|
| Enginner Name: | David A. Clark Architects PLLC
|
| Plankeeper Name |
|
| Scope: | PBX Upgrade / Office Phone Systems Move;
Audio/Visual Systems and Cabling.
|
|
| Owner Solicitation Name: | Roosevelt High School - Shotcrete Work - Determination of Eligibility
|
| Owner Name: | Seattle School District, Contracting Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide shotcrete work for the High School
renovation. Renovation and modernization of an
existing 175,000 SF structure built in 1922, and
construction of an approx 120,000 SF addition.
|
|
| Owner Solicitation Name: | Train Signal System for Central Link C802
|
| Owner Name: | Sound Transit, Contracts Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Completing final design to the above noted
contract which includes designing, furnishing,
and installing a Train Signal System.
|
|
| Owner Solicitation Name: | East Ductbank, Part 2 - Electrical Infrastructure Project at Sea-Tac International Airport
|
| Owner Name: | Seattle Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install one power and one communications
underground raceway. The raceway includes
reinforced concrete ductbank, manholes, vaults,
and pads.
|
|
| Owner Solicitation Name: | Yakima Valley Farm Workers' Clinic - Lincoln Avenue Clinic
|
| Owner Name: | Yakima Valley Farm Workers Clinic
|
| Enginner Name: | Clark/Kjos Architects
|
| Plankeeper Name |
|
| Scope: | Construct on-grade parking, landscaping, and a
21,470 sf new two-story medical office building
on a 2.1-acre site.
|
|
| Owner Solicitation Name: | Renovations at John Marshall Alternative High School and McClure Middle School
|
| Owner Name: | Seattle School District, Contracting Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide for re-roofing, seismic upgrades, new
fire alarm system, and science and arts
improvements at two schools.
|
|
| Owner Solicitation Name: | Columbarium and Cemetery Improvements at Tahoma National Cemetery
|
| Owner Name: | Dept. of Veterans Affairs, Office of Facilities Management
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | General construction; site preparation and
erosion control, earthwork, grading, drainage,
roads and pedestrian paving; precast columbarium
structures; preparation of gravesites for crypts;
drainage improvements; landscape planting, turf;
signage and site furnishings, irrigation system,
utilities; one committal service shelter;
automated entry gate and other items.
|
|
| Owner Solicitation Name: | Northeast Burton Road, Phase 3 - Street, Sidewalk, Signal, and Utility Improvements
|
| Owner Name: | Vancouver Procurement Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install asphalt pavement; sidewalks; curbs;
traffic signals; illumination; water systems;
sanitary sewer systems; drainage systems; and
construct a stormwater facility. Entire project
is approximately 8,000 LF. Open cut 1,700 LF 12"
DIP water line, 200 LF 8" DIP water line, 200 LF
6" DIP water line, 2,800 LF 8" PVC sanitary
sewer, 200 LF 6" PVC sanitary sewer, 200 LF 4"
PVC sanitary sewer.
|
|
| Owner Solicitation Name: | Badger Mountain Road, Phase 1 - Fancher Field Road to Urban Growth Boundary
|
| Owner Name: | Douglas County Board of Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove 5,700 SY bituminous pavement; perform
8,970 CY roadway excavation, including haul;
place 26,175 CY common borrow, including haul;
perform 35,145 CY embankment compaction; install
2,451 LF plain steel culvert pipe, 0.064” thick,
18” diameter; place 6,940 tons crushed surfacing
base course; and install 1,670 tons Class B
asphalt concrete pavement, PG 64-22.
|
|
| Owner Solicitation Name: | Substation Power Transformers
|
| Owner Name: | Cowlitz County Public Utility District No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supplying power transformers.
|
|
| Owner Solicitation Name: | Childcare Facility Improvements
|
| Owner Name: | Big Bend Community College
|
| Enginner Name: | Bernardo-Wills Architects, PC
|
| Plankeeper Name |
|
| Scope: | Childcare Facility Improvements.
|
|
| Owner Solicitation Name: | South 277th Street Trunk Sewer, Phase 4
|
| Owner Name: | King County Professional/Construction, Contracts Counter
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1) Approximately 133 LF of tunneled 72” ID steel
casing under railroad tracks; 2) approximately
133 LF of 54” diameter DIP inside the tunnel 72”
ID steel casing; 3) approximately 396 LF of open-
cut, 54” diameter DI pipeline, located mostly on
private property; 4) connection to existing
pipelines at each end of the 54” diameter
pipeline; 5) install one 96” manhole; 6) develop
and implement an asbestos abatement plan; employ
asbestos abatement workers and supervisor to
remove and dispose of approximately 20 LF of 6”
diameter asbestos cement water pipe; 7) cathodic
protection and test stations for DI sewer pipe;
8) traffic control; 9) utility support and/or
relocation; coordinate with utility owners; 10)
excavation and dewatering; 11) trench/excavation
support system, including county and contractor-
designed sheet piles, soldier piles, and
tiebacks; 12) bypass existing sewer flows; 13)
remove a brick wall in an existing manhole and
plug existing sewer pipes; 14) erosion and
sedimentation control; 15) restoration,
including farmland preservation areas; 16) pipe
cleaning and testing; 17) approximately 600 LF
of construction access road; and 18) all other
work necessary to complete the interceptor and
comply with all easement and permit conditions.
|
|
| Owner Solicitation Name: | Spillway Gate Repair for the Box Canyon Hydroelectric Project
|
| Owner Name: | Pend Oreille Co Pub. Utility Dist. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Repairing a segment of a spillway gate leaf. The
gate repair work involves thermal and saw cutting
the steel skin plate and stiffeners to remove the
damaged portion of the gate, and welding on a new
replacement section. The approximate size of the
gate replacement section is 41' long by 3' wide
by 2'-2" high, and it will be furnished to the
contractor by the Owner. The contractor's work
includes designing, fabricating and installing a
structural steel system to support the gate on
the spillway deck during the repairs, and design
of scaffolding and work platforms. The work
also includes, but is not limited to, removal and
installation of wheels, axles, and J-seals, and
painting the repair welds.
|
|
| Owner Solicitation Name: | Rock Island Hydro and Engineering Office
|
| Owner Name: | Chelan County PUD 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply all facilities, labor, materials, and
equipment as specified, and perform all work
required for the Hydro and Engineering Office.
|
|
| Owner Solicitation Name: | Hall of Justice Security Equipment
|
| Owner Name: | Cowlitz County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Security Equipment.
|
|
| Owner Solicitation Name: | Nash Hall Exterior Brick Renovation, Phase One
|
| Owner Name: | Western Washington University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Exterior Brick Renovation.
|
|
| Owner Solicitation Name: | Renovations to the Existing Centralia City Hall and Police Station
|
| Owner Name: | Centralia, City of
|
| Enginner Name: | Pfaff Architects
|
| Plankeeper Name |
|
| Scope: | Renovations to the Existing City Hall and Police
Station.
|
|
| Owner Solicitation Name: | 2004 Overlay Project
|
| Owner Name: | Kelso Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Overlay of various streets within the City.
|
|
| Owner Solicitation Name: | Installation of Electrical Conduit and Wire at Harborview Medical Center Garages
|
| Owner Name: | Harborview Medical Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The owner will install panic switches and
security cameras in three garages. The project
calls for install conduit and wire in each garage.
|
|
| Owner Solicitation Name: | Peninsula High School Kitchen, Locker Rooms, and Pool HVAC
|
| Owner Name: | Peninsula School Dist. 401
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | High School Kitchen, Locker Rooms, and Pool HVAC.
|
|
| Owner Solicitation Name: | Annual Supply of Gravel
|
| Owner Name: | Everett, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Annual Supply of Gravel.
|
|
| Owner Solicitation Name: | Re-Striping Program 2004
|
| Owner Name: | Grant County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Apply approximately 4,300,000 LF of pavement
striping.
|
|
| Owner Solicitation Name: | Construction Management Services for the South Treatment Plant Cogeneration Project
|
| Owner Name: | King County Professional/Construction, Contracts Counter
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide construction management services on a
power cogeneration facility. Work may include
project management; cost control; progress
reporting; quality assurance; bid assistance;
scheduling; document control; submittal control;
contractor progress payments; field inspection;
geotechnical field observation; and laboratory
services. The following subconsulting
opportunities may be available: Administrative
services; field inspection for civil/structural,
mechanical, electrical, and instrumentation and
controls; and project control services.
|
|
| Owner Solicitation Name: | Independent Inspection Services
|
| Owner Name: | Wahluke School Dist. 73
|
| Enginner Name: | KJM & Associates, Ltd.
|
| Plankeeper Name |
|
| Scope: | Perform testing as required by the Office of the
Superintendent of Public Instruction, and the
2003 IBC. Tests will involve asphalt, concrete,
soil compaction, structural steel welding, rebar
placement, and masonry. The project will consist
of construction of a new 118,000 SF high school.
|
|
| Owner Solicitation Name: | Commissioning Services
|
| Owner Name: | Wahluke School Dist. 73
|
| Enginner Name: | KJM & Associates, Ltd.
|
| Plankeeper Name |
|
| Scope: | Provide commissioning services for a new high
school, consisting of practice fields and
approximately 118,000 SF of new building space,
on a 20-acre site.
|
|
| Owner Solicitation Name: | King County International Airport - 7777 Site Remediation
|
| Owner Name: | King County Professional/Construction, Contracts Counter
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform excavation and disposal of contaminated
soils. Soils from the first 6' below the ground
surface (bgs) will be stockpiled and reused to
backfill the base of the excavation. The
contractor must excavate and dispose of the
contaminated soils from 6' to 10' bgs. The
project requires excavation of about 1,000 CY.
About 700 CY will be used to backfill the base of
the excavation. About 300 CY of contaminated soil
must be transported and disposed of off-site.
About 300 CY of clean backfill must be imported
to completely backfill the excavation.
Subcontracting opportunities may include the
following: Disposal-contaminated soil; import and
backfill; and mobilization of tanks.
|
|
| Owner Solicitation Name: | Aldercrest Elementary Re-Roofing
|
| Owner Name: | Shoreline School District 412
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Elementary School Re-Roofing.
|
|
| Owner Solicitation Name: | Small Construction On-Call Maintenance, Repair, Replacement, and Installation Services
|
| Owner Name: | Spokane County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The contract will consist of smaller general
construction projects on an on-call time and
materials basis for miscellaneous temporary or
permanent installation; repair; remodel; rebuild;
renovation; replacement; minor construction;
alteration; improvement; maintenance; and other
related misc items at various county location.
|
|
| Owner Solicitation Name: | Electrician Services, On-Call Maintenance, Repair, Replacement, and Installation Services - Fair and Expo Center
|
| Owner Name: | Spokane County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical services, on-call maintenance, repair,
replacement, and installation services at the
Fair and Expo Center.
|
|
| Owner Solicitation Name: | Montgomery Road and Wild Rose Road Improvements
|
| Owner Name: | Spokane County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct improvements on two roads. Provide for
cold in place asphalt recycling and construction
of cement treated base; mobilization; pulverize
existing surface; mix materials; place 1,642 tons
Type 2 Portland cement.
|
|
| Owner Solicitation Name: | Ainsworth Realignment and Heritage Trail - Construction Administration
|
| Owner Name: | Pasco, Port of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide construction administration and
inspection services for the Avenue realignment
and Trail project. The proposed improvements
include widening and realigning the Avenue to
three lanes; and adding storm drainage, lighting,
landscaping, curb and gutter, and striping. A 12'
wide paved pedestrian trail is also included. The
major features of the consultant's
responsibilities for the project are as follows:
Construction inspection to ensure compliance with
contract documents (does not include construction
testing); processing pay applications and change
orders; conducting construction meetings and
tracking progress of construction; processing
required state and federal documents including
forms for DBE compliance, prevailing wages, and
labor utilization; reviewing submittals and
construction testing results; and recommending
substantial and final completion.
|
|
| Owner Solicitation Name: | Hard Drives - Seagate Cheetah
|
| Owner Name: | University of Washington, Purchasing/Accounting Building
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hard Drives.
|
|
| Owner Solicitation Name: | 6-inch Dry Barrel Fire Hydrants, Barrel Extensions, Traffic Repair Kits, and Repair Tools
|
| Owner Name: | Tacoma Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply 6" dry barrel fire hydrants with 4"
standard thread pumper nozzles; barrel
extensions; traffic repair kits; and 4.5"
national standard threat pumper nozzles.
|
|
| Owner Solicitation Name: | Truck - Incident Response Vehicle
|
| Owner Name: | Washington Dept. of General Administration, Engineering and Architectural Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish an incident response truck with utility
body.
|
|
| Owner Solicitation Name: | Platform Edge Detectable Warning Tile
|
| Owner Name: | Central Puget Sound Regional Transit Authority (Sound Transit)
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply unglazed porcelain truncated dome
detectable warning tiles.
|
|
| Owner Solicitation Name: | Wells Creek Road to Mt. Baker
|
| Owner Name: | Washington Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clearing and grubbing, drainage modification,
pavement repair, asphalt concrete pavement for
preleveling, permanent signing, bridge end
treatments, bridge approach slabs and pavement
seats at five bridges, guardrail installation,
culvert extensions and replacements, erosion
control, traffic control and other work. 13480 SY
Pvmt repair excav incl haul, 78 EA drop inlet
type 1, 2351 T light loose rip rap, 2101 LF
corrugated polyethylene culv pipe, 436 LF precast
conc box culv, 302 LF pvmt seat for bridge
approach slab, 2250 T crushed surface base
course, 1700 T shoulder dressing, 842 SY bridge
approach slab, 12190 T ACP fro prelevel CL
superpave 3/8 IN PG 58-34, 1938 T asph conc for
pvmt repair, 23275 T ACP CL superpave 1/2 IN PG
58-34, 28 EA beam guardrail flared term, 8 EA
beam guardrail non-flared term, 248180 LF paint
line, 20 Hund recessed pvmt marker, 143160 LF
temp pvmt marking, 4470 CY struct excav CL B incl
haul. Lump Sum Bids for: Snow shed, conc
headwall, perm signing, temp traffic control
devices, rdwy surveying, cleaning exist drainage
struct, trim and cleanup, SPCC plan.
|
|
| Owner Solicitation Name: | Electrical Infrastructure Power Center Capacity Upgrade Projects at Seattle-Tacoma International Airport
|
| Owner Name: | Seattle Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Upgrade the capacity of existing power centers in
three areas. The existing electrical rooms, which
contain the power centers will require
modifications such as fire protection and alarm,
air conditioning, lighting, and
equipment/personnel doors. The South Satellite
electrical room will be expanded approximately 7'
to accommodate the new equipment. Existing panels
that do not meet the new available fault levels
will be replaced. The existing single-ended 2,000
KVA power center will be replaced with two 2,500
KVA transformers, each feeding one each of a
double-ended metal enclosed drawout switchgear,
with two main breakers and a tiebreaker. The
existing single-ended 2,000 KVA power center,
will be replaced with two 2,500 KVA transformers,
each feeding one end of a double-ended metal
enclosed drawout switchgear, with two main
breakers and a tiebreaker. Concourse B power
center consists of a double-ended unit
substation, with two 1,500 KVA transformers and
2,000 amp low voltage switchgear, which will be
replaced with two 1,500 KVA transformers (one
existing transformer will be re-used), each
feeding one end of a double-ended metal enclosed
drawout switchgear with two main breaker and a
tiebreaker. 1,600 amp Portable Generator
Interface Panels will be added to the South
Satellite and Concourse B power centers.
|
|
| Owner Solicitation Name: | International Boulevard Phase IV Improvement
|
| Owner Name: | SeaTac City Clerk
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct and install soldier pile walls with
tiebacks; concrete barrier curb and gutter;
concrete sidewalk; storm drainage; street
lighting; undergrounding of overhead utility
lines; landscaping; signalization;
channelization; pavement reconstruction; and
widening and overlay.
|
|
| Owner Solicitation Name: | Green River Valley Signal Interconnect
|
| Owner Name: | Tukwila, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Install approximately 30,200 LF of fiber optic
cable; 14,100 LF of interconnect communication
cable; conduit; and junction boxes. No plans for
boring on this project.
|
|
| Owner Solicitation Name: | Decommissioning of Wells No. 6 and No. 7
|
| Owner Name: | Annapolis Water District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Decommissioning of two Wells includes perforation
and sealing of two flowing artesian wells 960'
and 1,115' deep.
|
|
| Owner Solicitation Name: | Goldenrod Bridge and Road Improvements
|
| Owner Name: | Washington Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Constructing new
roadway, pedestrian improvements, clearing and
grubbing, earthwork and grading, asphalt concrete
paving, curb,
sidewalk, welded wire wall, single span
prestressed concrete girder bridge, storm
drainage system, water quality
vault, channelization, signing, guardrail,
temporary erosion control BMPs, water system,
hydrant, sanitary sewer
relocation, reconstructing sewer main, manhole
adjustment, installing utility conduit, hangers
and street light pole
bases, wetland mitigation, traffic control and
other work. 100 Working days. Involves 147 items.
2540 CY rdwy
excav incl haul, 9900 CY wetland excav incl haul,
11800 T select borrow incl haul, 4200 CY
unsuitable foundation
excav incl haul, 3500 T quarry spalls, 24 EA
catch basin type 1, 868 LF corrugated
polyethylene storm sewer pipe,
1272 LF ductile iron sewer pipe, 810 LF CL50
ductile iron pipe for water main, 1 EA blowoff
assembly, 1 EA
hydrant assembly, 4 EA gate valve, 2 EA flex tend
joint, 800 CY struct excav CL A incl haul, 1240
LF auger cast
piling, 16500 LB st rebar for bridge, 145 CY conc
CL 4000 for bridge, 5900 SF welded wire wall, 130
LF temp casing,
2300 T crushed surface top course, 225 SY bridge
approach slab, 1840 T ACP CL A, 3580 LF silt
fence, 1000 CY
topsoil type A, 5500 EA PSIPE carex aquatilis,
5500 EA PSIPE carex stipata, 5500 EA PSIPE carex
utriculata, 1000
CY bark or wood chip mulch, 3500 LF cement conc
barrier curb and gutter, 1095 LF beam guardrail
type 1 – 8 FT
long post, 5 EA beam guardrail non-flared term,
10600 LF utility conduit, 1753 CY struct excav CL
B incl haul, 382
CY gravel backfill for foundation CL B, 1100 SY
cement conc sidewalk, 1550 CY backfill for struct
earth wall incl
haul. Lump Sum Bids for: Shoring or extra excav
CL A, water quality vault, goose exclosure, perm
signing, temp
traffic control devices, traffic control, struct
survey, clean exist drainage struct, SPCC plan.
SUPERSTRUCTURE
TO INCLUDE: 18600 LB Epoxy-coated st rebar, 20400
LB st rebar, 160 CY conc CL 4000D, 53 CY conc CL
4000, 783
LF prestressed conc girder W58G, 14 EA
elastomeric bearing pad, 231 LF traffic barrier,
231 LF bridge railing type
BP, 50 LB inserts for bridge supported utility,
13 EA storm drainage sys utility hanger, 13 EA
utility
conduit(phone, TV, 4” city spare) Hanger, 30 LF
utility conduit sleeve.r
|
|
| Owner Solicitation Name: | N. Bay Rd. to Key Peninsula Hwy. - Paving
|
| Owner Name: | Washington Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Planing, pavement repair, paving with hot mix
asphalt, adjustment items, pavement markings,
permanent signing and other work. 500 SY pvmt
repair excav incl haul, 16 MI shoulder finish,
1380 SY plane bit pvmt, 26000 T HMA CL PG 58-
22, 147520 LF paint line, 8 HUND recessed pvmt
marker, 48840 LF temp pvmt marking, 20 EA
monument case, cover, and pipe, 25 EA adjust
catch basin.
|
|
| Owner Solicitation Name: | Intersection Signal
|
| Owner Name: | Washington Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Surfacing, paving with asphalt concrete, erosion
control and
planting, installing illumination system,
installing signal system, pavement marking,
traffic control and other work. 272 CY rdwy excav
incl haul, 870 T crushed surface base course, 600
SY
plane bit pvmt, 680 T HMA CL ½ IN Pg 64-22, 902
LF silt fence, 750 LF beam guardrail type 1, 3 EA
beam guardrail
flared term, 655 LF remove and reset beam
guardrail, 5210 LF paint line, 5210 LF temp pvmt
marking.
|
|
| Owner Solicitation Name: | Albertsons Store No. 0465
|
| Owner Name: | Albertson's Division Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform general construction, plumbing, automatic
fire sprinkler, HVAC, and electrical work.
|
|
| Owner Solicitation Name: | Double Contained Steam and Condensate Piping Systems
|
| Owner Name: | Western Washington University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide Manufacturers designed double contained
steam and condensate piping systems for direct
burial and all other required devices required
for future field installation of a leak detection
system. This proposal does not include
installation.
|
|
| Owner Solicitation Name: | Sand and Gravel
|
| Owner Name: | Lynnwood Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and deliver sand and gravel.
|
|
| Owner Solicitation Name: | Voter Registration and Election Management System
|
| Owner Name: | Whatcom County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide and implement a comprehensive voter
registration and election management system.
|
|
| Owner Solicitation Name: | Annual Supply of Asphaltic Mixes
|
| Owner Name: | Whatcom County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply asphaltic mixes for the owner's Public
Works Maintenance and Operations Division.
|
|
| Owner Solicitation Name: | Construction of new Single-Family Residence; North Cascades NPS Complex, Stehekin
|
| Owner Name: | PWR - NOCA North Cascades NPS Complex
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct a new single-family residence with an
option for a single-car garage. The single-story
residence is approximately 1450 SF plus porches.
Site clearing, grubbing, an on-site septic
system, and utility extensions for nearby water
and power.
|
|
| Owner Solicitation Name: | Maintenance and Repair of ICIDS II Intrusion Detection Systems/Entry Control Systems/Closed Circuit Television Systems and system Monitoring Services
|
| Owner Name: | ACA, Fort Lewis, Directorate of Contracting
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Maintain, and repair all Intrusion Detection
Systems/Electronic Entry Control Systems/Closed
Circuit Television (IDS/EECS/CCTV) components,
including integrated commercial Intrusion
Detection system II (ICIDS II) components,
sensors, connections, system wiring, control
units, and conduit that are an integral part of
the Ultrak Inc./MDI OS2/SAFENET system (ICIDS II)
with 3D Graphmap. Provide all necessary manpower
and material required to perform replacement of
components, scheduled adjustments, conducting
tests, or other scheduled or non-scheduled work
and all necessary services required for
administering the system.
|
|
| Owner Solicitation Name: | Computer Equipment
|
| Owner Name: | Washington Dept. of Information Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide personal computers (desktop workstations,
laptops, and mobile); small servers; storage
solutions hardware for small LANS; individual or
small shared printers; and limited peripherals to
support desktop computing.
|
|
| Owner Solicitation Name: | Quillayute Valley Aquatic Center
|
| Owner Name: | Quillayute Valley Park and Recreation District
|
| Enginner Name: | SERA Architects
|
| Plankeeper Name |
|
| Scope: | Construct a new 10,233 SF indoor aquatic center.
This facility will include two 25 yd lap lanes as
well as an 1,800 SF leisure pool that features a
beach entry; water toys; and a water slide. The
design also includes a spa. The building's
construction will be concrete masonry unit walls
with steel roof structure with both hi-sloping
and low-sloping roofs.
|
|
| Owner Solicitation Name: | Utility Vehicles
|
| Owner Name: | Seattle Dept. of Executive Administration
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Six each, 4 x 4, four-door large utility
vehicles - Chevrolet Suburban or GMC Yukon XL.
|
|
| Owner Solicitation Name: | Seattle-Tacoma International Airport AKART Pipeline in the Public Right-of-Way
|
| Owner Name: | Seattle Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct a new industrial wastewater system
pipeline, consisting of 16” Class 53 DIP with
restrained joints. Pipeline appurtenances
include blowoff stations and combination air
valve stations. Construct a jack and bore
pipeline crossing under Drive. Construct a 2”
asphalt concrete pavement overlay and restripe
the two eastbound lanes.
|
|
| Owner Solicitation Name: | Deep Wells 2 and 3 Rehabilitation
|
| Owner Name: | Ocean Shores Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform an initial test pumping of the wells to
determine their respective pumping capacities and
specific capacities; removal of the well pump and
column piping; cleaning of the wells using a
combination of disinfection, mechanical agitation
and/or chemical addition; redevelopment of the
screen areas and adjacent aquifer; flushing the
cleaning agents from the wells; test pumping the
wells after rehabilitation to determine the
increase in productivity achieved by the
rehabilitation work and reinstalling the well
pumps and column piping.
|
|
| Owner Solicitation Name: | Campus Wide Projects
|
| Owner Name: | Washington State School for the Blind
|
| Enginner Name: | Terra Architects
|
| Plankeeper Name |
|
| Scope: | Various Campus Wide Projects.
|
|
| Owner Solicitation Name: | Wire & Trim Visitor Center
|
| Owner Name: | Everett Purchasing Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Completing the electrical wiring and fire alarm
for an approximately 780 SF tenant space
including: providing power to the space - two
panels are available - PR2 75 [120/208 volt] and
LR1 [480 volt] both located in an electrical room
approximately 150' down a non rated hallway from
the space; provide and install light fixtures
[2X4 3 lamp 277 bolt Troffer w/18 cell parabolic
lens or equal] and switches; one horn/strobe and
two smoke detectors located per the Fire
Marshal's office approval; lighting control
relays; plugs; trim all work.
|
|
| Owner Solicitation Name: | South Plant Wastewater Treatment Facility - Santler and EPS Seismic Improvement and Santler HVAC Replacement
|
| Owner Name: | King County Professional/Construction, Contracts Counter
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1) Removal of an existing roofing material which
contains asbestos and then re-roofing. (The
existing roof at the Building is at least 15
years old, and a single-ply, EPDM-type roof.)
Additional asbestos abatement will include
removal of exterior transite wallboard on five
exterior awnings. A Bid Alternate to perform all
work necessary to remove and replace
approximately 100 SF of unsound roof deck
material at the Building with 2 x 6 tongue and
groove Decking is also included in this project;
2) HVAC replacement of the Building including
controls upgrade and installation of roof top
screening of new HVAC equipment; and 3) seismic
upgrade of the Pump Station Building.
Subcontracting opportunities include sheet rock,
roof, and HVAC.
|
|
| Owner Solicitation Name: | Collville Vehicle Shop Renovations
|
| Owner Name: | Washington Dept. of Transportation
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovate HVAC system to improve exhausting of
welding fumes in vehicle maintenance
shop. Work includes demolition of existing
ductwork and unit heater; and new piping,
ductwork,
make-up air unit, recirculating cabinet filter
fans, welding exhaust system with flexible arm
mounted
on a track and exterior mounted exhaust fan.
|
|
| Owner Solicitation Name: | Fort Flagler State Park - Water and Sewer System Improvements
|
| Owner Name: | Washington State Parks & Recreation Commission, Engineering Services Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace water and sewer utilities at the State
Park. Install 14,000 LF of 4"-10" PVC or DIP
water mains; install 5,000 LF 8" PVC sewer
mains; install large on-site septic system and
pump chamber; and install subsurface drip
system. Minimal boring under historical roadways.
|
|
| Owner Solicitation Name: | General Contractor and Construction Management Services - Shilshole Bay Marina Renewal and Replacement
|
| Owner Name: | Seattle Engineering Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide GCCM preconstruction services and
construction management of the Marina renewal and
replacement. The Marina provides monthly moorage
for 1,500 sailboats and powerboats; guest moorage
for more than 100 boats; and dry moorage for 80
vessels. The marina has slips from 28' (8 m) to
130' (40 m). The owner is undertaking renewal and
replacement of components of the Marina to
include the docks, buildings, and main
infrastructure. The project will replace 22 docks
and piers, including the sailing center
floats/docks in the north end; replace
infrastructure (utilities); provide new
restroom/shower/laundry buildings; replace the
administration building with a smaller building;
provide areas for developer-funded buildings for
restaurant and other marina related uses; and
improve overall site access, parking, and views.
|
|
| Owner Solicitation Name: | Diving Inspection and Repair - Work Order
|
| Owner Name: | King County Professional/Construction, Contracts Counter
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform inspection, maintenance, and repair work
for underwater sewage conveyance facilities
within the County wastewater system. The work
requires principally commercial diving
contractors.
|
|
| Owner Solicitation Name: | Othello School District Alternative High School
|
| Owner Name: | Othello School Dist. #147
|
| Enginner Name: | MEIER Enterprises, Inc.
|
| Plankeeper Name |
|
| Scope: | Remodel of an existing building into a new
alternative high school. Construction efforts
include, but are not limited to: Selective
demolition and disposal; and remodel and new
construction of mainly interior spaces, including
new doors, windows, flooring, ceiling, fire rated
construction, alteration to existing and new
mechanical and electrical services.
|
|
| Owner Solicitation Name: | Supply and Install One Automated Payment Station at the Redondo Boat Ramp Parking Lot
|
| Owner Name: | Des Moines Marina
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Supply and install an automated payment station
at the parking lot, in the city of Des Moines.
The payment station must be able to withstand the
weather and other conditions found in a shoreline
environment. In addition, the payment station
must have a high degree of physical security and
be convenient and easily operated by the general
public. The payment station will be required to
handle bills and credit cards, but will not need
to make change. The receipt printer must be
capable of printing high-quality receipts in a
flexible format. The pay station must have some
method of managing parking violations. The site
has 120 volt power available.
|
|
| Owner Solicitation Name: | LID 355 and 356 - Sanitary Sewer Improvements, and LID 357 - Sanitary Sewer and Water Main Improvements
|
| Owner Name: | Kent, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | LID 355: Install approx 2,800 LF of 8” PVC
sanitary gravity main, and 1,200 LF of 6” PVC
side sewer pipe, with associated sewer main
structure and appurtenances. For surface
restoration, the project includes approx 350
Tons of asphalt concrete pavement for roadway
pavement patch and 360 Tons of asphalt concrete
overlay. LID 356: Install approx 820 LF of 8”
PVC sanitary gravity main, and 320 LF of 6” PVC
side sewer pipe, with associated sewer main
structures. For surface restoration, the project
includes approx 100 Tons of asphalt concrete
pavement for roadway pavement patch, and 362
Tons of asphalt concrete overlay. LID 357:
Install approx 184 LF of 8” PVC sanitary gravity
main, 185 LF of 6” PVC side sewer pipe, with
associated sewer main structures. The water
improvements include approx 244 LF of 8” DIP
water main with associated water main
appurtenances. For surface restoration the
project includes approx 119 Tons of asphalt
concrete pavement for roadway pavement.
|
|
| Owner Solicitation Name: | Donor Suites and Media Center at Woodward Field
|
| Owner Name: | Eastern Washington University
|
| Enginner Name: | Zeck Butler Architects, P.S.
|
| Plankeeper Name |
|
| Scope: | Construction of Donor Suites and Media Center.
|
|
| Owner Solicitation Name: | Electric Rebuild - "F" Street Substation
|
| Owner Name: | Port Angeles, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replace the fuse protection of 15 MVA
transformers with 69 kV circuit switchers; and
install electronic relays at the Substation.
|
|
| Owner Solicitation Name: | Spanaway Loop Road South Extension - Vicinity of Coffee Creek to 176th Street South/SR-7
|
| Owner Name: | Pierce County Council
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Improvement of approximately one mile of the
Road, clearing and grubbing, roadway excavation
including haul, embankment compaction, storm
drainage facilities, replacement of an existing
box culvert at the Creek with an open bottomed
culvert, installation of approximately 400 LF of
watermain, surfacing, asphalt concrete pavement,
cement concrete traffic curb and gutter, cement
concrete sidewalks, and other work. *See attached
file for quantities.
|
|
| Owner Solicitation Name: | Pavement Conditions Survey for 2004
|
| Owner Name: | Kitsap County, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pavement Conditions Survey.
|
|
| Owner Solicitation Name: | Phase II NPDES Stormwater Program
|
| Owner Name: | Puyallup Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide planning, engineering, and water quality
management services to develop the owner's Phase
II National Pollutant Discharge Elimination
System (NPDES) Stormwater Program.
|
|
| Owner Solicitation Name: | Architectural Services - Study of Status and Location of Three Fire Stations
|
| Owner Name: | Vashon Island Fire & Rescue
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide architectural consultant services,
including a study of the status and location of
three fire stations.
|
|
| Owner Solicitation Name: | Site Preparation for Beacon Hill Station
|
| Owner Name: | Sound Transit, Contracts Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Demolish and remove buildings, including
foundations and concrete slabs; perform grading;
backfill; disconnect utility services; remove
underground storage tanks; remove hazardous
materials from existing building; provide storm
drain inlet protection, dust control, and mud
control; and install a perimeter security fence
supplied by the owner.
|
|
| Owner Solicitation Name: | B Street Substation Upgrades
|
| Owner Name: | Centralia, City of
|
| Enginner Name: | Rex Brown Consulting Engineers
|
| Plankeeper Name |
|
| Scope: | Remove sod and concrete including replacement
with gravel; install a concrete slab; gravel
fill; clean existing concrete; seal existing and
new concrete; install a oil/water separator tank
and related piping; and a ground grid upgrade
including ties to existing equipment and fence.
|
|
| Owner Solicitation Name: | Martin Luther King Family Housing
|
| Owner Name: | Archdiocesan Housing Authority
|
| Enginner Name: | Environmental Works
|
| Plankeeper Name |
|
| Scope: | Construct a new 26-unit multi-family housing
project consisting of four-story wood-frame
buildings over a post-tensioned concrete parking
garage.
|
|
| Owner Solicitation Name: | 12kV Direct Replacement Circuit Breakers for the Leavenworth 1 Substation
|
| Owner Name: | Chelan County PUD 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 12kV Direct Replacement Circuit Breakers.
|
|
| Owner Solicitation Name: | Front Mounted Deck Commercial Mower and 16-foot self Propelled Wide Area Mower
|
| Owner Name: | Oak Harbor, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish one front mounted deck commercial mower
and one 16' self-propelled wide area mower.
|
|
| Owner Solicitation Name: | Architectural and Engineering Services
|
| Owner Name: | Chelan County & Wenatchee Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide architectural and engineering services to
develop the plans for infrastructure and
construction of a combined multi-family and
single-family housing project. Provide for
initial schematic design; assistance in obtaining
governmental approvals; preparation of
construction plans; infrastructure construction
plans; and oversight of infrastructure
construction through closeout.
|
|
| Owner Solicitation Name: | Electrical Engineer for Correctional Facility Electronic Door Control, Intercom, and Video Camera Security Controls
|
| Owner Name: | Sunnyside Dept. of Public Works
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide electrical engineering and design
services for a correctional facility electronic
door control, intercom, and video camera security
controls consolidation project. The project will
include upgrade and replacement of the electronic
security controls and intercom in the Law and
Justice Center.
|
|
| Owner Solicitation Name: | Toughbook CF-48 Laptops
|
| Owner Name: | Kent, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnish Panasonic Toughhbook CF-48 semi-
ruggedized laptops.
|
|
| Owner Solicitation Name: | Tree Trimming
|
| Owner Name: | Grays Harbor PUD No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide a tree trimming crew or crews, and
manlift and tree trimming equipment, to cut and
dispose of trees and brush along rights-of-way
occupied by the owner's power lines. Apply EPA-
approved chemical treatment as required to power
line rights-of-way.
|
|
| Owner Solicitation Name: | Kalaloch Lodge Conduit Installation
|
| Owner Name: | Grays Harbor PUD No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide for installation of conduits, primary
and secondary conductors, transformers, primary
metering cabinet, vaults, and misc fixtures.
Installation methods are to include underground
boring and backhoe. 647 LF 4" conduit, Bore
under highway.
|
|
| Owner Solicitation Name: | Motor Grader
|
| Owner Name: | East Columbia Basin Irrigation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Motor Grader.
|
|
| Owner Solicitation Name: | Prequalification - 2004 - 2005 Small Works Roster
|
| Owner Name: | Whatcom Co Public Utility Dist. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Electrical utility - Line maintenance and repair
(115 kV); substation (high side) maintenance and
repair; substation transformer inspection,
maintenance, and repair; substation (15 kV)
switchgear maintenance and repair; and building
maintenance and fencing within substation
compound; Telecommunications utility - Fiber
optic cable installation and splicing;
telecommunications hardware installations; and
network installation; Water utility - Waterline
installation and repair; pump maintenance and
repair; clarification plant maintenance and
repair; electrical (2.4 kV and 480 V)
motor/equipment maintenance and repair.
|
|
| Owner Solicitation Name: | Stainless Steel Conveyor Roller Chains for Extended Submerged Bar Screens (ESBS) at Little Goose and Lower Granite Dam
|
| Owner Name: | US Army Engineer District, Walla Walla
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Fabricate and deliver conveyor roller chains. The
roller chain shall be Double-Pitch Conveyor
Roller Chain C2160H in accordance with ASME
B29.1M and ASME B29.4M. The chain shall be of the
riveted pin construction with press fit link
plates. The connecting links shall be drive fit
with cotter pin construction. Roller chain
components shall be stainless steel meeting the
following specifications: (a) Chain pins: ASTM A
276 or ASTM A 479/A 479M, UNS Designation S21800,
60,000-psi minimum Yield Strength (0.2% Offset
Method). (b) Bushings: ASTM A 564 or ASTM A 693,
Type 630, 40-48 Rockwell "C" hardness. (c) Pin
links and Roller links: ASTM A 276 or ASTM A 240,
300 series stainless steel. All pin links and
roller links shall be of the same type and grade
of stainless steel. (d) Rollers: Type 304 or Type
316 stainless steel. (e) Cotter pins: Type 302,
Type 304 or Type 316 stainless steel. Each chain
length assembly (strand) shall be 82', 8" long.
|
|
| Owner Solicitation Name: | Six Padmounted Transformers
|
| Owner Name: | Western Washington University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide six padmounted transformers.
|
|
| Owner Solicitation Name: | Metal Enclosed Switchgear
|
| Owner Name: | Western Washington University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide metal enclosed switchgear.
|
|
| Owner Solicitation Name: | Padmounted Switchgear
|
| Owner Name: | Western Washington University
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide padmounted switchgear.
|
|
| Owner Solicitation Name: | Consultant Services for the Preparation of the Fidalgo Island Subarea Plan
|
| Owner Name: | Skagit County Planning & Permit
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Assist a Citizens Advisory Committee with the
preparation of the Island Subarea Plan.
|
|
| Owner Solicitation Name: | West Hylebos Creek Restoration Project
|
| Owner Name: | Federal Way, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Creek Restoration.
|
|
| Owner Solicitation Name: | Provide Specialized Equipment for Crisis Management
|
| Owner Name: | Grant County Emergency Management
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide specialized equipment for crisis
management, and interoperable communication
equipment. Provide one remote activated,
motorized security gate; provide one to five GPS
receivers; and provide one security badge printer
and software system.
|
|
| Owner Solicitation Name: | Design, Construct, and Operate a Multi-Function Campground in Columbia Park
|
| Owner Name: | Kennewick, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Design, construct, and operate a multi-function,
100+ unit campground.
|
|
| Owner Solicitation Name: | Fire Protection Engineering
|
| Owner Name: | Washington State Patrol Budget & Fiscal Services
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide fire inspection engineering. Inspect
completed automatic fire sprinkler installations
and report findings to the owner.
|
|
| Owner Solicitation Name: | Building Environmental Systems Maintenance
|
| Owner Name: | Franklin County Commissioners
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide mechanical contractor (HVAC) services to
perform building environmental systems
maintenance for county facilities.
|
|
| Owner Solicitation Name: | Air Sealing
|
| Owner Name: | King County Housing Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Air Sealing.
|
|
| Owner Solicitation Name: | Asotin County Fairgrounds Erosion Control Measures
|
| Owner Name: | Asotin County Commissioners
|
| Enginner Name: | Thomas, Dean & Hoskins, Inc.
|
| Plankeeper Name |
|
| Scope: | Provide erosion restoration and prevention
measures at the County Fairgrounds. Perform site
grading; install stormdrains and catch basins;
construct a detention pond; place bituminous
surface treatment; and perform landscaping.
|
|
| Owner Solicitation Name: | Conduit and Vault Installation - Badger Mountain Road
|
| Owner Name: | Douglas County PUD #1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Conduit and Vault Installation. Approximately
2,150 LF trenching.
|
|
| Owner Solicitation Name: | 2004 - 2005 Clamming Services, Wells Hydroelectric Project
|
| Owner Name: | Douglas County PUD #1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clamming Services, Wells Hydroelectric Project.
|
|
| Owner Solicitation Name: | Computer Systems Maintenance Services
|
| Owner Name: | Jefferson Transit Authority
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Perform ongoing computer system maintenance
services.
|
|
| Owner Solicitation Name: | One 2004 Cab and Chassis, 60,000 Pounds GVWR
|
| Owner Name: | Douglas County PUD #1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase of one 2004 cab and chassis, 60,000
pounds GVWR.
|
|
| Owner Solicitation Name: | Remove Old Roof Material and Replace with New Roofing on Shop Bay Roof at Station 1
|
| Owner Name: | Whatcom County Fire Protection Dist. 8
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove old roof material and replace with new
roofing on shop bay roof at the Station.
|
|
| Owner Solicitation Name: | Prep, Water Seal, and Paint Shop Bays at Station 1
|
| Owner Name: | Whatcom County Fire Protection Dist. 8
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Prep, water seal, and paint shop bays at the
Station.
|
|