There are 765 projects in this report.
This page shows all projects in the range 1 through 20

Work Type=Cured-In-Place-Pipe (CIPP)  

  

Bid
Date
Date
Posted
Date
Updated
Project NameWork TypesStateProj
No.

07/13/1602/12/1605/24/16Permanent Solution to Sewer Force Main Break *Rebid*Rock Excavation & Blasting, Boring, Horizontal, By-Pass Pumping, Cured-In-Place-Pipe (CIPP), Pipe - Concrete, Demolition, Pipe - Ductile Iron, Erosion Control, Excavation & Grading, Fencing, Pipe - HDPE, Jack and Bore, Manhole Installation, Manhole Adjustment, Pipe - Steel Casing, Pipe - PVC, Roads and Paving, Sanitary Sewer, Seeding, Sodding & Mulching, Sewer, Signage & Signalization, Site Work, Slip-Lining, Pipe - Steel, Pipe Rehab, Trenching, Valves & FittingsGA6845017
07/12/1605/07/1605/20/16District 6 Trunk Sewer Reliedistrict 6 Trunk Sewer ReliefBoring, Horizontal, Cured-In-Place-Pipe (CIPP), Directional Boring, Excavation & Grading, Jack and Bore, Landscaping, Manhole Installation, Manhole Rehab, Pipe Bursting, Pipe - PVC, Roads and Paving, Sanitary Sewer, Sewer, Pipe Rehab, Trenchless Point RepairCA7026569
06/29/1605/26/1605/26/162016 SRF - Full Length and Sectional CIPP LiningCured-In-Place-Pipe (CIPP), Excavation & Grading, Sanitary Sewer, Sewer, Pipe RehabMI7068838
06/28/1605/21/1605/21/16Construction, Drainage Improvements Kenlake DriveBoring, Horizontal, Cured-In-Place-Pipe (CIPP), Excavation & Grading, Jack and Bore, Pipe - Steel Casing, Roads and Paving, Pipe - Steel, Storm Sewer & Drainage, Pipe Rehab, Water Line RehabFL7059443
06/28/1605/27/1605/27/1648-Inch Prestressed Concrete Cylinder Pipe Force Main Cured-In-Place Lining: Phase 2Boring, Horizontal, By-Pass Pumping, Cured-In-Place-Pipe (CIPP), Pipe - Concrete, Concrete & Masonry, Directional Boring, Erosion Control, Roads and Paving, Sanitary Sewer, Sewer, Pipe RehabFL7071991
06/23/1605/20/1605/27/1696819 Eastrn Interch -Access RdBy-Pass Pumping, Bridge Work, Concrete & Asphalt Cutting, Cured-In-Place-Pipe (CIPP), Cleaning - Industrial, Pipe - Concrete, Concrete & Masonry, Demolition, Pipe - Ductile Iron, Electrical Work, Erosion Control, Excavation & Grading, Fencing, Guard Rail Work, Lighting, Landscaping, Lighting - Outdoor, Lighting - Roadway, Manhole Installation, Metal Fabrication/Welding, Milling, Pre-Cast Concrete, Pavement Marking, Pavement Patching & Sealing, Roads and Paving, Service Connections, Seeding, Sodding & Mulching, Signage & Signalization, Site Work, Storm Sewer & Drainage, Surveying, Pipe Rehab, TrenchingPA7057276
06/22/1605/24/1605/25/16Phase 2 Sanitary Sewer, Water Main, and Roadway ImprovementsCured-In-Place-Pipe (CIPP), Concrete & Masonry, Excavation & Grading, Manhole Installation, Roads and Paving, Sanitary Sewer, Service Connections, Sewer, Site Work, Utility Locating, Water Distrib. & Trans.ID7064645
06/22/1605/19/1605/19/16Chapel Hill I/I Reduction (Mattis Rd and Venarde Dr)Cured-In-Place-Pipe (CIPP), Concrete & Masonry, Demolition, Excavation & Grading, Lateral Rehab, Pipe Abandonment, Pipe - PVC, Pavement Patching & Sealing, Roads and Paving, Retaining Walls, Sanitary Sewer, Pipe Cleaning, Seeding, Sodding & Mulching, Sidewalk Const. & Repair, Sewer, Storm Sewer & Drainage, Pipe & Manhole Televising & Inspection, Pipe Rehab, Trenchless Point Repair, Vacuum & Air Excavating / PumpingMO7054993
06/22/1605/20/1605/24/16Find and Fix Construction ServicesCured-In-Place-Pipe (CIPP), Concrete & Masonry, Dewatering, Pipe - Ductile Iron, Excavation & Grading, Manhole Installation, Manhole Adjustment, Milling, Pipe Abandonment, Pipe - PVC, Roads and Paving, Sanitary Sewer, Pipe Cleaning, Service Connections, Sidewalk Const. & Repair, Sewer, Pipe & Manhole Televising & Inspection, Pipe Rehab, Trenchless Point Repair, Vacuum & Air Excavating / Pumping, Valves & FittingsVA7055352
06/22/1605/20/1605/20/16Restoration of Stormwater Pipe (Annual Award)Cured-In-Place-Pipe (CIPP), Excavation & Grading, Root Control, Pipe Cleaning, Service Connections, Storm Sewer & Drainage, Pipe & Manhole Televising & Inspection, Pipe Rehab, Vacuum & Air Excavating / PumpingFL7056694
06/21/1605/27/1605/27/16Sewer Lift Station Rehabilitation: 24th Street and Oak StreetCured-In-Place-Pipe (CIPP), Demolition, Pipe - Ductile Iron, Pipe - Ductile Iron Restrained Joint, Electrical Work, Fencing, Mechanical, Plumbing, Pump/Lift Station-water/sewer, Pipe - PVC, Sanitary Sewer, Sewer, Pipe Rehab, Vacuum & Air Excavating / Pumping, Valves & FittingsCA7070467
06/21/1605/17/1605/17/16CIPP SouthEast(SE) Sewer RehabilitationCured-In-Place-Pipe (CIPP), Cement Mortar Lining, Concrete & Masonry, Erosion Control, Excavation & Grading, Fencing, Landscaping, Lateral Rehab, Manhole Installation, Manhole/Wetwell Lining - Cementitious, Manhole/Wetwell Lining - Epoxy, Manhole Rehab, Pedestrian/Cycle Trails & Walkways, Pipe - PVC, Roads and Paving, Sanitary Sewer, Pipe Cleaning, Service Connections, Seeding, Sodding & Mulching, Sidewalk Const. & Repair, Sewer, Signage & Signalization, Site Work, Pipe & Manhole Televising & Inspection, Pipe Rehab, Trenching, Vacuum & Air Excavating / Pumping, Valves & FittingsOR7049240
06/20/1605/17/1605/17/16Basin 1022 I/I RehabilitationBy-Pass Pumping, Cured-In-Place-Pipe (CIPP), Pipe - Concrete, Manhole/Wetwell Lining - Epoxy, Manhole Rehab, Pipe & Manhole Grouting, Sanitary Sewer, Pipe Cleaning, Service Connections, Sewer, Pipe & Manhole Televising & Inspection, Pipe Rehab, Vacuum & Air Excavating / PumpingWA7047300
06/18/1605/02/1605/27/16U City Public I/I Reduction -EastBy-Pass Pumping, Cured-In-Place-Pipe (CIPP), Cement Mortar Lining, Concrete & Masonry, Excavation & Grading, Manhole Installation, Manhole/Wetwell Lining - Cementitious, Manhole Lining - Cured-in-Place, Manhole Adjustment, Manhole Rehab, Pavement Patching & Sealing, Roads and Paving, Sanitary Sewer, Pipe Cleaning, Service Connections, Sewer, Pipe & Manhole Televising & Inspection, Pipe Rehab, Trenchless Point Repair, Vacuum & Air Excavating / PumpingMO7015059
06/17/1605/20/1605/20/16Sanitary Sewer RehabilitationCured-In-Place-Pipe (CIPP), Electrical Work, Excavation & Grading, Instrumentation, Manhole Installation, Manhole Lining - Cured-in-Place, Mechanical, Manhole Adjustment, Pump/Lift Station-water/sewer, Sanitary Sewer, Pipe Cleaning, Sewer, Smoke/Air/Dye Testing, Pipe & Manhole Televising & Inspection, Pipe Rehab, Trenchless Point Repair, Vacuum & Air Excavating / PumpingMS7057044
06/17/1605/25/1605/25/16Claussen Overcrossing and Highway 101 Sewer Main Investigation and Rehabilitation ProjectCured-In-Place-Pipe (CIPP), Manhole Rehab, Sanitary Sewer, Pipe Cleaning, Sewer, Pipe & Manhole Televising & Inspection, Pipe Rehab, Vacuum & Air Excavating / Pumping, Waste Disposal & RecyclingCA7065530
06/16/1605/20/1605/20/16On-Call Sewer System ServicesCured-In-Place-Pipe (CIPP), Excavation & Grading, Manhole Rehab, Pipe & Manhole Grouting, Sanitary Sewer, Sewer, Storm Sewer & Drainage, Pipe & Manhole Televising & Inspection, Pipe RehabMI7057865
06/16/1605/20/1605/20/16Bloomington Interceptor Rehabilitation Cured-In-Place-Pipe (CIPP), Concrete & Masonry, Demolition, Dewatering, Logging, Tree Trimming, Forestry, Manhole Installation, Pipe Abandonment, Pipe - Composite (CCFR, FRP, GRP, RPMP, cement-polymer), Pipe Insulation, Pipe & Manhole Grouting, Pedestrian/Cycle Trails & Walkways, Pavement Marking, Pavement Patching & Sealing, Roads and Paving, Sanitary Sewer, Pipe Cleaning, Seeding, Sodding & Mulching, Sidewalk Const. & Repair, Sewer, Signage & Signalization, Site Work, Pipe Rehab, Trucking & Hauling, Utility Locating, Vacuum & Air Excavating / PumpingMN7057907
06/16/1605/19/1605/19/16Request for Pre-qualification - Buena Outfall Force Main Phase IIIBoring, Horizontal, Cured-In-Place-Pipe (CIPP), Concrete & Masonry, Excavation & Grading, Flow Monitoring, Pipe - HDPE, Irrigation, Jack and Bore, Manhole Installation, Meter - Water, Gas, Elec, Pre-Cast Concrete, Pipe - Steel Casing, Pavement Patching & Sealing, Roads and Paving, Service Connections, Sidewalk Const. & Repair, Sewer, Storm Sewer & Drainage, Pipe Rehab, Trenching, Utility Material PurchaseCA7053416
06/16/1605/12/1605/25/16WA3445272--I-81 Improvements from South of US 11 in West Virginia to North of the MD 63/68 Interchange Abrasive Blasting, Rock Excavation & Blasting, Bridge Repair, Bridge Work, Fiber Reinforced Polymer (FRP), Channel/Waterway Work, Cured-In-Place-Pipe (CIPP), Pipe - Culvert, Galvanized Steel, Pipe - Concrete, Concrete & Masonry Repair, Concrete & Masonry, Coating - Industrial, Demolition, Dewatering, Pipe - Ductile Iron, Electrical Work, Erosion Control, Excavation & Grading, Fencing, Guard Rail Work, Herbicide/Pesticide/Fertilizer , Lighting, Landscaping, Lighting - Roadway, Manhole Adjustment, Milling, Pre-Cast Concrete, Pilings & Pile-Driving, Pipe - PVC, Pavement Marking, Pavement Patching & Sealing, Roads and Paving, Retaining Walls, Pipe Cleaning, Seeding, Sodding & Mulching, Sidewalk Const. & Repair, Signage & Signalization, Trench Shoring , Site Work, Lighting - LED, Structural Steel, Pipe - Steel, Storm Sewer & Drainage, Pipe Rehab, TrenchingMD7036745