| Project Name |
Project Cost |
| Glenbrook Sewer |
$38,126.00 |
| Recovery Act: Water Tower Improvements |
$398,500.00 |
| Supply and Installation of Mainline and Manhole Rehabilitation Works for Sanitary Sewer Systems At Various Locations |
$2,857,743.04 |
| Construction of Water Distribution System Improvements for Fire Protection |
$688,568.50 |
| Weigel Avenue Vicinity Water Main Replacement |
$1,097,150.93 |
| Water Treatment Plant Alum Tank Cleaning |
$3,955.25 |
| 96th Street Interceptor Lining |
$144,273.00 |
| Historic District Water Main Improvements |
$566,695.00 |
| CSA 64 Water Well # 4 Rehabilitation Project |
$99,266.00 |
| Dublin Road 0.5 MG Water Tower |
$2,184,000.00 |
| North 40th Street Sanitary Sewer Rehabilitation |
$251,402.00 |
| Greenhill Reservoir Rehabilitation |
$746,040.00 |
| Mulch Area and Road Improvements |
$672,225.34 |
| 2012 Rehabilitation of Sanitary Sewers By CIPP |
$109,300.00 |
| Sidewalks and Related Work |
$113,304.00 |
| Sanitary Sewer Manhole Rehabilitation |
$91,400.00 |
| 2012 Sanitary Sewer Rehabilitation |
$223,185.00 |
| Sanitary Sewer Lining Project |
$223,185.00 |
| Rest Area Water System |
$466,983.00 |
| Construction Of: CIPP 36-48 Rehab Projects |
$1,922,750.00 |
| CIPP 84-96 Rehab Projects Contract 1 |
$2,358,500.00 |
| Recovery Act - Project Consists of the Installation of Landscaped Medians With Irrigation Systems, Installation of Decorative Overhead |
$1,564,231.35 |
| Roadway New Construction |
$6,558,141.75 |
| Roadway Reconstruction |
$1,829,894.75 |
| South Kniss Utility Improvements |
$759,454.50 |
| Puppy Dog Sewer System Improvements Phase 3 - First Larson Collector Sewer Main |
$1,413,132.50 |
| Construction of Contract No. 2 - Elevated Storage Tank and Controls |
$3,282,000.00 |
| Sewer Rehabilitation Project No. 4 |
$154,438.75 |
| 2012 Collection System CIPP Repairs |
$158,773.50 |
| Micro-Surfacing, Various Locations, Region One |
$498,000.00 |
| Wagner Ford Sanitary Liner Installation - Phase 2 (Open Market Contract) |
$3,197,794.00 |
| Airport Apron Slurry Seal |
$93,339.00 |
| Watson Way Upsizing and Realignment |
$5,703,440.00 |
| Grading, Drainage, Paving, Signals and Structure |
$1,637,240.49 |
| Rehabilitation of the 0.5 MG Arlington Avenue Elevated Storage Tank |
$1,220,906.00 |
| Joint Outfall "F" Unit 3C Rehabilitation - 2011 |
$255,970.00 |
| 2011 Sanitary Sewer System Rehabilitation CWSRF 2006-192 |
$366,675.00 |
| Park & 4th Street - Phase Two (Eastern Portion) |
$722,500.00 |
| 2012 Water Main Rehabilitation Project |
$2,540,700.00 |
| Valley Center Flood Control Project Structure Rehabilitation |
$104,316.00 |
| Rehabilitation of Existing Steel Pipeline for Landfill Gas Transmission |
$2,649,530.00 |
| Sanitary Sewer Upgrade |
$245,900.00 |
| 2011 Well No. 1 Rehabilitation |
$171,507.64 |
| Wastewater Manhole Rehabilition Phase IX |
$706,708.00 |
| C.I.P.P. Project |
$124,665.00 |
| Briggs Street Trail |
$210,422.18 |
| 2011 Hackberry Street Elevated Storage Tank (EST) Rehabilitation |
$223,113.00 |
| Lead Paint Abatement |
$276,964.95 |
| Ball Street Extension |
$2,018,716.40 |
| 2012 Water Main Replacement Phase 1 |
$1,009,371.42 |
| P-Drainage Improvements - Culvert Repairs, Milepost 118.5 and 121.5 |
$6,145,182.50 |
| Transmission and Distribution Augmented Crews |
$4,973,297.00 |
| Sanitary Sewer Rehab by Lining |
$135,885.00 |
| Hot Mix Asphalt Overlay |
$1,620,176.00 |
| Waterline and Elevated Water Storage Tank Improvements |
$732,771.00 |
| Culvert Replacement On M-142 Over Nettle Run, East of Elkton, Huron County |
$1,048,423.75 |
| Sewer Rehab |
$108,160.00 |
| Spearsville Well Site - Water Storage Tank Standpipe Replacement |
$225,000.00 |
| Bellflower Lining Project No. 1 |
$124,977.00 |
| Construct Curb Ramps for Ada Compliance |
$2,540,920.76 |
| Water System Extensions & Improvements To Serve the Queensland Community |
$185,624.45 |
| PS 194 (K), Student Toilets & Roof Upgrade |
$945,000.00 |
| Railroad Crossing |
$184,340.66 |
| Demolition of 916 Douglas |
$4,250.00 |
| 2012 Upper Tier Sewer Line Cleaning/Televising and Manhole Cleaning and Inspections |
$23,350.09 |
| Siphon Lining Only for the Sewer Interceptor Outfall Phase 2 |
$148,250.00 |
| Construction of the Georgia and First Sanitary Sewer Replacement |
$125,847.10 |
| Gravity Sewer System for Neffs, West Neffs, & St. Joe |
$2,809,805.36 |
| Park & 4th Street - Phase Two 4th Street Improvements |
$383,500.00 |
| Fourth Street Improvements - Western Portion |
$383,500.00 |
| Infrastructure Repairs (Rehabilitation) (FY 2012 Contract A) |
$7,577,720.75 |
| Wastewater Collection System Rehabilitation and Renewal |
$3,092,643.27 |
| Bore and Install 9,000-Feet of HDPE Continuous Duct |
$83,726.00 |
| Memphis Dr. & Winchester Way, Sewer Improvements |
$107,817.35 |
| Structural Demolition and Land Clearance for New Southwest Middle School |
$567,741.00 |
| Pipe Liner Repairs at Various Locaitons FY 2011/2012 |
$798,116.00 |
| Grading, Drainage, Paving, and Structure |
$3,025,965.11 |
| Uit Metro-Optical Network Duct Construction * Re-Bid * |
$216,368.00 |
| Black River Tunnel Phase 1- (*Re-Bid*) |
$5,363,871.00 |
| Water System Improvements |
$294,748.08 |
| Construction of the First Street Trunk Line Pipe Jacking Project |
$2,446,820.00 |
| Bridge Repair and Rehabilitation |
$464,250.00 |
| Moorehead Road Sanitary Sewer Rehabilitation SS0#14 Elimination- Consent Decree - *Rebid |
$1,094,267.24 |
| Asbestos Abatement |
$4,380.00 |
| Recovery Act - Sanitary Sewer System Upgrades Inflow & Infiltration Reduction Program Phase III |
$2,008,733.50 |
| Sanitary Sewer Rehabilitation |
$698,730.00 |
| Sanitary Sewer Rehabilitation |
$698,730.00 |
| Beeds Lake State Park Sanitary Sewer Rehab |
$162,596.25 |
| As Needed Electrical Systems Maintenance & Repair - Airport, Road Stations, Wastewater Facilities |
$323,015.00 |
| Depot Street Sewer Project |
$30,230.00 |
| Campus Wayfinding Signage Phase 2, Fy 12 |
$120,991.00 |
| Lakeside Sewer Rehabilitation |
$50,955.00 |
| EWCRWS Contract B-Transmission Pipeline |
$3,524,940.50 |
| Combined Sewer Separation CSS, 5(2B), 6(3C) and CSO 38 Modifications - *Rebid* |
$4,780,847.50 |
| Structure Replacement, Bridge No. 18-9000 & Bridge No. 18-9001 * REBID* |
$247,984.00 |
| Construction - Thermal Striping |
$64,300.00 |
| US Highway 30 Water Main Crossing |
$268,485.00 |
| Routine Bridge Maintenance |
$799,378.00 |
| City of Onalaska, Great River Road, Elm Street to Locust Street, Streetscaping; 2nd Avenue, City of Onalaska, Elm Street to Poplar Street |
$4,598,951.83 |
| Open Ditch Cleanout Line "B", Lateral No. 11 |
$89,307.00 |
| Emergency Interconnect & Timberline Lift Station Decommissioning*re-bid* |
$736,157.02 |
| Pump Station & Drainage System Cleaning |
$192,550.00 |
| NE Padden/Andresen Road Traffic Signal & NE 99th Street Traffic Signal Optimization |
$454,549.00 |
| Maintenance Long Life Pavement Markings Contract, South - 2012 |
$298,950.00 |
| Spencer Road Reclaimed Water Pipe Bursting |
$426,587.72 |
| Town of Lake Clarke Shores Sewer Rehabilitation South Service Area - Phase II |
$473,280.00 |
| Downtown Demolition Project |
$14,000.00 |
| Crystal Lake Estates Water System Improvements |
$182,687.24 |
| Cynthia Square Sanitary Sewer Rehab |
$95,110.00 |
| Bridge Painting |
$148,522.43 |
| Carmichael Park Construction |
$1,708,374.00 |
| Resurfacing on SR 19 |
$1,839,428.21 |
| Sanitary Sewer Lining |
$37,662.00 |
| Miller Street Improvements Phase 1 & 2 |
$1,378,039.00 |
| Countywide Sewer Rehabilitation CIPPL |
$618,679.14 |
| Removal of Structure 8641 Big Bend Road Hillsboro |
$7,900.00 |
| Student Recreation Center |
$121,294.00 |
| Water Tower Maintenance - Wyatt, Gypsum Hill, Key Acres |
$106,680.00 |
| Demolition At 2715 Union Street |
$2,500.00 |
| Demolition of 714 S 11th Street |
$5,850.00 |
| Sanitary Sewer Cleaning and Inspection |
$29,514.00 |
| Wastewater Pump Station Rehabilitation at Pump Stations No. 5 and No. 24 |
$199,090.00 |
| Manhole Lining Contract |
$50,949.50 |
| Wastewater Facilities Improvements Parish-Wide |
$822,321.00 |
| Water Distribution System Improvements Gantt Street - Fourth Street To Fifth Street and Mulberry Street - Fourth Street To Fifth Street |
$170,644.00 |
| 2011 Sanitary Sewer Rehabilitation Phase A (North of Pawnee and East of Seneca) |
$196,924.00 |
| Non-Site Specific Sign Replacemnt & Refurbish in Dallas County |
$883,958.00 |
| Sand Coulee Water Supply Well |
$94,930.00 |
| SR-282; North/south Campus Drive Pavement Preservation |
$376,174.38 |
| Refurbish Guide Signs |
$158,950.57 |
| Sanitary Sewer Cleaning and Television Inspection In Support of Rehabilitation |
$488,415.74 |
| Emergency Sewer System Improvements |
$116,016.00 |
| Open Ditch Cleanout |
$49,772.50 |
| Water Meter Replacement Project |
$216,920.73 |
| Redi-Mix Concrete - Various New York (NY) Facilities - One Year Requirements Contract |
$122,750.00 |
| Fremont Area Sewer Rehabilitation Phase 3 |
$807,990.00 |
| I-465/Chestnut Hills Pipe Rehabilitation |
$79,378.00 |
| Desert Willow Well No. 2 Refurbishment |
$61,491.90 |
| Sanitary Sewer Replacement |
$113,140.00 |
| Construction of the Bonnie Brae Substation |
$634,739.00 |
| Pipeline Rehabilitation O-1 |
$4,076,968.80 |
| Trenchless Installation of 8" Diameter Ductile-iron Water Mains, Service Lines, and Related Appurtenances |
$897,249.13 |
| Provide Condition Assessment for Sewer Lines and Manholes |
$104.25 |
| Lighting Control Upgrade At the Transportation Building |
$831,750.00 |
| Merry Lake Wastewater System Improvements |
$1,442,760.50 |
| Stormwater Improvements To Serve Amarado Estates 4th Addition |
$15,324.00 |
| US 64 Near Bloomfield |
$369,462.00 |
| Residential Structure Demolition and Site Clearance |
$10,800.00 |
| Hikes Point Relief Sewer |
$383,000.00 |
| Grade, Bridge & Surfacing |
$3,911,628.06 |
| Water Storage Standpipe for Deer Creek (100,000 Gallon) |
$309,000.00 |
| Mill and Resurface Various State Roads |
$341,815.00 |
| Downtown Water and Sanitary Sewer Replacement Phase II: Projects 5 and 7 |
$1,630,783.00 |
| Lift Station No. 7 Repairs - Waste Water Treatment Plant |
$310,978.67 |
| Culvert Invert Lining/Located on Route 2 at Dunn Brook Bridge |
$126,439.94 |
| Sewer Improvements |
$216,671.50 |
| Babcock Pumping Plant Discharge Manifold Lining |
$248,790.00 |
| South Interceptor Sanitary Sewer Project |
$351,868.75 |
| 2011 Critical Sewer Repairs |
$68,388.50 |
| Sewer Pipe Lining - October 2011 |
$547,925.50 |
| Rehabilitating 8 Sewer Line By Pipe Bursting and HDPE Replacement |
$404,000.00 |
| Street Sewer Main Lining |
$157,500.00 |
| Transite Pipe Lining Program – Phase 3 |
$684,251.40 |
| Air Condensing Unit Replacement |
$55,320.00 |
| Chip Seal |
$752,995.60 |
| Rubberized Hot And Warm Mix Asphalt Pavement Rehabilitation |
$14,930,743.00 |
| Widen Roadway From 2 To 4 Lanes With Hma Over Ab |
$9,810,418.70 |
| Grading, Utilities and Paving Improvements for Bellaire Addition Phase C (Parcel 25 Phase C) |
$818,322.86 |
| Place Seal Coat |
$2,497,000.00 |
| Provide and Install Cured In Pipe |
$47.67 |
| Stafford Run Creek Sanitary Sewer Cleaning and Televising |
$299,689.00 |
| Marriottsville Road Elevated Tank & Booster Station |
$3,321,000.00 |
| Sadler Drive and Thompson Drive Sewer Repair |
$171,190.00 |
| Water System Improvements 2011 |
$399,465.00 |
| Royal Lakes WWTF Phase Out - Booster Pump Station |
$995,910.00 |
| Construction of Water Distribution Improvements |
$856,389.00 |
| Phase 4 Water System Improvements |
$323,000.00 |
| Sanitary Sewer Lining - CIPP |
$144,128.50 |
| 1.50 Mi of Non-motorized Pathway With Concrete Curb and Gutter Replacement, Hot Mix Asphalt, Concrete Sidewalk Ramp Replacement, and Pavement Markings |
$493,848.88 |
| 0.98 Mi of Hot Mix Asphalt Cold Milling and Overlay, Drainage Structure Repair, Concrete Curb and Gutter Repair, Sidewalk and Ramps, Pedestrian Signal |
$1,114,951.89 |
| Directional Bore Drills of City's Service Areas |
$60,393.00 |
| Hayward Trunk Sewer Lining |
$1,027,781.25 |
| Water Main Replacement, Clemens Avenue and Missouri Avenue |
$295,008.56 |
| SR-10 MP 34.0 To 37.64 Bituminous Pavement, Chip Seal |
$349,287.00 |
| Sanitary Sewer System Improvements - Phase II |
$389,693.00 |
| Recovery Act - Sanitary Sewer Rehabilitation |
$400,080.75 |
| On-call Sewer Rehabilitation Construction |
$2,289,925.00 |
| Bootfoot Bridge Culvert Slipline |
$311,159.16 |
| Savage Interceptor Improvements – Phase 1 |
$4,648,091.25 |
| SR-10; Fremont Jct. To Emery Bituminous Pavement, Chip Seal |
$638,638.00 |
| Lackman Road Traffic Signal Coordination |
$186,106.00 |
| US-89 and SR-132 Chip Seal Bituminous Pavement, Chip Seal |
$742,000.00 |
| Marina Del Rey Sanitary Sewer Manhole Lining - Phase III |
$570,300.00 |
| Pipeline Rehabilitation N-1 |
$5,608,897.25 |
| Cleaning, Televising, Point Repair of Sanitary Sewer Pipes |
$394,920.00 |
| Supply and Installation of Mainline and Manhole Rehabilitation Works for Sanitary Sewer Systems At Various Locations |
$2,627,709.88 |
| FM 78 12" Water Line from Woodlake Drive to Congressional Boulevard |
$346,634.00 |
| 2012 Annual Sanitary Sewer Project |
$760,117.00 |
| Contract 6 - Water Line Extensions |
$331,936.00 |
| Haagard Drive Galvanized Water Main Replacement |
$75,193.00 |
| Construction of One 400,000 Gallon Elevated Water Storage Tank |
$592,000.00 |
| Sewerage System Improvements - Phase I |
$139,016.00 |
| US-6; Delta To Juab County Line Bituminous Pavement, Chip Seal |
$1,434,062.00 |
| HCRH State Trail, JB Yeon - Moffett Creek section of the Columbia River Highway |
$6,688,442.00 |
| Sanitary Sewer Rehabilitation |
$264,254.00 |
| Sewer Lining Contract 2011 |
$560,545.85 |
| Richardson Park Marina Boat Dock Replacement |
$514,353.00 |
| Sewer Lining and PDC Lining On Various Streets |
$541,219.60 |
| 2012 Sewer Lining Program |
$2,739,276.50 |
| Bristol Street Sewer Replacement Phase II |
$299,700.00 |
| Sanitary Sewer Televising and Cleaning |
$116,300.00 |
| Seneca, I-235 to 31st Street South |
$3,459,310.00 |
| Conveyance Gates Rehabilitation and Replacement |
$687,980.00 |
| CIPP Rehab of Sanitary Sewers Phase 2 - 2011 |
$140,653.00 |
| Utility Bore and Conduit - Steptoe Street |
$180,716.00 |
| Houser Road (KY 1014) Replace Bridge and Approaches Over Blizzard Bottom Ditch 0.65 Mile South of KY 999 |
$964,598.00 |
| Elm Street Storm Sewer Rehabilitation |
$285,000.00 |
| 2011 CDBG Water Main Replacements |
$177,059.00 |
| Groove Pavement, Overlay Ramps With Oghma, And Modify Signals |
$1,398,553.50 |
| Sewer Rehabilitation Phase 2 - Consent Decree |
$3,076,141.50 |
| West Ridgeway Road Water Main Extension |
$85,585.14 |
| Sanitary Sewer Rehabilitation Phase Two To Serve Timber Forest and Clayton Corner |
$30,291.70 |
| Grade & Surfacing |
$121,918.95 |
| Sewer Cement Pipe Rehabilitation/Replacement - Group 3 |
$926,556.30 |
| Carrico Addition Utility Development |
$427,417.00 |
| Ditch No. 55, Lateral A, Realignment |
$98,433.00 |
| Grading, Drainage, Paving, and Structure |
$1,433,695.26 |
| Annual Parishwide Cured-In-Place Lining Project |
$1,856,634.00 |
| North Side Plant Drain Rehabilitation, North Service Area |
$449,200.00 |
| Nectar I/I Reduction |
$373,126.00 |
| EAP Phase II Sewer System Rehabilitation |
$132,504.00 |
| 2501 Boulevard Avenue Sanitary Sewer Line Repairs |
$161,418.67 |
| Goose Creek Streambank Stabilization |
$21,400.00 |
| Demolition of 719 S 17th Street |
$4,450.00 |
| 2011 Sanitary Sewer Lining Project |
$35,950.00 |
| Traffic Signal Cabinets and Accessories |
$14,807.00 |
| Two Year - Contract - Sanitary Sewer Manhole and Lift Station Rehabilitation |
$2,499.40 |
| HVAC & Exterior Modernization of 50 Units at the USDA-Arvin Development |
$913,466.00 |
| Pipeline Replacement Project |
$674,900.00 |
| Reconstruction of Brick Street Main St. 13th To 12th & Main St. 12th To 11th |
$508,860.00 |
| 2011 Sanitary Sewer Interceptor Rehabilitation Project |
$653,138.00 |
| Riverside Community Utility & Street Improvements |
$6,627,107.27 |
| HVAC & Exterior Modernization of 50 Units at the USDA-Lamont Development |
$945,734.00 |
| Guide and Call-Out Sign Installation |
$289,075.00 |
| Pettibone Bath House - Sanitary and Water Connections |
$266,875.00 |
| Recovery Act - 2011 Sewer Rehabilitation Project - Sanitary Sewer Lining and Replacement *Rebid* |
$362,344.00 |
| 4th St Trenching & Surface Restoration |
$52,830.00 |
| Pump and Force Main for Residuals |
$489,000.00 |
| CCTV of 17,500+/-LF of 8” & 12” VCP Sanitary Sewer Piping |
$14,479.84 |
| Furnish and Install LED Modules Within All Borough Traffic Signals |
$8,625.00 |