Following is a small sampling of the opportunities recently won by members of the Bid Ocean Network

Thelma and Vanadium Sewer Lining$93,869.20
Osseo, Harmony Street, Park Avenue to USH 10 West$1,229,089.75
W. Wisconsin Avenue, Oconomowoc Bypass To S. Concord Road; W. Wisconsin Avenue, Oconomowoc Bypass To S. Concord Road$13,131,713.63
Asbestos Abatement - Biology Lab$26,000.00
Cleaning & Lining of Watermains$1,098,963.00
Keystone Regional Industrial Park - Phase I Water System Construction - Transmission Main Extension - West$283,754.00
Application of Pavement Markings and Centerline and Shoulder Corrugations$678,561.73
Interceptor Sewer$26,870,000.00
2010 Sewer Lining Projects$1,016,147.00
Seattle Ferry Terminal Anchor Chain Replacement$147,245.00
Trenchless Sanitary Sewer Rehabilitation At Various Locations$205,965.15
Sanitary Sewer Pipelining$88,350.00
Lockridge Road Sewer Rehabilitation$111,639.98
2009 Sewer Lining Projects$343,705.00
Ballard Siphon Tunnel Construction and Slip Lining *RE-BID*$31,755,000.00
State, Fy10 D6 Distwide Seal Coat$1,440,999.00
Conduit Installation-2150 Laura St$49,500.00
2010 Sanitary Sewer Rehabilitation CIPP Sewer Rehab$211,988.20
Replacement of Sewer Mains At City Heights$100,996.00
Demolition of a Vacant, Partially Burned Residential Building$8,900.00
Settled Sewage Pump Replacement at the Wastewater Treatment Plant$219,900.00
2010 Water Main, Sanitary Sewer and Sewage Lift Station$1,159,725.80
Inlet and Pipe Cleaning$71,113.00
Recovery Act - Sanitary Sewer Replacement at East Acres$226,485.00
Contract 2 - Infrastructure Improvements$451,200.00
Repair Existing Storm Sewer Laporte District$1,659,700.40
Small Diameter Sanitary Sewer Cleaning and Inspection in the Edwards Aquifer Recharge Zone (EARZ) Packages 1, 2, 3 and 4$519,588.28
Plant Mix$239,392.06
I-20 Pavement Marker Replacement$51,059.00
Recovery Act - Water Service Meter Retrofit - Phase 14$883,670.00
Pipe Lining$118,146.00
Pipe Lining$828,966.00
Sanitary Sewer Rehabilitation$181,717.00
CAL 8-3, Valle Vista - HVAC & Exterior Modernization of 50 Units $1,098,899.00
Greenway - Phase I $464,886.34
Tree and Stump Removal LA 37$91,200.00
Greenway - Phase I$464,886.34
Rehabilitate Lock Keeper Houses, Fox River Navigation System$1,449,997.00
Rehabilitation of Sanitary Sewers$66,470.25
Sanitary Sewer Improvements by Pipe Bursting$203,798.00
Valley Sanitary Relief (SKME-014) Phase I$1,181,362.40
66" Outfall Pipe and Structure Rehabilitation$2,427,128.00
Hampton Road Water Main Rehabilitation$139,125.00
Joint Outfall "H" Unit 1D Trunk Sewer Rehabilitation$2,344,115.00
Warren Avenue Capital Improvement Project$84,560.00
North Business Park Access Road$272,060.46
Lilac Ridge Service Area Sewer Rehabilitation$1,274,838.90
Morse Road Project$379,892.55
Modernization of 74 Dwelling Units$202,088.00
Traffic Signal Work$268,703.00
Rice / Concordia Sanitary Sewer Cleaning & TV Inspection$384,716.52
Sugar Grove Interceptor Rehabilitation$424,810.00
Paseo Del Volcan and Broadmoor Intersection$99,246.46
Demolish Delapidated Structures at the Barstow/Daggett Airport$117,797.00
2010 Water Main Rehabilitation Project$2,066,660.60
2010 Sanitary Sewer Rehabilitation - C.I.P.P$163,266.00
Lawn Maintenance 2010$47,180.00
Wisconsin Ave. and W. Sunset Dr. Sanitary Sewer Rehabilitation$57,247.50
2010 Health Life Safety Work$78,000.00
Hma Overlay, Minor Widening, Unclassified Excavation, Topsoil$403,509.27
Cleaning and Cement Mortar Lining Area 2010-A$2,992,869.00
Rock Island Swing Bridge Rehab (INVER 108546)$1,877,732.00
Annual - Sewer System Rehabilitation $42,550.00
2010 CIPP Sewer Repair$36,255.00
2010 Fiber Optic Installation Project Phase II$194,380.80
Vine Street Sewer Lining$166,683.00
New Bridge Special Construction$5,081,428.25
Louisiana Highway 48 Turn Lane Improvements Near Schexnaydre Lane$193,622.00
Upgrade HVAC System - College of DuPage$85,300.00
Sanitary Sewer Improvements $63,966.60
Northwest Industrial Park Sanitary Sewer, Northwest Industrial Park Lift Station and Forcemain, Northwest Industrial Park Water Main$437,947.00
2010 Water Main Replacement Phase 1$951,423.00
Asbestos Abatement, Hazardous Materials Removal and Selective Building Demolition At Lapham Park Housing Development$356,000.00
2010 Bulk Purchase for County and Institutions - REBID$375,517.25
Sewers 2-10 (Including Water Main)$199,916.50
2010 Pickard and Harris Sewer Relining Project$206,155.00
Building Modifications and Demolition at Becher Court Housing Development$310,380.00
Commercial Structure Demolition and Site Clearance$6,495.00
Watson Street Bridge, Culdesac Nez Perce County$797,813.00
Hickory Creek Interceptor Improvements Project$5,491,682.00
Monticello Boulevard Pavement Rehabilitation$1,323,402.00
2010 Sanitary Sewer Lining Project$81,970.00
Bridge Replacement (1 Bridge)$156,794.00
Project 2: Canterbury Lift Station Demolition & Flow Metering$1,321,321.00
Parking Lot Remediation and Repair$826,510.00
Mt. Pleasant Road Distribution Project$127,295.00
Recovery Act - Water Service Meter Retrofit - Phase 13$2,357,045.00
Sanitary Sewer I/I Project$160,911.50
Mckay Street Inflow/infiltration Repairs Phase II$261,745.00
Annual 2010 Pipe Bursting Work Order Construction Contract$3,373,300.00
799-K-3993; 167th St. West Between 37th & 45th Streets North$654,926.13
Chilled Water System Improvements Phase 7B Task 100 - Chilled Water and Steam Underground Piping$2,945,000.00
Unit A-10 Concrete Paving$274,649.00
Sanitary Sewer Pipe Rehabilitation ñ Phase III$179,992.50
2010 Citywide Palm Tree Pruning$69,584.00
Mowing$99,993.73
Maintenance for Uninterruptible Power System (UPS)$840.00
24" DI Pipe Water Transmission Main Installation$109,792.00
Alta Canyada Overpass Pipe Lining$261,990.00
Sewer Main Rehabilitations$383,717.50
Construction of the Sanitary Sewer Rehabilitation Phase II 2009 Sections 3 & 4$147,365.00
Sewer Rehabilitation in E Bullard Ave$712,577.00
Sanitary Sewer Rehabilitation Phase II - 2009, Sections 3 & 4$147,365.00
Asbestos Abatement & Demolition - Old Huffhines Recreation Center$73,400.00
Hesperian Boulevard Pipeline Relocation Project$409,100.00
2010 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract - Package 4$589,250.00
2010 Annual Sanitary Sewer Main Point Repair Adjustments Construction Contract - Package 3$586,250.00
Construction of the Wastewater Improvement Project Phase 2$1,034,842.30
Power Generator System Installation At Point Vicente Interpretive Center (PVIC) and Hesse Park$139,465.00
Removal and Installation of Dynamic Message Signs On I-40 in Haywood County$584,995.00
Combined Sewer Main Lining$207,153.25
Sanitary Sewer Main & Lateral Lining$207,153.25
Sanitary Sewer Main Relay and Storm Sewer Lining $207,153.25
2009 Part 12 Improvements$2,269,439.00
Overhead Bridge Road$1,595,299.81
Roadway Reconstruction$398,819.91
Rauville Wellfield Construction$360,303.00
Construction of the 2009 ARC Wastewater System Rehabilitation Project$567,130.00
Relocation of Natural Gas G-271$1,429,783.00
Cleaning and Repainting Bridge No.'s 59, 466, 467, 504 & 507 in Buncombe County$881,219.95
Cleaning and Repainting Bridge No.’s 33, 84, 121, 128, 132 & 144 in McDowell County$667,720.55
Gilcrest Retention Pond$240,893.00
Sewer Line Video Inspection$9,536.10
2010 Asphalt Reconstruct and Overlay Program$990,320.16
Hazardous Material Abatement at 140 East Oak Street $67,154.31
2010 Water and Sewer Main Trench Asphalt Replacement$858,091.42
2010 CIPP Lining Project$177,772.50
2010 Annual Sanitary Sewer Main Point Repair and Manhole Adjustments Construction Contract - Package 2 $527,730.00
Campbell Road At Plano Road Intersection Improvements$364,560.04
Blunston Run Interceptor Sanitary Sewer Lining$467,927.30
Line Creek Sewer Rehabilitation$1,484,400.00
Interceptor Sewer Improvements, Phase 2$407,500.00
Airport Pavement Marking - Cairo Regional Airport$44,828.02
Trammell Street Area - Sewer Sys. Rehab$276,950.00
Relocation of Airport & De La Torre Sanitary Sewer Force Main Lines$96,517.50
Reconstruction of Fully Deteriorated Sewers Using a Structural C.I.P.P. Relining Process$40,988.50
Recovery Act - Chip Seal of US-89; Boys Ranch to Birdseye$233,461.33
8" Force Main Rehabilitation$257,269.00
Sanitary Sewer 30 Inch Relining$133,750.00
TV Inspection of Sanitary Sewers$96,250.00
Elroy Road Waterline Rehabilitation Phase 1$754,124.00
S. I35, Seg.2/5 - I35 Slaughter & Onion Crk Crossings, 36" Water Main$5,587,835.00
Forcemain 7508 Barrel Repair$214,760.00
Sanitary Sewer Collection System Rehabilitation-FY 2008-2009$516,992.20
2009 Combined Sewer Rehabilitation Program$820,755.00
Street Reconstruction Project$1,498,400.00
Chip Seal of Sr-9; Rockville To Springdale; Mp 27 To 32 in Washington County$262,956.00
2008 CDBG I & I Sewer Rehabilitation$295,250.00
Multiple Flooring Installation Projects 2009 - University Apartments$849,130.00
Denver Street CSO Storage Project Phase 3$6,046,488.00
Water System Extension To Shalimar, Driftwood and Chateau Ranchettes$1,787,112.00
Drinking Water Distribution Line Replacement$938,450.79
Parkwood Hills Sub-Trunkline Sanitary Sewer Phase II$438,402.25
Quarry Hill Ravine and Stream Stabilization Project Phase II $438,402.25
Recovery Act Hot Mix Asphalt Paving for Non-motorized Path, Grading, Aggregate Base, Wooden Boardwalk and Retaining Walls - M-43 From the Intersection$1,694,914.65
Road Reconstruction - Cricklewood Avenue From Birch Street To West of Cypress Street and On Cypress Street From 23 Mile Road To Cricklewood Avenue$736,128.36
Greenwich Road From South of Harry Street North to Shopping Center Intersection$5,465,173.37
Hot Mix Asphalt Crack Treatment$100,240.88
Recovery Act - Ocean Blvd. Water Main Replacement$116,003.07
Main Sanitary Line Project$160,018.00
Asphalt Concrete Surfacing To Be Replaced$306,306.00
2009/2010 Water Line Replacement Project Phase 2$851,336.20
365 Days Pushbutton Improvements (Road Work)$323,358.00
Recovery Act - 2010 Sanitary & Storm Sewer Rehabilitation Project Maps$2,772,780.00
Wastewater Collection System Small Main Rehabilitation At Focus Areas - Pipebursting Method$177,775.00
Waterline Bores$18.00
Sewer Rehabilitation$1,767,594.90
Wastewater Pumping Facilities 2010$522,895.00
Little Turtle River Utility Bridge and Trail - Rebid$225,451.40
2009 Sanitary Sewer Slip Lining Improvements$57,647.50
Sewer System Improvements - Main Interceptor Rehabilitation$469,297.00
Shotcrete Restorative Services for Public Works Stormwater Projects$581,890.00
CSO-Edgewood L-174 & Ladue Forest I-125 Interceptor/Outfall Removal$351,678.50
Thermal Striping $74,900.00
16 Hugh Lane Renovations$310,800.00
Sanitary Sewer Rehabilitation of Small Diameter Mains-Contract XVII$788,933.00
Sewer Main Rehabilitation Phase J-1B$1,596,656.80
Harvard Square Station Vertical Transportation Improvements$3,932,396.00
Maintenance Beam Guide Rail and Attenuator Repair Contract, South - 2010; Various Locations$461,502.00
2009 Sanitary Sewer Lining Project$990,417.00
Utility District Cleaning & Televising of Sanitary Sewers Within Fox Run Sections One & Two$49,287.80
Fender Removal On Bridge No. 62912$153,770.00
Recovery Act - Sanitary Sewer Rehabilitation, Phase 2$288,142.00
Electrical Improvements$2,055,735.08
Phase I Consent Order Sewer Repair and Rehabilitation$629,251.00
Water Tower Rehabilitation$140,800.00
Recovery Act - 10.0 MG Reservoir Improvements and Transfer Pump Station$4,887,317.00
Recovery Act - 2009 Sanitary Sewer Inflow Reduction Project, Phase 2$541,080.00
Maintenance Beam Guide Rail and Attenuator Repair Contract, Central - 2010$529,981.00
Construction of the 0.33 MG Water Storage Tank$318,660.00
SR 14, East of I-5 and I-205 ATIS infill Clark County$639,773.00
Grading, Bridge & Surfacing 0.29 Miles$717,874.68
Lift Station Rehabilitation$424,440.00
Capital Facilities Rehabilitation Phase V$1,246,038.00
Cooper Foster Park Road Sanitary Sewer Rehabilitation$344,816.00
Construction of South Santa Fe Avenue$14,171,342.00
Local Let Maintenance Contracts, Jasper Co, Sign Relocation$119,795.00
Interceptor Sewer - Bryant Road and Foothills Road Pump Stations$1,789,050.00
CIPP Sewer Lining$208,500.00
Vault Additions & Renovations$199,000.00
Replace Deep Sewer$350,145.00
Recovery Act - Clean Water Projects - Division 1 - Simmons Ridge Sanitary Sewer$867,584.00
Recovery Act - Infrastructure Repairs (Rehabilitation)$4,827,637.05
Underground Utilities Directional Boring$163,500.00
Grading, Drainage, and Structures$633,137.49
Relining of the Peachwood Sewer Line$17,300.00
Cobbs Creek Interceptor Sanitary Sewer Lining$65,567.00
George Street Sidewalk/ Curbing Restoration Project$841,150.00
Storm Sewer Lining$23,101.00
Miller Avenue Sanitary Sewer Liner Installation (Open Market Contract)$260,525.75
Sanitary Sewer Rehabilitation - Package 2$575,970.00
Airport Sewer Repair Project$800,000.00
Calabazas Branch Library$4,707,500.00
Interceptor Rehabilitation$1,121,310.00
Directional Boring 2010 - Rebid$5.50
Chip Sealing and Miscellaneous Work$2,535,798.22
Repairs/Rehabilitation of the Sewer Collection System$124,100.00
Recovery Act - Crack and Joint Sealing$64,301.00
Cured in Place Sanitary Sewer Lining$51,270.00
2009 Water and Wastewater Improvements Project$437,237.38
Sewer Deficiency Repairs, Wilmerding$318,300.00
Sewer Deficiency Repairs, East McKeesport$318,300.00
Sewer Deficiency Repairs, Rankin$268,460.00
2009 Sewer Lining Project$69,851.59
Traffic Signal Modification at Central Ave & 11th St, 12th St, 13th St, and 14th St$605,960.00
Recovery Act - Water Meters$105,350.00
Sewer Line and Manhole Rehabilitation Project$1,724,920.50
Recovery Act - Northwest Trunk Sewer Rehabilitation$607,440.00
Reline Existing Waterline Under Union Pacific Railroad Tracks On "I" Street Between 8th & 9th Street$144,132.00
Post Office Interceptor Reconstruction - Phase 2 *Re-bid*$1,573,837.00
Sewer Deficiency Repairs, North Braddock$658,540.00
Sewer Deficiency Repairs, Swissvale$357,700.00
Sewer Deficiency Repairs, Wall$72,250.00
As Needed Manhole Repairs On and Off Road$71,492.00
Catch Basin and Inlet Cleaning$19,000.00
Closed Circuit Color Television Inspection$20,400.00
Roadway Concrete Joint Sealing, Spall Repair, and Concrete Patching$451,887.09
Hot Mix Asphalt Crack Treatment On Various Routes$193,092.00
Terminal Preservation Project$66,000.00
Lagoon Sludge Removal and Disposal Project$207,593.00
Double Branch Road Bridge Foundations$106,899.00
Cold Plane Ac Pavement And Place Rubberized Hma (type G)$1,358,210.00
Kearney Men's and Randall Hall Renovation$4,049,744.00
EARZ-V Trenchless Rehabilitation 3BN$74,624.00
Resurfacing$2,063,517.44
Fillmore Combined Sewer System Improvements$2,579,742.00
Recovery Act - Waterworks Improvements$554,966.70
Wastewater Effluent Disposal Facilities Reserve Area Expansion$160,750.00
Sewer System Improvements$170,455.00
2009 Part 14 Improvements$58,335.00

Copyright © 2000 - 2010 Bid Ocean, Inc.

data