| Owner Solicitation Name: | Antelope Valley Well No. 5 Completion and Chlorination Facilities Upgrade
|
| Owner Name: | Antelope Valley Improvement & Service Dist.
|
| Enginner Name: | Wester-Wetstein & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Two prefabricated concrete buildings (Well House
No. 5 and Chlorine Building), submersible well
pump, pitless adapter, telemetry, valves,
fittings, connection to existing system, fencing,
reclamation, and associated items.
|
|
| Owner Solicitation Name: | Powell High School Track Repair
|
| Owner Name: | Park County School District 1
|
| Enginner Name: | Plan One/Architects
|
| Plankeeper Name |
|
| Scope: | High school track repair, removal of the existing
track surface, and installation of a new track
surface and accessories.
|
|
| Owner Solicitation Name: | Inductively Coupled Plasma-Optical Emission Spectrometer (ICP-OES)
|
| Owner Name: | Cheyenne Board of Public Utilities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Inductively Coupled Plasma-Optical Emission
Spectrometer (ICP-OES).
Please see attached file for more techical
information.
|
|
| Owner Solicitation Name: | Campbell County High School Auditorium Renovations
|
| Owner Name: | Campbell County School District
|
| Enginner Name: | Schutz Foss Architects, PC
|
| Plankeeper Name |
|
| Scope: | High school auditorium renovations.
|
|
| Owner Solicitation Name: | Installation of Outdoor Sports Lighting for Riske Field at Central High School
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: | MKK Consulting Engineers, Inc.
|
| Plankeeper Name |
|
| Scope: | New stadium light poles, light fixtures,
underground power, controls, and associated items
required for a complete installation.
|
|
| Owner Solicitation Name: | Central Warehouse and Wash Bay Buildings
|
| Owner Name: | Gillette, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Central warehouse and buildings.
|
|
| Owner Solicitation Name: | A Cheyenne Area Master Plan
|
| Owner Name: | Cheyenne Metropolitan Planning Organization
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Professional services to update plan.
Please, see the attached file for further
information.
|
|
| Owner Solicitation Name: | Conference Room Expansion & Construction
|
| Owner Name: | Dept. of Health and Human Services, Indian Health Services, Aberdeen Area Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construct and expand the Conference Room.
|
|
| Owner Solicitation Name: | Medical Records Renovation
|
| Owner Name: | Dept. of Health and Human Services, Indian Health Services, Aberdeen Area Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Renovate the Medical Records Department.
|
|
| Owner Solicitation Name: | Campbell County High School Security System
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | High school security system.
|
|
| Owner Solicitation Name: | Cheyenne Depot Square Building - West Wing Museum
|
| Owner Name: | Cheyenne Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Building - west wing museum.
|
|
| Owner Solicitation Name: | Projectors
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Projector.
|
|
| Owner Solicitation Name: | Airport Terminal Re-Roof Project
|
| Owner Name: | Gillette-Campbell Airport
|
| Enginner Name: | Schutz Foss Architects, PC
|
| Plankeeper Name |
|
| Scope: | Airport terminal re-roof project.
|
|
| Owner Solicitation Name: | Fort Warren Relief Sewer Cleaning and Videoing
|
| Owner Name: | Cheyenne Board of Public Utilities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Clean and Televise 3,824 LF 12" sewer, 4,280 LF
15" sewer, and 152 LF 24" sewer.
|
|
| Owner Solicitation Name: | Spillway and Toe Drain Modifications
|
| Owner Name: | Bureau of Reclamation / Contracts Group
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Spillway and Toe Drain Modifications. Replacing a
557' section of the concrete-spillway chute and
replacing the drainage system in the embankment
and complete removal of a section of the covered
spillway beginning at a location downstream from
the inlet (station 3+23) and ending just upstream
from the stilling basin (station 8+80). An under-
drain system and surface-runoff system -
installed along the spillway alignment, and an
open concrete-spillway chute will be constructed.
The drain system along the left and right groins
and toe of the embankment - excavated and
replaced with new filters and drains. Concrete
for the spillway - batched on site. Processed
sand and gravel - filter and drain water from
around the drainage pipe. The concrete debris
from the old spillway chute - disposed of in an
existing borrow site. No new borrow sites -
needed for the construction.
|
|
| Owner Solicitation Name: | Printer Cartridges
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Printer cartridges.
|
|
| Owner Solicitation Name: | Patching
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Contract patching and miscellaneous work on
111.67 miles of various roads.
|
|
| Owner Solicitation Name: | Road Improvement
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base,
bituminous pavement surfacing, fencing and
miscellaneous work.
|
|
| Owner Solicitation Name: | Micro-Surfacing
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Micro-surfacing and miscellaneous work on 12.25
miles of road.
|
|
| Owner Solicitation Name: | Micro-Surfacing
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Micro-surfacing and miscellaneous work on
11.93 miles of road.
|
|
| Owner Solicitation Name: | Pavement Surfacing, Grading
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base,
bituminous pavement surfacing, cover coat
material, curb and gutter and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Pavement Leveling
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement leveling and surfacing and
miscellaneous work.
|
|
| Owner Solicitation Name: | Pavement Surfacing, Grading, Draining
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement leveling and surfacing and
miscellaneous work on 8.26 miles of road.
|
|
| Owner Solicitation Name: | Fence Removal
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of right-of-way fence
and miscellaneous work along 6.03 miles of road.
|
|
| Owner Solicitation Name: | Guardrail Replacement, Crushed Base Placing
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of guardrail, placing
crushed base and miscellaneous work on 11.34
miles of road.
|
|
| Owner Solicitation Name: | Purchase and Removal of 4 Modular Buildings, 1 Steel Building Garage and 1 Shed
|
| Owner Name: | Campbell County Senior Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase and removal of 4 modular buildings, 1
steel building garage and 1 shed.
|
|
| Owner Solicitation Name: | Ceramic Tile Repairs for Swimming Pool and Locker Rooms at Central High School
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of individual damaged or missing
ceramic tiles within the swimming pool tub, on
the swimming pool deck, in the boy’s locker room
(including toilet room, showers and accessory
rooms); in the boy’s varsity locker room
(including toilet room, showers and accessory
rooms); in the girl’s locker room (including
toilet room, showers and accessory rooms); re-
grouting the swimming pool tub; and replacement
and re-grading of portions of the swimming pool
deck ceramic tile and mortar bed.
|
|
| Owner Solicitation Name: | Crook County Reservoirs and Water Management Study
|
| Owner Name: | Wyoming Water Development Commission
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Water Development Commission
|
| Scope: | The consultant will perform a reconnaissance study. The study shall evaluate potential permitting associated with the Corps of Engineers 404 permit. Past studies, designs and cost estimates will be updated, and the benefits to the state and region of reservoir development and water management will be conducted. The study will review the work that has been conducted in the past, including but not limited to identified management opportunities and identified reservoirs sites. New sites will be identified and evaluated, and an in-depth economic benefit cost analysis will be conducted.
|
|
| Owner Solicitation Name: | Kirby Area Water Supply Study
|
| Owner Name: | Wyoming Water Development Commission
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Water Development Commission
|
| Scope: | The consultant will perform a reconnaissance study of the potential to manage and/or store and re-regulate winter releases from Reservoir. The study will review the US Bureau of Reclamation operation of Reservoir, evaluate potential permitting issues associated with the Corps of Engineers 404 permit. Past studies, designs and cost estimates will be updated, and the benefits to the state and region of a reservoir development will be conducted. Reconnaissance estimate of benefits that may accrue to the state and region through conservation will also be included. The study will review the work that has been conducted in the past, identified reservoirs sites will be screened, new sites will be identified and evaluated, management options evaluated and an in-depth economic benefit cost analysis will be conducted.
|
|
| Owner Solicitation Name: | Westside Irrigation NEPA
|
| Owner Name: | Wyoming Water Development Commission
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Water Development Commission
|
| Scope: | The consultant will complete the NEPA analysis requirements (cultural, soils, wildlife, vegetation, paleontology, etc.) as mandated by the federal government for transfer of 16,500 acres of federal land. The consultant will prepare a detailed environmental statement, which will describe the impacts, possible alternatives, any adverse environmental effects, relationships between short-term effects and long-term productivity, and any irreversible consequences due to the project
|
|
| Owner Solicitation Name: | Crowheart/Dinwoody Delivery System
|
| Owner Name: | Wyoming Water Development Commission
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Water Development Commission
|
| Scope: | The consultant will perform a reconnaissance study of the water supply needs, seepage losses, rehabilitation needs, erosion problems in the conveyance system, and reservoir storage potentials in the lower reaches of the system. The study shall identify and evaluate potential permitting issues associated with reservoir construction to include state water rights and the Corps of Engineers 404 permit. Past studies will be reviewed and designs and cost estimates will be updated. The benefits to the state and Tribes of reservoir development and system management will be conducted. The study will review the work that has been conducted in the past, identified reservoir sites will be screened, new sites will be identified and evaluated, and an in-depth economic benefit cost analysis will be conducted.
|
|
| Owner Solicitation Name: | Asphalt Improvements at Central High School, Administration Complex and Transportation Complex
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: | AVI Engineering
|
| Plankeeper Name |
|
| Scope: | Maintenance on asphalt areas may include crack-
seal, seal coat, and pothole repair, replacement
of deteriorated areas at various sites. Major
asphalt projects will include new asphalt
surfacing upgrades at high school asphalt paving
at transportation services, and other sites as
needed.
|
|
| Owner Solicitation Name: | Allison Channelization Water and Sewer Main Relocations
|
| Owner Name: | Laramie County
|
| Enginner Name: | Johnson Engineering Associates
|
| Plankeeper Name |
|
| Scope: | Installation of 3,000 LF 8" & 12" sewer main,
600 LF 8" & 10" water main.
|
|
| Owner Solicitation Name: | Sidewalk New and Repair 2004
|
| Owner Name: | Gillette, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Sidewalk new and repair.
|
|
| Owner Solicitation Name: | Rooftop HVAC Unit Replacement at Johnson Junior High School
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: | Gust & Johnston
|
| Plankeeper Name |
|
| Scope: | HVAC rooftop unit replacement and associated work.
|
|
| Owner Solicitation Name: | Replacement of the Campbell County Recreation Center Rooftop HVAC Units
|
| Owner Name: | Campbell County, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and disposal of the existing RTU and the
furnishing and installation of new units and
shall include all materials and equipment.
|
|
| Owner Solicitation Name: | South Douglas Highway Sanitary Sewer Trunk Line, Phase 1
|
| Owner Name: | Gillette, City of
|
| Enginner Name: | CER Professional Consultants (Centennial Engineering Research)
|
| Plankeeper Name |
|
| Scope: | Phase I: 1,400 LF 36" PVC sewer, 6,900 LF 24"
PVC sewer, Bore under roadway in 1 location
approximately 120 LF using 30" casing, 21 EA 48"
manholes, 8 EA 72" manholes.
|
|
| Owner Solicitation Name: | Water Softener Replacement for Sunflower and Rozet
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Water softener replacement.
|
|
| Owner Solicitation Name: | Analysis of Campus Infrastructure
|
| Owner Name: | Laramie County Community College, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering services for an analysis of campus
infrastructure.
|
|
| Owner Solicitation Name: | Big Goose Fuel Cell Installation Project
|
| Owner Name: | US Dept. of Agriculture, Forest Service, R-2 Rocky Mountain Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site, utility and preparation work for
installation of a government furnished 10KW solid
oxide fuel cell. Installation of government
furnished fuel cell and all associated electrical
and plumbing utilities; Trenching and
construction of water and electrical utilities
between fuel cells, barracks and generator
building; Installation of a new generator in
existing building and removal of existing
generator; Installation of water storage tanks
and water heater in barracks and associated
utilities for hydronic heating system;
installation of a photovoltaic system and sump
pump and rewiring of two historic barracks
buildings.
|
|
| Owner Solicitation Name: | Professional Investigative Services
|
| Owner Name: | Wyoming Dept. of Environmental Quality, Admin. & Info. Procurement Sect.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Providing professional investigative services -
professional engineers and professional land
surveyors.
|
|
| Owner Solicitation Name: | South Douglas Highway Regional Sewer System Phase 1A
|
| Owner Name: | South Douglas Highway Water & Sewer District
|
| Enginner Name: | PCA Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Sewer system.
|
|
| Owner Solicitation Name: | 1 New Rescue Utility Trailer
|
| Owner Name: | Campbell County Fire Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1 new rescue utility trailer.
|
|
| Owner Solicitation Name: | Parkside Elementary School HVAC Upgrades and Clark Elementary School HVAC Upgrades
|
| Owner Name: | Park County School District 1
|
| Enginner Name: | JGA Architects-Engineers-Planners of Montana & Wyoming
|
| Plankeeper Name |
|
| Scope: | 2 elementary schools HVAC upgrades, general,
mechanical and electrical work.
|
|
| Owner Solicitation Name: | Road Improvement
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 1.65 miles of grading, draining, placing crushed
base, bituminous pavement surfacing, bridge
removal and replacement, concrete
sidewalk, curb and gutter, electrical systems,
guardrail, landscaping and miscellaneous work.
|
|
| Owner Solicitation Name: | Snow Fence Removal
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Removal and replacement of snow fence and
miscellaneous work.
|
|
| Owner Solicitation Name: | Road Improvement
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement leveling and surfacing
and miscellaneous work on 2.13 miles of road.
|
|
| Owner Solicitation Name: | Improvements to Gillette-Campbell County Airport, Extend 48" CMP Culverts
|
| Owner Name: | Gillette-Campbell Airport
|
| Enginner Name: | Washington Group International
|
| Plankeeper Name |
|
| Scope: | Extend 48" CMP culverts.
|
|
| Owner Solicitation Name: | Facility Project Planner/Architect Consultant
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | The selected individual will coordinate and
assist in updating the district's master plan and
assist in the facilitation of the district's
strategic planning process as a whole. Assist
owner and consultants in the planning process and
development of new projects, including school
additions and renovations.
|
|
| Owner Solicitation Name: | Replacement of the Cooling Tower at the Powell Middle School
|
| Owner Name: | Park County School District 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacement of the cooling tower at middle school.
|
|
| Owner Solicitation Name: | Hail Damage Asphalt Roof Replacement at CAM-PLEX
|
| Owner Name: | Campbell County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Hail damage asphalt roof replacement.
|
|
| Owner Solicitation Name: | 2004 Cody Ave and 8th Street 6" Water Line Construction
|
| Owner Name: | Cody, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Site clearing, trench excavations, Open cut
installation of approximately 1,000 LF of 6"
C900 PVC water line and
appurtenances, crushed base gravel, paving and
miscellaneous concrete work.
|
|
| Owner Solicitation Name: | Purchase and Removal of 3 Modular Buildings
|
| Owner Name: | Campbell County Senior Center
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Purchase and removal of 3 modular buildings.
|
|
| Owner Solicitation Name: | Madison Cathodic Protection Project Priority C Section Joint Bonding
|
| Owner Name: | Gillette, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Cathodic protection.
|
|
| Owner Solicitation Name: | Force Road Reconstruction
|
| Owner Name: | Campbell County Engineer
|
| Enginner Name: | Stetson Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Road reconstruction.
|
|
| Owner Solicitation Name: | Mobile Shower Unit
|
| Owner Name: | Cam-plex Multi Event Facilities
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Furnishing a mobile shower unit.
|
|
| Owner Solicitation Name: | Crack Sealing
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Preparing and sealing random cracks in asphaltic
concrete paving with hot poured, elastic type
crack sealant. Materials: The sealant shall
conform to AASHTO M 173. The sealant manufacturer
shall provide a written certification stating the
quantity of sealant and that the sealant conforms
to AASHTO M 173. Preparation of Cracks: Cracks
shall be cleaned for the entire crack depth using
sandblasting, brushing, and air blowing
techniques as required to provide a crack free
from all debris, plant material, dust, loose
material, and moisture. The cracks shall then be
cleaned of dust, dirt, and other loose
deleterious materials with oil-free compressed
air. Gouging or plowing may be required to remove
materials from deep in the crack. Crack Sealing:
Conditions; Crack sealing shall be done only when
the weather conditions are dry, and in accordance
with the sealant manufacturer’s recommendations.
Equipment; The machine used to apply the sealant
shall continuously maintain the recommended
sealant application temperature. Application of
Sealant;
The cleaned crack shall then be filled with
sealant from the bottom up to surface level in a
manner
which does not result in sealant bridging or
entrapped air pockets. The sealant shall be
recessed
slightly below the pavement surface. Any excess
material shall be smoothed tightly against the
pavement surface. With deep cracks, settlement of
the sealant may occur, thus requiring application
of a second layer of sealant material. For cracks
which have a depressed surface on each side of the
crack, the crack shall be overfilled to level
with the pavement surface and then "squeeged" to
fill in the depressed area. The sealant shall not
be tracked or pulled out during construction.
Sealant damaged by tracking shall be replaced at
the Contractor’s expense.
|
|
| Owner Solicitation Name: | Asphalt Seal Coating, Crack Sealing, and Striping Work on Campus
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Asphalt seal coating, crack sealing, and striping
work. All asphalt pavements shall be sound prior
to application of sealcoat material. All
structural defects shall be repaired; all cracks
filled with a rubberized crack sealant and all
oil spots shall be treated and primed. The entire
pavement surface shall be cleaned by water
flushing prior to application of sealcoat
material. Sealcoat material shall be a rubberized
asphalt emulsion specifically produced for use as
a protective coating for asphalt in Wyoming’s
climate. Due to the carcinogenic properties of
coal tar sealers, coal tar seal products will not
be accepted. Sealcoat shall be applied in dry
weather and when the pavement and atmospheric
temperatures are above 50 degrees F. Sealcoat
shall be applied to provide uniform coverage of
the entire pavement surface. Striping may begin
after seal coat application has cured adequately
(per manufacture specification). Striping shall
be a two-coat application of latex traffic paint.
|
|
| Owner Solicitation Name: | Carpeting of Building 1501, Few AFB
|
| Owner Name: | Dept. of the Air Force Air Force Space Command
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Provide and install approximately 470 SY of
carpeting. Additionally all cove base in the
building will be replaced. Carpet and cove base
must be installed in accordance with
manufacturer's recommendation. Remove and
properly dispose of all existing carpeting and
cove base. Moving furniture; government
representatives will be responsible for clearing
furniture. Carpeting must be Bigelow Contempo II
(or equal). Color for carpeting must be wineberry
(or equal) and cove base color must be brown.
|
|
| Owner Solicitation Name: | Elevator Inspection and Certification at Missile Alert Facilities
|
| Owner Name: | Dept. of the Air Force Air Force Space Command
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | 5 year inspections and repairs on 20 facility
elevators.
|
|
| Owner Solicitation Name: | Design-Build Services for Albany County Campus Facility
|
| Owner Name: | Laramie County Community College, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | DESING-BUILD services for campus facility. The
design-build team shall perform the services
required for a complete and appropriate design
and construction for the campus facility: 1.
provide Owner with alternative financing options;
2. basic design services to include site
development (access and utility infrastructure);
3. preparation of facility design, cost control,
specifications, drawings, detailed estimates of
construction; and 4. construction contract
administration, consultation, presentations,
construction quality assurance, and building
commissioning.
|
|
| Owner Solicitation Name: | Conestoga Elementary School: Grading, Paving and Drainage Project and Gutter and Downspout Replacement Project
|
| Owner Name: | Campbell County School District
|
| Enginner Name: | Schutz Foss Architects, PC
|
| Plankeeper Name |
|
| Scope: | Elementary school grading, paving and drainage
project and gutter and downspout replacement.
|
|
| Owner Solicitation Name: | Improvements to Gillette-Campbell County Airport
|
| Owner Name: | Gillette-Campbell Airport
|
| Enginner Name: | Carter & Burgess, Inc.
|
| Plankeeper Name |
|
| Scope: | Airport improvements, Bid Package (BP) I:
Construct Concrete T-Hangar Apron, BP II:
Construct Aircraft Rescue and Firefighting
(ARFF)/Snow Removal Equipment (SRE) Building and
Utilities, BP III: Construct ARFF/SRE Building
Concrete Apron, BP IV: Install Fueling Station
Complete (Non-Federal). The approximate
quantities of major items: 1 LS for construction
of 15,000 SF metal building, 7,500 SY of P-501
portland cement concrete pavement, 1,900 LF of
8" sanitary sewer line, 900 LF of 8" C-900 water
line. No boring is associated with this project.
|
|
| Owner Solicitation Name: | Pavement Management System 2004-A
|
| Owner Name: | Gillette, City of
|
| Enginner Name: | PCA Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Pavement management system.
|
|
| Owner Solicitation Name: | Collins Heights Subdivision Street Lighting
|
| Owner Name: | Gillette, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Street lighting.
|
|
| Owner Solicitation Name: | Annual Water Main Replacement - 2004
|
| Owner Name: | Gillette, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Water main replacement.
|
|
| Owner Solicitation Name: | Alley PMS-2004
|
| Owner Name: | Gillette, City of
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Alley construction.
|
|
| Owner Solicitation Name: | Carpet and Floor Base
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Labor, installation, removal and disposal of
existing carpet and base. Please see the attached
file for specifications.
|
|
| Owner Solicitation Name: | Highway Construction - WY PRA-YELL 13(3), East Entrance Road, Segment C
|
| Owner Name: | DOT, Federal Highway Administration, Western Federal Lands Highway Division
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, drainage, base, paving, concrete and MSE
retaining walls, and stone masonry guardwalls.
Construction survey & staking, sampling &
testing, construction schedules; blasting
consultant, soil erosion control devices.
Watering for dust control, clearing & grubbing,
removal of guardrail, excavation & embankment,
rock blasting, earthwork geotextiles, structure
excavation, roadway obliteration, subexcavation,
riprap, permanent ground anchors, reinforced
concrete retaining walls, minor crushed
aggregate, emulsified asphalt, treated base
course, recycled aggregate course, hot asphalt
concrete pavement, asphalt tack coat, timber
structures, minor concrete structures, culverts,
underdrains, paved waterways, simulated stone
masonry surface, sidewalks and paved medians,
guardrail, permanent traffic control devices,
permanent pavement markings.
|
|
| Owner Solicitation Name: | Pavement and Curb Painting
|
| Owner Name: | Laramie County Community College, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Pavement and curb painting. Some of these areas
to be re-painted will receive crackfill,
sealcoat, and/or replaced pavement, so the
painting project cannot proceed without the
approval of the owner’s representative in order
to ensure that the other pavement maintenance
projects are complete. The triangular areas at
the ends of the rows of parking stalls are to be
re-painted solid rather than striped. The
handicap markings will be re-painted as they
previously existed and in compliance with ADA
standards. Also, the directional arrows in these
lots and driveways are to be repainted as they
previously existed. The curbs that were
previously painted (around the perimeters of lots
and driveways) are to be re-painted where they
have previously been painted and in the same
colors as they had before.
|
|
| Owner Solicitation Name: | Construction of a new 26,000 SF Visitor Center
|
| Owner Name: | Yellowstone National Park
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a complete new 26,000 SF visitor
education center. The existing visitor center
will be demolished except for the auditorium and
foundations, which will be incorporated into the
new building.
|
|
| Owner Solicitation Name: | CCI Carpet and Wall Covering Replacement
|
| Owner Name: | Laramie County Community College, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Carpet and wall covering replacement.
|
|
| Owner Solicitation Name: | PE Building Air Handling Unit
|
| Owner Name: | Laramie County Community College, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Building air handling unit.
|
|
| Owner Solicitation Name: | Install Government Furnished Carpet In BLDG 238
|
| Owner Name: | Dept. of the Air Force Air Force Space Command
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | To install approximately 2500 SF of government
furnished carpet, to include removal and off-base
disposal of existing carpet.
|
|
| Owner Solicitation Name: | Science Center Partial Carpet Replacement
|
| Owner Name: | Laramie County Community College, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Partial carpet replacement.
|
|
| Owner Solicitation Name: | Re-Roof Project at Westwood High School
|
| Owner Name: | Campbell County School District
|
| Enginner Name: | Schutz Foss Architects, PC
|
| Plankeeper Name |
|
| Scope: | Re-roof project at high school.
|
|
| Owner Solicitation Name: | Quality/ Risk Management Remodel
|
| Owner Name: | Campbell County Memorial Hospital
|
| Enginner Name: | Schutz Foss Architects, PC
|
| Plankeeper Name |
|
| Scope: | Quality/ risk management remodel.
|
|
| Owner Solicitation Name: | Pavement Management System 2004-C
|
| Owner Name: | Gillette, City of
|
| Enginner Name: | PCA Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Pavement management system.
|
|
| Owner Solicitation Name: | Pavement Management System 2004-D
|
| Owner Name: | Gillette, City of
|
| Enginner Name: | CER Professional Consultants (Centennial Engineering Research)
|
| Plankeeper Name |
|
| Scope: | Pavement management system.
|
|
| Owner Solicitation Name: | Reclamation of Open Pit Uranium Mines
|
| Owner Name: | Wyoming Dept. of Environmental Quality, Admin. & Info. Procurement Sect.
|
| Enginner Name: | AVI Engineering
|
| Plankeeper Name |
|
| Scope: | Reclamation of open pit uranium mines, pit
backfill, drainage construction, revegetation and
fencing.
|
|
| Owner Solicitation Name: | Campbell County Public Library Project
|
| Owner Name: | Campbell County Engineer
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Construction of a 2-step elevator addition and
remodel of finished and unfinished basement space
at the existing library.
|
|
| Owner Solicitation Name: | Administration Building Window Replacement
|
| Owner Name: | Park County School District 1
|
| Enginner Name: | Plan One/Architects
|
| Plankeeper Name |
|
| Scope: | Administration building window replacement.
|
|
| Owner Solicitation Name: | Pershing Boulevard Overlay Project
|
| Owner Name: | Cheyenne Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Road overlay project.
|
|
| Owner Solicitation Name: | FY 2005 Miscellaneous Concrete for Street and Alley Overlay
|
| Owner Name: | Cheyenne Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | FY 2005 Miscellaneous concrete for street and
alley overlay.
|
|
| Owner Solicitation Name: | Bridge Rehabilitation
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge rehabilitation and miscellaneous work.
|
|
| Owner Solicitation Name: | Fence Replacement
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Right-of-way fence replacement and miscellaneous
work.
|
|
| Owner Solicitation Name: | Bridge Rehabilitation
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Bridge rehabilitation and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Draining, Fencing
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement surfacing, electrical
systems, fencing and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Draining, Surfacing
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement surfacing, electrical
systems, fencing and miscellaneous work.
|
|
| Owner Solicitation Name: | Landscaping, Sprinkler Systems
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement surfacing, electrical
systems, fencing and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Draining
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement surfacing, electrical
systems, fencing and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Draining, Surfacing
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement surfacing, sidewalk,
curb and gutter and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Draining, Paving
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading draining, bituminous pavement
surfacing and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Draining, Surfacing
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement surfacing and miscellaneous
work.
|
|
| Owner Solicitation Name: | Mailing Equipment and Software
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Mailing equipment and software.
|
|
| Owner Solicitation Name: | Red Desert Road
|
| Owner Name: | BLM National Business Center BC662
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Re-crown and gravel 19.1 miles of road.
|
|
| Owner Solicitation Name: | Reclamation of Abandoned Underground Mines
|
| Owner Name: | Wyoming Dept. of Environmental Quality, Admin. & Info. Procurement Sect.
|
| Enginner Name: | JFC Engineers, Architects, Surveyors
|
| Plankeeper Name |
|
| Scope: | Reclamation of abandoned underground mines,
rotary drilling and as necessary the pressure
injection of a low to moderate slump grout into
mine voids, workings, and rubblized zones, coring
(as needed), installation of monitor wells, hole
backfilling, and surface restoration work.
|
|
| Owner Solicitation Name: | Bleistein Avenue 6" Water Main Replacement
|
| Owner Name: | Cody, City of
|
| Enginner Name: | Graham, Dietz & Associates (GDA)
|
| Plankeeper Name |
|
| Scope: | Upgrading approximately 1,560 LF of 6" C900
Class 150 water main and related appurtenances.
No boring is associated with this project.
|
|
| Owner Solicitation Name: | Roof Replacement at the Transfer Station
|
| Owner Name: | Cheyenne Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Roof replacement at the transfer station.
|
|
| Owner Solicitation Name: | Building Renovation
|
| Owner Name: | Meeteetse Recreation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Replacing the board walk, minor roof repair, and
an application of wood preserver on the building.
|
|
| Owner Solicitation Name: | Elimination of Dangerous Highwalls and Control Environmental Degradation
|
| Owner Name: | Wyoming Dept. of Environmental Quality, Admin. & Info. Procurement Sect.
|
| Enginner Name: | BRS, Inc.
|
| Plankeeper Name |
|
| Scope: | Elimination of dangerous highwalls and control
environmental degradation by regrading mine spoil
to eliminate erosion at the Gas Hills Uranium
District site.
|
|
| Owner Solicitation Name: | Reclamation of Abandoned Underground Mines
|
| Owner Name: | Wyoming Dept. of Environmental Quality, Admin. & Info. Procurement Sect.
|
| Enginner Name: | CTL Thompson, Inc.
|
| Plankeeper Name |
|
| Scope: | Reclamation of abandoned underground mines,
pressure injection of low slump grout into mine
voids, workings, and rubblized zones underlaying
various areas.
|
|
| Owner Solicitation Name: | Chiller Replacement at Cheyenne Police Department
|
| Owner Name: | Cheyenne Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Chiller replacement at Police Department.
|
|
| Owner Solicitation Name: | Central High School Field House Renovation and Addition
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Addition and renovation to the existing Field
House, including, but not limited to, new wood
flooring, bleacher system, masonry bearing walls,
steel bar joist roof structure, mechanical,
plumbing, electrical, interior finishes and
furnishings.
|
|
| Owner Solicitation Name: | Elimination of Physical and Chemical Hazards, Control Environmental Degradation
|
| Owner Name: | Wyoming Dept. of Environmental Quality, Admin. & Info. Procurement Sect.
|
| Enginner Name: | Lidstone and Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Elimination of physical and chemical hazards,
control environmental degradation by regrading
mine pit areas and mine spoil. Special handling,
grading, coversoil recovery and placement,
ditching and sediment control.
|
|
| Owner Solicitation Name: | East High School Gymnasium Addition and Renovation
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Addition and renovation to the existing
gymnasium, including but not limited to, metal
building structure, pre-finished metal siding
masonry, new wood flooring, bleacher system,
mechanical, plumbing, electrical, interior
finishes and furnishings.
|
|
| Owner Solicitation Name: | Renovation of Public Housing Units Project at Century Square
|
| Owner Name: | Rock Springs, City of
|
| Enginner Name: | Indo American Engineering, Inc.
|
| Plankeeper Name |
|
| Scope: | Renovation of public housing units which includes
22 two-story apartments with six, 4- bedroom
apartments; eight, 3-bedroom apartments; eight,
and 2-bedroom apartments and consists of 4
buildings. This Renovation Project consists of
furnishing and installation of Vinyl Siding,
Soffit, Gutters, Downspouts, fascia, Drip edge,
refurbishing and/or weather proofing windows,
refurbishing and/or weather proofing doors,
repairing concrete sidewalks, and other
miscellaneous work.
|
|
| Owner Solicitation Name: | Asphalt Patching
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Approximately 20,000 SF of asphalt patching work.
Asphalt patches shall be saw cut prior to the
removal of material. Asphalt will be installed
with a minimum of 6" base mix if subsoil beneath
patch area is wet, and 4" if the subsoil is dry.
Base mix shall be grading W compacted and a tack
coat applied as specified by the WY Highway
Department "Standard Specifications for Road &
Bridge Construction". Paving material shall be
hot plant mix bituminous material with Grading C
aggregate, applied a minimum of 3" thick. The
edges shall be tacked as specified by the WY
Highway Department. All patching work listed
includes removal and disposal of existing paving
materials. Disposal of waste soil and paving
materials is the responsibility of the contractor
and shall be done off the College campus in
accordance with all applicable governmental
regulations.
|
|
| Owner Solicitation Name: | Sublette County School District No. 1 2004 Renovations
|
| Owner Name: | Sublette County School District No. 1
|
| Enginner Name: | Groathouse Construction, Inc.
|
| Plankeeper Name |
|
| Scope: | School renovations.
|
|
| Owner Solicitation Name: | New Elementary School at F E Warren Air Force Base
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Approximately 42,000 SF, 1-story elementary
school including site work, grading, paving, site
utilities, brick veneer, CMU walls, built-up
roofing, metal roofing, aluminum windows, metal
studs and drywall, finishes, casework, flooring,
plumbing, mechanical and electrical.
|
|
| Owner Solicitation Name: | Engineering Design for the Reconstruction of a Portion of Campstool Road
|
| Owner Name: | Laramie County
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Engineering design for the reconstruction of a
portion of road.
|
|
| Owner Solicitation Name: | Servicing of Fire Extinguishers
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Servicing of fire extinguishers.
|
|
| Owner Solicitation Name: | Campbell County High School - Gym No.2, Acoustical Upgrade
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | High school gym acoustical upgrade.
|
|
| Owner Solicitation Name: | Pine Haven Well No. 2 Completion
|
| Owner Name: | Pine Haven, Town of
|
| Enginner Name: | Wester-Wetstein & Associates, Inc.
|
| Plankeeper Name |
|
| Scope: | Well completion.
|
|
| Owner Solicitation Name: | Southern Drive and Highway 50 Roadway Lighting
|
| Owner Name: | Campbell County Engineer
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County Engineer
|
| Scope: | Construction of 5 new roadway luminaries and
associated electrical circuits near the
intersection of 2 roads.
|
|
| Owner Solicitation Name: | Blue Ribbon Baseball Complex, Phase II
|
| Owner Name: | Cheyenne Purchasing Office
|
| Enginner Name: |
|
| Plankeeper Name | Cheyenne Purchasing Office
|
| Scope: | Baseball complex, Phase II - landscaping, i,
athletic turf.
|
|
| Owner Solicitation Name: | Storm Sewer, Asphalt Street Paving, and Asphalt Recreational Path
|
| Owner Name: | Pavillion, Town of
|
| Enginner Name: | Apex Surveying, Inc.
|
| Plankeeper Name | Apex Surveying, Inc.
|
| Scope: | Storm sewer, asphalt street paving, and asphalt
recreational path construction project to include
the following: approximately 1,248 LF of 18" RCP
storm sewer, 6 manhole/inlets, approximately
1,288 LF of 24' wide street paving and 1,848 LF
of 8' wide recreational path.
|
|
| Owner Solicitation Name: | Natrona County Library Parking Lot Rehabilitation Project
|
| Owner Name: | Natrona County
|
| Enginner Name: | Civil Engineering Professionals, Inc. (CEPI)
|
| Plankeeper Name | Civil Engineering Professionals, Inc. (CEPI)
|
| Scope: | Removing and replacing the existing asphalt
parking lot and adjacent concrete curb, gutter
and sidewalks and associated landscape and
drainage improvements.
|
|
| Owner Solicitation Name: | Noxious Weed Spraying
|
| Owner Name: | Willwood Irrigation District
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Annual weed spraying for control of noxious
weeds. The Owner covers approximately 27 1/2
miles of canal, 53 miles of open laterals, 54
miles of open drains and 20 miles of closed
drains.
|
|
| Owner Solicitation Name: | 2004 Mount Pisgah Cemetery Paving Project
|
| Owner Name: | Campbell County Cemetery District
|
| Enginner Name: | Stetson Engineering, Inc.
|
| Plankeeper Name | Stetson Engineering, Inc.
|
| Scope: | Cemetery paving.
|
|
| Owner Solicitation Name: | 2 Turf Utility Vehicles
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name | Casper College
|
| Scope: | 2 turf utility vehicles.
|
|
| Owner Solicitation Name: | WFO Blading FY04
|
| Owner Name: | Bureau of Land Management (BLM), Wyoming State Office
|
| Enginner Name: |
|
| Plankeeper Name | Bureau of Land Management (BLM), Wyoming State Office
|
| Scope: | Road Maintenance.( Quantity - 120.7)
|
|
| Owner Solicitation Name: | Northland Village Lid #50 Water/Sewer/Streets
|
| Owner Name: | Gillette, City of
|
| Enginner Name: | PCA Engineering, Inc.
|
| Plankeeper Name | Gillette, City of
|
| Scope: | Open cut installation of 5,300 LF 6" water main,
4,380 LF 8" water main, 8,550 LF 8" sanitary
sewer, 26,800 SY 6" asphalt paving, 26 EA
manhole and appurtenances.
|
|
| Owner Solicitation Name: | 69 kV Transmission Line Wyodak Extension
|
| Owner Name: | Gillette, City of
|
| Enginner Name: |
|
| Plankeeper Name | Gillette, City of
|
| Scope: | 3 miles of Overhead Transmission line extension.
|
|
| Owner Solicitation Name: | Water Pipeline Insulation and Protection Project II
|
| Owner Name: | Shoshone Municipal Water Joint Powers Board
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Remove excavation and stockpile, place
embankment, install insulation, install concrete
planking, on approximately 500 LF of the
Municipal Pipeline treated water pipeline; remove
an existing air/vacuum valve vault and
appurtenances, install new air/vacuum valve
vault; and miscellaneous work.
|
|
| Owner Solicitation Name: | Sunset Elementary School Electrical Upgrades
|
| Owner Name: | Park County School District #6
|
| Enginner Name: | Plan One/Architects
|
| Plankeeper Name |
|
| Scope: | Elementary school electrical upgrades.
|
|
| Owner Solicitation Name: | Purchase and Installation of Gymnasium HVAC System Renovations at Guernsey-Sunrise High School
|
| Owner Name: | Platte County School District No. 2
|
| Enginner Name: | Long & Associates, Inc.
|
| Plankeeper Name | Long & Associates, Inc.
|
| Scope: | Purchase and installation of gymnasium HVAC
system renovations at high school.
|
|
| Owner Solicitation Name: | 1 New Theatre Lighting Control Console
|
| Owner Name: | Casper, City of
|
| Enginner Name: |
|
| Plankeeper Name | Casper, City of
|
| Scope: | 1 new theatre lighting control console.
|
|
| Owner Solicitation Name: | Cody High School Window Replacement
|
| Owner Name: | Park County School District #6
|
| Enginner Name: | Plan One/Architects
|
| Plankeeper Name | Plan One/Architects
|
| Scope: | High school window replacement.
|
|
| Owner Solicitation Name: | Wright Junior High/Senior High School Bus Garage Remodel
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County School District
|
| Scope: | Bus garage remodel.
|
|
| Owner Solicitation Name: | Wright Junior High/Senior High School Exterior Locker Room Access
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County School District
|
| Scope: | Exterior locker room access.
|
|
| Owner Solicitation Name: | Sage Valley Junior High School Locker Replacement - Phase 1
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County School District
|
| Scope: | Locker replacement - Phase 1.
|
|
| Owner Solicitation Name: | **Balefill Fence Improvements
|
| Owner Name: | Casper, City of
|
| Enginner Name: |
|
| Plankeeper Name | Casper, City of
|
| Scope: | Replacement of approximately 1,300 LF of
existing 6' high chain link fencing with an
equivalent length of 16' high litter fence and
Installation of approximately 900 LF of 6" chain
link security fencing with barbed wire anti-
climbers.
|
|
| Owner Solicitation Name: | Portable Theatrical Inverted Hoists and Trussing
|
| Owner Name: | Casper, City of
|
| Enginner Name: |
|
| Plankeeper Name | Casper, City of
|
| Scope: | Portable theatrical inverted hoists and trussing.
|
|
| Owner Solicitation Name: | North Fork Waterline Extension
|
| Owner Name: | Shoshone Utility Organization
|
| Enginner Name: |
|
| Plankeeper Name | Shoshone Utility Organization
|
| Scope: | Schedule No. 1: Construction of approximately
32,525 LF of 6" C900 PVC water main with
appurtenances and related items per bid
schedule. 43 EA water services, Bore in 3
locations totaling 160 LF 6" water main, Bore
280 LF service line, Bore 160 LF service line.
Schedule No. 2: Consturction of an additional
10,400 LF of 6" C900 PVC water main with
appurtenances and related items per bid schedule.
|
|
| Owner Solicitation Name: | 2004 Tank Painting Project
|
| Owner Name: | Wright Water and Sewer District
|
| Enginner Name: | Stetson Engineering, Inc.
|
| Plankeeper Name | Stetson Engineering, Inc.
|
| Scope: | Tank painting.
|
|
| Owner Solicitation Name: | Grading, Draining
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Grading, draining, placing crushed base,
bituminous
pavement surfacing, concrete sidewalk, fencing
and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Draining
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Grading, draining, placing crushed base,
bituminous
pavement surfacing, concrete sidewalk, fencing
and miscellaneous work.
|
|
| Owner Solicitation Name: | Snow Fence
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Installation of snow fence and miscellaneous work.
|
|
| Owner Solicitation Name: | Removal and Replacement of Right-Of-Way Fence
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Removal and replacement of Right-Of-Way fence and
miscellaneous work.
|
|
| Owner Solicitation Name: | Right-of-Way Fence Replacement
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Fence replacement and miscellaneous work.
|
|
| Owner Solicitation Name: | Grading, Draining
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Grading, draining, placing crushed base and
bituminous pavement surfacing, concrete pavement,
bridge removal and replacement, fencing and
miscellaneous work.
|
|
| Owner Solicitation Name: | Removal and Replacement of Mailboxes
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Removal and replacement of mailboxes.
|
|
| Owner Solicitation Name: | Right-of-Way Fence Replacement
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Right-of-way fence replacement and miscellaneous
work.
|
|
| Owner Solicitation Name: | Grading, Surfacing
|
| Owner Name: | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Transportation, Purchasing Dept.
|
| Scope: | Grading,
placing crushed base and bituminous pavement
surfacing, concrete sidewalk, electrical systems,
landscaping and miscellaneous work.
|
|
| Owner Solicitation Name: | Improvements to Worland Municipal Airport Schedules IV and V
|
| Owner Name: | Worland Municipal Airport
|
| Enginner Name: | Airport Development Group, Inc.
|
| Plankeeper Name | Airport Development Group, Inc.
|
| Scope: | Improvements to airport, Schedule IV: Canal
Siphon, and V: Trail Relocation.
|
|
| Owner Solicitation Name: | Stock Activity Center Renovation – Phase 3
|
| Owner Name: | Park County School District #6
|
| Enginner Name: | Plan One/Architects
|
| Plankeeper Name | Plan One/Architects
|
| Scope: | Activity center renovation – Phase 3.
|
|
| Owner Solicitation Name: | Seismic Upgrades
|
| Owner Name: | Park County School District #6
|
| Enginner Name: | Plan One/Architects
|
| Plankeeper Name | Plan One/Architects
|
| Scope: | Seismic upgrades.
|
|
| Owner Solicitation Name: | 2004 Miscellaneous Waterline Replacement
|
| Owner Name: | Casper, City of
|
| Enginner Name: | Civil Engineering Professionals, Inc. (CEPI)
|
| Plankeeper Name | Civil Engineering Professionals, Inc. (CEPI)
|
| Scope: | 2004 Miscellaneous waterline replacement.
|
|
| Owner Solicitation Name: | Wyoming Bank Building Selective Demotion and Clean-up
|
| Owner Name: | Casper, City of
|
| Enginner Name: | Randall W. Hein Architects
|
| Plankeeper Name | Randall W. Hein Architects
|
| Scope: | Renovation of the basement, first, and second
floors of the building.
|
|
| Owner Solicitation Name: | Life Steps Campus Irrigation
|
| Owner Name: | Casper, City of
|
| Enginner Name: |
|
| Plankeeper Name | Casper, City of
|
| Scope: | Installation of new irrigation system.
|
|
| Owner Solicitation Name: | Casper Ice Arena Roof Replacement
|
| Owner Name: | Casper, City of
|
| Enginner Name: | Patrick Amend & Associates
|
| Plankeeper Name | Patrick Amend & Associates
|
| Scope: | Ice arena roof replacement.
|
|
| Owner Solicitation Name: | Irrigation Improvements - Bicentennial, Lasting Legacy and Camplex Parks
|
| Owner Name: | Campbell County Parks and Recreation Dept.
|
| Enginner Name: | Carl Thuesen, ASLA
|
| Plankeeper Name | Carl Thuesen, ASLA
|
| Scope: | Irrigation improvements at 3 parks: 1. Construct
new turf irrigation system including pump,
automatic centralized irrigation control system,
piping, sprinkler heads and miscellaneous
electrical work. Owner potable water will be
extended to service the new irrigation system and
several structures within the park. New backflow
prevention devices will be installed. 2. Remove
existing turf irrigation control system and
install new automatic centralized irrigation
control system in its place. New above ground
backflow prevention devices will be installed.
3. Remove existing turf irrigation control system
and install new automatic centralized irrigation
control system in its place. New above ground
backflow prevention devices will be installed.
|
|
| Owner Solicitation Name: | Fox Creek Work Camp Construction
|
| Owner Name: | US Dept. of Agriculture, Forest Service, R-2 Rocky Mountain Region
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Campground construction. Water well
modifications, clearing and grubbing, road prisms
and culverts, road surfacing, and campground
construction, which includes electrical for water
systems and recreation vehicle pedestal hook-ups,
sanitary sewer dump stations and tanks,
prefabricated toilet facility and modular
restroom/shower building.
|
|
| Owner Solicitation Name: | Riverton High School and Riverton Middle School Security Camera Installation
|
| Owner Name: | Fremont County School District 25
|
| Enginner Name: | JGA Architects-Engineers-Planners of Wyoming, PC
|
| Plankeeper Name | JGA Architects-Engineers-Planners of Wyoming, PC
|
| Scope: | High school and middle school security camera
installation.
|
|
| Owner Solicitation Name: | 2nd and Beech Streets Plaza
|
| Owner Name: | Casper, City of
|
| Enginner Name: | GSG Architecture
|
| Plankeeper Name | GSG Architecture
|
| Scope: | Construction of public plaza.
|
|
| Owner Solicitation Name: | TPO Fully Adhered Roofing System
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name | Casper College
|
| Scope: | TPO fully adhered roofing system.
|
|
| Owner Solicitation Name: | Lakeway Learning Center
|
| Owner Name: | Campbell County School District
|
| Enginner Name: | Schutz Foss Architects, PC
|
| Plankeeper Name | Schutz Foss Architects, PC
|
| Scope: | Learning center.
|
|
| Owner Solicitation Name: | Professional Electrical Engineering Services for the Wyoming State Fair Park
|
| Owner Name: | Wyoming Dept. of Agriculture
|
| Enginner Name: |
|
| Plankeeper Name | Wyoming Dept. of Agriculture
|
| Scope: | Providing written survey of the current
electrical system, review and design of
appropriate system upgrades within the building
for the heating system and HVAC system
improvement/upgrade, providing drawings and
specifications with project administration for
the electrical improvements/upgrades.
|
|
| Owner Solicitation Name: | Water Distribution System Improvements
|
| Owner Name: | Northwest Rural Water District
|
| Enginner Name: | Engineering Associates
|
| Plankeeper Name | Engineering Associates
|
| Scope: | Materials, labor, services, transportation and
complete construction of water distribution
system improvements. 3,468 LF 6" PVC water main,
installation of 8 EA 35,000 gallon fiberglass
tanks, replace 2 pumps.
|
|
| Owner Solicitation Name: | Transfer Station Liner Panel and Insulation Improvements
|
| Owner Name: | Casper, City of
|
| Enginner Name: | Randall W. Hein Architects
|
| Plankeeper Name | Randall W. Hein Architects
|
| Scope: | Transfer station liner panel and insulation
improvements for the Waste Management Facility,
replacement of specific damaged metal wall panels
on existing buildings at the Solid Waste
Management Facility (Balefill). Buildings include
the Scale House, Baler Building and Hazardous
Materials Building.
|
|
| Owner Solicitation Name: | Transfer Station Painting Improvements
|
| Owner Name: | Casper, City of
|
| Enginner Name: | Randall W. Hein Architects
|
| Plankeeper Name | Randall W. Hein Architects
|
| Scope: | Surface preparation and painting of metal wall
panels and trim on existing buildings at the
Solid Waste Management Facility (Balefill), and
related miscellaneous Work. Buildings include the
Scale House, Baler Building, Office Trailer and
Hazardous Materials Building.
|
|
| Owner Solicitation Name: | Hulett City Park Improvements
|
| Owner Name: | Hulett, Town of
|
| Enginner Name: | Bearlodge Ltd., Inc.
|
| Plankeeper Name | Bearlodge Ltd., Inc.
|
| Scope: | Constructing a concrete surfaced outdoor
basketball court and associated work.
|
|
| Owner Solicitation Name: | Playground Equipment at Various Sites
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Installation of new and replacement playground
equipment, improvements to ADA accessibility and
fall surfaces at various schools.
|
|
| Owner Solicitation Name: | Campus Infrastructure
|
| Owner Name: | Laramie County Community College, Purchasing Dept.
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Analysis of campus infrastructure.
|
|
| Owner Solicitation Name: | AML Project 17F-7, Kirwin Townsite – Wolf Shaft House, Tumlum Shaft House, and Tumlum Cabin
|
| Owner Name: | Wyoming Dept. of Environmental Quality, Admin. & Info. Procurement Sect.
|
| Enginner Name: | PHC Reclamation, Inc.
|
| Plankeeper Name |
|
| Scope: | Stabilization and rehabilitation of 3 historic
buildings, foundation jacking, repair, and
support construction, removal and replacement of
roof structures, partial removal and replacement
of sill and crown logs, wall, window, and door
rehabilitation and preservation; and
establishment of a drainage swale in a non-
erosive and stable manner.
|
|
| Owner Solicitation Name: | Sale of Equipment
|
| Owner Name: | Bureau of Reclamation - Wyoming Area Office
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Computers, monitors with keyboards, and mouse,
printers, typewriters, and power supplies ADP.
|
|
| Owner Solicitation Name: | Bus Barn
|
| Owner Name: | Fremont Co School Dist. 2
|
| Enginner Name: | JGA Architects-Engineers-Planners of Wyoming, PC
|
| Plankeeper Name | JGA Architects-Engineers-Planners of Wyoming, PC
|
| Scope: | Bus barn.
|
|
| Owner Solicitation Name: | Historic Structure Assessment of the Commerce Block Building
|
| Owner Name: | Glenrock, Town of
|
| Enginner Name: |
|
| Plankeeper Name | Glenrock, Town of
|
| Scope: | Historic structure assessment of the Commerce
Block Building. Historic Structure Assessment
will include the current an proposed use and an
examination of all structural components (e.g.
foundation, framing, walls, and roof), all
building systems and assemblies (e.g. mechanical
and electrical doors and windows) and the
interior and exterior materials and finishes.
The assessment will also address issues
regarding access by the disabled and building
code compliance. Detailed structural plans will
be developed along with a pictorial outline of
the structure. The completed assessment will
provide the Town with a pln that prioritizes
work necessary to treat deficiencies and include
a preliminary estimate of the probable costs of
construction.
|
|
| Owner Solicitation Name: | Purchase and Installation of: New Boiler Plant for Gymnasium / Cafeteria Building
|
| Owner Name: | Sublette County School District No. 1
|
| Enginner Name: | Long & Associates, Inc.
|
| Plankeeper Name | Long & Associates, Inc.
|
| Scope: | Purchase and installation of new boiler plant for
gymnasium / cafeteria building.
|
|
| Owner Solicitation Name: | Purchase and Installation of: Lighting Upgrades and Renovations for: Gymnasium/ Cafeteria Building, Administration / Classroom Building
|
| Owner Name: | Sublette County School District No. 1
|
| Enginner Name: | Long & Associates, Inc.
|
| Plankeeper Name | Long & Associates, Inc.
|
| Scope: | Purchase and installation of lighting upgrades
and renovations for gymnasium / cafeteria
building.
|
|
| Owner Solicitation Name: | Paintbrush Elementary Tile Floor Replacement
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County School District
|
| Scope: | Elementary school tile floor replacement.
|
|
| Owner Solicitation Name: | Green Mountain East Road
|
| Owner Name: | Bureau of Land Management (BLM), Wyoming State Office
|
| Enginner Name: |
|
| Plankeeper Name | Bureau of Land Management (BLM), Wyoming State Office
|
| Scope: | Install culverts and gravel the road.
|
|
| Owner Solicitation Name: | Kelly Walsh High School Fire Alarm System
|
| Owner Name: | Natrona County School District #1
|
| Enginner Name: |
|
| Plankeeper Name | Natrona County School District #1
|
| Scope: | Installation of intelligent fire detection
system, all controls, annunciator devices,
initiating devices, new wiring, and removal of
existing fire alarm devices.
|
|
| Owner Solicitation Name: | Casper Wells 2004
|
| Owner Name: | Bureau of Land Management (BLM), Wyoming State Office
|
| Enginner Name: |
|
| Plankeeper Name | Bureau of Land Management (BLM), Wyoming State Office
|
| Scope: | Drill, construct and develop seven water wells.
|
|
| Owner Solicitation Name: | Playground Equipment Replacement at Aspen Elementary
|
| Owner Name: | Uinta County School District No. 1
|
| Enginner Name: |
|
| Plankeeper Name | Uinta County School District No. 1
|
| Scope: | Playground equipment replacement at elementary
school.
|
|
| Owner Solicitation Name: | Sunrise III Tank Improvements
|
| Owner Name: | Casper, City of
|
| Enginner Name: |
|
| Plankeeper Name | Casper, City of
|
| Scope: | Interior and exterior surface preparation and
painting and modifications of the tank, an
approximately 350,000 Gal. capacity municipal
potable water supply tank.
|
|
| Owner Solicitation Name: | Claude Creek Interceptor Sewer
|
| Owner Name: | Casper, City of
|
| Enginner Name: | Civil Engineering Professionals, Inc. (CEPI)
|
| Plankeeper Name | Civil Engineering Professionals, Inc. (CEPI)
|
| Scope: | Furnishing and installing approximately 4,900
LF of 15" PVC sewer piping, a flow metering
station, equipment vault, associated manholes
and other sewer system appurtenances, and
approximately 1,200 LF of buried secondary
electrical service line. Bore in 1 location
under Interstate.
|
|
| Owner Solicitation Name: | Main Street Reconstruction: Phase I and Phase II
|
| Owner Name: | Burns, Town of
|
| Enginner Name: | BenchMark Engineers, P.C
|
| Plankeeper Name | BenchMark Engineers, P.C
|
| Scope: | 12,435 SY of removal existing asphalt pavement,
2,068 LF of new 8" sanitary sewer, 1,388 LF of
new 18" storm sewer, 1,575 LF of new 24" storm
sewer, 10,730 SY of 4" new hot plant mix
bituminous pavement, 2,486 SY of 8" concrete
pavement.
|
|
| Owner Solicitation Name: | Balefill Truck Garage
|
| Owner Name: | Casper, City of
|
| Enginner Name: |
|
| Plankeeper Name | Casper, City of
|
| Scope: | Balefill truck garage.
|
|
| Owner Solicitation Name: | Improvements to Converse County Airport
|
| Owner Name: | Converse County Airport
|
| Enginner Name: | Washington Group International
|
| Plankeeper Name | Washington Group International
|
| Scope: | Schedule 1: Rehabilitation of taxiway A, A1, A2,
A3, and A4 with a nominal 4" asphalt overlay,
shoulder grading, seeding and pavement markings,
Schedule II: Rehabilitation of aircraft parking
apron with an asphalt overlay and installation of
a 50'x175' concrete pad, Schedule III:
Installation of a new guidance signs.
|
|
| Owner Solicitation Name: | Rozet King Coal System and Installation
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County School District
|
| Scope: | Coal system and installation.
|
|
| Owner Solicitation Name: | Paintbrush King Coal System and Installation
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County School District
|
| Scope: | Coal system and installation.
|
|
| Owner Solicitation Name: | Ice arena Heating Improvements
|
| Owner Name: | Casper, City of
|
| Enginner Name: |
|
| Plankeeper Name | Casper, City of
|
| Scope: | Ice arena heating improvements.
|
|
| Owner Solicitation Name: | Moving Frame and Log Buildings, Constructing Foundations and Placing Buildings on Constructed Foundations for Adaptive Use
|
| Owner Name: | IMR - GRTE - Grand Teton National Park
|
| Enginner Name: |
|
| Plankeeper Name |
|
| Scope: | Dismantling, moving, foundation construction,
placement, reconstruction, and rehabilitation of
13 log and frame buildings. Buildings, aged 25-50
years, are to be moved from a remote location,
along narrow, confined roads to alternate
locations within the Park. Movement of other
buildings presently owned by a private party and
would require a high degree of co-ordination in
order to complete movement and rehabilitation
within a short time-frame of 3-4 summer months.
|
|
| Owner Solicitation Name: | Aquatic Center Kalwall Replacement
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County School District
|
| Scope: | Aquatic center kalwall replacement.
|
|
| Owner Solicitation Name: | NEW BOCES Re-Roof Project School and Cottages
|
| Owner Name: | Northeast Wyoming Board of Cooperative Education Services
|
| Enginner Name: | Schutz Foss Architects, PC
|
| Plankeeper Name | Schutz Foss Architects, PC
|
| Scope: | Re-roof project, demolition, rigid insulation,
single-ply PVC membrane roof with decorative
ribs, exterior insulating finish system.
|
|
| Owner Solicitation Name: | Callen West Subdivision Treated Water System
|
| Owner Name: | Northwest Rural Water District
|
| Enginner Name: | Engineering Associates
|
| Plankeeper Name | Engineering Associates
|
| Scope: | Labor, services, transportation and complete
construction of treated water system.
|
|
| Owner Solicitation Name: | Lander and Riverton Baler Facility Construction
|
| Owner Name: | Fremont County Solid Waste Disposal District
|
| Enginner Name: | Inberg-Miller Engineers
|
| Plankeeper Name | Inberg-Miller Engineers
|
| Scope: | Metal-sided or fabric arch buildings with
concrete foundations and floors, at both
locations, plus a road, water main and sewer
force main.
|
|
| Owner Solicitation Name: | Chipseal of primary roadway in Grand Teton National Park
|
| Owner Name: | IMR - GRTE - Grand Teton National Park
|
| Enginner Name: |
|
| Plankeeper Name | IMR - GRTE - Grand Teton National Park
|
| Scope: | Chipseal of approximately 15 miles of roadway.
|
|
| Owner Solicitation Name: | Welding Equipment
|
| Owner Name: | Casper College
|
| Enginner Name: |
|
| Plankeeper Name | Casper College
|
| Scope: | Welding equipment.
|
|
| Owner Solicitation Name: | Seasonal Engineering Services
|
| Owner Name: | State of Wyoming, State Engineer's Office
|
| Enginner Name: |
|
| Plankeeper Name | State of Wyoming, State Engineer's Office
|
| Scope: | Provide seasonal engineering services (river
basin area coal bed natural gas reservoir
inspector).
|
|
| Owner Solicitation Name: | East casper Zone 2 Water System Improvements
|
| Owner Name: | Casper, City of
|
| Enginner Name: | Civil Engineering Professionals, Inc. (CEPI)
|
| Plankeeper Name | Civil Engineering Professionals, Inc. (CEPI)
|
| Scope: | Water system improvements.
|
|
| Owner Solicitation Name: | Replace Boat Dock at Wedding of the Waters Boat Ramp Area near Thermopolis
|
| Owner Name: | Wyoming Game and Fish Commission
|
| Enginner Name: | AVI Engineering
|
| Plankeeper Name | AVI Engineering
|
| Scope: | Replacement of a boat dock.
|
|
| Owner Solicitation Name: | Road Maintenance Project
|
| Owner Name: | Dept. of Agriculture, Forest Service, R-4 Geospatial Service & Technology Center
|
| Enginner Name: |
|
| Plankeeper Name | Dept. of Agriculture, Forest Service, R-4 Geospatial Service & Technology Center
|
| Scope: | Road maintenance project, which will consist of
grading and reshaping the existing aggregate
road, in addition applying magnesium chloride.
|
|
| Owner Solicitation Name: | Facility Project Planner/Architect Consultant
|
| Owner Name: | Laramie County School District No. 1
|
| Enginner Name: |
|
| Plankeeper Name | Laramie County School District No. 1
|
| Scope: | Assistance in planning and coordinating
renovation and building additions to existing
schools, and assistance in the facilitation of
the district’s strategic planning process, assist
the owner and consultants in the planning and
development of new projects, and provide site
observation during construction consultant.
|
|
| Owner Solicitation Name: | Wigwam Rearing Station Rehabilitation Project
|
| Owner Name: | Wyoming Game and Fish Commission
|
| Enginner Name: | States West Water Resources Corporation
|
| Plankeeper Name | States West Water Resources Corporation
|
| Scope: | Furnishing materials, equipment, and labor for
the installation of piping, 2 pump stations,
three low head oxygenators, a 32' by 44' pre-
engineered building, 24 circular raceways, a
concrete brood pond, seven "loafing" sheds,
electrical, and earthwork. Excavation in
saturated soils and below the groundwater table
is possible and dewatering will be required as
necessary.
|
|
| Owner Solicitation Name: | Airport Improvements
|
| Owner Name: | Afton-Lincoln County Airport
|
| Enginner Name: | Morrison Maierle, Inc.
|
| Plankeeper Name | Morrison Maierle, Inc.
|
| Scope: | Mill and overlay 5220' x 75' existing asphalt
Runway 16-34 and overlay existing 35' wide
Parallel Taxiway System, including new pavement
markings and sign improvements; New 1,800 LF
extension of Runway 16-34 and Parallel
Taxiway "A" including runway lighting, Precision
Approach Path Indicator (PAPI) installation,
pavement markings and sign improvements; Remove
and reconstruct 30,700 SY existing asphalt
general aviation Apron; Drainage, electrical and
miscellaneous work items. This work is to
include
all tools, equipment, materials and labor to
complete this project.
|
|
| Owner Solicitation Name: | Campbell County Detention Center Roof Repairs Project
|
| Owner Name: | Campbell County, Public Works Dept.
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County, Public Works Dept.
|
| Scope: | Furnishing and installation of EPDM roofing
material around the roof parapet wall and at all
roof penetrations.
|
|
| Owner Solicitation Name: | Inspection of the Fire Alarm Systems
|
| Owner Name: | Campbell County School District
|
| Enginner Name: |
|
| Plankeeper Name | Campbell County School District
|
| Scope: | Inspection of the fire alarm systems.
|
|